CN106759203A - Self-elevating ocean platform pile leg structure installs the method closed up - Google Patents

Self-elevating ocean platform pile leg structure installs the method closed up Download PDF

Info

Publication number
CN106759203A
CN106759203A CN201611199100.7A CN201611199100A CN106759203A CN 106759203 A CN106759203 A CN 106759203A CN 201611199100 A CN201611199100 A CN 201611199100A CN 106759203 A CN106759203 A CN 106759203A
Authority
CN
China
Prior art keywords
hull
spud
platform
spud leg
leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611199100.7A
Other languages
Chinese (zh)
Inventor
王维玉
郭相维
李虎清
张永杰
霍力强
王荣祥
张顺
郭亮
于延斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ocean Engineering Co Ltd Of Dalian Shipbuilding Industry Corp
Original Assignee
Ocean Engineering Co Ltd Of Dalian Shipbuilding Industry Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ocean Engineering Co Ltd Of Dalian Shipbuilding Industry Corp filed Critical Ocean Engineering Co Ltd Of Dalian Shipbuilding Industry Corp
Priority to CN201611199100.7A priority Critical patent/CN106759203A/en
Publication of CN106759203A publication Critical patent/CN106759203A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The method closed up is installed the present invention relates to a kind of self-elevating ocean platform pile leg structure, process is:S1:By hull support on overhead pier, the height of hull bottom to ground is segmented more than single-stage spud leg;S2:Based on hull, in depressed place or building berth first installs two or three spud legs segmentation for closing up top using crane;S3:For the mounted spud legs of step S2, jacking system to lifting foundation structure is installed;S4:Mounted spud leg is lifted by the jacking system, hull bottom is left room, next spud leg segmentation push-in hull lower section for treating that group is vertical is carried out into abutting joint;S5:Repeat step S4, is segmented abutting joints and finishes to all spud legs;S6:The overhead pier in platform main hull lower section is removed, decline main hull using the elevating mechanism of platform itself prepares to undock or lower water to desired height.It is contemplated that reducing task difficulty and production cost, platform service life is improved, shorten construction period.

Description

Self-elevating ocean platform pile leg structure installs the method closed up
Technical field
The method closed up is installed the present invention relates to a kind of self-elevating ocean platform pile leg structure.
Background technology
In the construction of jack-up unit, no matter the installation of spud leg all occupies significant proportion from cycle, equipment and cost.Stake The set-up time of leg often determines the construction period of whole platform, and because spud leg height is high, always jack up sea is closed up in installation Foreign platform construction difficult point.Traditional installation folding method is to be divided into 15~30 meters of sectional constructions first, is then closed respectively Hold together and be attached to self-elevating ocean platform, but because build the side crane hangs limitation high, jack-up unit undock or lower water before can only Installation close up bottom 2-3 section segmentation, remaining spud leg segmentation need to undock or lower water after using large-scale floating crane or rise ship connect Stake mode is closed up.The resource of large-scale floating crane is restricted and use cost is high, and rising ship pile extension needs supporting large-scale tooling device, Self-elevating ocean platform needs multiple lift work during construction, influences other constructions and debugging, and long construction period.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of reduction task difficulty and production cost, improves platform and uses the longevity Life, the self-elevating ocean platform spud leg for shortening construction period installs the method closed up.
In order to solve the above-mentioned technical problem, self-elevating ocean platform spud leg of the invention installs the method closed up, and makes first The standby spud leg for treating that group is vertical is segmented and sets the hull of lifting foundation structure, and subsequent process is:
S1:By hull support on overhead pier, the height of hull bottom to ground is segmented more than single-stage spud leg.Be higher by away from From the height being segmented slightly larger than single-stage spud leg, under preferred embodiment, no more than the height that two-stage spud leg is segmented.
S2:Based on hull, in depressed place or building berth first installs two or three spud legs segmentation for closing up top using crane.
S3:For the mounted spud legs of step S2, jacking system to the lifting foundation structure is installed.
S4:Mounted spud leg is lifted by the jacking system, hull bottom is left room, treat that group is vertical by next Spud leg segmentation push-in hull lower section carry out abutting joint.
S5:Repeat step S4, is segmented abutting joints and finishes to all spud legs.
S6:Remove the overhead pier in platform main hull lower section, main hull is declined to requiring using the elevating mechanism of platform itself Highly prepare to undock or lower water.
Self-elevating ocean platform spud leg of the invention installs the method closed up and not only eliminates Large marine crane barge and complexity Tooling device, improve the service life after platform is paid, while avoiding the construction of substantial amounts of high-altitude and operation on the sea, reduce Danger, it is to avoid construction delay caused by marine bad weather, has saved production cost.
Brief description of the drawings
Fig. 1 is self-elevating ocean platform spud leg schematic diagram.
Fig. 2 closes up overhead pier paving pier top view in depressed place for platform main hull.
Fig. 3 is that platform main hull closes up overhead pier paving pier Section A-A sectional view in depressed place in Fig. 2.
The schematic diagram that Fig. 4 closes up for two spud legs segmentation lifting installation from top to down of platform top.
Fig. 5 is platform hoist system scheme of installation
Fig. 6 is the schematic diagram that spud leg segmentation and spud leg segmental slipping to be closed up have been closed up in platform hoist system lifting.
Fig. 7 is that schematic diagram is closed up in the segmentation installation of platform leg the 5th.
Fig. 8 is that the schematic diagram for closing up completion is all installed in certain platform leg and shoe.
Fig. 9 is that the overhead pier of platform is removed, drop platform to undocking/schematic diagram of lower water state.
In figure:1, main hull;2, overhead big and heavy stone;3, lift foundation structure;4, jacking system;5, drag slideway;6, shoe;7, Suspension hook;8, hoist cable.
Specific embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by specific embodiment.
As shown in figure 1, each spud leg of certain jack-up unit is divided into 7 sectional constructions, respectively G1~G7 from bottom to top, About 26 meters of the maximum height of spud leg segmentation.As shown in Figures 2 and 3, platform in depressed place or building berth build when, main hull 1 and lifting Foundation structure 3 closes up shaping on overhead big and heavy stone 2, is more than the bottom surface of main hull 1 distance from the ground when laying overhead big and heavy stone 2 and waits to close up Spud leg section length certain distance is in order to operate.
Specific installation be divided into following steps when closing up:
S1:Such as Fig. 4, according to building berth or dock hoisting power elder generation, using equipment such as suspension hook 7, hoist cables 8 by the spud leg of top It is segmented Section of six G6 and spud leg and is segmented Section of seven G7 and lifts installation successively using crane from the top down and closes up.
S2:Such as Fig. 5, after Section of seven G7 of spud leg Section of six G6 of segmentation and spud leg segmentation closes up, jacking system 4 to lifting is installed Foundation structure 3 is simultaneously debugged.
S3:Such as Fig. 6, segmentation spud leg G6, the G7 for having installed and having closed up are lifted using the jacking system 4 of platform itself, will wait to close Hold together spud leg to be segmented Section five G5 slideway 5 is traversing to be aligned to having closed up pile leg structure lower section and positioned using dragging.As shown in fig. 7, Spud leg segmentation G6, G7 is now closed up and lower section spud leg segmentation G5 to be closed up has had certain interval.
S4:Decline and adjust spud leg segmentation G6, the G7 for having closed up using jacking system 4 and be segmented Section five with spud leg to be closed up G5 is docked.
S5:As shown in figure 8, take same method, gradually complete remaining spud leg be segmented Section of four G4, Section of three G3, Welding is closed up in second section G2, first segment G1 and shoe 6, and between shoe 6 and ground preferred place mat sandbag makes shoe close with ground Cut-grafting is touched.
S6:As shown in figure 9, removing the overhead pier 2 in the lower section of platform main hull 1, the elevating mechanism 4 using platform itself declines master Hull 1 prepares to undock or lower water to desired height.
The above, the only present invention preferably specific embodiment, but protection scope of the present invention is not limited thereto, Any one skilled in the art in the technical scope of present disclosure, technology according to the present invention scheme and its Inventive concept is subject to equivalent or change, should all be included within the scope of the present invention.

Claims (1)

1. a kind of self-elevating ocean platform pile leg structure installs the method closed up, and the spud leg segmentation and set for treating that group is vertical are prepared first The hull (1) of lifting foundation structure (3);Characterized in that, subsequent process is:
S1:Hull (1) is supported on overhead pier (2), the height of hull (1) bottom to ground is segmented more than single-stage spud leg;
S2:Based on hull (1), in depressed place or building berth first installs two or three spud legs segmentation for closing up top using crane;
S3:For the mounted spud legs of step S2, jacking system (4) to lifting foundation structure (3) is installed;
S4:Mounted spud leg is lifted by the jacking system (4), hull bottom is left room, treat that group is vertical by next Spud leg segmentation push-in hull lower section carry out abutting joint;
S5:Repeat step S4, is segmented abutting joints and finishes to all spud legs;
S6:The overhead pier (2) in platform main hull (1) lower section is removed, the elevating mechanism (4) using platform itself declines main hull (1) Prepare to undock or lower water to desired height.
CN201611199100.7A 2016-12-22 2016-12-22 Self-elevating ocean platform pile leg structure installs the method closed up Pending CN106759203A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611199100.7A CN106759203A (en) 2016-12-22 2016-12-22 Self-elevating ocean platform pile leg structure installs the method closed up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611199100.7A CN106759203A (en) 2016-12-22 2016-12-22 Self-elevating ocean platform pile leg structure installs the method closed up

Publications (1)

Publication Number Publication Date
CN106759203A true CN106759203A (en) 2017-05-31

Family

ID=58897290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611199100.7A Pending CN106759203A (en) 2016-12-22 2016-12-22 Self-elevating ocean platform pile leg structure installs the method closed up

Country Status (1)

Country Link
CN (1) CN106759203A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537555A (en) * 2018-09-25 2019-03-29 武汉船用机械有限责任公司 A kind of self-elevating ocean platform
CN110171783A (en) * 2019-05-13 2019-08-27 中国电建集团山东电力建设第一工程有限公司 A kind of tower boiler hoisting of slab beam method
CN112077469A (en) * 2020-08-25 2020-12-15 广东工业大学 Method for continuously preheating and welding and installing giant maritime work pile leg in field and in multiple sections
CN116620515A (en) * 2023-07-19 2023-08-22 中船黄埔文冲船舶有限公司 Mounting, positioning and folding method for lifting foundation of self-elevating type working platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5941507A (en) * 1982-08-31 1984-03-07 Mitsui Eng & Shipbuild Co Ltd Assembly of leg for high-level landing type vertically movable working platform
US4854778A (en) * 1987-09-04 1989-08-08 Cameron Iron Works Usa, Inc. Caisson tower platform and method of setting same
CN105586864A (en) * 2015-11-30 2016-05-18 中国国际海运集装箱(集团)股份有限公司 Method for folding self-lifting-type platform truss-type pile legs
CN105692449A (en) * 2016-03-22 2016-06-22 中交第二航务工程勘察设计院有限公司 Method for spud leg lengthening and folding of self-elevating drilling platform

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5941507A (en) * 1982-08-31 1984-03-07 Mitsui Eng & Shipbuild Co Ltd Assembly of leg for high-level landing type vertically movable working platform
US4854778A (en) * 1987-09-04 1989-08-08 Cameron Iron Works Usa, Inc. Caisson tower platform and method of setting same
CN105586864A (en) * 2015-11-30 2016-05-18 中国国际海运集装箱(集团)股份有限公司 Method for folding self-lifting-type platform truss-type pile legs
CN105692449A (en) * 2016-03-22 2016-06-22 中交第二航务工程勘察设计院有限公司 Method for spud leg lengthening and folding of self-elevating drilling platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537555A (en) * 2018-09-25 2019-03-29 武汉船用机械有限责任公司 A kind of self-elevating ocean platform
CN110171783A (en) * 2019-05-13 2019-08-27 中国电建集团山东电力建设第一工程有限公司 A kind of tower boiler hoisting of slab beam method
CN112077469A (en) * 2020-08-25 2020-12-15 广东工业大学 Method for continuously preheating and welding and installing giant maritime work pile leg in field and in multiple sections
CN116620515A (en) * 2023-07-19 2023-08-22 中船黄埔文冲船舶有限公司 Mounting, positioning and folding method for lifting foundation of self-elevating type working platform
CN116620515B (en) * 2023-07-19 2023-11-03 中船黄埔文冲船舶有限公司 Mounting, positioning and folding method for lifting foundation of self-elevating type working platform

Similar Documents

Publication Publication Date Title
CN106759203A (en) Self-elevating ocean platform pile leg structure installs the method closed up
CN101672011B (en) Steel tube arch rib vertical lifting method
CN102849185B (en) Pile leg installation method for self-elevating drilling platform
CN100523388C (en) Large-scale trussed-beam spud leg waterborne transmitting and mounting method
CN102582786A (en) Building process for deep sea spar platform
CN203097737U (en) Telescopic integral hoisting type headframe device
CN104963327A (en) Jacket
CN204825839U (en) Can dismantle elevating gear
CN106089560A (en) Seat bottom type liftable tidal current energy generating equipment and elevating method
CN103171976B (en) Hoisting method for shipyard gantry crane
CN101725114B (en) Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN201151904Y (en) Large-sized pile leg structure pulling and moving chute device for water borne mounting
CN107399412B (en) The method of construction of MOPU
CN107487724B (en) Non-crane-assisted large floating crane arm support mounting device and mounting method
CN104290866B (en) Split type dock construction method of self-elevating production platform and oil storing and discharging platform
CN102050377B (en) Method for installing combined hoist and oil production platform drilling equipment
CN101148870B (en) Large-scale pile leg structure waterborne mounting dragging slide way device
CN203834448U (en) Novel six-leg platform jacket
CN102101629B (en) Hierarchical synchronous hydraulic jacking process for large-tonnage ocean engineering structure
CN108930260A (en) The installation method of jack-up unit spud leg
US10302068B2 (en) Conversion of movable offshore drilling structure to wind turbine application
CN113800411A (en) Method for hoisting FPSO torch tower by using floating crane
CN109204702B (en) Method for segmental assembling and lengthening tension tendon of tension leg platform
CN207226943U (en) A kind of double crossbeam synchronous hoisting devices
CN107628537B (en) A kind of spud leg hanging method using secondary lever principle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication