CN106741646A - A kind of raft - Google Patents

A kind of raft Download PDF

Info

Publication number
CN106741646A
CN106741646A CN201710066231.6A CN201710066231A CN106741646A CN 106741646 A CN106741646 A CN 106741646A CN 201710066231 A CN201710066231 A CN 201710066231A CN 106741646 A CN106741646 A CN 106741646A
Authority
CN
China
Prior art keywords
floating body
raft
space framework
arm
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710066231.6A
Other languages
Chinese (zh)
Other versions
CN106741646B (en
Inventor
余德海
肖福勤
许明
杨海强
吴昊
宋金鹏
王玉琨
陈震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sunshine Water Surface Photovoltaic Technology Co ltd
Original Assignee
Sungrow Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sungrow Power Supply Co Ltd filed Critical Sungrow Power Supply Co Ltd
Priority to CN201710066231.6A priority Critical patent/CN106741646B/en
Publication of CN106741646A publication Critical patent/CN106741646A/en
Application granted granted Critical
Publication of CN106741646B publication Critical patent/CN106741646B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4433Floating structures carrying electric power plants
    • B63B2035/4453Floating structures carrying electric power plants for converting solar energy into electric energy

Abstract

The embodiment of the invention discloses a kind of raft, including at least one standard installation unit, the standard installation unit, including:Space framework, adjustment part, anchor line and at least one movement floating body;The mobile floating body is arranged on the inside of the space framework;The adjustment part, for adjusting position of the mobile floating body inside the space framework;Anchor point is provided with the space framework;One end of the anchor line connects the anchor point, the fixing point at the other end connection bottom of the anchor line.The raft that the present invention is provided, tactical rule, component specification unification.Standard installation unit first can be produced in batches by factory, Assembling saves the duration into raft, saves manpower, and construction quality is easily controlled.

Description

A kind of raft
Technical field
The present invention relates to technical field of photovoltaic power generation, more particularly to a kind of raft.
Background technology
The construction of photovoltaic plant has many years of experience at home, with the development of photovoltaic generation industry, large-scale ground power station The more aobvious protrusion of occupation of land problem, be that this many enterprise has turned one's attention to the water surface.During beginning, water surface photovoltaic power station is with phytal zone Based on the stand column fixing strutting system high in domain, shallow water area is only applicable to, the utilization rate to the water surface is not high.In order to make full use of Water surface area, the floating power station that can adapt to deepwater regions arises at the historic moment.Further, since there are extensive lake, pond, water in China The water surface resource such as storehouse, the temperature of the water surface is relatively low, and floating power station can also improve the efficiency of photovoltaic generation, and development prospect is wide.
The inverter and transformer of floating power station are disposed on the water surface, it is therefore desirable to carry these by raft Equipment.However, existing raft is formed as the cast of cabinet shell central filler floating substance by concrete, not only body The huge, transport difficult of product, engineering time are long, relatively costly, there may be due to the weight of equipment after equipment is installed Equipment platform tilt problem caused by the heart is misaligned with buoyancy center of gravity, the difficulty of leveling is very big.In addition, existing floating is flat Platform outer surface is big with water body contact area, and the effect to current is more sensitive, under wind wave action, easily produces and rocks.These The operation of electric equipment on platform will be impacted.
The content of the invention
In view of this, the invention provides a kind of raft, can solve the problem that raft is pacified in equipment in the prior art Install the misaligned caused equipment platform of complete tailheaviness to incline, bulky, transport difficult, engineering time are long, relatively costly Problem.
Raft provided in an embodiment of the present invention, including at least one standard installation unit, the standard installation unit, Including:Space framework, adjustment part, anchor line and at least one movement floating body;
The mobile floating body is arranged on the inside of the space framework;
The adjustment part, for adjusting position of the mobile floating body inside the space framework;
Anchor point is provided with the space framework;
One end of the anchor line connects the anchor point, the fixing point at the other end connection bottom of the anchor line.
Optionally,
The adjustment part, including:Slide bar, fixed cross-arm and sleeve nut;
Through hole is provided with the mobile floating body and the fixed cross-arm, the fixed cross-arm is located at the mobile floating body Top;
The slide bar is each passed through the through hole on the through hole on the mobile floating body and the fixed cross-arm, and is fixed on institute State on space framework;
Screw thread is offered on the slide bar, described sleeve pipe nut is spun on the slide bar, described sleeve pipe nut is located at described The top of fixed cross-arm.
Optionally, the adjustment part, including:Static line, fixed cross-arm and telescopic tube;
Through hole is provided with the mobile floating body and the fixed cross-arm, the fixed cross-arm is located at the mobile floating body Top;
The static line is each passed through the through hole on the through hole on the mobile floating body and the fixed cross-arm;
The telescopic tube is enclosed within the static line, and the telescopic tube is located at the top of the fixed cross-arm.
Optionally, the standard installation unit, also including at least one support member;
The support member is arranged on the space framework, for supporting the space framework;
The space framework is divided at least two spaces by the support member, in each space of the space framework It is provided with mobile floating body described at least one;
Fulcrum is additionally provided with the space framework, for fixing equipment.
Optionally, the fulcrum is located at the top of the support member.
Optionally, the standard installation unit, also fixes floating body including at least one;
The fixed floating body is located at the inside of the space framework and in the lower section of the mobile floating body;
The adjustment part, is additionally operable to fix the fixed floating body.
Optionally, the standard installation unit, also includes:Lower perforating canal;
The anchor line is by the lower perforating canal to the bottom of the standard installation unit.
Optionally, capstan winch is provided with the anchor point, for receiving the short or anchor line that lengthens.
Optionally, the material of the floating body is high density polyethylene (HDPE).
Optionally, the upper surface of the raft is equipped with cover plate, and the surrounding and lower surface of the raft spread It is provided with protection network panel.
Compared with prior art, the present invention at least has advantages below:
The raft that the present invention is provided, is spliced by the standard installation unit of at least one space frame structure.Mark Include at least one movement floating body in quasi- installation unit, the position of mobile floating body can be adjusted by adjusting part.Standard is installed single Anchor point and anchor line are provided with unit, for fixing raft in the position of the water surface.Use is additionally provided with standard installation unit In the fulcrum of fixing equipment.The raft that the present invention is provided, tactical rule, component specification unification.Can be first raw by factory's batch Product standard installation unit, Assembling saves the duration into raft, saves manpower, and construction quality is easily controlled.When equipment peace After dress is in place, there is planar tilt phenomenon in such as raft, can be floating to change by adjusting the drinking water position of the floating body of the right and left Power center so that raft keeps level, it is ensured that the running environment of equipment.Also, platform is frame structure, inner filling water Body, platform is smaller in the upward contact area of level with water body, and current can reduce stormy waves pair by platform interior interstitial flow What platform was produced rocks.
Brief description of the drawings
In order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work, Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of raft provided in an embodiment of the present invention;
Fig. 2 is the structural representation of raft Plays installation unit provided in an embodiment of the present invention;
Fig. 3 is a kind of structural representation for adjusting part provided in an embodiment of the present invention;
Fig. 4 is the detail view of adjustment part in Fig. 3;
Fig. 5 is the structural representation of another adjustment part provided in an embodiment of the present invention;
Fig. 6 is the structural representation of telescopic tube in Fig. 5.
Specific embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, is clearly and completely described to the technical scheme in the embodiment of the present invention, it is clear that described embodiment is only this A part of embodiment is invented, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art exist The every other embodiment obtained under the premise of creative work is not made, the scope of protection of the invention is belonged to.
Referring to Fig. 1, the figure is the structural representation of raft provided in an embodiment of the present invention.
The raft that the present embodiment is provided, including at least one standard installation unit 100.
It is understood that in actual installation, can according to the actual size of the equipment 200 laid on raft and Multiple standard installation units 100 are assembled into a raft by weight, with standard, modularization, can prefabrication, can The features such as on-site consolidation, detachable, strong applicability, low cost.Fig. 1 is combined into a raft with 3 standard installation units Example, the exemplified concrete structure of raft provided in an embodiment of the present invention.
In some possible implementations of the present embodiment, the upper surface of the raft is equipped with cover plate, described The surrounding and lower surface of raft are equipped with protection network panel.
The cover plate can also enable personnel exist by cover plate with the facility inside protective standard installation unit 100 Activity on raft, its material can be steel plate.The protection network panel can protect part inside raft not Can be damaged because of collision, for example, can select the waffle slab of glass steel material.Additionally, the contact area of waffle slab structure and current Smaller, current can reduce influence of the stormy waves to raft stability by the interstitial flow inside raft.
The standard installation unit 100, it is specific as shown in Fig. 2 including:Space framework 101, adjustment part 102, anchor line 103 and at least one move floating body 104.
The mobile floating body 104 is arranged on the inside of the space framework 101.
Need exist for explanation, the mobile floating body 104 can be by high density polyethylene (HDPE) material be made it is hollow vertical Cube, pollutes and prevents the erosion of water with cost-effective, reduction.Additionally, being damaged or because inside is entered to prevent from moving floating body 104 Water and influence the buoyancy suffered by standard installation unit 100, can be filled with the lightweight such as foaming agent material inside it.In addition, mobile floating Body 104 can also be steel matter, and its inner hollow can be as the oil storage pool of transformer.
During specific implementation, those skilled in the art can increase or decrease the movement in space framework 101 according to actual needs The size and number of floating body 104, will not enumerate here.
The adjustment part 102, for adjusting position of the mobile floating body 104 inside the space framework 101.
It is understood that the drinking water position for changing mobile floating body 104 by adjusting the position of mobile floating body 104 is i.e. adjustable The stressing conditions of whole raft, by raft leveling.
During specific implementation, at least following two possible implementations of the adjustment part 102.
The first possible implementation, as shown in figure 3, the adjustment part 102, including:Slide bar 102a, fixed cross-arm 102b and sleeve nut 102c, its detail may refer to Fig. 4.
Through hole is provided with the mobile floating body 104 and the fixed cross-arm 102b, the fixed cross-arm 102b is located at The top of the mobile floating body 104;
The slide bar 102a is each passed through logical on the through hole on the mobile floating body 104 and the fixed cross-arm 102b Hole, and be fixed on the space framework 101;
Screw thread is offered on the slide bar 102a, described sleeve pipe nut 102c is spun on the slide bar 102a, described sleeve pipe Nut 102c is located at the top of the fixed cross-arm 102b.
It is understood that in practical operation, can be by being rotated down sleeve nut 102c, by sleeve nut 102c Height of the fixed mobile floating body 104 of cross-arm 102b reductions of pressure in space framework 101 increases mobile floating body 104 in water Volume;Conversely, by rotating up sleeve nut 102c, depressing fixed cross-arm 102b by sleeve nut 102c makes to move floating body 104 can above move a certain distance, improve height of the mobile floating body 104 in space framework 101 to reduce mobile floating body 104 Volume in water.
Also, it should be noted that when standard installation unit 100 includes two or more movement floating bodies 104, can be with At least one fixation cross-arm is set again on the mobile floating body of lower section, and the mobile floating body for making lower section receives mobile floating body above Power effect so that it is moved downwardly together with mobile floating body above.
Second possible implementation, as shown in figure 5, the adjustment part 102, including:Static line 1021, fixed horizontal stroke Load 1022 and telescopic tube 1023;
Through hole is provided with the mobile floating body 104 and the fixed cross-arm 1022, the fixed cross-arm 1022 is located at The top of the mobile floating body 104;
The static line 1021 is each passed through logical on the through hole on the mobile floating body 104 and the fixed cross-arm 1022 Hole;
Explanation is needed exist for, static line 1021 can be anchor chain, steel chain, wirerope or steel wire rope etc., for that will move Floating body 104 is fixed on inside space framework 101.
The telescopic tube 1023 is enclosed within the static line 1021, and the telescopic tube 1023 is located at the fixed cross-arm Top.
It is understood that in practical operation, can be depressed by telescopic tube 1023 by extending telescopic tube 1023 Fixed cross-arm 1022 reduces height of the mobile floating body 104 in space framework 101 to increase body of the mobile floating body 104 in water Product;Conversely, by shortening telescopic tube 1023, depressing that fixed cross-arm 102b makes to move floating body 104 by telescopic tube 1023 can A certain distance is moved above, improves height of the mobile floating body 104 in space framework 101 to reduce mobile floating body 104 in water In volume.
A kind of exemplified concrete structures of telescopic tube 1023 of Fig. 6.The telescopic tube 1023 can be by fixture 1023a is fixed on space framework, and also opening up threaded hollow pipe 1023b including one is used for through static line 1021.It is logical Crossing sleeve nut 1023c of the rotary sleeve on hollow pipe 1023b can increase or shorten the length of whole telescopic tube 1023.This Outward, those skilled in the art can also realize adjusting mobile floating body according to actual conditions from the telescopic tube of other structures The effect of 104 drinking water position, no longer repeats one by one here.
In a word, movement can be fixed using the object (such as slide bar 102a of Fig. 3) of rigid in adjustment part 102 The position of floating body 104, it is also possible to fix mobile floating body 104 using the object (such as static line 1021 of Fig. 5) of non-rigid material Position, will not enumerate here.
Also, it should be noted that when mobile floating body 104 is cube structure, during actual installation, can be in movement A through hole is respectively provided with four angles of floating body 104 and be each passed through a slide bar or static line.At two of mobile floating body 104 A fixed cross-arm is respectively provided with opposite side, the through hole at fixed cross-arm two ends is each passed through a slide bar or static line.Then, exist It is respectively provided with a sleeve nut or telescopic tube on each slide bar or static line to adjust four angles of mobile floating body 104 respectively Highly, with raft described in leveling.
Anchor point 101a is provided with the space framework 101;One end of the anchor line 103 connects the anchor point 101a, the fixing point at the other end connection bottom of the anchor line 103.
In some possible implementations of the present embodiment, capstan winch is provided with the anchor point 101a, it is short for receiving Or the anchor line 103 that lengthens.So, the length of anchor line 103 is adjusted by capstan winch, it becomes possible to which ensureing will drift in flood tide or ebb tide Floating platform is fixed in certain scope.
It is understood that the water-bed fixing point can be water-bed anchoring pile.
In some possible implementations of the present embodiment, for the buoyancy that more flexible adjustment raft is subject to Situation, the standard installation unit 100 can also include that at least one fixes floating body 106;The fixed floating body 106 is located at institute State the inside of space framework 101 and in the lower section of the mobile floating body 104;The adjustment part 102, is additionally operable to fix described solid Determine floating body 106.
Specifically, fixing movement when adjustment part 102 is the object (such as slide bar 102a of Fig. 3) using rigid During the position of floating body 104, fixed floating body 106 can be fixed on below mobile floating body 104 with the object of the rigid, Fixed floating body 106 can be fixed under mobile floating body 104 in modes such as welding fixtures on the object of the rigid Face.Mobile floating body 104 is fixed when adjustment part 102 is the object (such as static line 1021 of Fig. 5) using non-rigid material During position, the fixed cross-arm that locking can be added on the object of the non-rigid material (moves the lower section of floating body 104 in such as Fig. 5 Fixed cross-arm) etc. part fixed floating body 106 is fixed on below mobile floating body 104, will not enumerate here.
It is understood that position of the fixed floating body 106 in space framework 101 immobilizes, movement is placed it in The lower section of floating body 104 does not interfere with the adjustment to the mobile position of floating body 104.It is of course also possible to fixed floating body 106 is placed in into movement The top of floating body 104, but so be unfavorable for adjusting position of the mobile floating body 104 in space framework 101.
It should be noted that fixed floating body 106 can be used being made with the mobile identical material of floating body 104, its structure Can be identical with mobile floating body 104, repeat no more here.
Additionally, the bearing capacity in order to ensure raft, described in some possible implementations of the present embodiment Standard installation unit 100, also including at least one support member 105;
The support member 105 is arranged on the space framework 101, for supporting the space framework 101;The branch 101 points by the space framework of support part part 105 is at least two spaces, is respectively provided with each space of the space framework 101 There is mobile floating body 104 described at least one, and each position for moving floating body 104 is adjusted respectively by adjusting part 102.So The stressing conditions of raft just more flexibly can be accurately adjusted, raft is kept horizontality.
Explanation is needed exist for, support member 105 can be provided in the quadra on space framework 101, also may be used Being two support columns being fixed on space framework 101 parallel to each other, phase between each space of the space framework 101 Intercommunicated, current may pass through each space of space framework 101, reduce influence of the stormy waves to raft stability.
In addition, for the equipment 200 preferably supported and on fixed raft, being also set up on the space framework 101 There is fulcrum 101b, for fixing equipment 200.
Specifically, perforate can be set by fulcrum 101b, equipment 200 is fixed on by fulcrum 101b by bolt On.Furthermore it is possible to be respectively provided with one in each support member 105 of standard installation unit 100 and the junction of space framework 101 The fulcrum 101b carrys out fixing equipment 200.
In some possible implementations of the present embodiment, the standard installation unit 100 also includes:Lower perforating canal 107;
The anchor line 103 is by the lower perforating canal 107 to the bottom of the standard installation unit 100.
It is understood that anchor line 103 to be fixed on the bottom of the standard installation unit 100, can cause in fixation During raft, the stress point of raft will not be inclined in its bottom because of the pulling force of anchor line, can make raft more Steadily.
It should be noted that each part of the raft of the present embodiment offer can be metallic steel material.
Raft provided in an embodiment of the present invention, by the standard installation unit splicing of at least one space frame structure Into.Include at least one movement floating body in standard installation unit, the position of mobile floating body can be adjusted by adjusting part.Standard is pacified Anchor point and anchor line are provided with dress unit, for fixing raft in the position of the water surface.Also set up on standard installation unit There is the fulcrum for fixing equipment.Raft provided in an embodiment of the present invention, tactical rule, component specification unification.Can first by Factory produces standard installation unit in batches, and Assembling saves the duration into raft, saves manpower, and construction quality is easily controlled System.When equipment is installed it is in place after, there is planar tilt phenomenon in such as raft, can be by adjusting the drinking water of the floating body of the right and left Position changes the centre of buoyancy so that raft keeps level, it is ensured that the running environment of equipment.Also, platform is frame structure, Inner filling water body, platform is smaller in the upward contact area of level with water body, and current can be by platform interior interstitial flow, can be with Reduce stormy waves to rock platform generation.
It should be noted that herein, term " including ", "comprising" or its any other variant be intended to non-row His property is included, so that article or equipment including a series of key elements not only include those key elements, but also including not having There are other key elements being expressly recited, or it is this article or the intrinsic key element of equipment also to include.Without more limits In the case of system, the key element limited by sentence "including a ...", it is not excluded that in the article including the key element or set Also there is other identical element in standby.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not made to the present invention.Though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention.It is any to be familiar with those skilled in the art Member, in the case where technical solution of the present invention ambit is not departed from, all using the methods and techniques content of the disclosure above to the present invention Technical scheme makes many possible variations and modification, or the Equivalent embodiments for being revised as equivalent variations.Therefore, it is every without departing from The content of technical solution of the present invention, according to technical spirit of the invention to any simple modification made for any of the above embodiments, equivalent Change and modification, still fall within the range of technical solution of the present invention protection.

Claims (10)

1. a kind of raft, it is characterised in that including at least one standard installation unit, the standard installation unit, including: Space framework, adjustment part, anchor line and at least one movement floating body;
The mobile floating body is arranged on the inside of the space framework;
The adjustment part, for adjusting position of the mobile floating body inside the space framework;
Anchor point is provided with the space framework;
One end of the anchor line connects the anchor point, the fixing point at the other end connection bottom of the anchor line.
2. raft according to claim 1, it is characterised in that
The adjustment part, including:Slide bar, fixed cross-arm and sleeve nut;
Through hole is provided with the mobile floating body and the fixed cross-arm, the fixed cross-arm is located at the upper of the mobile floating body Portion;
The slide bar is each passed through the through hole on the through hole on the mobile floating body and the fixed cross-arm, and is fixed on described vertical On body framework;
Screw thread is offered on the slide bar, described sleeve pipe nut is spun on the slide bar, described sleeve pipe nut is located at the fixation The top of cross-arm.
3. raft according to claim 1, it is characterised in that the adjustment part, including:Static line, fixed horizontal stroke Load and telescopic tube;
Through hole is provided with the mobile floating body and the fixed cross-arm, the fixed cross-arm is located at the upper of the mobile floating body Portion;
The static line is each passed through the through hole on the through hole on the mobile floating body and the fixed cross-arm;
The telescopic tube is enclosed within the static line, and the telescopic tube is located at the top of the fixed cross-arm.
4. raft according to claim 1, it is characterised in that the standard installation unit, also including at least one Support member;
The support member is arranged on the space framework, for supporting the space framework;
The space framework is divided at least two spaces by the support member, is respectively provided with each space of the space framework There is mobile floating body described at least one;
Fulcrum is additionally provided with the space framework, for fixing equipment.
5. raft according to claim 4, it is characterised in that the fulcrum is located at the top of the support member.
6. raft according to claim 1, it is characterised in that the standard installation unit, also including at least one Fixed floating body;
The fixed floating body is located at the inside of the space framework and in the lower section of the mobile floating body;
The adjustment part, is additionally operable to fix the fixed floating body.
7. raft according to claim 1, it is characterised in that the standard installation unit, also includes:Lower break-through Pipe;
The anchor line is by the lower perforating canal to the bottom of the standard installation unit.
8. raft according to claim 1, it is characterised in that be provided with capstan winch on the anchor point, it is short for receiving Or the anchor line that lengthens.
9. raft according to claim 1, it is characterised in that the material of the floating body is high density polyethylene (HDPE).
10. raft according to claim 1, it is characterised in that the upper surface of the raft is equipped with cover plate, The surrounding and lower surface of the raft are equipped with protection network panel.
CN201710066231.6A 2017-02-06 2017-02-06 A kind of raft Active CN106741646B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710066231.6A CN106741646B (en) 2017-02-06 2017-02-06 A kind of raft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710066231.6A CN106741646B (en) 2017-02-06 2017-02-06 A kind of raft

Publications (2)

Publication Number Publication Date
CN106741646A true CN106741646A (en) 2017-05-31
CN106741646B CN106741646B (en) 2019-03-05

Family

ID=58955226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710066231.6A Active CN106741646B (en) 2017-02-06 2017-02-06 A kind of raft

Country Status (1)

Country Link
CN (1) CN106741646B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107644141A (en) * 2017-09-30 2018-01-30 长江勘测规划设计研究有限责任公司 Water surface floating photovoltaic plant anchor system design method
CN109353464A (en) * 2018-12-05 2019-02-19 大连英蕴科技有限公司 A kind of ocean engineering job platform and operational method
CN109720514A (en) * 2019-02-25 2019-05-07 中交第三航务工程局有限公司 A kind of tendon for tension leg floatation type wind power platform
CN112644653A (en) * 2020-12-30 2021-04-13 山东海洋盛景渔业科技有限公司 Deep open sea semi-submersible lifting HDPE multilayer platform
CN113273528A (en) * 2021-06-24 2021-08-20 安徽农业大学 Outdoor aquaculture catches and uses aquaculture net and cursory structure
CN114932984A (en) * 2022-07-01 2022-08-23 武昌船舶重工集团有限公司 Overwater platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2572769Y (en) * 2002-09-05 2003-09-17 潘竫一 Adjustable stationary and float combined structure
CN203902802U (en) * 2014-04-30 2014-10-29 大连理工大学 Deep sea glass steel survey platform device
CN105736221A (en) * 2014-03-04 2016-07-06 杭州林黄丁新能源研究院有限公司 Modularized ocean energy power generation device
CN105947138A (en) * 2016-05-20 2016-09-21 河南丹江大观苑旅游有限公司 Scenic spot tourist ship
CN205596054U (en) * 2016-05-04 2016-09-21 青岛迪玛尔海洋工程有限公司 Surface of water floats formula photovoltaic power generation system
CN106080997A (en) * 2016-07-15 2016-11-09 上海勘测设计研究院有限公司 Marine floating carrying platform and the method for construction of photovoltaic plant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2572769Y (en) * 2002-09-05 2003-09-17 潘竫一 Adjustable stationary and float combined structure
CN105736221A (en) * 2014-03-04 2016-07-06 杭州林黄丁新能源研究院有限公司 Modularized ocean energy power generation device
CN203902802U (en) * 2014-04-30 2014-10-29 大连理工大学 Deep sea glass steel survey platform device
CN205596054U (en) * 2016-05-04 2016-09-21 青岛迪玛尔海洋工程有限公司 Surface of water floats formula photovoltaic power generation system
CN105947138A (en) * 2016-05-20 2016-09-21 河南丹江大观苑旅游有限公司 Scenic spot tourist ship
CN106080997A (en) * 2016-07-15 2016-11-09 上海勘测设计研究院有限公司 Marine floating carrying platform and the method for construction of photovoltaic plant

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107644141A (en) * 2017-09-30 2018-01-30 长江勘测规划设计研究有限责任公司 Water surface floating photovoltaic plant anchor system design method
CN107644141B (en) * 2017-09-30 2020-11-24 长江勘测规划设计研究有限责任公司 Design method of water surface floating type photovoltaic power station anchoring system
CN109353464A (en) * 2018-12-05 2019-02-19 大连英蕴科技有限公司 A kind of ocean engineering job platform and operational method
CN109720514A (en) * 2019-02-25 2019-05-07 中交第三航务工程局有限公司 A kind of tendon for tension leg floatation type wind power platform
CN109720514B (en) * 2019-02-25 2024-03-12 中交第三航务工程局有限公司 Tendon for tension leg floating type wind power platform
CN112644653A (en) * 2020-12-30 2021-04-13 山东海洋盛景渔业科技有限公司 Deep open sea semi-submersible lifting HDPE multilayer platform
CN113273528A (en) * 2021-06-24 2021-08-20 安徽农业大学 Outdoor aquaculture catches and uses aquaculture net and cursory structure
CN114932984A (en) * 2022-07-01 2022-08-23 武昌船舶重工集团有限公司 Overwater platform

Also Published As

Publication number Publication date
CN106741646B (en) 2019-03-05

Similar Documents

Publication Publication Date Title
CN106741646A (en) A kind of raft
US10259542B2 (en) Support structure floating in the open sea and connected to anchors by bracing means, for wind turbines, service stations or converter stations
KR101886777B1 (en) Floating photovoltaic power station and anchor system thereof
US20120093589A1 (en) Foundation support system for an offshore wind energy convertor, corresponding to an offshore wind power generating facility
WO2010147481A1 (en) Wind turbine foundation for variable water depth
US20200032473A1 (en) Maritime structure for laying the foundations of buildings, installations and wind turbines by means of gravity in a marine environment
JP2020045760A (en) Sea tunnel
JP6901867B2 (en) Floating offshore platform
KR20170028329A (en) Tidal energy converter system
KR20200079216A (en) Naval platform to support wind turbines and related naval facilities
KR20220029529A (en) Offshore semi-submersible platform for supporting a wind turbine and offshore electrical energy production facility
WO2010117289A3 (en) Truss tower
DK153960B (en) DRILLING AND PRODUCTION CONSTRUCTION FOR OFFSHORE OPERATIONS
CN104313999A (en) Bridge pier structure
JP2010018129A (en) Inclination adjusting method of tension mooring floating body, and tension mooring floating body
JP2016084660A (en) Foundation structure of off-shore wind turbine generator
KR101406677B1 (en) Floating wind power generation with passive underwater heaving and rolling/pitching damper, passive heaving and rolling/pitching damper for floating wind power generation
KR100979256B1 (en) Mooring Method Enhancing the Side Retaining Force of A Floating Structure
CN210364274U (en) Buoy device with balancing means
Elistratov et al. The development of conceptual options to the construction of ice-resistant floating wind power plants
CN204385762U (en) A kind of Rock Bolt Foundation structure
RU2698367C1 (en) Settlement structure
CN104532873A (en) Rock anchor rod foundation structure
CN213206772U (en) Civil engineering antidetonation additional strengthening
CN220746985U (en) Bus bridge support and cable double-ditch integrated foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220321

Address after: 232089 Management Committee of Pingwei Economic Development Zone, Panji District, Huainan City, Anhui Province 207

Patentee after: Sunshine water surface photovoltaic technology Co.,Ltd.

Address before: 230088 No. 1699 Xiyou Road, Hefei High-tech Zone, Anhui Province

Patentee before: SUNGROW POWER SUPPLY Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 232089 Management Committee of Pingwei Economic Development Zone, Panji District, Huainan City, Anhui Province 207

Patentee after: Sunshine Water Surface Photovoltaic Technology Co.,Ltd.

Address before: 232089 Management Committee of Pingwei Economic Development Zone, Panji District, Huainan City, Anhui Province 207

Patentee before: Sunshine water surface photovoltaic technology Co.,Ltd.