CN106759202A - A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform - Google Patents

A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform Download PDF

Info

Publication number
CN106759202A
CN106759202A CN201611170104.2A CN201611170104A CN106759202A CN 106759202 A CN106759202 A CN 106759202A CN 201611170104 A CN201611170104 A CN 201611170104A CN 106759202 A CN106759202 A CN 106759202A
Authority
CN
China
Prior art keywords
spud leg
spud
ship
leg
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611170104.2A
Other languages
Chinese (zh)
Inventor
蔡小强
范金阳
邵荣
窦太卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DAJIN HEAVY INDUSTRY Co Ltd
Original Assignee
JIANGSU DAJIN HEAVY INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DAJIN HEAVY INDUSTRY Co Ltd filed Critical JIANGSU DAJIN HEAVY INDUSTRY Co Ltd
Priority to CN201611170104.2A priority Critical patent/CN106759202A/en
Publication of CN106759202A publication Critical patent/CN106759202A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0034Maintenance, repair or inspection of offshore constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • E02B2017/0047Methods for placing the offshore structure using a barge

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform, by control and the grasp of tidal fluctuations to platform, two merging precisions of spud leg are determined according to spud leg latch centerline hole.The present invention solves the problems, such as that hypervelocity cannot be closed up on building berth, that is, meet final required precision, also shortens the production cycle, has saved production cost.

Description

A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform
Technical field
The present invention relates to a kind of pile extension under water technique, specifically a kind of spud leg water for broken stone pile offshore engineering platform Lower pile extension technology, belongs to shipbuilding processing technique field.
Background technology
The structure type of pile legs of self-elevating drilling platform is triangle, truss transmission pattern, and weight is all at 150 tons -220 tons Between.The liter ship pile extension technology of existing pile legs of self-elevating drilling platform segmentation is that the stake in outfitting quay will be transported to ocean crane ship Leg segmentation is stood up, then in the sliding guide rail frock being lifted on self-elevating drilling platform deck with ocean crane ship, then adopt Pile extension technology method is slid with the straight line for a liter ship → slide → position → close up.The method has following shortcoming:1st, building expense With higher, 2 are influenceed larger by natural cause, 3, spud leg folding when safety coefficient it is low.
The content of the invention
The technical problems to be solved by the invention are the shortcomings for overcoming prior art, there is provided one kind is used for broken stone pile ocean The spud leg pile extension under water technique of operation platform, solves the problems, such as that hypervelocity cannot be closed up on building berth, that is, meet final Required precision, also shortens the production cycle, has saved production cost.
In order to solve the above technical problems, the present invention provides a kind of spud leg for broken stone pile offshore engineering platform connecing under water Stake technique, comprises the following steps:
(1) the spud leg of separate unit tower crane erect:In tower crane lifting coverage, the softer place of geology, ground soft object is by stake Leg pad is good, and spud leg is kept flat on the ground, and the suspension ring installed installed in spud leg top are hooked by the suspension hook of tower crane, slowly lifts by crane Spud leg is erect;
(2) the influence that tower crane operator is risen/fallen to ship height by tidewater, so the length to tower crane steel wire rope influence, see The change of loop wheel machine lifting weight data table is examined, the hook of tower crane is operated when less than actual weight, when more than actual weight When operation tower crane suspension hook decline;
(3) the ship that control is swum on the water surface is in relative plateau, is absorbed water according to corner, takes ballast tank of ship ballast Ship is adjusted to level by the mode of water, and hawser is fixed on harbour checking bollard;
(4) when constructing, before 1# spud legs are lifted, change is brought to ship center of gravity according to the spud leg weight center of gravity for being lifted, taken The corresponding ballast water of injection in the ballast tank of diagonal storage spud leg;Similarly, ballast tank when lifting 2# spud legs in the storage of 3# spud legs is noted Enter corresponding ballast water;During lifting 3# spud legs, now need the water in ballast tank at 2# spud legs to extract corresponding amount out, lift 4# spud legs When, the water in the ballast tank of 1# spud legs storeroom need to be extracted out corresponding amount;Ship is in horizontal after keeping a piece leg of lifting State;
(5) spud leg on ship declines, and 5-6 meter of fixed pile chamber deck is only stretched out in spud leg end, i.e., 3 length of pin hole, when needing to lift Spud leg placing flat on the ground when, find out laterally adjacent latch centerline hole, and carry out mark, from top from top to down, Steel wire is drawn to easy to remember point, the center line of upper end spud leg is aligned with bottom spud leg latch centerline hole, you can according to center Line completes alignment pile extension.
Further, the spud leg pile extension under water technique of broken stone pile offshore engineering platform, the soft object are previously described for It is rubber tyre.
The beneficial effects of the invention are as follows:Present invention eliminates the use of ocean crane ship, by environment and inside even from weather Small, job area is small, and lifting operation is more steady, improves safety coefficient during spud leg folding, greatly save the engineering time and Construction cost, the scale requirements that the outfitting quay and basin moored is stayed to platform are low, it is ensured that spud leg turns to the suitable of sliding pile extension technology Profit is implemented.Solve the problems, such as that hypervelocity cannot be closed up on building berth, that is, meet final required precision, also shorten production In the cycle, production cost is saved.
Specific embodiment
Embodiment 1
The present embodiment provides a kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform, comprises the following steps:
(1) the spud leg of separate unit tower crane erect:In tower crane lifting coverage, the softer place of geology, ground rubber tyre is by stake Leg pad is good, and spud leg is kept flat on the ground, and the suspension ring installed installed in spud leg top are hooked by the suspension hook of tower crane, slowly lifts by crane Spud leg is erect;
(2) the influence that tower crane operator is risen/fallen to ship height by tidewater, so the length to tower crane steel wire rope influence, see The change of loop wheel machine lifting weight data table is examined, the hook of tower crane is operated when less than actual weight, when more than actual weight When operation tower crane suspension hook decline;
(3) the ship that control is swum on the water surface is in relative plateau, is absorbed water according to corner, takes ballast tank of ship ballast Ship is adjusted to level by the mode of water, and hawser is fixed on harbour checking bollard;
(4) when constructing, before 1# spud legs are lifted, change is brought to ship center of gravity according to the spud leg weight center of gravity for being lifted, taken The corresponding ballast water of injection in the ballast tank of diagonal storage spud leg;Similarly, ballast tank when lifting 2# spud legs in the storage of 3# spud legs is noted Enter corresponding ballast water;During lifting 3# spud legs, now need the water in ballast tank at 2# spud legs to extract corresponding amount out, lift 4# spud legs When, the water in the ballast tank of 1# spud legs storeroom need to be extracted out corresponding amount;Ship is in horizontal after keeping a piece leg of lifting State;
(5) spud leg on ship declines, and 5-6 meter of fixed pile chamber deck is only stretched out in spud leg end, i.e., 3 length of pin hole, when needing to lift Spud leg placing flat on the ground when, find out laterally adjacent latch centerline hole, and carry out mark, from top from top to down, Steel wire is drawn to easy to remember point, the center line of upper end spud leg is aligned with bottom spud leg latch centerline hole, you can according to center Line completes alignment pile extension.The step of following table is recorded when being the present embodiment Specific construction and parameter:
Above example is only explanation technological thought of the invention, it is impossible to limit protection scope of the present invention with this, every According to technological thought proposed by the present invention, any change done on the basis of technical scheme each falls within the scope of the present invention Within.

Claims (2)

1. a kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform, it is characterised in that comprise the following steps:
(1) the spud leg of separate unit tower crane erect:In tower crane lifting coverage, the softer place of geology, ground soft object is by stake Leg pad is good, and spud leg is kept flat on the ground, and the suspension ring installed installed in spud leg top are hooked by the suspension hook of tower crane, slowly lifts by crane Spud leg is erect;
(2) the influence that tower crane operator is risen/fallen to ship height by tidewater, so the length to tower crane steel wire rope influence, see The change of loop wheel machine lifting weight data table is examined, the hook of tower crane is operated when less than actual weight, when more than actual weight When operation tower crane suspension hook decline;
(3) the ship that control is swum on the water surface is in relative plateau, is absorbed water according to corner, takes ballast tank of ship ballast Ship is adjusted to level by the mode of water, and hawser is fixed on harbour checking bollard;
(4) when constructing, before 1# spud legs are lifted, change is brought to ship center of gravity according to the spud leg weight center of gravity for being lifted, taken The corresponding ballast water of injection in the ballast tank of diagonal storage spud leg;Similarly, ballast tank when lifting 2# spud legs in the storage of 3# spud legs is noted Enter corresponding ballast water;During lifting 3# spud legs, now need the water in ballast tank at 2# spud legs to extract corresponding amount out, lift 4# spud legs When, the water in the ballast tank of 1# spud legs storeroom need to be extracted out corresponding amount;Ship is in horizontal after keeping a piece leg of lifting State;
(5) spud leg on ship declines, and 5-6 meter of fixed pile chamber deck is only stretched out in spud leg end, i.e., 3 length of pin hole, when needing to lift Spud leg placing flat on the ground when, find out laterally adjacent latch centerline hole, and carry out mark, from top from top to down, Steel wire is drawn to easy to remember point, the center line of upper end spud leg is aligned with bottom spud leg latch centerline hole, you can according to center Line completes alignment pile extension.
2. the spud leg pile extension under water technique for broken stone pile offshore engineering platform according to claim 1, it is characterised in that: The soft object is rubber tyre.
CN201611170104.2A 2016-12-16 2016-12-16 A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform Pending CN106759202A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611170104.2A CN106759202A (en) 2016-12-16 2016-12-16 A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611170104.2A CN106759202A (en) 2016-12-16 2016-12-16 A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform

Publications (1)

Publication Number Publication Date
CN106759202A true CN106759202A (en) 2017-05-31

Family

ID=58893297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611170104.2A Pending CN106759202A (en) 2016-12-16 2016-12-16 A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform

Country Status (1)

Country Link
CN (1) CN106759202A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523477A (en) * 2016-01-08 2016-04-27 招商局重工(江苏)有限公司 Method for carrying out pile leg connection by utilizing 3000t floating crane

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105523477A (en) * 2016-01-08 2016-04-27 招商局重工(江苏)有限公司 Method for carrying out pile leg connection by utilizing 3000t floating crane

Similar Documents

Publication Publication Date Title
CN108454798B (en) Integrated construction and installation method of upper process module of floating production facility
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN105152040B (en) Process for sectionally closing and hoisting pile legs of self-elevating offshore oil platform through crawler crane
CN105000137B (en) Covering of the fan revolution single point mooring transfusion system
CN201224866Y (en) Floating pier steel bridge approach floating type elevating system
CN102168417A (en) Truss framed leg folding method of jack-up drilling platform
CN104002937A (en) Offshore oilfield extending testing platform
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN206635654U (en) A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam
CN104250968B (en) From installation suction pile formula moveable platform structure
CN109024525A (en) A kind of artificial island structure and its construction method considering underground space development
CN105523477A (en) Method for carrying out pile leg connection by utilizing 3000t floating crane
CN203373716U (en) Self-installation suction pile type movable platform structure
CN107653856B (en) The construction folding method of jack-up unit
CN101380992A (en) Launching and landing method of ships and special buoyancy device
CN204589969U (en) Be applicable to the small modular jack-up unit of greater coasting area operation
CN105586864A (en) Method for folding self-lifting-type platform truss-type pile legs
CN105735223B (en) A kind of technique for turning to sliding pile extension for pile legs of self-elevating drilling platform
CN201151904Y (en) Large-sized pile leg structure pulling and moving chute device for water borne mounting
CN107399412A (en) MOPU method of construction
CN106759202A (en) A kind of spud leg pile extension under water technique for broken stone pile offshore engineering platform
CN203569531U (en) Buoyant box type self-adjustment temporary wharf
CN104290866B (en) Split type dock construction method of self-elevating production platform and oil storing and discharging platform
CN104895043B (en) A kind of deep water long period that is applied to is surged the Macadam Pile Construction method in waters
CN205168832U (en) Pier of perpendicular keg float formula heaving pile ware

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531