CN106758880B - A kind of sagging bracing means of bridge and its construction method - Google Patents
A kind of sagging bracing means of bridge and its construction method Download PDFInfo
- Publication number
- CN106758880B CN106758880B CN201710043332.1A CN201710043332A CN106758880B CN 106758880 B CN106758880 B CN 106758880B CN 201710043332 A CN201710043332 A CN 201710043332A CN 106758880 B CN106758880 B CN 106758880B
- Authority
- CN
- China
- Prior art keywords
- line wheel
- bridge
- fixed
- hawser
- mounting hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710043332.1A CN106758880B (en) | 2016-04-29 | 2016-04-29 | A kind of sagging bracing means of bridge and its construction method |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610275591.2A CN105735154B (en) | 2016-04-29 | 2016-04-29 | Bridge droop reinforcing device and construction method thereof |
CN201710043332.1A CN106758880B (en) | 2016-04-29 | 2016-04-29 | A kind of sagging bracing means of bridge and its construction method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610275591.2A Division CN105735154B (en) | 2016-04-29 | 2016-04-29 | Bridge droop reinforcing device and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106758880A CN106758880A (en) | 2017-05-31 |
CN106758880B true CN106758880B (en) | 2018-08-24 |
Family
ID=56287779
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610275591.2A Expired - Fee Related CN105735154B (en) | 2016-04-29 | 2016-04-29 | Bridge droop reinforcing device and construction method thereof |
CN201710043332.1A Active CN106758880B (en) | 2016-04-29 | 2016-04-29 | A kind of sagging bracing means of bridge and its construction method |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610275591.2A Expired - Fee Related CN105735154B (en) | 2016-04-29 | 2016-04-29 | Bridge droop reinforcing device and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105735154B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111472282B (en) * | 2020-04-23 | 2021-03-19 | 乔磊 | Prestressed anchorage utensil is used in road bridge construction |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001164519A (en) * | 1999-12-03 | 2001-06-19 | Hanshin Kosoku Doro Kanri Gijutsu Center | Bridge-steel i-girder maintenance inspection device |
CN2641113Y (en) * | 2003-06-07 | 2004-09-15 | 青岛铁路工务机电技术公司 | Steel cable and double wire bridge type repairing trolly for concrete up beam |
CN201292512Y (en) * | 2008-08-29 | 2009-08-19 | 北京公联洁达公路养护工程有限公司 | Suspended cable sliding table for spraying main steel box beam of overpass |
JP5374130B2 (en) * | 2008-12-09 | 2013-12-25 | 東日本旅客鉄道株式会社 | Girder rigidity increasing method and girder member |
CN101942812B (en) * | 2009-07-09 | 2012-09-05 | 北京公科固桥技术有限公司 | Bridge reinforcing method and uses of prestress reinforced steel wire net anchor in bridge reinforcement |
KR101197318B1 (en) * | 2010-02-19 | 2012-11-05 | 김재흥 | Joint reinforcing method using bending connection member and bridge construction method therewith |
CN102296546A (en) * | 2011-06-02 | 2011-12-28 | 河南省交通工程加固有限责任公司 | Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof |
CN103132464B (en) * | 2013-03-27 | 2014-12-10 | 双鸭山市吉昌机械制造有限公司 | Built-in two-way sliding maintenance platform of tower crown |
CN203452004U (en) * | 2013-06-21 | 2014-02-26 | 重庆运安机电制造有限责任公司 | Bottom width overhaul hanging basket of bridge |
CN104894985A (en) * | 2015-06-29 | 2015-09-09 | 郑州大学 | Construction method for rapidly reinforcing orthotropic board bridge floor of U-shaped ribs |
CN204875563U (en) * | 2015-09-02 | 2015-12-16 | 东北林业大学 | Bridge reinforcing apparatus based on polyurethane cement and prestressed wire rope |
-
2016
- 2016-04-29 CN CN201610275591.2A patent/CN105735154B/en not_active Expired - Fee Related
- 2016-04-29 CN CN201710043332.1A patent/CN106758880B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106758880A (en) | 2017-05-31 |
CN105735154A (en) | 2016-07-06 |
CN105735154B (en) | 2017-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN110359359B (en) | Supporting structure for pouring box girder zero blocks and construction process thereof | |
CN102979221B (en) | Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN110820950B (en) | Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure | |
CN106836024B (en) | Across sagging bracing means construction method in a kind of bridge | |
CN106758880B (en) | A kind of sagging bracing means of bridge and its construction method | |
CN206487069U (en) | One kind is reinforced with exempting from jack compressor wire stretching and anchoring device | |
CN103806645B (en) | A kind of light-duty intelligent hydraulic climbing apparatus with good wind resistance fireproof performance | |
CN208309396U (en) | A kind of bridge pier column overturn-preventing operation platform | |
CN110158453A (en) | A kind of BRB and the concatenated damper of carriage and its construction method | |
CN106525471A (en) | Apparatus for continuous collapse dynamic test of steel frame | |
CN206538687U (en) | Cable-stayed bridge end bay beam section construction system | |
CN104989092B (en) | A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform | |
CN107366229A (en) | Both a kind of construction method of wired transom pier bent cap | |
CN111622126A (en) | Construction method of high-altitude vertical manned channel in high mountain rock area | |
JP5080373B2 (en) | Transmission type dam | |
CN214090672U (en) | Shock-proof type assembled hangs staircase structure | |
CN111021567B (en) | Damping structure of small-sized residence | |
CN212562625U (en) | Wind-resistant reinforcing structure of prefabricated house | |
CN112695621A (en) | Construction method of counterweight type bridge pier | |
CN112281622A (en) | Temporary suspension cable trestle and construction method thereof | |
CN101818578B (en) | Disaster prevention and reinforcement method for brick house | |
CN207469300U (en) | A kind of double skin wall constructions of underground garage | |
CN218621836U (en) | Steel pipe support pre-compaction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180626 Address after: 430000 6 Bridge Road, New Bridge District, Jiangxia District, Wuhan, Hubei Applicant after: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd. Address before: 212400 305, room 3, Heping Village, 30 Zhenjiang long road, Baohua, Zhenjiang, Jiangsu, Jurong Applicant before: Xia Yujuan |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190424 Address after: 430200 No. 6 Daqiao Road, Jiangxia District, Wuhan City, Hubei Province Co-patentee after: The Fourth Engineering Co., Ltd of The Seventh Engineering Group Co., Ltd. of China Railway Patentee after: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd. Address before: 430000 6 Bridge Road, New Bridge District, Jiangxia District, Wuhan, Hubei Patentee before: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200820 Address after: 430200 No. 6 Bridge Road, Jiangxia District, Hubei, Wuhan Patentee after: WUHAN ENGINEERING CO., LTD., CHINA RAILWAY 7TH BUREAU GROUP Co.,Ltd. Address before: 430200 No. 6 Bridge Road, Jiangxia District, Hubei, Wuhan Co-patentee before: THE FOURTH ENGINEERING CO., LTD. OF CHINA RAILWAY SEVENTH Group Patentee before: WUHAN ENGINEERING CO., LTD., CHINA RAILWAY 7TH BUREAU GROUP Co.,Ltd. |