CN106758646A CN201611050655.5A CN201611050655A CN106758646A CN 106758646 A CN106758646 A CN 106758646A CN 201611050655 A CN201611050655 A CN 201611050655A CN 106758646 A CN106758646 A CN 106758646A
Authority
CN
China
Prior art keywords
asphalt
rut
thickness
conditions
treatment methods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611050655.5A
Other languages
Chinese (zh)
Inventor
孙娜峰
赵光磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Polytron Technologies Inc
Original Assignee
Hangzhou Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Polytron Technologies Inc filed Critical Hangzhou Polytron Technologies Inc
Priority to CN201611050655.5A priority Critical patent/CN106758646A/en
Publication of CN106758646A publication Critical patent/CN106758646A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/187Repairing bituminous covers, e.g. regeneration of the covering material in situ, application of a new bituminous topping

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

Asphalt pavement rut Treatment Methods under the conditions of not suspended the invention discloses one kind, using rigidity plus flexible through thickness recovery scenario, first the bituminous concrete through thickness in rut disease region is cut off, and basic unit's cement concrete surface is carried out into dabbing treatment, then cutting optimal pours rigid material for quickly repairing, and upper layer making heat mixes modified asphalt mixture to former grade elevation.The method of the present invention not only reduces bituminous concrete thickness, and modified asphalt mixture has excellent combination property, can effectively, quickly solve the problems, such as asphalt pavement rut, and the airfield pavement effect thicker to asphalt concrete layer is particularly evident.

Description

One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods
Technical field
The invention belongs to asphalt concrete pavement recovery technique field, bituminous concrete road under the conditions of being related to one kind not suspend Face rut Treatment Methods.
Background technology
At present, civil airport asphalt pavement rut disease never has and is controlled very well.In movement area asphalt pavement, fly , easily there is rut, influence road face operation safety in the slow region of machine sliding speed, aircraft holding fix.
The processing method of common airfield pavement rut mainly has two kinds:The first is treatment, that is, exclude top layer 5~ 7 centimetres, then overlay to Yuan Dao faces absolute altitude;This kind of method treatment thoroughly, does not easily continue rut occur in very short time road face.The Two kinds is through thickness treatment, but because airfield runway can be generally less than 8 hours the engineering time, causes it to divide by standard requirement Layer construction, construction quality cannot often ensure, it is impossible to fundamentally solve the problems, such as rut.It is therefore proposed that one kind is more effectively, soon The asphalt pavement rut Treatment Methods of speed are into the task of top priority.
The content of the invention
The purpose of the present invention is to solve the shortcomings of the prior art, there is provided one kind do not suspend under the conditions of at asphalt pavement rut Control method, using rigidity plus flexible through thickness recovery scenario, reduce asphalt pavement thickness degree, can it is fundamentally quick, have Effect ground solves the problems, such as rut, is particularly well-suited to asphalt pavement thicker, the serious Airport Asphalt of rut problem of layer.
The main technique of rut Treatment Methods proposed by the present invention comprises the following steps:
Through thickness is first carried out to the asphalt concrete pavement in rut disease region and abolishes cleaning, form bar shaped pit;Then Rigid material for quickly repairing is first poured in bar shaped pit, pouring preceding substrate need not sprinkle water wetting, pour, vibrate, plucking it is complete After into 1 hour again thereon making hot-mix asphalt mixture to former grade elevation.
Concrete construction method can be as follows:
1st, cleaning is abolished in rut region
Through thickness is carried out to asphalt concrete pavement to abolish, i.e., first use and cut by the way of " sawing+pick crusher machine " Cutting mill perpendicular cuts go out repairing area, and depth of cut is asphalt concrete pavement thickness;Then using pick crusher machine and remove Totally;Dabbing treatment is finally carried out to basic unit's cement concrete surface using dabbing machine, then is cleaned out and to be formed bar shaped pit.
2nd, rigid material for quickly repairing is poured
Rigid material for quickly repairing is directly poured in bar shaped pit, pouring preceding substrate need not sprinkle water moistening, pour, shake Smash, making upper layer hot-mixed asphaltic concrete by 1 hour after the completion of plucking.
Existing material for quickly repairing mainly have phosphate cement class, sulphate aluminium cement class, fluoroaluminate cement class and Organic polymer class;Wherein, sulphate aluminium cement class and fluoroaluminate cement class adhesive property are poor, it is impossible to be combined into basic unit whole Body, organic polymer class is (such as:Epoxy resin) there are excellent adhesion strength, but its non-refractory, elastic modelling quantity, thermal coefficient of expansion Differed greatly with base material, it is easily aging.Rigid material for quickly repairing of the present invention is phosphate cement concrete, its morning Phase intensity is high, good with basic unit bond effect.
3rd, making heat mixes modified asphalt mixture
Sticking layer oil is spilt in cement concrete surface, pave modified asphalt mixture;Pave to designed elevation, first laterally grind Pressure, longitudinal direction fully compacting, makes it be connected smooth-going with former road surface afterwards.
Described modified asphalt mixture is close by the modifying agent such as high-modulus asphalt, rut agent, the skeleton that constitutes such as gather materials Full mold Modified Bitumen SMA Mixture, it has excellent high-temperature stability (anti-rut ability), low temperature anti-cracking performance, water steady Qualitative energy, antiskid performance and anti-fatigue ability;Thickness is 5~7 centimetres after described modified asphalt concrete roller-compaction.
The beneficial effects of the invention are as follows:The method of the present invention not only reduces bituminous concrete thickness, and entirely constructs Process is simple, efficient, quick, can effectively, quickly solve the problems, such as asphalt pavement rut, the airport thicker to asphalt concrete layer Road face effect is particularly evident, it is ensured that rut disease is punished under the conditions of not suspending;And bonded by force using with excellent The material for quickly repairing phosphate cement concrete and framework compact type Modified Bitumen SMA Mixture of degree and early strength, can make It is combined into an entirety with substrate concrete, so as to effectively solve rut disease.
Specific embodiment
Embodiment 1
One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods (surface layer be 15 cm thick modified asphalt concretes, base Bottom is semi-rigid type base), its concrete construction method is as follows:
1st, cleaning is abolished in rut region
The mode of " sawing+pick crusher machine " carries out through thickness and abolishes to asphalt concrete pavement, i.e., first use cutting machine Perpendicular cuts go out repairing area (width is more long than rut width 5~10 centimetres, and a time Cutting Length is 5 meters), are cut to semi-rigid Substrate surface, then uses pick crusher machine and removes clean, formation bar shaped pit.
2nd, rigid material for quickly repairing is poured
Phosphate cement concrete is directly poured in bar shaped pit, thickness is poured for 10 centimetres, preceding substrate is poured and is not required to Sprinkle water moistening, pour, vibrate, making upper layer hot-mixed asphaltic concrete by 1 hour after the completion of plucking.
3rd, making heat mixes modified asphalt mixture
Sticking layer oil is spilt in cement concrete surface, pave Modified Bitumen SMA Mixture;Pave to designed elevation, it is first horizontal To rolling, longitudinal direction fully compacting, makes it that smooth-going is connected with former road surface afterwards, and thickness is 5~7 after modified asphalt concrete roller-compaction Centimetre.
Embodiment 2
One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods (surface layer be 18 cm thick modified asphalt concretes, base Bottom is cement concrete), its concrete construction method is as follows:
1st, cleaning is abolished in rut region
The mode of " sawing+pick crusher machine " carries out through thickness and abolishes to asphalt concrete pavement, i.e., first use cutting machine Perpendicular cuts go out repairing area (width is more long than rut width 5~10 centimetres, and a time Cutting Length is 5 meters), are cut to semi-rigid Substrate surface, then uses pick crusher machine and removes clean;Basic unit's cement concrete surface is carried out using dabbing machine finally Dabbing treatment, then clean out and to form bar shaped pit.
2nd, rigid material for quickly repairing is poured
Phosphate cement concrete is directly poured in bar shaped pit, thickness is poured for 13 centimetres, preceding substrate is poured and is not required to Sprinkle water moistening, pour, vibrate, making upper layer hot-mixed asphaltic concrete by 1 hour after the completion of plucking.
3rd, making heat mixes modified asphalt mixture
Sticking layer oil is spilt in cement concrete surface, pave Modified Bitumen SMA Mixture;Pave to designed elevation, it is first horizontal To rolling, longitudinal direction fully compacting, makes it that smooth-going is connected with former road surface afterwards, and thickness is 5~7 after modified asphalt concrete roller-compaction Centimetre.

Claims (5)

1. asphalt pavement rut Treatment Methods under the conditions of one kind is not suspended, it is characterised in that comprise the following steps:
Through thickness is first carried out to the asphalt concrete pavement in rut disease region and abolishes cleaning, form bar shaped pit;Then in bar Rigid material for quickly repairing is first poured in shape pit, pouring preceding substrate need not sprinkle water wetting, pour, vibrate, plucking completion 1 it is small Shi Houzai thereon making hot-mix asphalt mixture to former grade elevation.
2. it is according to claim 1 do not suspend under the conditions of asphalt pavement rut Treatment Methods, it is characterised in that using " saw Cut+pick crusher machine " mode through thickness carried out to asphalt concrete pavement abolish, cutting machine is first used to rut disease region Perpendicular cuts go out repairing area, and depth of cut is asphalt concrete pavement thickness, then uses each region of pick crusher machine simultaneously again Remove clean.
3. it is according to claim 1 do not suspend under the conditions of asphalt pavement rut Treatment Methods, it is characterised in that described is firm Property material for quickly repairing be phosphate cement concrete.
4. it is according to claim 1 do not suspend under the conditions of asphalt pavement rut Treatment Methods, it is characterised in that described heat Asphalt is mixed by high-modulus asphalt, modifying agent and the framework compact type Modified Bitumen SMA Mixture for constituting of gathering materials.
5. it is according to claim 1 do not suspend under the conditions of asphalt pavement rut Treatment Methods, it is characterised in that making heat is mixed During asphalt, first in cement concrete surface spread sticking layer oil, pave hot-mix asphalt mixture to designed elevation, rolls simultaneously Compacting makes it that smooth-going is connected with former road surface, and thickness is 5~7cm after asphalt surface course roller-compaction.
CN201611050655.5A 2016-11-24 2016-11-24 One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods Pending CN106758646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611050655.5A CN106758646A (en) 2016-11-24 2016-11-24 One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611050655.5A CN106758646A (en) 2016-11-24 2016-11-24 One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods

Publications (1)

Publication Number Publication Date
CN106758646A true CN106758646A (en) 2017-05-31

Family

ID=58910521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611050655.5A Pending CN106758646A (en) 2016-11-24 2016-11-24 One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods

Country Status (1)

Country Link
CN (1) CN106758646A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235351A (en) * 2021-04-30 2021-08-10 东南大学 Airport pavement structure with asphalt layer paved on old cement airport runway and paving method thereof
CN113463483A (en) * 2021-07-13 2021-10-01 民航建设(天津)科技有限公司 Airport pavement repairing and maintaining system and method based on airport non-stop construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201400841Y (en) * 2009-01-09 2010-02-10 长沙理工大学 Continuously reinforced concrete composite asphalt pavement structure
CN102251454A (en) * 2011-04-27 2011-11-23 浙江大学 Process for quickly repairing semi-rigid substrate damage of asphalt pavement
CN102864715A (en) * 2012-10-15 2013-01-09 英达热再生有限公司 Repairing method for serious track groove on municipal road
CN202787044U (en) * 2012-09-12 2013-03-13 浙江八咏公路工程有限公司 Longitudinal crack treatment structure for bituminous concrete pavement
KR20140086793A (en) * 2013-05-20 2014-07-08 최종탁 mending-construction of asphalt
CN103952958A (en) * 2014-05-08 2014-07-30 苏州市市政工程设计院有限责任公司 Method for rut maintaining and paving of municipal road

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201400841Y (en) * 2009-01-09 2010-02-10 长沙理工大学 Continuously reinforced concrete composite asphalt pavement structure
CN102251454A (en) * 2011-04-27 2011-11-23 浙江大学 Process for quickly repairing semi-rigid substrate damage of asphalt pavement
CN202787044U (en) * 2012-09-12 2013-03-13 浙江八咏公路工程有限公司 Longitudinal crack treatment structure for bituminous concrete pavement
CN102864715A (en) * 2012-10-15 2013-01-09 英达热再生有限公司 Repairing method for serious track groove on municipal road
KR20140086793A (en) * 2013-05-20 2014-07-08 최종탁 mending-construction of asphalt
CN103952958A (en) * 2014-05-08 2014-07-30 苏州市市政工程设计院有限责任公司 Method for rut maintaining and paving of municipal road

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
严捍东等: "《土工工程材料》", 31 August 2014, 同济大学出版社 *
甘先永等: "湖南某机场滑行道道面轮辙病害成因及处治", 《公路与汽运》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235351A (en) * 2021-04-30 2021-08-10 东南大学 Airport pavement structure with asphalt layer paved on old cement airport runway and paving method thereof
CN113235351B (en) * 2021-04-30 2022-05-06 东南大学 Airport pavement structure with asphalt layer paved on old cement airport runway and paving method thereof
CN113463483A (en) * 2021-07-13 2021-10-01 民航建设(天津)科技有限公司 Airport pavement repairing and maintaining system and method based on airport non-stop construction

Similar Documents

Publication Publication Date Title
CN102392405B (en) Super-early-strength super-rapid-hardening concrete pavement and construction method thereof
CN108070269A (en) A kind of epoxy-modified emulsified asphalt mist containing sand sealing material and its preparation method and application
CN103145396B (en) Multifunctional quick repair material for cement concrete pavements and preparation method thereof
CN104402339A (en) Pervious concrete and construction method thereof
CN102677567B (en) Asphalt pavement structure regenerated from concrete pavement and construction method of asphalt pavement structure
CN106396561B (en) A kind of micro-surfacing mixture and preparation method thereof with snow melting function
CN102225855B (en) Wear-resistant noise-reducing thermal-insulating modified emulsified asphalt mortar paint
CN110499692A (en) One kind pouring into formula composite pavement construction method
CN102425092A (en) Ultra-viscous seal coat on bituminous pavement and construction method thereof
CN106800400B (en) A kind of preparation method and applications of road repair mortar dry powder
CN102745947A (en) Modified asphalt mixture
CN109797620A (en) A kind of Heavy Traffic globality Rut resistance road paving structure based on composite material
CN104672929B (en) A kind of preparation method of anticoagulant ice asphalt material
CN106758646A (en) One kind do not suspend under the conditions of asphalt pavement rut Treatment Methods
CN107419635A (en) A kind of composite pavement sealing method
CN112301826B (en) Emulsified asphalt cold-recycling pavement structure and rapid curing method for pavement
CN104927759B (en) A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN107098648B (en) A kind of Cement Concrete Pavement Reconstruction material and preparation method thereof
CN107905082A (en) Suitable for the broken Application way of Deteriorated concrete pavement panel under bad support
CN107288003A (en) A kind of road surface or preventive maintenance of deck structure and its construction method
CN109082966A (en) Cracking resistance thermoregulation cement base pavement construction engineering method
CN114182595B (en) Construction method of long-life asphalt road
CN208917613U (en) A kind of white based on polymer modified asphalt changes black pavement structure
CN110093830A (en) The fine rubble top dressing layer of bituminous pavement and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination