CN106758880B - A kind of sagging bracing means of bridge and its construction method - Google Patents

A kind of sagging bracing means of bridge and its construction method Download PDF

Info

Publication number
CN106758880B
CN106758880B CN201710043332.1A CN201710043332A CN106758880B CN 106758880 B CN106758880 B CN 106758880B CN 201710043332 A CN201710043332 A CN 201710043332A CN 106758880 B CN106758880 B CN 106758880B
Authority
CN
China
Prior art keywords
line wheel
bridge
fixed
hawser
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710043332.1A
Other languages
Chinese (zh)
Other versions
CN106758880A (en
Inventor
夏玉娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201710043332.1A priority Critical patent/CN106758880B/en
Publication of CN106758880A publication Critical patent/CN106758880A/en
Application granted granted Critical
Publication of CN106758880B publication Critical patent/CN106758880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of sagging bracing means of bridge, it is characterised in that:Including correcting device, amendment support both sides are mounted on damping unit and two-wire reel;The correcting device includes upper mounted plate, and fixed bolt hole is equipped on fixed plate, and supporting rod is connected with below fixed plate, and hawser cord hole is mounted below the supporting rod;Beneficial effects of the present invention:The device is prevented its sagging, traffic safety is effectively ensured to being reinforced at bridge expanssion joint, highly practical, is suitble to promote the use of.

Description

A kind of sagging bracing means of bridge and its construction method
Technical field
The present invention relates to a kind of exchanging bridge device and its construction methods, belong to engineering construction technology field.
Background technology
Bridge refers to and is erected in rivers,lakes and seas, the building for making traffic etc. that can smoothly pass through, referred to as bridge.Bridge one As be made of superstructure, substructure, bearing and attached structure, superstructure is also known as bridge span structure, is across obstacle Primary structure;Substructure includes abutment, bridge pier and basis;Bearing is that bridge span structure is arranged with the bearing place of bridge pier or abutment Load transfer device;Attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, training works etc..
Bridge expanssion joint:It refers to meet the requirement of bridge floor deformation, usually between two beam-ends, between beam-ends and abutment Or expansion joint is set in the articulated position of bridge.It is required that expansion joint is in both directions parallel, perpendicular to bridge axes, equal energy is certainly It is solid and reliable by stretching, it should be smoothed out when vehicle is run over, without kick and noise;It wants to prevent rainwater and rubbish soil from penetrating into resistance Plug;Installation, check, maintenance, eliminate dirt will simple and convenient.At setting expansion joint, railing will be disconnected with deck paving. The effect of bridge expanssion joint:Be to adjust by between the superstructure caused by vehicular load and bridge construction material displacement and It is coupled.The telescopic device of skew bridge is once destroyed, and will seriously affect speed, comfort and the safety of driving, or even cause to go Vehicle safety accident.
Application No. is CN204875563U to disclose a kind of bridge based on polyurethane cement and prestress rope such as one Bracing means, is related to a kind of bridge strengthening device, and the present invention is that there are bonds between fresh and hardened concretes for solution existing highway bridge bracing means Surface intensity is insufficient, dead weight increases the problems such as larger, tensile capacity improves unobvious.The present invention includes prestress rope and poly- ammonia Ester cement stabilization layer, prestress rope is mounted on bridge strengthening apparatus surface, using being fixed on after stretching end anchorage tensioning It is coated on the anchorage of fixed end, on prestress rope and is fixed with polyurethane cement reinforcing layer;It further includes plane formula pressure sensing Device is embedded in bridge pontic, and tablet is parallel to ground, and plane formula pressure sensor is measured when load change suffered by bridge and answered Power variable quantity, plane formula pressure sensor are exported stress variation to A/D converter, A/ by pressure simulation signal output end The digital signal output end of D converters and the digital signal input end of Acquisition Circuit connect.The present invention is used for civil engineering.
For another example one application No. is CN101942812A to disclose a kind of bridge reinforcing method.The reinforcement means of the present invention is to answer Bridge strengthening is carried out with prestressed high-strength wire netting anchorage;Hight strength cable net anchorage include anchoring piece (1), bolt (2), Screw rod (3) and intermediate plate (4);Bolt is set in the through-hole of anchoring piece;Screw rod and intermediate plate are set in the through-hole of bolt and connect;Intermediate plate Vertebra angle be more than the vertebra angle of bolt hole, two vertebra angles differ 0.05-0.5 degree.The anchorage that the present invention uses:Anchoring property can It leans on;Enough bearing capacitys;It is durable;Easy construction;It can tensioning immediately after assembling;Centering is convenient, and interchangeability is good, to environment Adaptability is high;The small-sized flat anchor of more high tensile steel wires can be anchored simultaneously;The intensity of pre-applied force muscle and safely can be given full play to Realize tensioning operation.Using the method reinforcement bridge of the present invention, use scope is wide, easy construction, cost are relatively low, can give full play to The intensity of pre-applied force muscle can safely realize tensioning operation, and can dramatically increase the bearing capacity of bridge.
After the long-time use of some bridge expanssion joints, since lower section does not have bridge pier support, under the one end for leading to expansion joint Drop, driving can be caused when vehicle passes by due to being uneven.Therefore, it is necessary to be reinforced to its sagging place, it is prevented Continue sagging influence traffic safety.
Invention content
The present invention overcomes problems of the existing technology, it is proposed that a kind of sagging bracing means of bridge and its construction party Method, the device and its construction method prevent its sagging, traffic safety are effectively ensured to being reinforced at bridge expanssion joint.
The specific technical solution of the present invention is as follows:
A kind of sagging bracing means of bridge, it is characterised in that:Including correcting device, the correcting device both sides are mounted on Damping unit and two-wire reel;
The correcting device includes upper mounted plate, and fixed bolt hole, fixed plate are equipped on fixed plate Lower section is connected with supporting rod, and hawser cord hole is mounted below the supporting rod;
The damping unit includes outline border, and hawser rope mounting hole is equipped with inside the outline border, and the hawser rope is solid Determine hole surrounding and be connected with telescopic device, one end of the telescopic device is connected with the inner wall of lower articulated connection outline border, and the other end connects It is connected to articulated connection hawser rope mounting hole;Threaded is installed in the hawser rope mounting hole, described threaded one end is set There is nut to fix, the other end is equipped with pulley;
The two-wire reel includes bolt fixed plate, and line wheel one and line wheel two are connected on the bolt fixed plate, hand Handle is connect with line wheel one and line wheel two, and self-locking structure is also equipped in the line wheel one and line wheel two;
Hawser rope is fixed in line wheel one and line wheel two, and sequentially passes through hawser rope mounting hole, hawser cord hole, another Outer hawser rope mounting hole is finally fixed on above the line wheel one and line wheel two of another set.
Preferentially, further include transport device, the transport device includes bottom plate, and the bottom plate is equipped with to be corrected for installing The groove of device, locking retaining ring are equipped with lifting and latch by being hingedly mounted on the side of groove, the side of the bottom plate, with being resuspended Peg installs activity on lifting lock side, the balance weight hanging bar is placed with clump weight.
In addition, the present invention also provides a kind of sagging bracing means construction methods of bridge, which is characterized in that including following step Suddenly:
1) prepare before construction:Correcting device, damping unit, two-wire reel and transport device are first placed on bridge floor On, crane is driven on bridge floor, checks Plant in good condition;
2) two-wire reel is installed:By construction personnel below safety rope, the bolt fixed plate of two-wire reel is passed through into expansion Bolt penetrates fixed in pontic;
3) damping unit is installed:By construction personnel below safety rope, the damping fixed plate at the top of damping unit is passed through Expansion bolt is penetrated in pontic and is fixed, while being detected to pulley rotary motion, and coats lubricating oil to pulley;
4) correcting device is installed:Correcting device is placed on above transport device, hawser rope is lived using tight locking button latch closure Transport device is fixed in hole, and installs clump weight;Lifting lock is clasped using crane, starts lower handling and is sent to sagging bridge expanssion joint Lower section, penetrated in fixed bolt hole and squeezed into pontic fixed by expansion bolt;
5) wire rope handling:Hawser rope is first fixed in line wheel one and line wheel two, hawser rope mounting hole, steel are being sequentially passed through Silk Suo Shengkong, another hawser rope mounting hole are finally fixed on above another set line wheel one and line wheel two;
6) it tightens:Hawser rope is tightened by shaking wind, so that correcting device is held by hawser, has reinforced At;
7) progress concrete repair at expansion bolt is set to step 2)-step 4), construction is completed.
Beneficial effects of the present invention:The device prevents its sagging, driving is effectively ensured to being reinforced at bridge expanssion joint Safety, it is highly practical, it is suitble to promote the use of.
Description of the drawings
Fig. 1 is the front view of the sagging bracing means of bridge of the present invention;
Fig. 2 is the structural schematic diagram of correcting device of the present invention;
Fig. 3 is the structural schematic diagram of damping unit of the present invention;
Fig. 4 is the structural schematic diagram of two-wire reel of the present invention;
Fig. 5 is the structural schematic diagram of transport device of the present invention;
Fig. 6 is the structural schematic diagram of hawser rope mounting hole of the present invention.
Specific implementation mode
As shown, a kind of sagging bracing means of bridge, including correcting device 5,5 both sides of the correcting device are mounted on Damping unit 4 and two-wire reel 2.Hawser rope is fixed in line wheel 1 and line wheel 2 23, and it is solid to sequentially pass through hawser rope Determine hole 403, hawser cord hole 54, another hawser rope mounting hole 403 are finally fixed on one 22 and of line wheel of another set Above line wheel 2 23;
Correcting device 5 includes upper mounted plate 52, and upper mounted plate 52 uses 30-50mm steel plates, on fixed plate 52 Fixed bolt hole 51 is installed, 52 lower section of fixed plate is connected with supporting rod 53, and hawser cord hole 54 is mounted on the branch Below strut 53.
Damping unit 4 includes outline border 402, and damping fixed plate 401,402 inside installation of the outline border are equipped on outline border 402 There are hawser rope mounting hole 403,403 surrounding of hawser rope mounting hole to be connected with telescopic device 404, the telescopic device 404 one end is connected with the inner wall of lower hinged 405 connection outline border 402, and it is solid that the other end is connected with hinged 406 connection hawser rope Determine hole 403, threaded 4031 is installed in the hawser rope mounting hole 403,4031 one end of the threaded is equipped with nut 4032 Fixed, the other end is equipped with pulley 4033.When hawser rope is shaken, telescopic device 404 plays the work for reducing vibrations With, it is ensured that correcting device 5 is stablized.
Two-wire reel 2 includes bolt fixed plate 21, and line wheel 1 and line wheel 2 23 are connected on the bolt fixed plate 21, Wind 25 is connect with line wheel 1 and line wheel 2 23, and self-locking structure 24 is also equipped in the line wheel 1 and line wheel 2 23.
In addition, further including transport device 1, the transport device 1 includes bottom plate 12, and the bottom plate 12 is equipped with for installing The groove 13 of correcting device 5, by being hingedly mounted on the side of groove 13, the side of the bottom plate 12 is equipped with locking retaining ring 17 Lock 16 is hung, the activity on 16 sides of lifting lock, the balance weight hanging bar 15 of balance weight hanging bar 15 is placed with clump weight 14.First the hawser cord hole 54 of correcting device 5 locking retaining ring 17 is fixed when transporting correcting device 5, when correcting device 5 Locking retaining ring 17 is being unclamped after being fixed on bridge, transport device 1 is made to be returned on bridge floor by loop wheel machine 3.
In addition, the present invention also provides a kind of sagging bracing means construction methods of bridge, which is characterized in that including following step Suddenly:
1) prepare before construction:Correcting device 5, damping unit 4, two-wire reel 2 and transport device 1 are first placed on bridge On 6 bridge floors, crane 3 is driven on bridge floor, checks Plant in good condition;
2) installation two-wire reel 2:By construction personnel below safety rope, the bolt fixed plate 21 of two-wire reel 2 is passed through Expansion bolt penetrates fixed in pontic;
3) damping unit 4 is installed:By construction personnel below safety rope, by the damping fixed plate 27 at 4 top of damping unit It is penetrated in pontic and is fixed by expansion bolt, while 4033 rotary motion of pulley is detected, and lubricating oil is coated to pulley 4033;
4) correcting device 5 is installed:Correcting device 5 is placed on above transport device 1, steel wire is clasped using locking retaining ring 17 Suo Shengkong 54 fixes transport device 1, and installs clump weight 14;Lifting lock 16 is clasped using crane 3, starts lower handling and is sent to down The lower section of vertical bridge expanssion joint is penetrated in fixed bolt hole 51 by expansion bolt and is squeezed into fixed in pontic;
5) wire rope handling:Hawser rope is first fixed in line wheel 1 and line wheel 2 23, is fixed sequentially passing through hawser rope Hole 403, hawser cord hole 54, another hawser rope mounting hole 403 are finally fixed on another set line wheel 1 and line wheel Above 2 23;
6) it tightens:Hawser rope is tightened by shaking wind 25, so that correcting device 5 is held by hawser, adds Gu completing;
7) progress concrete repair at expansion bolt is set to step 2)-step 4), construction is completed.
In addition to the implementation, the present invention can also have other embodiment.It is all to use equivalent substitution or equivalent transformation shape At technical solution, fall within the scope of protection required by the present invention.

Claims (2)

1. a kind of sagging bracing means of bridge, it is characterised in that:Including correcting device(5), the correcting device(5)Pacify both sides Equipped with damping unit(4)With two-wire reel(2);
The correcting device(5)Including upper mounted plate(52), fixed plate(52)On fixed bolt hole is installed(51), institute State upper mounted plate(52)Lower section is connected with supporting rod(53), hawser cord hole(54)Mounted on the supporting rod(53)Below;
The damping unit(4)Including outline border(402), the outline border(402)Inside is equipped with hawser rope mounting hole(403), The hawser rope mounting hole(403)Surrounding is connected with telescopic device(404), the telescopic device(404)One end be connected with It is lower hinged(405)Connect outline border(402)Inner wall, the other end is connected with hinged(406)Connect hawser rope mounting hole (403);The hawser rope mounting hole(403)Inside it is installed with threaded(4031), the threaded(4031)One end is equipped with nut (4032)Fixed, the other end is equipped with pulley(4033);
The two-wire reel(2)Including bolt fixed plate(21), the bolt fixed plate(21)On be connected with line wheel one(22)With Line wheel two(23), wind(25)With line wheel one(22)With line wheel two(23)Connection, the line wheel one(22)With line wheel two(23) On be also equipped with self-locking structure(24);
Hawser rope is fixed on line wheel one(22)With line wheel two(23)On, and sequentially pass through hawser rope mounting hole(403), steel wire Suo Shengkong(54), another hawser rope mounting hole(403)Finally it is fixed on the line wheel one of another set(22)With line wheel two (23)Above.
2. the sagging bracing means of bridge as described in claim 1, it is characterised in that:It further include transport device(1), the transport Device(1)Including bottom plate(12), the bottom plate(12)It is equipped with for installing correcting device(5)Groove(13), lock retaining ring (17)By being hingedly mounted on groove(13)Side, the bottom plate(12)Side be equipped with lifting latch(16), balance weight hanging Bar(15)It is latched mounted on lifting(16)Side, the balance weight hanging bar(15)Upper activity is placed with clump weight(14).
CN201710043332.1A 2016-04-29 2016-04-29 A kind of sagging bracing means of bridge and its construction method Active CN106758880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710043332.1A CN106758880B (en) 2016-04-29 2016-04-29 A kind of sagging bracing means of bridge and its construction method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610275591.2A CN105735154B (en) 2016-04-29 2016-04-29 Bridge droop reinforcing device and construction method thereof
CN201710043332.1A CN106758880B (en) 2016-04-29 2016-04-29 A kind of sagging bracing means of bridge and its construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610275591.2A Division CN105735154B (en) 2016-04-29 2016-04-29 Bridge droop reinforcing device and construction method thereof

Publications (2)

Publication Number Publication Date
CN106758880A CN106758880A (en) 2017-05-31
CN106758880B true CN106758880B (en) 2018-08-24

Family

ID=56287779

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610275591.2A Expired - Fee Related CN105735154B (en) 2016-04-29 2016-04-29 Bridge droop reinforcing device and construction method thereof
CN201710043332.1A Active CN106758880B (en) 2016-04-29 2016-04-29 A kind of sagging bracing means of bridge and its construction method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610275591.2A Expired - Fee Related CN105735154B (en) 2016-04-29 2016-04-29 Bridge droop reinforcing device and construction method thereof

Country Status (1)

Country Link
CN (2) CN105735154B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472282B (en) * 2020-04-23 2021-03-19 乔磊 Prestressed anchorage utensil is used in road bridge construction

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001164519A (en) * 1999-12-03 2001-06-19 Hanshin Kosoku Doro Kanri Gijutsu Center Bridge-steel i-girder maintenance inspection device
CN2641113Y (en) * 2003-06-07 2004-09-15 青岛铁路工务机电技术公司 Steel cable and double wire bridge type repairing trolly for concrete up beam
CN201292512Y (en) * 2008-08-29 2009-08-19 北京公联洁达公路养护工程有限公司 Suspended cable sliding table for spraying main steel box beam of overpass
JP5374130B2 (en) * 2008-12-09 2013-12-25 東日本旅客鉄道株式会社 Girder rigidity increasing method and girder member
CN101942812B (en) * 2009-07-09 2012-09-05 北京公科固桥技术有限公司 Bridge reinforcing method and uses of prestress reinforced steel wire net anchor in bridge reinforcement
KR101197318B1 (en) * 2010-02-19 2012-11-05 김재흥 Joint reinforcing method using bending connection member and bridge construction method therewith
CN102296546A (en) * 2011-06-02 2011-12-28 河南省交通工程加固有限责任公司 Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof
CN103132464B (en) * 2013-03-27 2014-12-10 双鸭山市吉昌机械制造有限公司 Built-in two-way sliding maintenance platform of tower crown
CN203452004U (en) * 2013-06-21 2014-02-26 重庆运安机电制造有限责任公司 Bottom width overhaul hanging basket of bridge
CN104894985A (en) * 2015-06-29 2015-09-09 郑州大学 Construction method for rapidly reinforcing orthotropic board bridge floor of U-shaped ribs
CN204875563U (en) * 2015-09-02 2015-12-16 东北林业大学 Bridge reinforcing apparatus based on polyurethane cement and prestressed wire rope

Also Published As

Publication number Publication date
CN106758880A (en) 2017-05-31
CN105735154A (en) 2016-07-06
CN105735154B (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN110359359B (en) Supporting structure for pouring box girder zero blocks and construction process thereof
CN102979221B (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN110820950B (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN106836024B (en) Across sagging bracing means construction method in a kind of bridge
CN106758880B (en) A kind of sagging bracing means of bridge and its construction method
CN206487069U (en) One kind is reinforced with exempting from jack compressor wire stretching and anchoring device
CN103806645B (en) A kind of light-duty intelligent hydraulic climbing apparatus with good wind resistance fireproof performance
CN208309396U (en) A kind of bridge pier column overturn-preventing operation platform
CN110158453A (en) A kind of BRB and the concatenated damper of carriage and its construction method
CN106525471A (en) Apparatus for continuous collapse dynamic test of steel frame
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN104989092B (en) A kind of construction method of high-altitude overhanging superposed type steel truss bearing platform
CN107366229A (en) Both a kind of construction method of wired transom pier bent cap
CN111622126A (en) Construction method of high-altitude vertical manned channel in high mountain rock area
JP5080373B2 (en) Transmission type dam
CN214090672U (en) Shock-proof type assembled hangs staircase structure
CN111021567B (en) Damping structure of small-sized residence
CN212562625U (en) Wind-resistant reinforcing structure of prefabricated house
CN112695621A (en) Construction method of counterweight type bridge pier
CN112281622A (en) Temporary suspension cable trestle and construction method thereof
CN101818578B (en) Disaster prevention and reinforcement method for brick house
CN207469300U (en) A kind of double skin wall constructions of underground garage
CN218621836U (en) Steel pipe support pre-compaction device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20180626

Address after: 430000 6 Bridge Road, New Bridge District, Jiangxia District, Wuhan, Hubei

Applicant after: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd.

Address before: 212400 305, room 3, Heping Village, 30 Zhenjiang long road, Baohua, Zhenjiang, Jiangsu, Jurong

Applicant before: Xia Yujuan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190424

Address after: 430200 No. 6 Daqiao Road, Jiangxia District, Wuhan City, Hubei Province

Co-patentee after: The Fourth Engineering Co., Ltd of The Seventh Engineering Group Co., Ltd. of China Railway

Patentee after: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd.

Address before: 430000 6 Bridge Road, New Bridge District, Jiangxia District, Wuhan, Hubei

Patentee before: Wuhan Engineering Co., Ltd., China Railway 7th Bureau Group Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200820

Address after: 430200 No. 6 Bridge Road, Jiangxia District, Hubei, Wuhan

Patentee after: WUHAN ENGINEERING CO., LTD., CHINA RAILWAY 7TH BUREAU GROUP Co.,Ltd.

Address before: 430200 No. 6 Bridge Road, Jiangxia District, Hubei, Wuhan

Co-patentee before: THE FOURTH ENGINEERING CO., LTD. OF CHINA RAILWAY SEVENTH Group

Patentee before: WUHAN ENGINEERING CO., LTD., CHINA RAILWAY 7TH BUREAU GROUP Co.,Ltd.