CN106758876A - A kind of cord clip friction skidding device - Google Patents

A kind of cord clip friction skidding device Download PDF

Info

Publication number
CN106758876A
CN106758876A CN201611202335.7A CN201611202335A CN106758876A CN 106758876 A CN106758876 A CN 106758876A CN 201611202335 A CN201611202335 A CN 201611202335A CN 106758876 A CN106758876 A CN 106758876A
Authority
CN
China
Prior art keywords
anchor slab
cord clip
circular hole
rod
depression bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611202335.7A
Other languages
Chinese (zh)
Inventor
邱文亮
姜涛
张哲�
黄才良
潘盛山
蒋少寒
谭岩斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201611202335.7A priority Critical patent/CN106758876A/en
Publication of CN106758876A publication Critical patent/CN106758876A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention provides a kind of cord clip friction skidding device, belong to bridge structure technical field of construction.Reinforcing pull rod is anchored on lower section cord clip and middle cord clip using lower anchor slab, middle anchor slab, be anchored at steel column on top cord clip and middle cord clip by anchor slab and upper anchor slab in utilization.In being constructed in the suspender replacement maintenance of suspension bridge, after the suspension rod of middle cord clip is removed, the sliding force of middle cord clip disappears, and the sliding force suffered by lower section cord clip and top cord clip increases, and is respectively provided with the possibility of downward sliding.The part sliding force of lower section cord clip can be undertaken by pull bar by the anti-slide performance of middle cord clip, and the part sliding force of top cord clip can be undertaken by depression bar by the anti-slide performance of middle cord clip, so as to avoid lower section cord clip and top cord clip from sliding.It is simple structure of the present invention, easy for installation;The anti-slide performance of existing cord clip is made full use of, stress is clearly, safe and reliable;Main cable protection layer need not be destroyed, maintenance cost is reduced.

Description

A kind of cord clip friction skidding device
Technical field
The invention belongs to bridge structure technical field of construction, it is related to a kind of bridge construction temperature pier measure, especially relates to And to it is a kind of prevent cord clip of suspension bridge slide device.
Background technology
Cord clip is the key member of suspension bridge, and its effect is that suspension rod is connected on main push-towing rope, and the pulling force of suspension rod is transmitted To main push-towing rope.Because main push-towing rope is shaped form, under steeve tension effect, the power that cord clip is produced to main push-towing rope includes vertical main push-towing rope direction Pressure and the sliding force along main push-towing rope direction, wherein sliding force undertake by the frictional force between cord clip and main push-towing rope.Specification specifies bridge Design service life is 100 years, but, because burn into is aging etc., the reason life-span does not reach 100 years hoist cable, and it makes in Bridge Design With needing during the life-span to change.In fact, the suspension rod of domestic many suspension bridges is just changed using 10 years or so.More Change in hanger construction, when a certain suspension rod is removed, the pulling force of the suspension rod will distribute to the adjacent suspension rod in its both sides, so as to make Pulling force into adjacent suspension rod increases by more than 40%.Steeve tension increase is likely to cause cord clip anti-slide performance not enough, causes rope Folder sliding failure, this not only results in main push-towing rope protection damage layer, or even jeopardizes bridge structure and workmen's safety.To ensure rope Folder does not produce sliding, and current solution is generally increases an interim cord clip below the cord clip that may be glided, the method Have the disadvantage to need destruction main cable protection layer, and installation and removal trouble.
The content of the invention
The invention provides a kind of cord clip friction skidding device, cord clip is slid when can prevent suspension bridge suspender replacement, and satisfaction is applied Work is quick, safety, expense it is low the need for.
Technical scheme:
A kind of cord clip friction skidding device, including reinforcing pull rod 1, steel column 2, lower anchor slab 3, middle anchor slab 4, upper anchor slab 5, pull-rod nut 6th, depression bar connecting rod 7, depression bar nut 8, anchor slab connecting bolt 9 and anchor slab attaching nut 10;
Lower anchor slab 3, middle anchor slab 4 and upper anchor slab 5 are constituted by two parts, are fixed by anchor slab connecting bolt 9 per two parts Connection, inside is respectively formed first kind circular hole, and the first kind Circularhole diameter is than the big 5~10mm of the diameter of main push-towing rope 11, lower anchor slab 3, middle anchor The first kind circular hole that plate 4 and upper anchor slab 5 are formed is sequentially sleeved on main push-towing rope 11;Lower anchor slab 3 and upper anchor slab 5 are respectively placed in lower section cord clip Below the cord clip of top, middle anchor slab 4 is placed in above middle cord clip;The lower periphery of anchor slab 3 opens up 4 Equations of The Second Kind circular holes, second Class Circularhole diameter is than the big 3~5mm of the diameter of reinforcing pull rod 1;2 the 3rd class circular holes are opened on the periphery of upper anchor slab 5, and the 3rd class Circularhole diameter is than pressure Big 3~the 5mm of bar connection shank diameter;6 circular holes are opened on the periphery of middle anchor slab 4, wherein 4 circular holes are Equations of The Second Kind circular hole, it opens up position Position is opened up with Equations of The Second Kind circular hole on lower anchor slab 3 identical, 2 circular holes are the 3rd class circular hole in addition, and it opens up position with upper anchor slab 5 It is identical that upper 3rd class circular hole opens up position;
Reinforcing pull rod 1 is solid cylindrical rod, and two ends are provided with screw thread, and the internal thread of pull-rod nut 8 is matched;4 steel draw Bar 1 is penetrated in the Equations of The Second Kind circular hole of lower anchor slab 3 and middle anchor slab 4, and is anchored at lower anchor slab 3 and middle anchor slab 4 using pull-rod nut 8 On;
Steel column 2 is circular or square-section hollow stem, and two ends are provided with axial internal thread;Depression bar connecting rod 7 is filled circles Mast, its surface is provided with screw thread;The one end of depression bar connecting rod 7 is connected through a screw thread with steel column 2, the other end penetrate middle anchor slab 4 or In 3rd class circular hole of upper anchor slab 5, and it is anchored on middle anchor slab 4 or upper anchor slab 5 by depression bar nut 8.
The invention has the advantages that:After the suspension rod of middle cord clip is removed, the sliding force of middle cord clip disappears, lower section Sliding force suffered by cord clip and top cord clip increases, and is respectively provided with the possibility of downward sliding.The part sliding force of lower section cord clip can be with Undertaken by the anti-slide performance of middle cord clip by pull bar, the part sliding force of top cord clip can be by depression bar by middle cord clip Anti-slide performance undertakes, so as to avoid lower section cord clip and top cord clip from sliding.It is simple structure of the present invention, easy for installation;Fully Using the anti-slide performance of existing cord clip, stress is clearly, safe and reliable;Main cable protection layer need not be destroyed, maintenance cost is reduced, can be Extensive use in the suspender replacement maintenance of suspension bridge, with good market prospects.
Brief description of the drawings
Fig. 1 is cord clip friction skidding device assembling figure.
Fig. 2 is lower anchor slab plan.
Fig. 3 is middle anchor slab plan.
Fig. 4 is upper anchor slab plan.
In figure:1 reinforcing pull rod;2 steel columns;3 times anchor slabs;Anchor slab in 4;Anchor slab on 5;6 pull-rod nuts;7 depression bar connecting rods;8 Depression bar nut;9 anchor slab connecting bolts;10 anchor slab attaching nuts;11 main push-towing ropes;12 cord clips;13 suspension rods.
Specific embodiment
Specific embodiment of the invention is described in detail below in conjunction with technical scheme (and accompanying drawing).
Embodiment
, be anchored to the two halves of lower anchor slab 3, middle anchor slab 4 and upper anchor slab 5 on main push-towing rope 11 respectively by a kind of cord clip friction skidding device, and The two halves of anchor slab are linked together with anchor slab connecting bolt 9 and anchor slab attaching nut 10.Anchor slab 3 and upper anchor slab 5 is wherein descended to put Below cord clip 12, middle anchor slab 4 is placed on above cord clip 12, and each anchor slab requirement is closely connected with cord clip.
4 reinforcing pull rods 1 are respectively penetrated the corresponding circular hole of lower anchor slab 3 and middle anchor slab 4, is then worn at the two ends of reinforcing pull rod 1 Pull-up stem nut 6, and tighten, lower anchor slab 3 and middle anchor slab 4 is closely pressed on the end face of cord clip 12.
Depression bar nut 8 is put on into one end of wherein 2 depression bar connecting rods 7, and respectively penetrates the circular hole of middle anchor slab 4, depression bar The other end of connecting rod 7 inserts 2 lower ends of steel column 2 respectively, and is connected through a screw thread.By other 2 depression bar connecting rods 7 Depression bar nut 8 is put in one end, and respectively penetrates the circular hole of anchor slab, and the other end of depression bar connecting rod 7 inserts 2 steel columns respectively 2 upper end, and be connected through a screw thread.Upper anchor slab is set closely to be pressed in the lower surface of top cord clip 12 by rotating depression bar nut 8.
As shown in drawings, when the suspension rod 13 on the cord clip 12 that is connected between is removed, lower section cord clip 12 and top cord clip 12 sliding force along main push-towing rope 11 increases.If lower section cord clip 12 glides, reinforcing pull rod 1 can play anti-skidding effect;If Top cord clip 12 glides, then steel column 2 can play anti-skidding effect.
In addition, the reinforcing pull rod 1 and steel column 2 of the device can be used in combination, it is also possible to be used alone.When in the absence of top During cord clip 12, steel column 2 can be cancelled;When in the absence of lower section cord clip 12, reinforcing pull rod 1 can be cancelled.
Besides these examples, all modifications made within inventive concept and principle, equivalent, improvement etc., all should wrap It is contained within protection scope of the present invention.

Claims (1)

1. a kind of cord clip friction skidding device, it is characterised in that the cord clip friction skidding device includes reinforcing pull rod (1), steel column (2), casts anchor Plate (3), middle anchor slab (4), upper anchor slab (5), pull-rod nut (6), depression bar connecting rod (7), depression bar nut (8), anchor slab connecting bolt And anchor slab attaching nut (10) (9);
Lower anchor slab (3), middle anchor slab (4) and upper anchor slab (5) are constituted by two parts, and anchor slab connecting bolt (9) is passed through per two parts It is fixedly connected, inside is respectively formed first kind circular hole, the first kind Circularhole diameter is than the big 5~10mm of main push-towing rope (11) diameter, lower anchor slab (3), the first kind circular hole that middle anchor slab (4) and upper anchor slab (5) are formed is sequentially sleeved on main push-towing rope (11);Lower anchor slab (3) and upper anchor slab (5) it is respectively placed in below lower section cord clip and top cord clip, middle anchor slab (4) is placed in above middle cord clip;Lower anchor slab (3) periphery 4 Equations of The Second Kind circular holes are opened up, Equations of The Second Kind Circularhole diameter is than the big 3~5mm of reinforcing pull rod (1) diameter;Open 2 in upper anchor slab (5) periphery Three class circular holes, the 3rd class Circularhole diameter is than the big 3~5mm of depression bar connection shank diameter;6 circular holes are opened on middle anchor slab (4) periphery, wherein 4 Individual circular hole is Equations of The Second Kind circular hole, and it opens up position and Equations of The Second Kind circular hole on lower anchor slab (3), and to open up position identical, in addition 2 circular holes It is the 3rd class circular hole, it opens up position, and to open up position with the 3rd class circular hole on upper anchor slab (5) identical;
Reinforcing pull rod (1) is solid cylindrical rod, and two ends are provided with screw thread, and the internal thread of pull-rod nut (8) is matched;4 steel draw Bar (1) is penetrated in the Equations of The Second Kind circular hole of lower anchor slab (3) and middle anchor slab (4), and is anchored at lower anchor slab (3) using pull-rod nut (8) On middle anchor slab (4);
Steel column (2) is circular or square-section hollow stem, and two ends are provided with axial internal thread;Depression bar connecting rod (7) is filled circles Mast, its surface is provided with screw thread;Depression bar connecting rod (7) one end is connected through a screw thread with steel column (2), and the other end penetrates middle anchor slab (4) or in the 3rd class circular hole of upper anchor slab (5), and it is anchored on middle anchor slab (4) or upper anchor slab (5) by depression bar nut (8).
CN201611202335.7A 2016-12-23 2016-12-23 A kind of cord clip friction skidding device Pending CN106758876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611202335.7A CN106758876A (en) 2016-12-23 2016-12-23 A kind of cord clip friction skidding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611202335.7A CN106758876A (en) 2016-12-23 2016-12-23 A kind of cord clip friction skidding device

Publications (1)

Publication Number Publication Date
CN106758876A true CN106758876A (en) 2017-05-31

Family

ID=58897623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611202335.7A Pending CN106758876A (en) 2016-12-23 2016-12-23 A kind of cord clip friction skidding device

Country Status (1)

Country Link
CN (1) CN106758876A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938513A (en) * 2017-12-31 2018-04-20 中交通力建设股份有限公司 A kind of existing cord clip antisliding apparatus of flexible suspension bridge and method
CN114562027A (en) * 2022-03-09 2022-05-31 北京市建筑工程研究院有限责任公司 Anti-sliding cable clamp node structure and construction method
CN114934441A (en) * 2022-05-23 2022-08-23 保利长大工程有限公司 Anti-slip temporary sling cable clamp structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000017614A (en) * 1998-06-30 2000-01-18 Shinko Kosen Kogyo Kk Cable connection method for suspended structure
CN1420234A (en) * 2001-11-16 2003-05-28 柳州市建筑机械总厂 Method for connecting suspension bridge main cable with steel strand of hanger rod
CN205088572U (en) * 2015-10-30 2016-03-16 成都市新筑路桥机械股份有限公司 Suspension bridge main push -towing rope cable clip with antiskid function
CN205711784U (en) * 2016-05-06 2016-11-23 中铁大桥局武汉桥梁特种技术有限公司 For changing the cord clip friction skidding device of suspension bridge suspension rod rope
CN206289545U (en) * 2016-12-23 2017-06-30 大连理工大学 A kind of cord clip friction skidding device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000017614A (en) * 1998-06-30 2000-01-18 Shinko Kosen Kogyo Kk Cable connection method for suspended structure
CN1420234A (en) * 2001-11-16 2003-05-28 柳州市建筑机械总厂 Method for connecting suspension bridge main cable with steel strand of hanger rod
CN205088572U (en) * 2015-10-30 2016-03-16 成都市新筑路桥机械股份有限公司 Suspension bridge main push -towing rope cable clip with antiskid function
CN205711784U (en) * 2016-05-06 2016-11-23 中铁大桥局武汉桥梁特种技术有限公司 For changing the cord clip friction skidding device of suspension bridge suspension rod rope
CN206289545U (en) * 2016-12-23 2017-06-30 大连理工大学 A kind of cord clip friction skidding device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938513A (en) * 2017-12-31 2018-04-20 中交通力建设股份有限公司 A kind of existing cord clip antisliding apparatus of flexible suspension bridge and method
CN114562027A (en) * 2022-03-09 2022-05-31 北京市建筑工程研究院有限责任公司 Anti-sliding cable clamp node structure and construction method
CN114562027B (en) * 2022-03-09 2023-11-28 北京市建筑工程研究院有限责任公司 Anti-slip cable clamp node structure and construction method
CN114934441A (en) * 2022-05-23 2022-08-23 保利长大工程有限公司 Anti-slip temporary sling cable clamp structure

Similar Documents

Publication Publication Date Title
CN206289545U (en) A kind of cord clip friction skidding device
CN106758876A (en) A kind of cord clip friction skidding device
CN106744431A (en) Oil exploitation well head quick locking steel wire rope multiple protector
CN104963355A (en) Classification anchoring type draught fan rock anchor rod assembly
CN207878295U (en) Suspension bridge changes rope device
CN204675621U (en) A kind of shackle for rapid unhooking in tubing string lifting
CN203125460U (en) Detachment tool of high-pressure safe valve
CN205772794U (en) A kind of suspender of revealing all the details of concrete prefabricated element
CN202440210U (en) Round tail rope suspension device
CN204457043U (en) A kind of anti-reversing device
CN205243545U (en) Novel anti -shearing stock
CN204849574U (en) Beam supports that falls is prevented to drag -line
CN202214681U (en) Suspension bridge sling replacing device
CN105655938B (en) A kind of flitting service cable protection device
CN102286943B (en) Suspension bridge sling replacing device
CN104555644A (en) Anti-drop skip tail rope suspension device and anti-drop method for tail rope
CN204873571U (en) Overhead isolation crane
CN210315543U (en) Novel static pressure pile machine clamp conversion equipment
CN208265608U (en) Large-tonnage hoisting device for reinforcement cage
CN203855991U (en) Device for conducting anti-pulling frictional resistance test on bed rock
CN204000611U (en) A kind of vertical amount of decrease based on fail safety design is from early warning type boom system
CN204490247U (en) A kind of skip bucket tail rope hanger of fall arrest
CN202338106U (en) Wall-body hoisting ring of cantilever discharging platform
CN108797583B (en) Anti-seismic prestressed anchor cable and construction method thereof
CN102780179B (en) The multiple general line hanging hook of wire of 66kV-220kV

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531

WD01 Invention patent application deemed withdrawn after publication