CN106742176A - A kind of Machine for packing steel band and steel band packaging method of the shear steel band that interlocks - Google Patents
A kind of Machine for packing steel band and steel band packaging method of the shear steel band that interlocks Download PDFInfo
- Publication number
- CN106742176A CN106742176A CN201710066256.6A CN201710066256A CN106742176A CN 106742176 A CN106742176 A CN 106742176A CN 201710066256 A CN201710066256 A CN 201710066256A CN 106742176 A CN106742176 A CN 106742176A
- Authority
- CN
- China
- Prior art keywords
- steel band
- tool rest
- leader tape
- tape part
- machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 204
- 239000010959 steel Substances 0.000 title claims abstract description 204
- 238000012856 packing Methods 0.000 title claims abstract description 45
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000004806 packaging method and process Methods 0.000 title claims abstract description 10
- 238000005520 cutting process Methods 0.000 claims abstract description 57
- 238000004804 winding Methods 0.000 claims abstract description 8
- 238000005452 bending Methods 0.000 claims description 3
- 238000003825 pressing Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010009 beating Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000010008 shearing Methods 0.000 description 2
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D5/00—Arrangements for operating and controlling machines or devices for cutting, cutting-out, stamping-out, punching, perforating, or severing by means other than cutting
- B26D5/08—Means for actuating the cutting member to effect the cut
- B26D5/12—Fluid-pressure means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B13/00—Bundling articles
- B65B13/02—Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes
- B65B13/04—Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes with means for guiding the binding material around the articles prior to severing from supply
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D1/00—Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor
- B26D1/01—Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work
- B26D1/04—Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member
- B26D1/045—Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor involving a cutting member which does not travel with the work having a linearly-movable cutting member for thin material, e.g. for sheets, strips or the like
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B13/00—Bundling articles
- B65B13/02—Applying and securing binding material around articles or groups of articles, e.g. using strings, wires, strips, bands or tapes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B13/00—Bundling articles
- B65B13/18—Details of, or auxiliary devices used in, bundling machines or bundling tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B13/00—Bundling articles
- B65B13/18—Details of, or auxiliary devices used in, bundling machines or bundling tools
- B65B13/185—Details of tools
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65B—MACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
- B65B61/00—Auxiliary devices, not otherwise provided for, for operating on sheets, blanks, webs, binding material, containers or packages
- B65B61/04—Auxiliary devices, not otherwise provided for, for operating on sheets, blanks, webs, binding material, containers or packages for severing webs, or for separating joined packages
- B65B61/06—Auxiliary devices, not otherwise provided for, for operating on sheets, blanks, webs, binding material, containers or packages for severing webs, or for separating joined packages by cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B26—HAND CUTTING TOOLS; CUTTING; SEVERING
- B26D—CUTTING; DETAILS COMMON TO MACHINES FOR PERFORATING, PUNCHING, CUTTING-OUT, STAMPING-OUT OR SEVERING
- B26D1/00—Cutting through work characterised by the nature or movement of the cutting member or particular materials not otherwise provided for; Apparatus or machines therefor; Cutting members therefor
- B26D1/0006—Cutting members therefor
- B26D2001/0066—Cutting members therefor having shearing means, e.g. shearing blades, abutting blades
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Forests & Forestry (AREA)
- Basic Packing Technique (AREA)
- Auxiliary Devices For And Details Of Packaging Control (AREA)
- Control And Other Processes For Unpacking Of Materials (AREA)
Abstract
The present invention discloses a kind of Machine for packing steel band and steel band packaging method of the shear steel band that interlocks, wherein, the Machine for packing steel band includes the first tool rest and the second tool rest, first tool rest can axially move, first tool rest is provided with the first cutting die and cutting edge, and second tool rest is provided with the second cutting die that can be matched with first cutting die;Also include leader tape part, the leader tape part is posted by the cutting edge and sets, the steel band may pass through the leader tape part, and bale cargo is treated in winding, have between the leader tape part and second tool rest for treating that the steel band of bale cargo unrolls the gap for passing through described in winding.The Machine for packing steel band of the shear steel band that interlocks provided by the present invention, the less stamping press of its need, you can cut steel band.
Description
Technical field
The present invention relates to steel band packaging technique field, more particularly to a kind of Machine for packing steel band and steel of the shear steel band that interlocks
Band packaging method.
Background technology
Machine for packing steel band is a kind of conventional package packing machine, is mainly used in non-ferrous metal, iron and steel enterprise and ties up all size
The product such as tubing, section bar, ingot class, sheet material.
Refer to Fig. 1, Fig. 1 is a kind of structural representation of the specific embodiment of Machine for packing steel band in the prior art.
As shown in figure 1, existing Machine for packing steel band generally comprises oil cylinder 01, upper cutter head 02 and lower tool rest 03, upper cutter head 02
Be connected with oil cylinder 01, and can be produced under the driving of oil cylinder 01 and move up and down, the bottom of upper cutter head 02 be provided with cutting die 021 and
Sword 022 is rushed, the top of lower tool rest 03 is provided with lower cutting die 031.
When using, the product to be tied up first can be bypassed using steel band 04, and two external parts of the steel band 04 are stretched into
Between tool rest 02 and lower tool rest 03, and then manipulate oil cylinder 01, to drive upper cutter head 02 to move downward, on above-mentioned cutting die 021 and
In the presence of lower cutting die 031, steel band can be carried out to beat button, and it is above-mentioned rush sword 022 then can while unnecessary steel band 04 be thrust, with
Completion is tied up to product.
However, the process that thrusts of above-mentioned steel band 04 is merely completed by the stamping press for rushing sword 022, whole process needs
Larger stamping press, to bear the larger stamping press, lower tool rest 03 need to possess enough thickness, and this is just unfavorable for steel band 04
Tighten.Simultaneously as needing frequently to work, larger stamping press can also aggravate to rush the loss of sword 022, and it makes to be unfavorable for extension
Use the life-span.
Therefore, how to provide a kind of stamping press less Machine for packing steel band, be still those skilled in the art urgently to be resolved hurrily
Technical problem.
The content of the invention
Machine for packing steel band and steel band it is an object of the invention to provide a kind of less shear steel band that interlocks of stamping press are beaten
Bag method.
In order to solve the above technical problems, the present invention provides a kind of Machine for packing steel band of the shear steel band that interlocks, including first
Tool rest and the second tool rest, first tool rest can axially move, and first tool rest is provided with the first cutting die and cutting edge, described
Two tool rests are provided with the second cutting die that can be matched with first cutting die;Also include leader tape part, the leader tape part is posted by
The cutting edge is set, and the steel band may pass through the leader tape part, and winds and treat bale cargo, the leader tape part and described the
Have between two tool rests for treating that the steel band of bale cargo unrolls the gap for passing through described in winding.
Than prior art, Machine for packing steel band provided by the present invention is additionally arranged leader tape part, and when in use, steel band can be first
Through the leader tape part, the periphery for treating bale cargo is then wound in again, and finally wrap to leader tape part and the second tool rest it
Between gap.In this way, there will be two-layer steel band between the first cutting die and the second cutting die, including positioned at the ground floor of the leader tape part
Steel band and the second layer steel band between leader tape part and the second tool rest.
When driving the first tool rest to the second tool rest movement to cut ground floor steel band, due to the support of leader tape part, the
One layer of steel band can not be moved directly to second layer steel band, and cutting edge produces the stamping press towards the second tool rest to the ground floor steel band,
And leader tape part can then produce the support force away from the second tool rest to the ground floor steel band.Cut because the leader tape part is posted by again
Sword is set, and above-mentioned stamping press and support force can simultaneously act on the same position of the ground floor steel band, with staggeredly shear this
One layer of steel band so that the stamping press needed for cutting ground floor steel band significantly reduces, and then can significantly extend the use of above-mentioned cutting edge
Life-span.
Alternatively, the leader tape part can axially move, and can will wrap to the steel band in the gap and be pressed in institute
State the second tool rest.
Alternatively, the leader tape part includes leader tape plate, and the leader tape plate is provided with the leader tape hole for being available for the steel band to pass through.
Alternatively, also including the first oil cylinder, first oil cylinder is connected with the leader tape plate, to drive the leader tape plate edge
Axial movement.
Alternatively, also including the second oil cylinder, second oil cylinder is connected with first tool rest, to drive first knife
Seat is axially moveable.
Alternatively, the leader tape plate has outward bending and the connecting portion for extending, institute away from one end of second tool rest
The first oil cylinder is stated to be connected with the connecting portion.
Alternatively, also including installing plate, the installing plate is located at first tool rest, the top of the leader tape part, institute
State the first oil cylinder and second oil cylinder and be located at the installing plate.
Alternatively, second tool rest position relative with the leader tape part is provided with slip limiting plate.
Present invention also offers a kind of steel band packaging method of the shear steel band that interlocks, for above-mentioned interlocked shear steel
The Machine for packing steel band of band, comprises the following steps:Step S1, passes through the leader tape part, and be wound in and wait to tie up by the steel band
The periphery of goods, and then wrap to the gap between the leader tape part and second tool rest;Step S2, drives described first
Tool rest is moved towards second tool rest, first cutting die can be engaged with second cutting die, with to therebetween
Two-layer steel band is carried out beating button, and the cutting edge can be engaged with the leader tape part, and the leader tape portion is arranged in the cutting that interlocks
The steel band of part.
Alternatively, can also include between the step S1 and the step S2:Step S11, drives the leader tape portion
Part is moved towards second tool rest, and the steel band that will wrap to the gap is pressed in second tool rest;Step S12, draws
The steel band of the leader tape part is tightly arranged in, described bale cargo is treated to tighten.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the specific embodiment of Machine for packing steel band in the prior art;
Fig. 2 is a kind of structure of specific embodiment of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention
Schematic diagram;
Fig. 3 is configuration state of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention before shear steel band
Figure;
Fig. 4 is configuration state of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention in shear steel band
Figure;
Fig. 5 is configuration state of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention after shear steel band
Figure.
Description of reference numerals in Fig. 1 is as follows:
01 oil cylinder, 02 upper cutter head, cutting die, 022 rush sword, 03 time tool rest, 031 time cutting die, 04 steel band on 021.
The description of reference numerals of Fig. 2-5 is as follows:
1 first tool rest, 11 first cutting dies, 12 cutting edges;
2 second tool rests, 21 second cutting dies;
3 steel bands, 31 ground floor steel bands, 32 second layer steel bands;
4 leader tape plates, 41 leader tape holes, 42 connecting portions;
5 first oil cylinders, 6 second oil cylinders, 7 installing plates, 8 slip limiting plates.
Specific embodiment
In order that those skilled in the art more fully understands technical scheme, it is below in conjunction with the accompanying drawings and specific real
The present invention is described in further detail to apply example.
The word such as " first " specifically described herein, " second " is for only for ease of the same or like two or more of description scheme
Part or structure, be not offered as certain particular determination to order.
Fig. 2 is refer to, Fig. 2 is a kind of specific implementation of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention
The structural representation of mode.
As shown in Fig. 2 the present invention provides a kind of Machine for packing steel band of the shear steel band that interlocks, including the first tool rest 1, second
Tool rest 2 and leader tape part, the first tool rest 1 can axially move, and the first tool rest 1 is provided with the first cutting die 11 and cutting edge 12, the second knife
Seat 2 is provided with the second cutting die 21 that can be matched with the first cutting die 11.The leader tape part is posted by cutting edge 12 and sets, and steel band 3 can be worn
Leader tape part is crossed, and bale cargo is treated in winding, has the steel band that bale cargo is treated for winding between leader tape part and the second tool rest 2
The gap that 3 unroll passes through.Above-mentioned " axial direction " movement refers to movement of first tool rest 1 toward and away from the second tool rest 2, is reflected in attached
Refer to the " upper and lower " mobile of the first tool rest 1 in Fig. 2.
Than prior art, Machine for packing steel band provided by the present invention is additionally arranged leader tape part, and when in use, steel band 3 can
The leader tape part is initially passed through, the periphery for treating bale cargo is then wound in again, and finally wrap to leader tape part and the second tool rest 2
Between gap.In this way, there will be two-layer steel band 3 between the first cutting die 11 and the second cutting die 21, including positioned at the leader tape part
Ground floor steel band 31 and the second layer steel band 32 between leader tape part and the second tool rest 2.
Fig. 3-5 are refer to, Fig. 3 is the Machine for packing steel band of the shear steel band that interlocks provided by the present invention before shear steel band
Configuration state figure, Fig. 4 is structure of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention in shear steel band
State diagram, Fig. 5 is configuration state figure of the Machine for packing steel band of the shear steel band that interlocks provided by the present invention after shear steel band.
As in Figure 3-5, when driving the first tool rest 1 to be moved to cut ground floor steel band 31 to the second tool rest 2, due to drawing
The support of tape member, ground floor steel band 31 can not be moved directly to second layer steel band 32, and cutting edge 12 can be to the ground floor steel band 31
The stamping press towards the second tool rest 2 is produced, and leader tape part can then produce the branch away from the second tool rest 2 to the ground floor steel band 31
Support force.Set because the leader tape part is posted by cutting edge 12 again, above-mentioned stamping press and support force can act on simultaneously this first
The same position of layer steel band 31, staggeredly to shear the ground floor steel band 31 so that the stamping press needed for cutting ground floor steel band 31
Significantly reduce, and then can significantly extend the service life of above-mentioned cutting edge 12.
On the other hand, because the stamping press needed for cutting ground floor steel band 31 significantly reduces, the first tool rest 1 towards the is driven
The power of the movement of two tool rest 2 then can significantly reduce, i.e., the stamping press that the second tool rest 2 is born will be greatly reduced, in this way, using thickness
The second relatively thin tool rest 2 can meet use requirement, so as to the manufacturing cost of the second tool rest 2 can be saved, and then can save the steel
Manufacturing cost with baling press.
It is to be understood that Machine for packing steel band is when specifically used, treat bale cargo typically located at the lower section of the second tool rest 2, steel
Through the gap the first tool rest 1 and the second tool rest 2 and the periphery for treating bale cargo is wound in 3, then wrapped to again
Between first tool rest 1 and the second tool rest 2, i.e., treat that bale cargo is hung on the lower section of the second tool rest 2 equivalent to this.In this way, second
The thickness of tool rest 2 is bigger, then steel band 3 more is difficult to tighten.And the Machine for packing steel band of the shear steel band that interlocks provided by the present invention, its
The thinner thickness of the second tool rest 2, bale cargo is treated to be conducive to tightening.
Additionally, the steel band section formed in the way of relying on stamping press merely in the prior art to thrust ground floor steel band 31
There is more burr, when the goods to tying up is transported, the burr may be to transport goods in itself and carrier
Member damages.And Machine for packing steel band provided by the present invention cuts ground floor steel band 31, this mode in the way of staggeredly shearing
The steel band section for being formed is more smooth, personnel and cargo security in more favourable guarantee transportation.
Further, above-mentioned leader tape part can also be axially moveable, and can will wrap to leader tape part and the second knife
Steel band 3 between seat 2 is pressed in the second tool rest 2.Above-mentioned " axial direction " movement is index strips part toward and away from the second tool rest 2
It is mobile, it is reflected in accompanying drawing 2 that to be that index strips part is " upper and lower " move.
Using above-mentioned setting, before being sheared to ground floor steel band 31, the leader tape part towards the can be first driven
Two tool rests 2 are moved, second layer steel band 32 is pressed in into the second tool rest 2, so can pull ground floor steel band 31, due to now
Second layer steel band 32 has been compacted, and the process of the above-mentioned ground floor steel band 31 of pull may be such that and be wound in the steel band 3 for treating bale cargo
Progressively tighten up, bale cargo is treated more effectively to tighten.
Specifically, above-mentioned leader tape part can include leader tape plate 4, and the leader tape plate 4 can be provided with leader tape hole 41.Still such as Fig. 3-
Shown in 5, when using, steel band 3 can first pass through the leader tape hole 41, and then be wound in the periphery for treating bale cargo;And when driving the
One tool rest 1 is moved towards the second tool rest 2 to shear during ground floor steel band 31, and the bottom in the leader tape hole 41 can be to ground floor steel band 31
It is supported, and then coordinates cutting edge 12 staggeredly to cut the ground floor steel band 31.And it is axially downward to work as the leader tape plate 4
When, second layer steel band 32 can be then pressed in the second tool rest 2 by the leader tape plate 4 near one end of the second tool rest 2, in order to pull the
One layer of steel band 31, and then tighten and treat bale cargo.
In fact, the setting in above-mentioned leader tape hole 41 can also be waited to tie through the first tool rest 1, the second tool rest 2 to steel band 3 to wind
The stroke for pricking goods plays certain guide function.Still as shown in Fig. 2 between the opening direction in the leader tape hole 41 and two tool rests
Gap is relative, from leader tape hole 41 through steel band 3 then can exactly from the first tool rest 1 and the second tool rest 2 gap lead to
Cross, and then treat bale cargo and form winding.
Above-mentioned leader tape part is it can also be provided that other forms, for example, the leader tape part can only include one layer of backing plate, are somebody's turn to do
There is gap with the second tool rest 2 located at the top of the second tool rest 2 in backing plate.When in use, steel band 3 can be logical from backing plate top
Cross, and then through the gap two tool rests, and finally wrap between backing plate and the second tool rest 2, in this way, when the first knife of driving
When seat 1 is moved to the second tool rest 2, cutting edge 12 can also be engaged with staggeredly shearing ground floor steel band 31 with the backing plate.Meanwhile, should
Backing plate can also be moved up and down vertically, second layer steel band 32 is pressed in into the second tool rest 2, in order to more effectively
Tighten and treat bale cargo.
Based on the setting of above-mentioned backing plate, above-mentioned leader tape part can also include the pressing plate above backing plate, pressing plate and pad
There is the gap for being available for that steel band 3 passes through between plate, when above-mentioned backing plate compress second layer steel band 32, and pull ground floor steel band 31 with
Tighten when bale cargo, above-mentioned pressing plate also can be axially downward, and ground floor steel band 31 is pressed in into backing plate.In this way,
When driving the first tool rest 1 to be moved to shear ground floor steel band 31 towards the second tool rest 2, then without being provided for ground floor steel band 31
Lasting tightening force is ensureing to treat the effect that tightens of bale cargo, and easily facilitate to shear the ground floor steel band 31.
It should be noted that above-mentioned two kinds of descriptions of concrete structure design on leader tape part are only the embodiment of the present invention
A kind of preferred scheme, it is impossible to as the limit of the practical range of the Machine for packing steel band to the shear steel band that interlocks provided by the present invention
It is fixed.Meeting on the premise of the Machine for packing steel band uses function, the leader tape part it can also be provided that other forms, specific real
Shi Shi, the concrete structure that those skilled in the art can be according to actual conditions to the leader tape part sets.
Please continue to refer to Fig. 2, above-mentioned Machine for packing steel band can also include the first oil cylinder 5 and the second oil cylinder 6, the first oil cylinder
5 are connected with leader tape part, and to drive the axial movement of leader tape part, and the second oil cylinder 6 is then connected with the first tool rest 1, to drive
The axial movement of the first tool rest 1.Above-mentioned first tool rest 1 can also be driven or hand-driven side with leader tape part using motor
Formula, when specifically used, those skilled in the art can select surely specific according to actual conditions such as equipment scale, use environments
Type of drive.
Above-mentioned leader tape plate 4 can have outward bending and the connecting portion 42, Jin Erke for extending away from one end of the second tool rest 2
First oil cylinder 5 is connected with connecting portion 42, in this way, two oil cylinders can be spaced a distance when mounted, so as to peace can be avoided
Two oil cylinder installation sites are interfered during dress, meanwhile, and do not influence each oil cylinder to be operated.It is above-mentioned to be bent simultaneously to " outward "
Extension is bent and extends to the direction away from the installation site of the second oil cylinder 6.
Above-mentioned Machine for packing steel band can also include installing plate 7, and the installing plate is located at the first tool rest, the top of leader tape part,
And then the oil cylinder 6 of above-mentioned first oil cylinder 5 and second can be located at the installing plate 7, in order to carry out installation fixation to two oil cylinders.
For above-mentioned each scheme, the concrete structure of the second tool rest 2 can be also improved further, the second tool rest 2 with draw
The relative position of tape member can be provided with slip limiting plate 8, and the second tool rest 2 is pressed in by second layer steel band 32 when leader tape part is driven
When, second layer steel band 32 can be resisted against the surface of the slip limiting plate 8, because the surface of the slip limiting plate 8 is more coarse, it is possible to increase its with
The frictional force of the contact position of second layer steel band 32, in this way, when pull ground floor steel band 31, second layer steel band 32 can more stably
It is placed between leader tape part and the second tool rest 2, without being moved, is more convenient for treating tightening for bale cargo.Above-mentioned slip limiting plate 8
Can be shaggy sheet metal, and then the sheet metal can be welded in the second tool rest 2.
For the Machine for packing steel band of the interlocked shear steel band of above-mentioned multi-form, present invention also offers different steel bands
Packaging method.
For the not axially displaceable scheme of above-mentioned leader tape part, when steel band is packed, following steps are referred to:
Step S1, leader tape part is passed through by steel band 3, and is wound in the periphery for treating bale cargo, and then wraps to leader tape portion
Gap between part and the second tool rest 2;
Step S2, drives the first tool rest 1 to be moved towards the second tool rest 2, and the first cutting die 11 can match with the second cutting die 21
Close, detained with to two-layer steel band 3 therebetween beat, cutting edge 12 can be engaged with leader tape part, and cutting wears to interlock
In the steel band 3 of leader tape part.
And for the scheme that above-mentioned leader tape part is axially movable, when steel band is packed, can above-mentioned steps S1 and S2 it
Between increase following steps:
Step S11, drives leader tape part to be moved towards the second tool rest 2, will wrap to leader tape part and the second tool rest 2 it
Between steel band 3 be pressed in the second tool rest 2;
Step S12, tension is arranged in the steel band 3 of leader tape part, and bale cargo is treated to tighten.
And include the scheme of pressing plate and backing plate for above-mentioned leader tape part, when steel band is packed, then refer to following step
Suddenly:
Step S1, steel band 3 is passed through from backing plate top, and is wound in the periphery for treating bale cargo, and then wraps to backing plate
With the gap between the second tool rest 2;
Step S2, drives the backing plate to be moved towards the second tool rest 2, will wrap to the steel between backing plate and the second tool rest 2
Band 3 is pressed in the second tool rest 2;
Step S3, tenses the steel band 3 above backing plate, and bale cargo is treated to tighten;
Step S4, drives pressing plate to be moved towards backing plate, and the steel band 3 between pressing plate and backing plate is pressed in into backing plate, drives
First tool rest 1 is moved towards the second tool rest 2, and the first cutting die 11 can be engaged with the second cutting die 21, with to two therebetween
Layer steel band 3 carries out beating button, and cutting edge 12 can be engaged with backing plate, staggeredly to cut the steel band 3 between pressing plate and backing plate.
In a word, the steel band packaging method of Machine for packing steel band provided by the present invention is adapted with the concrete structure of leader tape part,
In the specific implementation, according to the concrete structure of specific equipment, can treat bale cargo using steel band using different methods is carried out
Packing, and then staggeredly shear steel band 3.
The above is only the preferred embodiment of the present invention, it is noted that come for those skilled in the art
Say, under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be regarded as
Protection scope of the present invention.
Claims (10)
1. a kind of Machine for packing steel band of the shear steel band that interlocks, including the first tool rest (1) and the second tool rest (2), first knife
Seat (1) can axially move, and first tool rest (1) is provided with the first cutting die (11) and cutting edge (12), and second tool rest (2) sets
There is the second cutting die (21) that can be matched with first cutting die (11), it is characterised in that
Also include leader tape part, the leader tape part is posted by the cutting edge (12) setting, and the steel band (3) may pass through described drawing
Tape member, and bale cargo is treated in winding, is had between the leader tape part and second tool rest (2) for waiting to tie up described in winding
The steel band (3) of goods unrolls the gap for passing through.
2. the Machine for packing steel band of the shear steel band that interlocks according to claim 1, it is characterised in that the leader tape part can
It is axially moveable, and can will wraps to the steel band (3) in the gap and is pressed in second tool rest (2).
3. the Machine for packing steel band of the shear steel band that interlocks according to claim 2, it is characterised in that the leader tape part bag
Leader tape plate (4) is included, the leader tape plate (4) is provided with the leader tape hole (41) for being available for the steel band (3) to pass through.
4. the Machine for packing steel band of the shear steel band that interlocks according to claim 3, it is characterised in that also including the first oil cylinder
(5), first oil cylinder (5) is connected with the leader tape plate (4), to drive the leader tape plate (4) to be axially moveable.
5. the Machine for packing steel band of the shear steel band that interlocks according to claim 4, it is characterised in that also including the second oil cylinder
(6), second oil cylinder (6) is connected with first tool rest (1), to drive first tool rest (1) to be axially moveable.
6. the Machine for packing steel band of the shear steel band that interlocks according to claim 5, it is characterised in that the leader tape plate (4)
Away from second tool rest (2) one end have outward bending and extend connecting portion (42), first oil cylinder (5) with it is described
Connecting portion (42) is connected.
7. the Machine for packing steel band of the shear steel band that interlocks according to claim 6, it is characterised in that also including installing plate
(7), the installing plate (7) is positioned at first tool rest (1), the top of the leader tape part, first oil cylinder (5) and described
Second oil cylinder (6) is located at the installing plate (7).
8. the Machine for packing steel band of the interlocked shear steel band according to any one of claim 2-7, it is characterised in that described
Second tool rest (2) position relative with the leader tape part is provided with slip limiting plate (8).
9. a kind of steel band packaging method of the shear steel band that interlocks, it is characterised in that for such as any one of claim 1-8 institutes
The Machine for packing steel band of the interlocked shear steel band stated, comprises the following steps:
Step S1, by the steel band (3) through the leader tape part, and is wound in the periphery for treating bale cargo, and then wrap to
Gap between the leader tape part and second tool rest (2);
Step S2, drives first tool rest (1) mobile towards second tool rest (2), and first cutting die (11) can be with
Second cutting die (21) is engaged, and is detained with to two-layer steel band (3) therebetween beat, and the cutting edge (12) can be with institute
State leader tape part to be engaged, the steel band (3) of the leader tape part is arranged in staggeredly to cut.
10. the steel band packaging method of the shear steel band that interlocks according to claim 9, it is characterised in that in the step
Can also include between S1 and the step S2:
Step S11, drives the leader tape part mobile towards second tool rest (2), will wrap to the steel band in the gap
(3) it is pressed in second tool rest (2);
Step S12, tension is arranged in the steel band (3) of the leader tape part, and described bale cargo is treated to tighten.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710066256.6A CN106742176B (en) | 2017-02-06 | 2017-02-06 | Steel belt packing machine capable of shearing steel belts in staggered mode and steel belt packing method |
PCT/CN2018/074563 WO2018141239A1 (en) | 2017-02-06 | 2018-01-30 | Steel strip packaging machine which may staggeredly shear steel strips and steel strip packaging method |
EP18747501.7A EP3578469A4 (en) | 2017-02-06 | 2018-01-30 | Steel strip packaging machine which may staggeredly shear steel strips and steel strip packaging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710066256.6A CN106742176B (en) | 2017-02-06 | 2017-02-06 | Steel belt packing machine capable of shearing steel belts in staggered mode and steel belt packing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106742176A true CN106742176A (en) | 2017-05-31 |
CN106742176B CN106742176B (en) | 2023-04-25 |
Family
ID=58955309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710066256.6A Active CN106742176B (en) | 2017-02-06 | 2017-02-06 | Steel belt packing machine capable of shearing steel belts in staggered mode and steel belt packing method |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3578469A4 (en) |
CN (1) | CN106742176B (en) |
WO (1) | WO2018141239A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018141239A1 (en) * | 2017-02-06 | 2018-08-09 | 大连富地重工机械制造有限公司 | Steel strip packaging machine which may staggeredly shear steel strips and steel strip packaging method |
CN108423228A (en) * | 2018-05-16 | 2018-08-21 | 嘉兴鼎祥汽车零部件有限公司 | A kind of binding apparatus after wire rod rolled product wire drawing |
CN113102621A (en) * | 2021-03-09 | 2021-07-13 | 宁波如意股份有限公司 | Automatic clipping device for packing belt |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115320913B (en) * | 2022-08-30 | 2023-08-18 | 浙江卓锐智控科技有限责任公司 | Steel belt winding machine |
CN118315134B (en) * | 2024-06-06 | 2024-10-15 | 四川中源智慧电缆有限公司 | Cable metal interlocking armor bending control device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2549626A (en) * | 1944-02-15 | 1951-04-17 | Mosey Frederick William | Strapping machine |
GB695678A (en) * | 1951-10-05 | 1953-08-12 | Lennart Reinhold Kalb | Improvements in or relating to cutting devices |
AT240789B (en) * | 1962-03-30 | 1965-06-10 | Brueninghaus & Co Bezett Kg | Automatic machine for tying or strapping packages |
US3536430A (en) * | 1967-11-21 | 1970-10-27 | Ikegai Iron Works Ltd | Automatic strapping machine |
CA1312455C (en) * | 1989-06-16 | 1993-01-12 | Kanami Kato | Method of gripping a strap for bonding the strap end portions to each other |
CA1318365C (en) * | 1989-08-21 | 1993-05-25 | Kouichi Kusakabe | Bonding method of binding strap end portions by spot-welding |
CN202863790U (en) * | 2012-05-29 | 2013-04-10 | 江阴圆方机械制造有限公司 | Full-automatic metal strip welding packaging machine |
CN105667867A (en) * | 2016-01-12 | 2016-06-15 | 大连富地重工机械制造有限公司 | Split lower cutter body of buckle-free steel strip strapping machine |
CN206456597U (en) * | 2017-02-06 | 2017-09-01 | 大连富地重工机械制造有限公司 | A kind of Machine for packing steel band for the shear steel band that interlocks |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4953599A (en) * | 1989-07-17 | 1990-09-04 | Signode Corporation | Method of gripping a strap for bonding the strap end portions to each other |
DE4313641A1 (en) * | 1993-04-26 | 1994-10-27 | Krupp Ag Hoesch Krupp | Locking device |
CN202337368U (en) * | 2011-12-06 | 2012-07-18 | 延边龙川包装机械有限公司 | Clamp forcep lock buckle mechanism of pneumatic lock buckle automatic binding machine |
CN106742176B (en) * | 2017-02-06 | 2023-04-25 | 大连富地重工机械制造有限公司 | Steel belt packing machine capable of shearing steel belts in staggered mode and steel belt packing method |
-
2017
- 2017-02-06 CN CN201710066256.6A patent/CN106742176B/en active Active
-
2018
- 2018-01-30 EP EP18747501.7A patent/EP3578469A4/en not_active Withdrawn
- 2018-01-30 WO PCT/CN2018/074563 patent/WO2018141239A1/en unknown
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2549626A (en) * | 1944-02-15 | 1951-04-17 | Mosey Frederick William | Strapping machine |
GB695678A (en) * | 1951-10-05 | 1953-08-12 | Lennart Reinhold Kalb | Improvements in or relating to cutting devices |
AT240789B (en) * | 1962-03-30 | 1965-06-10 | Brueninghaus & Co Bezett Kg | Automatic machine for tying or strapping packages |
US3536430A (en) * | 1967-11-21 | 1970-10-27 | Ikegai Iron Works Ltd | Automatic strapping machine |
CA1312455C (en) * | 1989-06-16 | 1993-01-12 | Kanami Kato | Method of gripping a strap for bonding the strap end portions to each other |
CA1318365C (en) * | 1989-08-21 | 1993-05-25 | Kouichi Kusakabe | Bonding method of binding strap end portions by spot-welding |
CN202863790U (en) * | 2012-05-29 | 2013-04-10 | 江阴圆方机械制造有限公司 | Full-automatic metal strip welding packaging machine |
CN105667867A (en) * | 2016-01-12 | 2016-06-15 | 大连富地重工机械制造有限公司 | Split lower cutter body of buckle-free steel strip strapping machine |
CN206456597U (en) * | 2017-02-06 | 2017-09-01 | 大连富地重工机械制造有限公司 | A kind of Machine for packing steel band for the shear steel band that interlocks |
Non-Patent Citations (1)
Title |
---|
王金萍: "《物流设施与设备》", 31 March 2011 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018141239A1 (en) * | 2017-02-06 | 2018-08-09 | 大连富地重工机械制造有限公司 | Steel strip packaging machine which may staggeredly shear steel strips and steel strip packaging method |
CN108423228A (en) * | 2018-05-16 | 2018-08-21 | 嘉兴鼎祥汽车零部件有限公司 | A kind of binding apparatus after wire rod rolled product wire drawing |
CN113102621A (en) * | 2021-03-09 | 2021-07-13 | 宁波如意股份有限公司 | Automatic clipping device for packing belt |
Also Published As
Publication number | Publication date |
---|---|
EP3578469A1 (en) | 2019-12-11 |
EP3578469A4 (en) | 2020-12-16 |
WO2018141239A1 (en) | 2018-08-09 |
CN106742176B (en) | 2023-04-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106742176A (en) | A kind of Machine for packing steel band and steel band packaging method of the shear steel band that interlocks | |
US3964232A (en) | Method of packaging fibrous mat structure | |
US4348801A (en) | Bale untying machine | |
US4173313A (en) | Metal web handling method, apparatus and coil construct | |
EP1360112B1 (en) | Apparatus and method for securing a bundle with a strap | |
CN109795756B (en) | Gasket putting mechanism and gasket structure of high wire coil rod packer | |
CN109969502B (en) | Gasket placement mechanism and gasket structure of high wire coil rod packer | |
CN206456597U (en) | A kind of Machine for packing steel band for the shear steel band that interlocks | |
CN101125380B (en) | Strip steel continuous pickling edge processing device | |
US3910145A (en) | Apparatus for cutting a mat of bonded fiber | |
CN201376117Y (en) | Movable circle-shear slitter edge baffle used for finishing unit | |
CN212313965U (en) | Steel coil bundling machine | |
CN110861800A (en) | Wire rod packer gasket placing mechanism with packing head located on side pressing plate | |
CN112027177B (en) | Steel coil bundling machine | |
CN102556728B (en) | Paper tape conveying and bundling mechanism | |
CN114379833A (en) | Gasket placing device for wire rod packing machine and using method thereof | |
US4171080A (en) | Steel metal web handling method | |
JP2568885Y2 (en) | Continuous cold rolling equipment | |
US4953599A (en) | Method of gripping a strap for bonding the strap end portions to each other | |
CN2213054Y (en) | Strapping manipulator | |
CA2807182C (en) | Method for fastening wrapping sheets in pulp-bale packaging, and fastening element | |
CN206511168U (en) | A kind of hexagonal bag paper banding mechanism of line spices | |
CN215391682U (en) | A push down device for aluminium is rolled up | |
CN205324443U (en) | Punch a hole net and punch a hole with dog -ear and net synchronized production device in plane | |
CN113978787B (en) | Layering structure of gasket rolling channel of gasket placing machine of wire rod packing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A steel strip packaging machine and steel strip packaging method that can cross cut steel strips Effective date of registration: 20231218 Granted publication date: 20230425 Pledgee: Dalian Enterprise Credit Financing Guarantee Co.,Ltd. Pledgor: DALIAN FIELD HEAVY-MACHINERY MANUFACTURING Co.,Ltd. Registration number: Y2023980072581 |