CN106734812B - Planet carrier blank forging equipment - Google Patents

Planet carrier blank forging equipment Download PDF

Info

Publication number
CN106734812B
CN106734812B CN201611227208.2A CN201611227208A CN106734812B CN 106734812 B CN106734812 B CN 106734812B CN 201611227208 A CN201611227208 A CN 201611227208A CN 106734812 B CN106734812 B CN 106734812B
Authority
CN
China
Prior art keywords
planet carrier
staking punch
carrier blank
strut
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611227208.2A
Other languages
Chinese (zh)
Other versions
CN106734812A (en
Inventor
杨光明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Xinrui Technology Service Co.,Ltd.
Original Assignee
CHONGQING YONGCHUAN DISTRICT WANGCHENG MACHINERY PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING YONGCHUAN DISTRICT WANGCHENG MACHINERY PLANT filed Critical CHONGQING YONGCHUAN DISTRICT WANGCHENG MACHINERY PLANT
Priority to CN201611227208.2A priority Critical patent/CN106734812B/en
Publication of CN106734812A publication Critical patent/CN106734812A/en
Application granted granted Critical
Publication of CN106734812B publication Critical patent/CN106734812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J9/00Forging presses
    • B21J9/10Drives for forging presses
    • B21J9/18Drives for forging presses operated by making use of gearing mechanisms, e.g. levers, spindles, crankshafts, eccentrics, toggle-levers, rack bars
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K29/00Arrangements for heating or cooling during processing

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

This patent belongs to forging equipment field, and in particular to a kind of planet carrier blank forging equipment;Including incubation cavity, incubation cavity is semicircle, and punching press slide is equipped with the top of incubation cavity, the side wall both sides of punching press slide are equipped with liquid guiding cavity, and liquid guiding cavity tilts upward, and the input end of liquid guiding cavity is hinged with hollow connecting rod, rod surface slidably connects slide plate, and the end of connecting rod, which is fixed, is communicated with oil pocket;Staking punch is slidably connected in punching press slide, staking punch is equipped with hydraulic stem, and hydraulic stem is equipped with strut, and strut is compared with hydraulic pressure shank diameter smaller;Drive link is hinged with strut, the other end and the slide plate of drive link are hinged.Present patent application can keep the temperature planet carrier blank, and staking punch is heated in advance, when preventing the surface of pressure head contact workpiece moment reduce the temperature of the part.

Description

Planet carrier blank forging equipment
Technical field
The invention belongs to forging equipment field, and in particular to a kind of planet carrier blank forging equipment.
Background technology
Planet carrier blank forging is a common technology in planet carrier process, in order to reach certain characteristic, forging Part is needed after high temperature forging to obtain this kind of performance.Forge furnace is the indispensable process equipment of forging processing.And show The heat losses of workpiece are rapid in the forging process of some forge furnaces so that planet carrier slab temperature declines quickly, after forging Mechanical property do not reach requirement;And punching press head surface is low temperature, can be reduced moment at the surface of pressure head contact workpiece should Partial temperature, easily there is mechanical performance loss in the surface for the planet carrier blank for causing to be forged, or even slight crack occurs.
The content of the invention
It is an object of the invention to provide a kind of planet carrier blank forging equipment, and planet carrier blank can be kept the temperature, and And staking punch is heated in advance, when preventing the surface of staking punch contact workpiece moment reduce the temperature of the part.
To reach above-mentioned purpose, base case of the invention is as follows:
Planet carrier blank forging equipment, including incubation cavity, incubation cavity are semicircle, and punching press slide is equipped with the top of incubation cavity, The side wall both sides of punching press slide are equipped with liquid guiding cavity, and liquid guiding cavity tilts upward, and the input end of liquid guiding cavity is hinged with hollow connecting rod, Rod surface slidably connects slide plate, and the end of connecting rod, which is fixed, is communicated with oil pocket;Staking punch is slidably connected in punching press slide, is rushed Pressure head is equipped with hydraulic stem, and hydraulic stem is equipped with strut, and strut is compared with hydraulic pressure shank diameter smaller;Drive link is hinged with strut, is passed The other end of lever is hinged with slide plate.
The principle of this programme planet carrier blank forging equipment is:
When forging planet carrier blank, incubation cavity is covered on blank first, under the actuating unit for starting the external world at this time Staking punch is pressed, staking punch moves up and down the link rotatable that can be driven on oil pocket, when staking punch is moved to above liquid guiding cavity, The position of oil pocket is just slightly above liquid guiding cavity, so the fuel oil in oil pocket can be flowed out to liquid guiding cavity at this time, when punch rod downlink When, the fuel oil flowed out can be push and moved downward, be closed space below staking punch, pressure can be increasing, this The temperature of a little fuel oils can be higher and higher, finally burns when staking punch downlink, high temperature caused by burning just can be right The surface of staking punch is heated, and has achieveed the purpose that to preheat staking punch.Moment reduces when preventing the surface of pressure head contact workpiece The temperature of the part, avoids causing the surface of planet carrier blank from mechanical performance loss occur.Staking punch downlink to crossing drain After the distance of chamber one end, the connecting rod slide that can be stamped props up, and can only move on strut and play spacing effect without rotation.
This programme can keep the temperature planet carrier blank, and staking punch is heated in advance, prevent staking punch from contacting Moment reduces the temperature of the part during surface of workpiece.
Preferred solution one:As the further optimization to base case, the bottom of incubation cavity is equipped with cushion, cushion by Rubber is made, and avoids damage to incubation cavity.
Preferred solution two:As the further optimization to base case, the sidewall edge of staking punch is equipped with sealant, seals Layer by polyurethane into;So that airtight performance is more preferable.
Preferred solution three:As the further optimization to base case, the initial position of drive link tilts down, prevents from firing Oil is toppled over.
Brief description of the drawings
Fig. 1 is the structure diagram of planet carrier blank forging apparatus embodiments of the present invention.
Embodiment
Below by embodiment, the present invention is described in further detail:
Reference numeral in Figure of description includes:Incubation cavity 1, cushion 2, staking punch 3, hydraulic stem 4, strut 5, punching press Track 6, oil pocket 7, connecting rod 8.
Embodiment is substantially as shown in Figure 1:
The planet carrier blank forging equipment of the present embodiment includes incubation cavity 1, and incubation cavity 1 is semicircle, and the top of incubation cavity 1 is set There is punching press slide, the side wall both sides of punching press slide are equipped with liquid guiding cavity, and liquid guiding cavity tilts upward, and the input end of liquid guiding cavity is hinged with Hollow connecting rod 8,8 surface of connecting rod slidably connect slide plate, and the end of connecting rod 8, which is fixed, is communicated with oil pocket 7;Slided in punching press slide Staking punch 3 is connected with, staking punch 3 is equipped with hydraulic stem 4, and hydraulic stem 4 is equipped with strut 5, and strut 5 is compared with 4 diameter smaller of hydraulic stem; Drive link is hinged with strut 5, the other end and the slide plate of drive link are hinged.The sidewall edge of staking punch 3 is equipped with sealant, insulation The bottom of chamber 1 is equipped with cushion 2.
The specific work process of the present embodiment planet carrier blank forging equipment is:
When the present apparatus can forge planet carrier blank, incubation cavity 1 is covered on blank first, starts extraneous move at this time Force mechanisms push staking punch 3, and staking punch 3, which moves up and down, can drive the connecting rod 8 on oil pocket 7 to rotate, and staking punch 3 is moved to drain When above chamber, the position of oil pocket 7 is just slightly above liquid guiding cavity, so the fuel oil in oil pocket 7 can be flowed out to liquid guiding cavity at this time, When punch rod downlink, the fuel oil flowed out can be push and moved downward, the lower section of staking punch 3 is closed space, pressure Power can be increasing, and the temperature of these fuel oils can be higher and higher, finally burns when 3 downlink of staking punch, and when burning produces High temperature the surface of staking punch 3 can just be heated, achieveed the purpose that preheat staking punch 3.Prevent pressure head from contacting work Moment reduces the temperature of the part during surface of part, avoids causing the surface of planet carrier blank from mechanical performance loss occur.Punching press First 3 downlink to after crossing liquid guiding cavity one end distance, the connecting rod slide that can be stamped props up, can only be moved on strut 5 without Rotation plays spacing effect.
This programme can keep the temperature planet carrier blank, and staking punch is heated in advance, prevent staking punch from contacting Moment reduces the temperature of the part during surface of workpiece.
Above-described is only the embodiment of the present invention, and the general knowledge such as known concrete structure and characteristic is not made herein in scheme Excessive description., without departing from the structure of the invention, can be with it should be pointed out that for those skilled in the art Several modifications and improvements are made, these should also be considered as protection scope of the present invention, these are implemented all without the influence present invention Effect and practical applicability.The scope of protection required by this application should be based on the content of the claims, in specification The records such as embodiment can be used for the content for explaining claim.

Claims (4)

1. a kind of planet carrier blank forging equipment, it is characterised in that including incubation cavity, the incubation cavity is semicircle, the guarantor Warm top of chamber is equipped with punching press slide, and the side wall both sides of the punching press slide are equipped with liquid guiding cavity, and the liquid guiding cavity tilts upward, institute The input end for stating liquid guiding cavity is hinged with hollow connecting rod, and the rod surface slidably connects slide plate, and the end of the connecting rod is consolidated Surely it is communicated with oil pocket;Staking punch is slidably connected in the punching press slide, staking punch is equipped with hydraulic stem, is set on the hydraulic stem There is strut, the strut is compared with hydraulic pressure shank diameter smaller;Drive link, the other end of the drive link and institute are hinged with the strut Slide plate is stated to be hinged.
2. planet carrier blank forging equipment according to claim 1, it is characterised in that the bottom of the incubation cavity is equipped with slow Layer is rushed, the cushion is made of rubber.
3. planet carrier blank forging equipment according to claim 1, it is characterised in that the sidewall edge of the staking punch is set Have a sealant, the sealant by polyurethane into.
4. planet carrier blank forging equipment according to claim 1, it is characterised in that the initial position of the drive link to Lower inclination.
CN201611227208.2A 2016-12-27 2016-12-27 Planet carrier blank forging equipment Active CN106734812B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611227208.2A CN106734812B (en) 2016-12-27 2016-12-27 Planet carrier blank forging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611227208.2A CN106734812B (en) 2016-12-27 2016-12-27 Planet carrier blank forging equipment

Publications (2)

Publication Number Publication Date
CN106734812A CN106734812A (en) 2017-05-31
CN106734812B true CN106734812B (en) 2018-05-01

Family

ID=58922213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611227208.2A Active CN106734812B (en) 2016-12-27 2016-12-27 Planet carrier blank forging equipment

Country Status (1)

Country Link
CN (1) CN106734812B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5816749A (en) * 1981-07-24 1983-01-31 Sumitomo Heavy Ind Ltd Forging press
JP2000176592A (en) * 1998-12-09 2000-06-27 Gfm Beteiligungs & Manag Gmbh & Co Kg Forging machine provided with eccentric center ring transmitting system connecting rod type forging ram
CN202129398U (en) * 2011-05-18 2012-02-01 天津市锋环减速机配件厂 Forging press for small work-piece
CN104148897A (en) * 2014-08-06 2014-11-19 江苏亚太安信达铝业有限公司 Forging technology of support for electric appliance
CN204321079U (en) * 2014-12-20 2015-05-13 莱州市莱索制品有限公司 Forge die preheating device
CN105855439A (en) * 2016-04-05 2016-08-17 昌利锻造有限公司 Machining method for planet carrier

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5816749A (en) * 1981-07-24 1983-01-31 Sumitomo Heavy Ind Ltd Forging press
JP2000176592A (en) * 1998-12-09 2000-06-27 Gfm Beteiligungs & Manag Gmbh & Co Kg Forging machine provided with eccentric center ring transmitting system connecting rod type forging ram
CN202129398U (en) * 2011-05-18 2012-02-01 天津市锋环减速机配件厂 Forging press for small work-piece
CN104148897A (en) * 2014-08-06 2014-11-19 江苏亚太安信达铝业有限公司 Forging technology of support for electric appliance
CN204321079U (en) * 2014-12-20 2015-05-13 莱州市莱索制品有限公司 Forge die preheating device
CN105855439A (en) * 2016-04-05 2016-08-17 昌利锻造有限公司 Machining method for planet carrier

Also Published As

Publication number Publication date
CN106734812A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106746533B (en) Pressurizing system for forming curved glass of mobile terminal
CN105888712A (en) Initiative top coal caving crushing hydraulic support
US20150217354A1 (en) Press machine and pressing method
CN106734812B (en) Planet carrier blank forging equipment
CN102489656A (en) Bearing forging production process by blanking long bar at 900 DEG C and continuously heating to 1050 DEG C at intermediate frequency
CN104457278B (en) Aluminum bar feeding device
CN104209920A (en) Piston pin clamp spring press-fitting device
CN204276777U (en) A kind of anti-bending heading die
CN103658416B (en) A kind of laser auxiliary heating device for self-piercing riveting
JP2016043402A (en) Press forming die device
CN203501778U (en) Variable volume trolley type gas-fired thermal treatment furnace
CN202606760U (en) Forge piece waste heat utilizing device
CN105598255A (en) Gasket stamping die
CN102294425A (en) Forging device and forging method for upper wide anvil and lower narrow anvil
JP5183755B2 (en) Press machine
CN103785728A (en) Forming device for bending rod part to be cambered
CN103962486A (en) Whole forging process method of super-high pressure valve body
CN104148909B (en) The manufacture method of unit-welded planetary assemblies
CN102672091A (en) Efficient isothermal forging mould base
JP6036729B2 (en) Hot press mold and hot press molding method
CN202180169U (en) Forging device with upper wide anvil and lower narrow anvil
CN102383086A (en) Medium-temperature oxidation process for plug
CN203478951U (en) Novel stepping furnace beam
JP2016198820A5 (en)
CN207668429U (en) A kind of feeding mechanism of forging roll

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200117

Address after: Xiangyu Street Airport Development Zone Road 401120 Chongqing city Yubei District Shuangfeng Bridge No. 15 Building 2

Patentee after: Chongqing Bochuang Intellectual Property Operations Co., Ltd.

Address before: 402160 Chongqing Yongchuan District cool Pavilion pedestrian street

Patentee before: Chongqing Yongchuan District Wangcheng Machinery Plant

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201217

Address after: 402460 station 13, 10 / F, innovation and development center, 19 Lingfang Avenue, Changzhou street, Rongchang District, Chongqing

Patentee after: Chongqing Xinrui Technology Service Co.,Ltd.

Address before: 401120 Yubei District, Chongqing Shuangfeng bridge airport development zone, Xiangyu Road, No. 15, 2.

Patentee before: Chongqing Bochuang Intellectual Property Operations Co.,Ltd.

TR01 Transfer of patent right