CN106759456B - A kind of one-time formed lathe ground cast and recovery method and its implementation - Google Patents

A kind of one-time formed lathe ground cast and recovery method and its implementation Download PDF

Info

Publication number
CN106759456B
CN106759456B CN201611116451.7A CN201611116451A CN106759456B CN 106759456 B CN106759456 B CN 106759456B CN 201611116451 A CN201611116451 A CN 201611116451A CN 106759456 B CN106759456 B CN 106759456B
Authority
CN
China
Prior art keywords
fusible alloy
conduit
foundation
temperature
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611116451.7A
Other languages
Chinese (zh)
Other versions
CN106759456A (en
Inventor
张毅
王兴迪
李盼盼
王莎
李勇兴
蔺国旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xijing University
Original Assignee
Xijing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xijing University filed Critical Xijing University
Priority to CN201611116451.7A priority Critical patent/CN106759456B/en
Publication of CN106759456A publication Critical patent/CN106759456A/en
Application granted granted Critical
Publication of CN106759456B publication Critical patent/CN106759456B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of one-time formed lathe ground cast and recovery method and its implementation, its pouring procedure is applicable to not of uniform size, the different all kinds of lathes of structure, using the fusible alloy that fusing point is 70 DEG C ~ 232 DEG C as grouting material, only need once grouting, fusible alloy self drainage is good, it is fast hard, it is early strong, microdilatancy, fast it can recycle and recycle under conditions of not destroying foundation, so that the foundation with the structure can repeatedly use, the lathe ground casting device and its grouting material filling recovery method can be effectively reduced difficulty of construction, construction volume and its construction time, improve construction quality, reduce production cost.

Description

A kind of one-time formed lathe ground cast and recovery method and its implementation
Technical field
The present invention relates to lathe ground placingJi Shu field more particularly to a kind of one-time formed lathe ground cast and return Receiving method and its implementation.
Background technology
Solid smooth lathe ground bears the weight of lathe and workpiece, and absorb itself and shake for fixing bed piece It is dynamic, extraneous vibration is isolated, ensures the stability of the accurate coordinate position of lathe and lathe operation.The installation of lathe, debugging matter Amount and the postrun machining accuracy of lathe are all related to the robustness of lathe ground, Stability and adaptability.If the ground made Matrix amount is undesirable, then can directly contribute machine tool variety, reduces the machining accuracy and service life of lathe.
The construction of heavy machine tool and precision machine tool ground is typically necessary and carries out the processes such as once grouting and back-grouting, It also needs to carry out construction and maintenance, not only operational procedure is complicated, construction quality requirement is high, and takes a substantial amount of time.Meanwhile two It is secured that the concrete of secondary cast and the combination of original basis are not so good as once grouting.
When removing lathe, needs to remove original ground with strength, modify ground;And new in the installation of once visited place base location, Or when the different other types lathe of mounting structure, also needs to remove once visited place base, construct and do again according to Installing machine tool size New ground.
Fusible alloy is that fusing point is less than 232 DEG C, a kind of low melting point binary system made of the elements such as bismuth, lead, tin and cadmium or Person's polynary system alloy novel material has good mobility, expansion using immersion method or bath oiling, that is, fusible after heating Rate is controllable very small, and stability is good.
Invention content
In order to overcome the disadvantages of the above prior art, the purpose of the present invention is to provide a kind of one-time formed lathe grounds Cast and recovery method and its implementation, pouring procedure are applicable to all kinds of lathes not of uniform size, that structure is different, use The fusible alloy that fusing point is 70 DEG C ~ 232 DEG C only needs once grouting as grouting material, and fusible alloy self drainage is good, fast hard, early strong, Microdilatancy fast can be recycled and be recycled under conditions of not destroying foundation so that the foundation with the structure Can repeatedly use, the lathe ground running gate system and its grouting material filling recovery method can be effectively reduced difficulty of construction, Construction volume and its construction time improve construction quality, reduce production cost.
In order to achieve the above object, the technical solution that the present invention takes is:
A kind of one-time formed lathe ground cast and recycling implementation, including anchor bolt fixing bracket, foundation bolt Fixed frame is equipped with catheter-fixing rack, and catheter-fixing rack is set there are three conduit location hole, is inserted into the filling of liquid fusible alloy respectively Conduit, high-temperature heating carrier filling conduit, low-temperature heat carrier recovery conduit, liquid fusible alloy fill conduit, high-temperature heating Carrier filling conduit, low-temperature heat carrier recovery conduit are separately connected the third catheter interface of grouting material filling retracting device, the One catheter interface, the second catheter interface;Grouting material fills retracting device and is equipped with control device;The grouting material filling recycling dress It sets and is additionally provided with the 4th catheter interface.
The anchor bolt fixing bracket is welded using channel steel, is made according to the actual needs of lathe, foundation bolt Level meter, foundation bolt and stabilizer blade are additionally provided on fixed frame.
The grouting material fills retracting device(6)It is generated including high-temperature heating carrier generation module, liquid fusible alloy Module, low-temperature heat carrier recovery module and liquid fusible alloy recycling module, high-temperature heating carrier generation module pass through first Catheter interface(8)Output high-temperature heating carrier, low-temperature heat carrier recovery module pass through the second catheter interface(9)Recycling low temperature adds Heat carrier, liquid fusible alloy generation module pass through third catheter interface(7)Liquid fusible alloy is exported, liquid fusible alloy returns It receives module and passes through the 4th catheter interface(11)Recovering liquid fusible alloy.
A kind of one-time formed lathe ground cast and recovery method, which is characterized in that include the following steps:
A, grouting material fills:
1)The mounting foot bolt fixed frame above pre-filled ground, and level meter is installed on anchor bolt fixing bracket, After leveling, mounting foot bolt, it is ensured that the absolute altitude of foundation bolt meets the position essence of the requirement of lathe Foundation Design and foundation bolt Degree meets the construction requirement of lathe ground;
2)Carrier filling conduit will be heated at high temperature and be connected to the first catheter interface that grouting material fills retracting device, liquid is easy Fusion gold filling conduit is connected to the third catheter interface of grouting material filling retracting device, and low-temperature heat carrier recovery conduit is connected It is connected to the second catheter interface of grouting material filling retracting device;
3)Start grouting material using control device and fill retracting device, generate liquid fusible alloy and temperature higher than meltable The heating carrier of alloy melting point;
4)The place that conduit fills temperature into pre-filled ground higher than fusible alloy fusing point is filled by being heated at high temperature carrier In the heating carrier of high temperature, foundation is preheated;
5)After accumulating the heating carrier of a certain number of high temperature in pre-filled ground, led by the filling of liquid fusible alloy Pipe fills the fusible alloy of liquid into foundation, since the density of fusible alloy is more than the density of heating carrier, sinks In the lower section of heating carrier;
6)When heating carrier liquid level rises to setting height, pass through low-temperature heat carrier recovery conduit(5), from foundation The middle heating carrier in low temperature extracted after cold go, to ensure that the temperature of the heating carrier in foundation is in easy always On the fusing point for fusing gold;
7)With the continuous injection of the fusible alloy of liquid, the liquid level of fusible alloy constantly rises;Adjust the heating of high temperature The recycling speed of the injection rate of carrier and the heating carrier of low temperature so that injection rate is less than recycling speed, in case heating carries Body overflows foundation;
8)When the liquid level of the fusible alloy of liquid rises to preset height, control device instructs grouting material filling recycling dress It sets, stops the fusible alloy of filling liquid and the heating carrier of high temperature, liquid fusible alloy is filled into conduit from the easy of liquid It is extracted in fusion gold, high-temperature heating carrier filling conduit is extracted from the heating carrier of high temperature;
9)After the heating carrier of the low temperature in foundation has all recycled, control device instructs grouting material filling recycling Device is stopped, and withdraws low-temperature heat carrier recovery conduit;
10)After the fusible alloy in foundation all solidifies and is cooled to room temperature, anchor bolt fixing bracket is removed;
11)Ground cover board is finally passed through into 4 foundation bolts, is covered in the upper surface of the fusible alloy of cooling and solidifying, with Improve the bearing capacity of lathe ground;
12)Construction site is cleared up, one-time formed lathe foundation grouting material filling construction is completed;
B, grouting material recycles:
1)Remove ground cover board;
2)By anchor bolt fixing bracket is positioned over the foundation for accommodating solid-state fusible alloy to be recycled just on Side;
3)One end that liquid fusible alloy filling conduit is connected to third catheter interface removes, and connects the 4th conduit and connect Mouthful;
4)Start grouting material using control device and fill retracting device, by the high-temperature heating for being connected to the first catheter interface Carrier fills conduit, and heating in high temperature of the temperature higher than fusible alloy fusing point is filled into cured fusible alloy ground and is carried Body, for melting solid fusible alloy;
5)The liquid level of liquid fusible alloy after dissolving in fusible alloy ground rises to setting height, by being connected to The liquid fusible alloy of 4th catheter interface fills conduit, and the easy fusion of the solubilized chemical conversion liquid of recycling is extracted from foundation Gold;
6)At the same time, grouting material filling retracting device is by being connected to the low-temperature heat carrier recovery of the second catheter interface Conduit, the heating carrier in low temperature after extracting cold go in foundation, to ensure the heating carrier in foundation Temperature always be in fusible alloy fusing point on;
7)After the solid fusible alloy in foundation is all melted and is recovered, control device instruction grouting Material filling retracting device, stops the fusible alloy of recovering liquid, and stops filling the heating carrier of high temperature, withdraws liquid and easily fuses Gold filling conduit, high-temperature heating carrier fill conduit;
8)After the heating carrier of the low temperature in foundation has all recycled, control device instructs grouting material filling recycling Device is stopped, and withdraws low-temperature heat carrier recovery conduit;
9)Construction site is cleared up, original lathe foundation part such as recycling foundation bolt completes one-time formed lathe Foundation grouting material recovery operation.
The ground cover board includes 4 cover plate through holes.
The leveling adjusts stabilizer blade completion by observing level meter, it is ensured that foundation bolt keeps plumbness.
The heating carrier selects water as heating carrier when the fusing point of fusible alloy is less than 100 DEG C, and when easy When the fusing point of fusion gold is higher than 100 DEG C, select dimethicone as heating carrier.
The beneficial effects of the invention are as follows:
This method need not do embedding anchor bolts hole, and anchor bolt fixing bracket is simple in structure, ground one-time cast-forming, Without back-grouting, a large amount of construction and maintenance time is not needed;For fusible alloy as grouting material, self drainage is good, fast hard, micro- swollen It is swollen, be used for a long time ungauged regions, ensure equipment with basis be in close contact, due to its is nontoxic, harmless, not aging, to water quality and its week Enclose environmental nonpollution;Lathe ground is to be solidified to be formed by liquid fusible alloy, and horizon light is easily obtained because of the dead weight of itself Clean foundation surface;Such foundation is reusable, and fusible alloy grouting material is dismantled convenient for fast recycling and recycling When lathe, do not have to destroy foundation, it is convenient, fast, and when secondary installing lathe, existing foundation can be continued to use, reduced Construction volume;The lathe ground running gate system and its grouting material fill recovery method, have reliable in quality, reduction in construction party face Cost, the advantages that shortening the construction period and is easy to use.
Description of the drawings
Fig. 1 is one-time formed lathe ground running gate system schematic diagram.
Fig. 2 is that grouting material fills recovery method schematic diagram.
Fig. 3 is one-time formed lathe ground schematic diagram.
Wherein, 1 is anchor bolt fixing bracket;2 be catheter-fixing rack;3 fill conduit for liquid fusible alloy;4 be high temperature Heating carrier fills conduit;5 be low-temperature heat carrier recovery conduit;6 fill retracting device for grouting material;7 connect for third conduit Mouthful;9 be the second catheter interface;8 be the first catheter interface;10 devices in order to control;11 be the 4th catheter interface;12 be level meter; 13 be foundation bolt.
Specific implementation mode
The present invention is described in further detail below in conjunction with the accompanying drawings, and the given examples are served only to explain the present invention, not For limiting the scope of the present invention.
As shown in Figure 1, a kind of one-time formed lathe ground cast and recycling implementation, including anchor bolt fixing bracket 1, anchor bolt fixing bracket 1 is equipped with catheter-fixing rack 2, and catheter-fixing rack 2 is set there are three conduit location hole, is inserted into liquid respectively Fusible alloy fills conduit 3, high-temperature heating carrier filling conduit 4, low-temperature heat carrier recovery conduit 5, and liquid fusible alloy adds Note conduit 3, high-temperature heating carrier filling conduit 4, low-temperature heat carrier recovery conduit 5 are separately connected grouting material filling retracting device 6 third catheter interface 7, the first catheter interface 8, the second catheter interface 9;Grouting material fills retracting device 6 and is equipped with control device 10;The grouting material filling retracting device 6 is additionally provided with the 4th catheter interface 11.
The anchor bolt fixing bracket 1 is welded using channel steel, is made according to the actual needs of lathe, foundation bolt Level meter 12, foundation bolt 13 and stabilizer blade 14 are additionally provided on fixed frame 1.
The grouting material fills retracting device(6)It is generated including high-temperature heating carrier generation module, liquid fusible alloy Module, low-temperature heat carrier recovery module and liquid fusible alloy recycling module, high-temperature heating carrier generation module pass through first Catheter interface(8)Output high-temperature heating carrier, low-temperature heat carrier recovery module pass through the second catheter interface(9)Recycling low temperature adds Heat carrier, liquid fusible alloy generation module pass through third catheter interface(7)Liquid fusible alloy is exported, liquid fusible alloy returns It receives module and passes through the 4th catheter interface(11)Recovering liquid fusible alloy.
A kind of one-time formed lathe ground cast and recovery method as shown in Figure 2,3, which is characterized in that including following step Suddenly:
A, grouting material fills:
1)The mounting foot bolt fixed frame 1 above pre-filled ground, and level meter 12 is installed in anchor bolt fixing bracket 1 On, after leveling, mounting foot bolt 13, it is ensured that the absolute altitude of foundation bolt meets the position of the requirement of lathe Foundation Design and foundation bolt Set the construction requirement that precision meets lathe ground;
2)Carrier filling conduit 4 will be heated at high temperature and be connected to the first catheter interface 8 that grouting material fills retracting device 6, liquid State fusible alloy filling conduit 3 is connected to the third catheter interface 7 of grouting material filling retracting device 6, and low-temperature heat carrier is returned Receive the second catheter interface 9 that conduit 5 is connected to grouting material filling retracting device 6;
3)Start grouting material using control device 10 and fill retracting device 6, the fusible alloy and temperature for generating liquid are higher than The heating carrier of fusible alloy fusing point;
4)The place that conduit 4 fills temperature into pre-filled ground higher than fusible alloy fusing point is filled by being heated at high temperature carrier In the heating carrier of high temperature, foundation is preheated;
5)After accumulating the heating carrier of a certain number of high temperature in pre-filled ground, led by the filling of liquid fusible alloy Pipe 3 fills the fusible alloy of liquid into foundation, since the density of fusible alloy is more than the density of heating carrier, sinks In the lower section of heating carrier;
6)When heating carrier liquid level rises to setting height, pass through low-temperature heat carrier recovery conduit(5), from foundation The middle heating carrier in low temperature extracted after cold go, to ensure that the temperature of the heating carrier in foundation is in easy always On the fusing point for fusing gold;
7)With the continuous injection of the fusible alloy of liquid, the liquid level of fusible alloy constantly rises;Adjust the heating of high temperature The recycling speed of the injection rate of carrier and the heating carrier of low temperature so that injection rate is less than recycling speed, in case heating carries Body overflows foundation;
8)When the liquid level of the fusible alloy of liquid rises to preset height, control device 10 instructs grouting material filling recycling Device 6, stops the fusible alloy of filling liquid and the heating carrier of high temperature, and liquid fusible alloy is filled conduit 3 from liquid Fusible alloy in extract, will high-temperature heating carrier filling conduit 4 extracted from the heating carrier of high temperature;
9)After the heating carrier of the low temperature in foundation has all recycled, control device 10 instructs grouting material to fill back Receiving apparatus 6 is stopped, and withdraws low-temperature heat carrier recovery conduit 5;
10)After the fusible alloy in foundation all solidifies and is cooled to room temperature, anchor bolt fixing bracket 1 is moved It removes;
11)Ground cover board is finally passed through into 4 foundation bolts, is covered in the upper surface of the fusible alloy of cooling and solidifying, with Improve the bearing capacity of lathe ground;
12)Construction site is cleared up, one-time formed lathe foundation grouting material filling construction is completed;
B, grouting material recycles:
1)Remove ground cover board;
2)By anchor bolt fixing bracket 1 is positioned over the foundation for accommodating solid-state fusible alloy to be recycled just on Side;
3)One end that liquid fusible alloy filling conduit 3 is connected to third catheter interface 7 removes, and connects the 4th conduit and connect Mouth 11;
4)Start grouting material using control device 10 and fill retracting device 6, by the high temperature for being connected to the first catheter interface 8 Heating carrier fills conduit 4, and temperature is filled into cured fusible alloy ground higher than fusible alloy fusing point in high temperature Heating carrier, for melting solid fusible alloy;
5)The liquid level of liquid fusible alloy after dissolving in fusible alloy ground rises to setting height, by being connected to The liquid fusible alloy of 4th catheter interface 11 fills conduit 3, and the meltable of the solubilized chemical conversion liquid of recycling is extracted from foundation Alloy;
6)At the same time, grouting material fills retracting device 6 by being connected to the second catheter interface(9)Low-temperature heat carrier Recycle conduit 5, the heating carrier in low temperature after extracting cold go in foundation, to ensure the heating in foundation The temperature of carrier is on the fusing point of fusible alloy always;
7)After the solid fusible alloy in foundation is all melted and is recovered, the instruction of control device 10 fills Slurry fills retracting device 6, stops the fusible alloy of recovering liquid, and stops filling the heating carrier of high temperature, and it is easy to withdraw liquid Fusion gold filling conduit 3, high-temperature heating carrier fill conduit 4;
8)After the heating carrier of the low temperature in foundation has all recycled, control device 10 instructs grouting material to fill back Receiving apparatus 6 is stopped, and withdraws low-temperature heat carrier recovery conduit 5;
9)Construction site is cleared up, original lathe foundation part such as recycling foundation bolt completes one-time formed lathe Foundation grouting material recovery operation.
The ground cover board includes 4 cover plate through holes.
The leveling adjusts the completion of stabilizer blade 14 by observing level meter 12, it is ensured that foundation bolt keeps plumbness.
The heating carrier selects water as heating carrier when the fusing point of fusible alloy is less than 100 DEG C, and when easy When the fusing point of fusion gold is higher than 100 DEG C, select dimethicone as heating carrier.

Claims (7)

1. a kind of one-time formed lathe ground cast and recycling implementation, including anchor bolt fixing bracket(1), feature exists In anchor bolt fixing bracket(1)It is equipped with catheter-fixing rack(2), catheter-fixing rack(2)If there are three conduit location hole, respectively It is inserted into liquid fusible alloy and fills conduit(3), high-temperature heating carrier fill conduit(4), low-temperature heat carrier recovery conduit(5), Liquid fusible alloy fills conduit(3), high-temperature heating carrier fill conduit(4), low-temperature heat carrier recovery conduit(5)Connect respectively Connect grouting material filling retracting device(6)Third catheter interface(7), the first catheter interface(8), the second catheter interface(9);Grouting Material filling retracting device(6)Equipped with control device(10);The grouting material fills retracting device(6)The 4th conduit is additionally provided with to connect Mouthful(11).
2. a kind of one-time formed lathe ground cast according to claim 1 and recycling implementation, which is characterized in that The anchor bolt fixing bracket(1)It is welded, is made according to the actual needs of lathe, anchor bolt fixing bracket using channel steel (1)On be additionally provided with level meter(12), foundation bolt(13)And stabilizer blade(14).
3. a kind of one-time formed lathe ground cast according to claim 1 and recycling implementation, which is characterized in that The grouting material fills retracting device(6)Including high-temperature heating carrier generation module, liquid fusible alloy generation module, low temperature Heating carrier recycling module and liquid fusible alloy recycling module, high-temperature heating carrier generation module pass through the first catheter interface (8)Output high-temperature heating carrier, low-temperature heat carrier recovery module pass through the second catheter interface(9)Low-temperature heat carrier is recycled, Liquid fusible alloy generation module passes through third catheter interface(7)Export liquid fusible alloy, liquid fusible alloy recycling module Pass through the 4th catheter interface(11)Recovering liquid fusible alloy.
4. a kind of one-time formed lathe ground cast and recovery method, which is characterized in that include the following steps:
A, grouting material fills:
1)The mounting foot bolt fixed frame above pre-filled ground(1), and level meter is installed(12)In anchor bolt fixing bracket (1)On, after leveling, mounting foot bolt(13), it is ensured that the absolute altitude of foundation bolt meets the requirement of lathe Foundation Design and lower margin spiral shell The positional precision of bolt meets the construction requirement of lathe ground;
2)High-temperature heating carrier is filled into conduit(4)It is connected to grouting material filling retracting device(6)The first catheter interface(8), Liquid fusible alloy fills conduit(3)It is connected to grouting material filling retracting device(6)Third catheter interface(7), by low temperature plus Heat carrier recycles conduit(5)It is connected to grouting material filling retracting device(6)The second catheter interface(9);
3)Utilize control device(10)Start grouting material and fills retracting device(6), the fusible alloy and temperature that generate liquid are higher than The heating carrier of fusible alloy fusing point;
4)Conduit is filled by being heated at high temperature carrier(4)Temperature being in higher than fusible alloy fusing point is filled into pre-filled ground The heating carrier of high temperature, preheats foundation;
5)After accumulating the heating carrier of a certain number of high temperature in pre-filled ground, conduit is filled by liquid fusible alloy (3)The fusible alloy that liquid is filled into foundation sinks since the density of fusible alloy is more than the density of heating carrier In the lower section of heating carrier;
6)When heating carrier liquid level rises to setting height, pass through low-temperature heat carrier recovery conduit(5), taken out from foundation The heating carrier after cooling in low temperature is taken, to ensure that the temperature of the heating carrier in foundation is in easily fusion always On the fusing point of gold;
7)With the continuous injection of the fusible alloy of liquid, the liquid level of fusible alloy constantly rises;Adjust the heating carrier of high temperature Injection rate and low temperature heating carrier recycling speed so that injection rate be less than recycling speed, in order to avoid heating carrier overflow Go out foundation;
8)When the liquid level of the fusible alloy of liquid rises to preset height, control device(10)Instruct grouting material filling recycling dress It sets(6), stop the fusible alloy of filling liquid and the heating carrier of high temperature, liquid fusible alloy filled into conduit(3)From liquid It is extracted in the fusible alloy of state, high-temperature heating carrier is filled into conduit(4)It is extracted from the heating carrier of high temperature;
9)After the heating carrier of the low temperature in foundation has all recycled, control device(10)Instruct grouting material filling recycling Device(6)It is stopped, withdraws low-temperature heat carrier recovery conduit(5);
10)After the fusible alloy in foundation all solidifies and is cooled to room temperature, by anchor bolt fixing bracket(1)It removes;
11)Ground cover board is finally passed through into 4 foundation bolts, is covered in the upper surface of the fusible alloy of cooling and solidifying, to improve The bearing capacity of lathe ground;
12)Construction site is cleared up, one-time formed lathe foundation grouting material filling construction is completed;
B, grouting material recycles:
1)Remove ground cover board;
2)By anchor bolt fixing bracket(1)It is positioned over the surface for the foundation for accommodating solid-state fusible alloy to be recycled;
3)Liquid fusible alloy is filled into conduit(3)It is connected to third catheter interface(7)One end remove, and connect the 4th conduit connect Mouthful(11);
4)Utilize control device(10)Start grouting material and fills retracting device(6), by being connected to the first catheter interface(8)Height Warm heating carrier fills conduit(4), temperature is filled into cured fusible alloy ground higher than fusible alloy fusing point in height The heating carrier of temperature, for melting solid fusible alloy;
5)The liquid level of liquid fusible alloy after dissolving in fusible alloy ground rises to setting height, by being connected to the 4th Catheter interface(11)Liquid fusible alloy fill conduit(3), the meltable of the solubilized chemical conversion liquid of recycling is extracted from foundation Alloy;
6)At the same time, grouting material fills retracting device(6)By being connected to the second catheter interface(9)Low-temperature heat carrier return Receive conduit(5), the heating carrier after cooling in low temperature is extracted from foundation, to ensure the heating in foundation The temperature of carrier is on the fusing point of fusible alloy always;
7)After the solid fusible alloy in foundation is all melted and is recovered, control device(10)Instruction grouting Material filling retracting device(6), stop the fusible alloy of recovering liquid, and stop filling the heating carrier of high temperature, it is easy to withdraw liquid Fusion gold filling conduit(3), high-temperature heating carrier fill conduit(4);
8)After the heating carrier of the low temperature in foundation has all recycled, control device(10)Instruct grouting material filling recycling Device(6)It is stopped, withdraws low-temperature heat carrier recovery conduit(5);
9)Construction site is cleared up, original lathe foundation part is recycled, completes one-time formed lathe foundation grouting material recycling Work.
5. a kind of one-time formed lathe ground cast according to claim 4 and recovery method, which is characterized in that described Ground cover board include 4 cover plate through holes.
6. a kind of one-time formed lathe ground cast according to claim 4 and recovery method, which is characterized in that described Leveling pass through observe level meter adjust stabilizer blade(14)It completes, it is ensured that foundation bolt keeps plumbness.
7. a kind of one-time formed lathe ground cast according to claim 4 and recovery method, which is characterized in that described Heating carrier, when the fusing point of fusible alloy be less than 100 DEG C when, select water as heating carrier, and work as fusible alloy fusing point When higher than 100 DEG C, select dimethicone as heating carrier.
CN201611116451.7A 2016-12-07 2016-12-07 A kind of one-time formed lathe ground cast and recovery method and its implementation Active CN106759456B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611116451.7A CN106759456B (en) 2016-12-07 2016-12-07 A kind of one-time formed lathe ground cast and recovery method and its implementation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611116451.7A CN106759456B (en) 2016-12-07 2016-12-07 A kind of one-time formed lathe ground cast and recovery method and its implementation

Publications (2)

Publication Number Publication Date
CN106759456A CN106759456A (en) 2017-05-31
CN106759456B true CN106759456B (en) 2018-10-26

Family

ID=58882216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611116451.7A Active CN106759456B (en) 2016-12-07 2016-12-07 A kind of one-time formed lathe ground cast and recovery method and its implementation

Country Status (1)

Country Link
CN (1) CN106759456B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158215A (en) * 1995-12-07 1997-06-17 Toshiba Eng & Constr Co Ltd Construction method for installing large-sized machine
DE102007014334A1 (en) * 2007-03-26 2008-10-02 Robert Bosch Gmbh Fusible alloy element, thermal fuse with a fusible alloy element and method for producing a thermal fuse
CN101343879B (en) * 2008-08-26 2010-06-02 济南二机床集团有限公司 Secondary grouting construction method of machine setting
CN103418179A (en) * 2012-05-18 2013-12-04 无锡蠡湖叶轮制造有限公司 Method of recycling emulsion in aluminum scraps
CN102974669B (en) * 2012-11-30 2014-12-24 宁波思明汽车科技有限公司 Fusible alloy recycling method for pipe forming

Also Published As

Publication number Publication date
CN106759456A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN107989634B (en) Tunnel lining trolley concrete pouring informatization monitoring system
CN106759456B (en) A kind of one-time formed lathe ground cast and recovery method and its implementation
CN207171373U (en) A kind of horizontal steel pawl prosthetic appliance of Multifunctional stand
US4284123A (en) Arrangement for producing ingots of unalloyed and alloyed steels
CN103669359A (en) Pre-buried grout pipe truss device of impervious wall
CN102753731B (en) Shut-down and start-up procedures of an electrolytic cell
CN211163139U (en) Drilling device for steel structure production
CN203565818U (en) Automatic control system for molten steel liquid level in metallurgy continuous casting machine crystallizer
CN105543892B (en) A kind of zinc electrolysis lead silver alloy anode plate and preparation method thereof
CN208276173U (en) Ladle pours remaining oxygen gas direct-recycling device
CN202447644U (en) Progressive solidification device for solder ingots
CN206839071U (en) A kind of aluminium ingot cooling system
CN210754973U (en) Preheating device for casting mold
CN201695340U (en) Temporary supporting seat for crossbeam construction
CN109162208A (en) A kind of the Rotary ball hinge system and its construction method of manufacture and site operation easy to process
CN104695461A (en) Upright post-type heliostat mounting base and mounting method thereof
CN209681708U (en) The drilling equipment of hydraulic pressure system pipe fitting sleeve under the overall leadership
CN205722822U (en) The anti-floating device of a kind of steel drum
CN211228506U (en) Be used for underwater concrete placement template
CN101966563A (en) Waste heat recovering device and operating method thereof
CN206516361U (en) Nuclear power melts soil solidifing emergency treatment device after heap
CN215892949U (en) Cooling device
CN106521199B (en) A kind of portable fusible alloy filling recovery system and its application method
CN206232793U (en) A kind of fusible alloy fills retracting device
CN206186053U (en) Arch prefabricated mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant