CN106758666A - A kind of urban road list inner chamber double drainage kerbstone containing pavement - Google Patents

A kind of urban road list inner chamber double drainage kerbstone containing pavement Download PDF

Info

Publication number
CN106758666A
CN106758666A CN201611031570.2A CN201611031570A CN106758666A CN 106758666 A CN106758666 A CN 106758666A CN 201611031570 A CN201611031570 A CN 201611031570A CN 106758666 A CN106758666 A CN 106758666A
Authority
CN
China
Prior art keywords
osculum
kerbstone
inner chamber
urban road
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611031570.2A
Other languages
Chinese (zh)
Other versions
CN106758666B (en
Inventor
陈艳艳
邹传龙
陈姗
梁丽君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Chuangsu Technology Development Co.,Ltd.
Original Assignee
Nanning Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Institute filed Critical Nanning Institute
Priority to CN201611031570.2A priority Critical patent/CN106758666B/en
Publication of CN106758666A publication Critical patent/CN106758666A/en
Application granted granted Critical
Publication of CN106758666B publication Critical patent/CN106758666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/221Kerbs or like edging members, e.g. flush kerbs, shoulder retaining means ; Joint members, connecting or load-transfer means specially for kerbs
    • E01C11/223Kerb-and-gutter structures; Kerbs with drainage openings channel or conduits, e.g. with out- or inlets, with integral gutter or with channel formed into the kerb ; Kerbs adapted to house cables or pipes, or to form conduits

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of urban road list inner chamber double drainage kerbstone containing pavement, including cube concrete main body (1), there is an osculum through two opposing end surface on concrete main body (1), osculum inner wall surface is steel plate (2), the left bank water pipe (3 1) and right drainpipe (3 2) connected with osculum are respectively arranged with two end faces of the concrete main body (1) in direction parallel to osculum, the caliber and water inlet and draining open height of left bank water pipe (3 1) and right drainpipe (3 2) are differed.The present invention has opened up osculum in concrete main body (1), and drainage channel is formed after the combination of polylith kerbstone.Left bank water pipe (3 1) and right drainpipe (3 2) are used as independent diversion drainage channel, when running into drainage jam, kerbstone can one by one be taken apart to be dredged, the structure that steel plate (2) is connected with steel pipe (4) not only enhances integrated connection performance but also improves the compression strength of kerbstone.

Description

A kind of urban road list inner chamber double drainage kerbstone containing pavement
Technical field
The present invention relates to reinforced structure and discharge structure inside a kind of kerbstone, particularly kerbstone.
Background technology
In recent years, with the extensive development of urban road construction, road ponding drainage problem gradually attracts attention and weighs Depending on being on the other hand due to structure to find out its cause, being on the one hand such as unattended because the later maintenance of road is not in place Design is unreasonable, and the design of wherein kerbstone there is problem, and because parking space day is becoming tight, many automobiles are directly pressed through Kerbstone is parked on both sides of the road, and if things go on like this, the relatively low kerbstone of intensity is easy to breakage, causes much have draining work( The kerbstone drain line blockage destruction of energy.On the other hand, because the difference in height on pavement and road surface is larger, the rain on pavement Water converges to road surface with the rainwater on road surface simultaneously by a drainage ditch inlet drain by kerbstone, causes entrance part current Measure excessive and form ponding, influence safety.
The content of the invention
The technical problem to be solved in the present invention is:A kind of urban road list inner chamber double drainage curb containing pavement is provided Stone, intensity is high, can bear greater impact, and the drainage inlet on pavement and road surface is independently independent of each other, and good concealment does not influence U.S. See.
Technical scheme is as follows:
A kind of urban road list inner chamber double drainage kerbstone containing pavement, including cube concrete main body, coagulation There is an osculum through two opposing end surface in native main body, osculum inner wall surface is steel plate, is passed through parallel to osculum The left bank water pipe and right drainpipe connected with osculum, left bank are respectively arranged with two end faces of the concrete main body for wearing direction The caliber and water inlet and draining open height of water pipe and right drainpipe are differed.Steel plate is used as osculum and concrete main body Reinforcing rock-steady structure be located at draining internal surface of hole.Because osculum is through two end faces of concrete main body, therefore, polylith road Osculum may be constructed a drainage channel after kerb assembled arrangement.Left and right drainpipe one end flushes in road surface, the other end and row Water hole connects, and the ponding on road surface or pavement can enter osculum by drainpipe.Due to two water inlets have difference in height and Discharge outlet is connected to osculum, therefore drainage procedure is independent of each other.
The osculum rectangular cross-section, circular or polygon, the cross sectional shape of osculum can according to cost of manufacture and The factors such as drain discharge are selected.
The steel plate outer surface is connected with steel pipe, in order to further strengthen the switching performance of steel plate and concrete main body, carries The intensity of high concrete main body, can be in the outer surface joint steel pipe of steel plate.Fastener for connection in the outer surface of steel plate, as steel plate The intermediate structure being connected with concrete, because steel pipe is hollow, concrete can be filled to inside it, increase contact attachment surface, The two switching performance is enhanced, and steel pipe can bear compared with big load in itself, as another reinforced structure of kerbstone.
The cross sectional shape of the steel pipe is circle, rectangle or regular polygon, and the section selection of steel pipe can be selected according into original Select.
The axis of the steel pipe is perpendicular to the outer surface of steel plate, and the circumferential surface of steel pipe is non-close face, and breach area is accounted for The percentage of the circumferential gross area is less than or equal to 1/2, and on the one hand the design of breach can alleviate steel pipe with concrete in expansion character Stress caused by upper difference, is influenceed by the reduction of notched pipe deformation, when on the other hand can be poured into a mould in order to concrete Flowing, conveniently enters steel duct.
The length of the breach is equal with steel pipe, and the sensing of the breach of steel pipe is different.Difference is pointed in the opening of breach, Beneficial to steel duct is entered from different directions during cast concrete, the probability that space produces is reduced.
The present invention has opened up osculum in concrete main body, and drainage channel is formed after the combination of polylith kerbstone.Drainpipe Design it is hidden, the free end of left and right drainpipe is respectively placed in road surface and pavement as water inlet during construction, used as water inlet Mouth is connected to drainage channel, and can independently be intake during draining is independent of each other, and when running into drainage jam, can one by one take kerbstone apart and enter Row dredging.The structure that steel plate is connected with steel pipe not only enhances integrated connection performance but also improves the compression strength of kerbstone.
Brief description of the drawings
Fig. 1 is curb structure schematic diagram of the invention;
Fig. 2 is the floor map of Fig. 1;
Fig. 3 be kerbstone of the invention be arranged on road surface both sides when schematic diagram;
Fig. 4 is schematic diagram of the light plate outer surface of the present invention with circular cross-section steel pipe;
Fig. 5 is with circular cross-section steel pipe schematic diagram jaggy in the present invention;
Fig. 6 is with steel pipe schematic diagram in square-section jaggy in the present invention.
Specific embodiment
As shown in figs. 1 and 4, a kind of urban road list inner chamber double drainage kerbstone containing pavement, is layed in road surface two Side, monolithic kerbstone includes cube concrete main body 1, there is a square through two opposing end surface on concrete main body 1 Tee section osculum, osculum inner wall surface is steel plate 2, and two phases of the concrete main body 1 in direction are run through parallel to osculum To being respectively arranged with the left bank water pipe 3-1 and right drainpipe 3-2 that are connected with osculum, the water inlet of left bank water pipe 3-1 on end face Position and discharge outlet position are above right drainpipe 3-2, and its caliber is also greater than right drainpipe 3-2.Steel plate 2 is connected by 4 blocks of steel plates Form, wherein upper and lower 2 pieces of outer surface is connected with circular cross-section steel pipe 4.The axis of steel pipe 4 perpendicular to the outer surface of steel plate 2, and The circumferential surface of steel pipe 4 is non-close face, and the percentage that the area of breach 5 accounts for the circumferential gross area is equal to 1/4.The length and steel of breach 5 Pipe 4 is equal, and the sensing of the breach 5 of steel pipe 4 is different.
As shown in figure 3, during laying, the polylith kerbstone of homonymy is fitted along straight line, left bank water pipe 3-1 and right drainpipe 3-2 The concordant road surface of upper end water inlet (or being connected with the bottom portion of groove on road surface), surface gathered water pass through left bank water pipe 3-1 and right row Water pipe 3-2 independently enters osculum, then converges and flows away.

Claims (6)

1. a kind of urban road list inner chamber double drainage kerbstone containing pavement, including cube concrete main body (1), it is special Levy and be:There is an osculum through two opposing end surface on concrete main body (1), osculum inner wall surface is steel plate (2) left side connected with osculum, is respectively arranged with two end faces of the concrete main body (1) in direction parallel to osculum Drainpipe (3-1) and right drainpipe (3-2), the caliber and water inlet and draining of left bank water pipe (3-1) and right drainpipe (3-2) Open height is differed.
2. a kind of urban road list inner chamber double drainage kerbstone containing pavement according to claim 1, its feature exists In:The osculum rectangular cross-section, circular or polygon.
3. a kind of urban road list inner chamber double drainage kerbstone containing pavement according to claim 2, its feature exists In:Steel plate (2) outer surface is connected with steel pipe (4).
4. a kind of urban road list inner chamber double drainage kerbstone containing pavement according to claim 3, its feature exists In:The cross sectional shape of the steel pipe (4) is circle, rectangle or regular polygon.
5. a kind of urban road list inner chamber double drainage kerbstone containing pavement according to claim 4, its feature exists In:The axis of the steel pipe (4) is perpendicular to the outer surface of steel plate (2), and the circumferential surface of steel pipe (4) is non-close face, breach (5) The percentage that area accounts for the circumferential gross area is less than or equal to 1/2.
6. a kind of urban road list inner chamber double drainage kerbstone containing pavement according to claim 5, its feature exists In:The length of the breach (5) is equal with steel pipe (4), and the sensing of the breach (5) of steel pipe (4) is different.
CN201611031570.2A 2016-11-18 2016-11-18 A kind of urban road list inner cavity double drainage kerbstone containing pavement Active CN106758666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611031570.2A CN106758666B (en) 2016-11-18 2016-11-18 A kind of urban road list inner cavity double drainage kerbstone containing pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611031570.2A CN106758666B (en) 2016-11-18 2016-11-18 A kind of urban road list inner cavity double drainage kerbstone containing pavement

Publications (2)

Publication Number Publication Date
CN106758666A true CN106758666A (en) 2017-05-31
CN106758666B CN106758666B (en) 2019-03-26

Family

ID=58971674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611031570.2A Active CN106758666B (en) 2016-11-18 2016-11-18 A kind of urban road list inner cavity double drainage kerbstone containing pavement

Country Status (1)

Country Link
CN (1) CN106758666B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040050691A (en) * 2002-12-31 2004-06-16 신촌종합건설(주) Drain structure of cleaning water and rainwater constructed on sidewalk adjacent to street
CH697138A5 (en) * 1999-01-19 2008-05-15 Vonroll Infratec Invest Ag Water drainage gutter has water guides at the side walls which direct the water inflow into the outflow direction along the drain and also support the covering grid
JP2011241675A (en) * 2010-04-23 2011-12-01 Takara Kizai Co Ltd Drainage channel for road surface
CN205224335U (en) * 2015-11-22 2016-05-11 陈一其 High strength thermal insulation wall
CN205474681U (en) * 2016-03-04 2016-08-17 广州市合信方园工业设备有限公司 Formula curb is held in cabin

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH697138A5 (en) * 1999-01-19 2008-05-15 Vonroll Infratec Invest Ag Water drainage gutter has water guides at the side walls which direct the water inflow into the outflow direction along the drain and also support the covering grid
KR20040050691A (en) * 2002-12-31 2004-06-16 신촌종합건설(주) Drain structure of cleaning water and rainwater constructed on sidewalk adjacent to street
JP2011241675A (en) * 2010-04-23 2011-12-01 Takara Kizai Co Ltd Drainage channel for road surface
CN205224335U (en) * 2015-11-22 2016-05-11 陈一其 High strength thermal insulation wall
CN205474681U (en) * 2016-03-04 2016-08-17 广州市合信方园工业设备有限公司 Formula curb is held in cabin

Also Published As

Publication number Publication date
CN106758666B (en) 2019-03-26

Similar Documents

Publication Publication Date Title
EP3786376B1 (en) Road gutter having dust collection function
CN106522060B (en) A kind of more skirt road list inner cavity water drainage curbs of runway
CN108894239A (en) The mobile cofferdam of whole walking
CN204352649U (en) Construction rainwater-collecting cyclic utilization system
CN106758666A (en) A kind of urban road list inner chamber double drainage kerbstone containing pavement
CN108978459A (en) The bridge structure of included drainage system
CN106758667B (en) A kind of runway intracavity single slope drainage kerbstone
CN106498821B (en) A kind of double inner cavity double drainage kerbstones of the urban road containing pavement
CN106049651A (en) Urban water-logging prevention and control method
KR102116480B1 (en) Drainage system by the Acorn-shaped pipe which have the optimum hydraulic characteristic according to rainfall and easy manufacture, Construction method by its
CN2929003Y (en) Water drain base for city road
CN114922277A (en) A sponge type side ditch structure for urban road
CN107386053A (en) A kind of construction method on pavement
CN209924095U (en) Prefabricated assembly type linear drainage ditch structure for overpass road section
CN106522059B (en) A kind of urban road Two-way side female water drainage curb containing pavement
CN206815490U (en) Draining four-way inspection shaft
CN106758665A (en) A kind of urban road extending type double drainage kerbstone containing pavement
CN106638351B (en) A kind of runway side female single slope drainage kerbstone
JP3926613B2 (en) Repair method for underground structures
CN205935171U (en) Slab formula rainwater detention pond
CN214994496U (en) Sewage interception structure
CN114411578B (en) Box culvert structure of underpass railway and construction method
CN215104646U (en) Siphon rainwater hopper applied to viaduct
CN221255100U (en) Town road oozes row structure
CN107313324A (en) A kind of pin-connected panel pavement and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221220

Address after: No. A14-3, No. 2, Caihong Road, Qingxiu District, Nanning, 530000 Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Quantulai Investment Co.,Ltd.

Address before: 530200 No.8, Longting Road, Yongning District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee before: NANNING University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230509

Address after: 530200 No. 8, Ting Ting Road, Yongning District, Nanning, the Guangxi Zhuang Autonomous Region

Patentee after: NANNING University

Address before: No. A14-3, No. 2, Caihong Road, Qingxiu District, Nanning, 530000 Guangxi Zhuang Autonomous Region

Patentee before: Guangxi Quantulai Investment Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231026

Address after: Room B601, 6th Floor, Building B, No. 88 Daxue West Road, Xixiangtang District, Nanning City, Guangxi Zhuang Autonomous Region, 530000

Patentee after: Guangxi Chuangsu Technology Development Co.,Ltd.

Address before: 530200 No. 8, Ting Ting Road, Yongning District, Nanning, the Guangxi Zhuang Autonomous Region

Patentee before: NANNING University

TR01 Transfer of patent right