CN106712301A - Fault-tolerant processing method suitable for distributed fault self-recovery of power distribution network - Google Patents

Fault-tolerant processing method suitable for distributed fault self-recovery of power distribution network Download PDF

Info

Publication number
CN106712301A
CN106712301A CN201710072220.9A CN201710072220A CN106712301A CN 106712301 A CN106712301 A CN 106712301A CN 201710072220 A CN201710072220 A CN 201710072220A CN 106712301 A CN106712301 A CN 106712301A
Authority
CN
China
Prior art keywords
distribution network
intelligent terminal
fault
stu
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710072220.9A
Other languages
Chinese (zh)
Other versions
CN106712301B (en
Inventor
陈羽
徐丙垠
王敬华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Technology
State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Shandong University of Technology
State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Technology, State Grid Zhejiang Electric Power Co Ltd filed Critical Shandong University of Technology
Priority to CN201710072220.9A priority Critical patent/CN106712301B/en
Publication of CN106712301A publication Critical patent/CN106712301A/en
Application granted granted Critical
Publication of CN106712301B publication Critical patent/CN106712301B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0006
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H7/00Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
    • H02H7/26Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
    • H02H7/28Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/20Systems supporting electrical power generation, transmission or distribution using protection elements, arrangements or systems

Landscapes

  • Data Exchanges In Wide-Area Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to the technical field of power distribution automation, and particularly relates to a fault-tolerant processing method suitable for distributed fault self-recovery of a power distribution network. The method comprises the following steps of (a) building a network topology; (b) setting a fault-tolerant stage number according to the importance degree of a line; and (c) determining fault positions and processing the faults. Excessive dependence on communication in a distributed processing system is overcome, an optimal processing method in communication faults is provided, minimization of the blackout range is achieved, and the method is simple and easy to implement. When a communication network is broken down, peer-to-peer communication between devices cannot be achieved by a distributed processing system, and the whole fault self-recovery logic is stopped and the whole line is powered off if the line is broken down. Compared with the prior art, the processing method when the communication network is broken down has the advantages that the power supply interval can be recovered to the maximum extent and the power supply reliability is improved.

Description

Suitable for the fault-tolerance processing method of power distribution network distributed fault self-healing
Technical field
The present invention relates to Distribution Automation Technology field, and in particular to a kind of suitable for power distribution network distributed fault self-healing Fault-tolerance processing method.
Background technology
The various failures of generation that can not can be envisioned in the distribution network operation of distributed AC servo system, including busbar short-circuit, branch road In short circuit, the malfunction of on-load switch, tripping, distribution terminal processing procedure the problems such as communication disruption, anticipation circuit overload, these are asked Topic is all the problem for needing to consider during power distribution network relay protection is processed.Wherein, the problem on distribution terminal performance in itself:Load Communication disruption, anticipation circuit overload etc., are because terminal is hard in malfunction, tripping, the Intelligent terminal of distribution network processing procedure of switch The force majeure problem that part, software equipment self reason are produced, after there are these problems, can Intelligent terminal of distribution network in terminal Rational relevant action is made to failures such as the short circuits of circuit when there is the problem of force majeure factor, be it is very important, i.e., It is related to fault-tolerant ability of the Intelligent terminal of distribution network in distributed proccessing.
The content of the invention
In order to solve the above-mentioned technical problem the deficiency in, it is an object of the invention to:There is provided a kind of suitable for power distribution network point The fault-tolerance processing method of cloth fault self-recovery, overcomes and communication is depended on unduly in distributed processing system(DPS), realizes power failure Scope is minimized, and improves power supply reliability.
The present invention for the technical scheme that is used of its technical problem of solution for:
The fault-tolerance processing method suitable for power distribution network distributed fault self-healing, comprises the following steps:
A, set up network topology:When device is installed, manually for each Intelligent terminal of distribution network STU configures adjacent power distribution network intelligence The network address of energy terminal STU ';
B, the significance level according to circuit, set fault-tolerant series:When fault-tolerant series is 0, inside Intelligent terminal of distribution network STU The network address of adjacent Intelligent terminal of distribution network STU ' is only stored, when fault-tolerant series is 1, is needed inside Intelligent terminal of distribution network STU To inquire about by its adjacent Intelligent terminal of distribution network STU ' and store time neighbour's power distribution network intelligence of adjacent Intelligent terminal of distribution network STU ' The network address of energy terminal STU ", when fault-tolerant series is more than 1, the like;
C, determine abort situation, failure is processed:When there is over current fault in system, Intelligent terminal of distribution network STU After detecting fault current, the fault-tolerant grade that inquiry pre-sets;If fault-tolerant grade is 0, Intelligent terminal of distribution network STU is only To adjacent Intelligent terminal of distribution network STU ' inquire about, determine abort situation, now, if adjacent distribution terminal because certain reason not Response, such as there occurs plant failure or communication failure, and system logic stops;If fault-tolerant grade is 1, power distribution network intelligence Terminal STU continues to inquire about adjacent Intelligent terminal of distribution network STU's ' after the adjacent Intelligent terminal of distribution network STU ' of inquiry is unresponsive Secondary adjacent Intelligent terminal of distribution network STU ", if secondary adjacent Intelligent terminal of distribution network STU " responses are normal, realize fault location, if Secondary adjacent Intelligent terminal of distribution network STU " is unresponsive, and system logic stops, when fault-tolerant series is more than 1, the like, carry out failure Positioning, after fault location is finished, is processed failure.
Compared with prior art, the invention has the advantages that:
Instant invention overcomes being depended on unduly to communication in distributed processing system(DPS), there is provided one kind breaks down when communication When optimal processing method, realize the minimum of power failure range, method is simple and easily realizes;When communication network breaks down When, distributed processing system(DPS) cannot realize the peer-to-peer communications between device, and now in the event of line fault, whole fault self-recovery is patrolled Collecting to stop, and cause whole piece line outage, compared with prior art, the treatment in communication network failure proposed by the present invention Method, can at utmost restore electricity interval, improve the reliability of power supply.
Brief description of the drawings
Fig. 1 FB(flow block)s of the invention;
Fault Isolation flow chart during Fig. 2 on-load switch trippings of the present invention;
Fault Isolation flow chart during Fig. 3 on-load switch malfunctions of the present invention.
Specific embodiment
The embodiment of the present invention is described further below in conjunction with the accompanying drawings:
Embodiment 1
The fault-tolerance processing method suitable for power distribution network distributed fault self-healing, comprises the following steps:
A, set up network topology:When device is installed, manually for each Intelligent terminal of distribution network STU configures adjacent power distribution network intelligence The network address of energy terminal STU ';
B, the significance level according to circuit, set fault-tolerant series:When fault-tolerant series is 0, inside Intelligent terminal of distribution network STU The network address of adjacent Intelligent terminal of distribution network STU ' is only stored, when fault-tolerant series is 1, is needed inside Intelligent terminal of distribution network STU To inquire about by its adjacent Intelligent terminal of distribution network STU ' and store time neighbour's power distribution network intelligence of adjacent Intelligent terminal of distribution network STU ' The network address of energy terminal STU ", when fault-tolerant series is more than 1, the like;
C, determine abort situation, failure is processed:When there is over current fault in system, Intelligent terminal of distribution network STU After detecting fault current, the fault-tolerant grade that inquiry pre-sets;If fault-tolerant grade is 0, Intelligent terminal of distribution network STU is only To adjacent Intelligent terminal of distribution network STU ' inquire about, determine abort situation, now, if adjacent distribution terminal because certain reason not Response, such as there occurs plant failure or communication failure, and system logic stops;If fault-tolerant grade is 1, power distribution network intelligence Terminal STU continues to inquire about adjacent Intelligent terminal of distribution network STU's ' after the adjacent Intelligent terminal of distribution network STU ' of inquiry is unresponsive Secondary adjacent Intelligent terminal of distribution network STU ", if secondary adjacent Intelligent terminal of distribution network STU " responses are normal, realize fault location, if Secondary adjacent Intelligent terminal of distribution network STU " is unresponsive, and system logic stops, when fault-tolerant series is more than 1, the like, carry out failure Positioning, after fault location is finished, is processed failure.
Embodiment 2
As shown in Figure 1:Two ends power supply is powered, and switch Q31 is interconnection switch.Below for trouble point in diverse location, point The fault-tolerant ability of cloth treatment technology.
There is over current fault in a, power outlet, trouble point is located between switch QF1 and switch Q11 switches
1) Intelligent terminal of distribution network STUA now detects failure, when Intelligent terminal of distribution network STUA communicates with STU1 When normal, Intelligent terminal of distribution network STUA judges event by itself with adjacent Intelligent terminal of distribution network STU1 fault current informations Barrier point Intelligent terminal of distribution network STUA and Intelligent terminal of distribution network STU1 controlling switches QF1 and is opened between QF1 and Q11 is switched Q11 tripping operation isolated faults are closed, after Fault Isolation success, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate and sends failure Isolation successful information, after Intelligent terminal of distribution network STU3 receives Fault Isolation success message, when contact combined floodgate condition is met, control Interconnection switch Q31 processed closes a floodgate, and completes service restoration;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent Intelligent terminal of distribution network STU2 communications, by itself and Intelligent terminal of distribution network STU2 fault current informations, judge to be out of order Point has now ignored Intelligent terminal of distribution network STU1 control areas, Intelligent terminal of distribution network STUA between QF1 and Q21 is switched With Intelligent terminal of distribution network STU2 controlling switches QF1 and Q21 tripping operation isolated fault, after Fault Isolation success, power distribution network intelligence is eventually End STUA controlling switches QF1 closes a floodgate and sends Fault Isolation success message, and Intelligent terminal of distribution network STU3 judges that meeting contact closes During lock condition, control interconnection switch Q31 closes a floodgate, and completes service restoration.
If 3) communicated between Intelligent terminal of distribution network STUA, Intelligent terminal of distribution network STU1, Intelligent terminal of distribution network STU2 Abnormal, logic is exited.
There is over current fault between b, switch, trouble point is located between switch Q12 and switch Q21
1) now Intelligent terminal of distribution network STUA and Intelligent terminal of distribution network STU1 detects failure, when power distribution network intelligence Terminal STUA, STU1, STU2 communications are normal, by fault current information judge trouble point switch Q12 and switch Q21 it Between, Intelligent terminal of distribution network STU1 and STU2 controlling switch Q12 and Q21 tripping operation isolated fault, power distribution network after Fault Isolation success Intelligent terminal STU1 sends Fault Isolation success message, and Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, power distribution network intelligence When terminal STU3 judges to meet contact combined floodgate condition, control interconnection switch Q31 closes a floodgate, and completes service restoration;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, judges trouble point in switch QF1 and Q21 by fault current information Between, Intelligent terminal of distribution network STUA and STU2 controlling switch QF1 and Q21 tripping operation isolated fault, distribution after Fault Isolation success Net intelligent terminal STU1 sends Fault Isolation success message, and Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, power distribution network intelligence When energy terminal STU3 judges to meet contact combined floodgate condition, control interconnection switch Q31 combined floodgates complete service restoration;
If 3) Intelligent terminal of distribution network STU1 communicates abnormal with STU2, Intelligent terminal of distribution network STU1 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU3, judges trouble point in switch QF12 and Q31 by fault current information Between, now ignore Intelligent terminal of distribution network STU2 control areas, Intelligent terminal of distribution network STU1 and STU3 controlling switch Q12 and Q31 tripping operation isolated faults, Intelligent terminal of distribution network STU1 sends Fault Isolation success message, power distribution network intelligence after Fault Isolation success Energy terminal STUA controlling switches QF1 closes a floodgate, and when Intelligent terminal of distribution network STU3 judges to meet contact combined floodgate condition, controls contact to open Close Q31 to close a floodgate, complete service restoration.
If 4) communicate abnormal between Intelligent terminal of distribution network STUA, STU1, STU2, logic is exited.
There is over current fault in c, analog line end, trouble point is located between switch Q22 and switch Q31 switches
1) now Intelligent terminal of distribution network STUA, STU1, STU2 detects failure, when Intelligent terminal of distribution network STUA, STU1, STU2, STU3 communication are normal, judge trouble point between Q22 and Q31 is switched by fault current information, power distribution network Intelligent terminal STU2 controlling switches Q22 tripping operation isolated faults, Intelligent terminal of distribution network STU2 sends failure after Fault Isolation success Isolation success message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer Close a floodgate;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, by fault current information failure judgement point not in switch QF1 and Q21 Between;Intelligent terminal of distribution network STU1 and STU2 interaction fault information judges trouble point not between Q12 and Q21 is switched;Match somebody with somebody Power network intelligent terminal STU2 and STU3 interaction fault information judges trouble point between Q22 and Q31 is switched, and power distribution network intelligence is eventually End STU2 controlling switches QF22 tripping operation isolated fault, after Fault Isolation success Intelligent terminal of distribution network STU2 send Fault Isolation into Work(message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer closes a floodgate.
3) if Intelligent terminal of distribution network STU1 communicates abnormal with STU2, but Intelligent terminal of distribution network STU1 communicates with STU3 Normally, now it is possible that 2 kinds of situations.The first situation, Intelligent terminal of distribution network STU2 communicates abnormal with STU3, distribution Net intelligent terminal STU1 communicates, by fault current information active and next adjacent terminal with Intelligent terminal of distribution network STU3 Judge trouble point switch Q12 and Q31 between, Intelligent terminal of distribution network STU1 controlling switches Q12 tripping operation isolated fault, failure Intelligent terminal of distribution network STU1 sends Fault Isolation success message, Intelligent terminal of distribution network STUA controlling switches after isolating successfully QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer closes a floodgate;Second situation, Intelligent terminal of distribution network STU2 with STU3 communications are normal, judge trouble point between Q22 and Q31 is switched by fault current information, Intelligent terminal of distribution network STU2 controlling switches Q22 tripping operation isolated faults, Intelligent terminal of distribution network STU2 sends Fault Isolation success after Fault Isolation success Message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer closes a floodgate;
If 4) Intelligent terminal of distribution network STU2 communicates abnormal with STU3, Intelligent terminal of distribution network STU2 is matched somebody with somebody by topological piece Put, learn right-side switch for interconnection switch, but because with Intelligent terminal of distribution network STU3 communication abnormalities, it is impossible to know power distribution network intelligence A kind of energy terminal STU3 liaison states, scheme only controls itself to trip;Another scheme because will actively and next adjacent terminal, i.e., with Intelligent terminal of distribution network STU4 communicate, by fault current information judge trouble point switch Q22 and Q41 between, power distribution network Intelligent terminal STU2 and STU4 controlling switch Q22 and Q41 tripping operation isolated fault, may now expand power failure range;Failure every Intelligent terminal of distribution network STU2 sends Fault Isolation success message, Intelligent terminal of distribution network STUA controlling switches QF1 after success Close a floodgate, complete service restoration, switch Q31 is located at trouble point downstream border, no longer closes a floodgate.
If 5) communicate abnormal between Intelligent terminal of distribution network STUA, STU1, STU2, STU3, STU4, logic is exited.
There is over current fault in d, simulation power distribution station internal bus, trouble point is located between switch Q21 and switch Q22 switches
1) when bus where Intelligent terminal of distribution network STU2 breaks down, Intelligent terminal of distribution network STU2 only needs to die certainly Barrier information, that is, switch Q21 excessively streams, switch Q22 not excessively streams, you can judge it is bus-bar fault, controlling switch Q21, Q22, Q23, Q24 separating brake isolated faults, Intelligent terminal of distribution network STU2 sends Fault Isolation success message, Intelligent terminal of distribution network STUA controls Switch QF1 closes a floodgate and restores electricity, and when Intelligent terminal of distribution network STU3 judges to meet contact combined floodgate condition, controls interconnection switch Q13 Close a floodgate, complete service restoration.
There is over current fault under e, dry run mode situation of change, interconnection switch is changed into switching Q41 from switch Q31, therefore Barrier point is located between switch Q22 and switch Q31
1) now Intelligent terminal of distribution network STUA, STU1, STU2 detects failure, when Intelligent terminal of distribution network STUA, STU1, STU2, STU3 communication are normal, judge trouble point between Q22 and Q31 is switched by fault current information, power distribution network Intelligent terminal STU2 and STU3 controlling switch Q22 and Q31 tripping operation isolated fault, switch QF1 and close a floodgate after Fault Isolation success, distribution When net intelligent terminal STU4 judges to meet contact combined floodgate condition, control interconnection switch Q41 closes a floodgate, and completes service restoration;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, by fault current information failure judgement point not in switch QF1 and Q21 Between;Intelligent terminal of distribution network STU1 and STU2 interaction fault information judges trouble point not between Q12 and Q21 is switched;Match somebody with somebody Power network intelligent terminal STU2 and STU3 interaction fault information judges trouble point between Q22 and Q31 is switched, and power distribution network intelligence is eventually End STU2 and STU3 controlling switches Q22 and Q31 tripping operation isolated fault, Intelligent terminal of distribution network STU2 sends after Fault Isolation success Fault Isolation success message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and Intelligent terminal of distribution network STU4 judges to meet During contact combined floodgate condition, control interconnection switch Q41 closes a floodgate, and completes service restoration;
If 3) Intelligent terminal of distribution network STU1 communicates abnormal with STU2, Intelligent terminal of distribution network STU1 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU3, by fault current information judge trouble point not switch Q12 with Between Q31;Intelligent terminal of distribution network STU2 and STU3 interaction fault information judges that trouble point between Q22 and Q31 is switched, is matched somebody with somebody Power network intelligent terminal STU2 and STU3 controlling switch Q22 and Q31 tripping operation isolated fault, power distribution network intelligence is whole after Fault Isolation success End STU2 sends Fault Isolation success message, and Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, Intelligent terminal of distribution network When STU4 judges to meet contact combined floodgate condition, control interconnection switch Q41 closes a floodgate, and completes service restoration;
If 4) Intelligent terminal of distribution network STU2 communicates abnormal with STU3, Intelligent terminal of distribution network STU2 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU4, judges trouble point in switch Q22 and Q41 by fault current information Between, Intelligent terminal of distribution network STU2 controlling switches Q22 tripping operation isolated faults, switch Q41 is interconnection switch, is no longer tripped;Therefore Phragma Intelligent terminal of distribution network STU2 after success sends Fault Isolation success message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate.
If 5) communicate abnormal between Intelligent terminal of distribution network STUA, STU1, STU2, STU3, STU4, logic is exited.
There is over current fault under f, simulation inspecting state, switch Q22 and switch Q31 is point, and trouble point is located at and switchs Q12 And switch Q21 between
Q22 is switched under inspecting state and switch Q31 is unsatisfactory for interconnection switch condition, so contact closing function is exited.
1) now Intelligent terminal of distribution network STUA, STU1 detects failure, when Intelligent terminal of distribution network STUA, STU1, STU2 communications are normal, judge trouble point between Q12 and Q21 is switched by fault current information, Intelligent terminal of distribution network STU1 and STU2 controlling switches Q12 and Q21 tripping operation isolated fault, switch QF1 and close a floodgate after Fault Isolation success;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, by fault current information failure judgement point in switch QF1 and switch Between Q21;Intelligent terminal of distribution network STUA and STU3 controlling switch QF1 and Q21 tripping operation isolated fault;
If 3) Intelligent terminal of distribution network STU1 communicates abnormal with STU2, Intelligent terminal of distribution network STU1 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU3, and Intelligent terminal of distribution network STU1 and STU3 interaction fault information is judged Trouble point switch Q12 and Q31 between, Intelligent terminal of distribution network STU1 controlling switches Q12 tripping operation isolated fault, Fault Isolation into Intelligent terminal of distribution network STU1 sends Fault Isolation success message after work(, and Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, Interconnection switch no longer closes a floodgate.
G, simulate it is double diverse location occur over current fault, first time failure be located at switch Q22 and switch Q31 it Between, second failure is located between switch Q12 and switch Q21
(1) during first time failure there is over current fault in reference line end, and trouble point is located at switch Q22 and switch Q31 is opened Situation when between pass, it is considered to problem caused by communication terminal, it may appear that following pattern;
1) Intelligent terminal of distribution network STUA, STU1, STU2 detects failure, when Intelligent terminal of distribution network STUA, STU1, STU2, STU3 communication are normal, and trouble point is judged between Q22 and Q31 is switched by fault current information, and power distribution network intelligence is eventually End STU2 controlling switches Q22 tripping operation isolated fault, after Fault Isolation success Intelligent terminal of distribution network STU2 send Fault Isolation into Work(message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer closes a floodgate;
Second failure occurs between Q12 and Q21 is switched, and Intelligent terminal of distribution network STU1 and STU2 can correctly judge event Hinder point between Q21 and Q21 is switched, Intelligent terminal of distribution network STU1 and STU2 difference controlling switch Q12 and Q21 separating brake isolate event Barrier, Intelligent terminal of distribution network STU1 sends Fault Isolation success message, and Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate extensive Multiple upstream powers;
If 2) Intelligent terminal of distribution network STUA communicates abnormal with STU1, Intelligent terminal of distribution network STUA will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, by fault current information failure judgement point not in switch QF1 and Q21 Between;Intelligent terminal of distribution network STU1 and STU2 interaction fault information judges trouble point not between Q12 and Q21 is switched;Match somebody with somebody Power network intelligent terminal STU2 and STU3 interaction fault information judges trouble point between Q22 and Q31 is switched, and power distribution network intelligence is eventually End STU2 controlling switches Q22 tripping operation isolated fault, after Fault Isolation success Intelligent terminal of distribution network STU2 send Fault Isolation into Work(message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate, and switch Q31 is located at trouble point downstream border, no longer closes a floodgate;
Second failure occurs between Q12 and Q21 is switched, and Intelligent terminal of distribution network STU1 and STU2 can correctly judge event Hinder point between Q21 and Q21 is switched, Intelligent terminal of distribution network STU1 and STU2 difference controlling switch Q12 and Q21 separating brake isolate event Barrier, switch QF1 combined floodgates recover upstream and power.But now Intelligent terminal of distribution network STUA is directly logical with Intelligent terminal of distribution network STU2 Letter, judges trouble point between switch QF1 and switch Q21, and Intelligent terminal of distribution network STUA controlling switch QF1 separating brakes are caused Power failure range expands;
If 3) Intelligent terminal of distribution network STU1 communicates abnormal with STU2, Intelligent terminal of distribution network STU1 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU3, judges trouble point in switch Q12 and Q31 by fault current information Between, Intelligent terminal of distribution network STU1 controlling switches Q12 tripping operation isolated faults switch QF1 and close a floodgate after Fault Isolation success, switch Q31 is located at trouble point downstream border, no longer closes a floodgate;
Will not now be broken down again between switch Q12 and switch Q21;
If 4) Intelligent terminal of distribution network STU2 communicates abnormal with STU3, Intelligent terminal of distribution network STU2 is matched somebody with somebody by topological piece Put, learn right-side switch for interconnection switch, but because with Intelligent terminal of distribution network STU3 communication abnormalities, it is impossible to know power distribution network intelligence A kind of energy terminal STU3 liaison states, scheme only controls itself to trip;Another scheme because will actively and next adjacent terminal, i.e., with Intelligent terminal of distribution network STU4 communicate, by fault current information judge trouble point switch Q22 and Q41 between, power distribution network Intelligent terminal STU2 and STU4 controlling switch Q22 and Q41 tripping operation isolated fault, may now expand power failure range;Failure every Intelligent terminal of distribution network STU2 sends Fault Isolation success message, Intelligent terminal of distribution network STUA controlling switches QF1 after success Close a floodgate, complete service restoration, switch Q31 is located at trouble point downstream border, no longer closes a floodgate.
Second failure occurs between switch Q12 and switch Q21, and Intelligent terminal of distribution network STU1 is with power distribution network intelligence eventually End STU2 communications, judge that trouble point is being switched between Q12 and switch Q21, Intelligent terminal of distribution network by fault current information STU1 and STU2 difference controlling switch Q12, Q21 separating brake isolated faults, Intelligent terminal of distribution network STU1 sends Fault Isolation success Message, Intelligent terminal of distribution network STUA controlling switches QF1 closes a floodgate and restores electricity, and switch Q13 contact combined floodgates restore electricity.
If 5) communicate abnormal between Intelligent terminal of distribution network STUA, STU1, STU2, STU3, STU4, logic is exited.
H, simulation branch line failure, trouble point is located in switch Q33 outlets
1) now Intelligent terminal of distribution network STUB, STU4, STU3 detects excessively stream;When Intelligent terminal of distribution network STUB, STU4, STU3 communication are normal, judge trouble point in switch Q33 outlets, Intelligent terminal of distribution network by fault current information STU3 controlling switches Q33 tripping operation isolated faults, switch QF2 closes a floodgate and restores electricity, and interconnection switch does not close a floodgate;
If 2) Intelligent terminal of distribution network STUB communicates abnormal with STU4, Intelligent terminal of distribution network STUB will be adjacent eventually with next End Intelligent terminal of distribution network STU3 direct communications, judge trouble point in switch Q33 outlets, power distribution network by fault current information Intelligent terminal STU3 controlling switches Q33 tripping operation isolated faults, switch QF2 closes a floodgate and restores electricity, and interconnection switch does not close a floodgate;
If 3) Intelligent terminal of distribution network STU4 communicates abnormal with STU3, Intelligent terminal of distribution network STU4 will match somebody with somebody with next neighbour Power network intelligent terminal STU2 direct communications, by fault current information judge trouble point switch Q41 and Q22 between, distribution Net intelligent terminal STU4 and STU2 learns that Intelligent terminal of distribution network STU3 has interconnection switch by network topology piece, but does not know out Off status, so a kind of scheme is Intelligent terminal of distribution network STU4 and STU2 difference controlling switch Q41 and Q22 tripping operation isolation event Barrier;Another scheme is only Intelligent terminal of distribution network STU4 controlling switches Q41 tripping operation isolated faults;Switch QF2 closes a floodgate and recovers Power supply, interconnection switch does not close a floodgate.
I, simulation opposite end power failure, trouble point is located between switch Q32 and switch Q41
1) now Intelligent terminal of distribution network STUB and STU4 detect failure, when Intelligent terminal of distribution network STUB, STU4, STU3 communications are normal, judge trouble point between Q41 and Q32 is switched by fault current information, Intelligent terminal of distribution network STU4 and STU3 controlling switches Q41 and Q32 tripping operation isolated fault, switch QF2 and close a floodgate after Fault Isolation success, and power distribution network intelligence is whole When end STU3 judges to meet contact combined floodgate condition, control interconnection switch Q31 closes a floodgate, and completes service restoration;
If 2) Intelligent terminal of distribution network STUB communicates abnormal with STU4, Intelligent terminal of distribution network STUB will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU3, judges trouble point in switch QF2 and Q32 by fault current information Between, Intelligent terminal of distribution network STUB and STU3 controlling switch QF2 and Q32 tripping operation isolated fault are switched after Fault Isolation success QF2 closes a floodgate, and when Intelligent terminal of distribution network STU3 judges to meet contact combined floodgate condition, control interconnection switch Q31 closes a floodgate, and completes power supply Recover.
If 3) Intelligent terminal of distribution network STU4 communicates abnormal with STU3, Intelligent terminal of distribution network STU4 will actively and next Adjacent terminal, i.e., communicate with Intelligent terminal of distribution network STU2, judges trouble point in switch Q41 and switch by fault current information Between Q22, Intelligent terminal of distribution network STU4 and STU2 controlling switch Q41 and Q22 tripping operation isolated fault are opened after Fault Isolation success Close QF2 to close a floodgate, when Intelligent terminal of distribution network STU3 judges to meet contact combined floodgate condition, control interconnection switch Q31 closes a floodgate, and completes to supply Electricity recovers.
If 4) communicate abnormal between Intelligent terminal of distribution network STUB, STU4, STU3, STU2, logic is exited.
The fault-tolerant processing of j, element fault
1) it is due to self reason miss operation when on-load switch tripping, i.e. the on-load switch action.If basic routing line On distribution terminal occur this kind of failure when, after the tripping of its own detectable on-load switch, immediately to phase on its main line Adjacent distribution terminal sends open command, realizes that the equipment such as the isolation of failure, subsequent contacts switch continue relevant action with this, real The maximum power supply of existing non-faulting section.Example:If failure a, switch Q11 trippings because the communication between terminal is not interrupted, then by The principle of distributed proccessing understands must have switch QF1 to be each turned off with switch Q11, is as a result but that switch QF1 disconnects, switch Q11 is still closed in the case of detecting and itself not disconnecting, and switch Q11 sends and sends control command to switch Q12, makes switch Q12 disconnects, and failure is removed, and now failure is removed, and then switchs Q31 and proceeds relevant action:Load anticipation.If not therefore Barrier section load nonoverload, then interconnection switch action, is failure to actuate if overload, and distributed treatment action is reasonable.If failure b, opens Q12 trippings are closed, now the action command of terminal is:Switch QF1, switch Q12 and switch Q21 disconnections, detected certainly because switching Q12 Body is not moved, then send open command to adjacent basic routing line switch:Switch Q11 disconnects, and then fault section is isolated.Switch QF1 is closed, and switch Q31 carries out load anticipation to upstream non-faulting section, if not faulty section load nonoverload, then interconnection switch is dynamic Make, be failure to actuate if overload, distributed treatment action is reasonable;
If failure on branched line, then the terminal will be opened to the load on two basic routing lines adjacent thereto of its upstream Pass sends open command, realizes that the equipment such as the isolation of fault section, subsequent contacts switch continue relevant action with this, realizes non-event The maximum power supply of barrier section.Example:If failure h, Q23 trippings are switched, end command now is switch QF1, and switch Q23 breaks Open, because switch Q23 detect itself tripping, then its upstream main line way switch Q21 and switch Q22 send open command, realize The isolation of failure, interconnection switch Q31 carries out load anticipation and determines whether closure, and switch QF1 closures realize the confession of non-faulting section Electricity.During on-load switch tripping, the flow chart of Fault Isolation is realized as indicated with 2.
2) malfunction is switched, if the two of certain distribution terminal adjacent on-load switch remote control separating brake line reversal on circuit.Match somebody with somebody when one After the adjacent on-load switch of electric terminals two is defined as malfunction, distribution terminal carries out self-correcting:Two related loads are opened Put row command operation anti-again into.If example failure b, on-load switch Q21 and switch Q22 reversal connections, control command are broken for switch QF1 Open, switch Q12 disconnects with Q21 is switched, when STU2 detects switch Q21 to disconnect, and after switching Q22 disconnections, be judged to herein Two on-load switch malfunctions, i.e., send anti-command operation to it, realizes the isolation of failure, and it is true that interconnection switch Q31 carries out load anticipation Whether fixed to close, switch QF1 closures realize the power supply of non-faulting section.During on-load switch malfunction, the flow of Fault Isolation is realized Figure is as indicated at 3.

Claims (1)

1. a kind of fault-tolerance processing method suitable for power distribution network distributed fault self-healing, it is characterised in that comprise the following steps:
A, set up network topology:When device is installed, manually for each Intelligent terminal of distribution network STU configures adjacent power distribution network intelligence eventually Hold the network address of STU ';
B, the significance level according to circuit, set fault-tolerant series:When fault-tolerant series is 0, Intelligent terminal of distribution network STU is only deposited inside The network address of adjacent Intelligent terminal of distribution network STU ' is stored up, when fault-tolerant series is 1, needs to lead to inside Intelligent terminal of distribution network STU Its adjacent Intelligent terminal of distribution network STU ' is crossed to inquire about and store time neighbour's power distribution network intelligence of adjacent Intelligent terminal of distribution network STU ' eventually The network address of end STU ", when fault-tolerant series is more than 1, the like;
C, determine abort situation, failure is processed:When there is over current fault in system, Intelligent terminal of distribution network STU detections To after fault current, the fault-tolerant grade that inquiry pre-sets;If fault-tolerant grade is 0, Intelligent terminal of distribution network STU is only to phase Adjacent Intelligent terminal of distribution network STU ' inquiries, determine abort situation, now, if adjacent distribution terminal is not because certain reason should Answer, such as there occurs plant failure or communication failure, system logic stops;If fault-tolerant grade is 1, power distribution network intelligence is eventually End STU continues to inquire about the secondary of adjacent Intelligent terminal of distribution network STU ' after the adjacent Intelligent terminal of distribution network STU ' of inquiry is unresponsive Adjacent Intelligent terminal of distribution network STU ", if secondary adjacent Intelligent terminal of distribution network STU " responses are normal, fault location realized, if secondary Adjacent Intelligent terminal of distribution network STU " is unresponsive, and system logic stops, when fault-tolerant series is more than 1, the like, carry out failure and determine Position, after fault location is finished, is processed failure.
CN201710072220.9A 2017-02-09 2017-02-09 Fault-tolerance processing method suitable for power distribution network distributed fault self-healing Active CN106712301B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710072220.9A CN106712301B (en) 2017-02-09 2017-02-09 Fault-tolerance processing method suitable for power distribution network distributed fault self-healing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710072220.9A CN106712301B (en) 2017-02-09 2017-02-09 Fault-tolerance processing method suitable for power distribution network distributed fault self-healing

Publications (2)

Publication Number Publication Date
CN106712301A true CN106712301A (en) 2017-05-24
CN106712301B CN106712301B (en) 2019-04-12

Family

ID=58909105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710072220.9A Active CN106712301B (en) 2017-02-09 2017-02-09 Fault-tolerance processing method suitable for power distribution network distributed fault self-healing

Country Status (1)

Country Link
CN (1) CN106712301B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110867838A (en) * 2019-11-20 2020-03-06 国网河北省电力有限公司电力科学研究院 Distribution network fault processing method based on 5G communication technology
CN113872329A (en) * 2021-09-29 2021-12-31 湖北工业大学 Intelligent power distribution system and method
CN114142446A (en) * 2021-11-26 2022-03-04 贵州电网有限责任公司 Method for preventing intelligent distributed system from abnormity

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102411117A (en) * 2011-08-09 2012-04-11 中国电力科学研究院 Method for positioning short-circuit fault of distribution network based on distributed intelligent multi-calibration
KR101462230B1 (en) * 2013-07-08 2014-11-17 한전케이디엔주식회사 Gateway for smart distribution network
CN106253252A (en) * 2016-08-27 2016-12-21 国网山东省电力公司蓬莱市供电公司 A kind of feeder automation fault self-recovery method of high fault tolerance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102411117A (en) * 2011-08-09 2012-04-11 中国电力科学研究院 Method for positioning short-circuit fault of distribution network based on distributed intelligent multi-calibration
KR101462230B1 (en) * 2013-07-08 2014-11-17 한전케이디엔주식회사 Gateway for smart distribution network
CN106253252A (en) * 2016-08-27 2016-12-21 国网山东省电力公司蓬莱市供电公司 A kind of feeder automation fault self-recovery method of high fault tolerance

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范开俊等: "基于智能终端逐级查询的馈线拓扑识别方法", 《电力系统自动化》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110867838A (en) * 2019-11-20 2020-03-06 国网河北省电力有限公司电力科学研究院 Distribution network fault processing method based on 5G communication technology
CN113872329A (en) * 2021-09-29 2021-12-31 湖北工业大学 Intelligent power distribution system and method
CN114142446A (en) * 2021-11-26 2022-03-04 贵州电网有限责任公司 Method for preventing intelligent distributed system from abnormity
CN114142446B (en) * 2021-11-26 2023-10-24 贵州电网有限责任公司 Method for preventing intelligent distributed system from being abnormal

Also Published As

Publication number Publication date
CN106712301B (en) 2019-04-12

Similar Documents

Publication Publication Date Title
CN109193582B (en) Intelligent power distribution network area protection control system and control method
CN107069676A (en) Distribution network failure positions and quickly isolated recovery control method
CN109713794B (en) Distributed intelligent self-recovery system and method
CN102037630B (en) Feeder automation system and method for operating the same
WO2021139071A1 (en) Smart outdoor switch cabinet, and closed-loop i-shaped power distribution network for same
CN107394897A (en) A kind of power distribution network intelligence self-healing method and system based on topological diagram
WO2014201989A1 (en) Distributed intelligence feeder line automated control method
CN103872660B (en) Network type protection method based on closed-loop mode operation of power network
CN111786364A (en) Distributed complex power distribution network fault rapid self-healing control method and system
CN103872662A (en) Network type protection method for hybrid networking based on closed-loop model operation
CN106712301A (en) Fault-tolerant processing method suitable for distributed fault self-recovery of power distribution network
CN106026088A (en) Distribution network automation policy based on load section dividing transferring
CN106787141A (en) A kind of extension spare power automatic switching method of 10kV switchyards interconnection
CN109245072B (en) Self-adaptive in-situ feeder automation fault processing method based on regional sequence number
CN104882959A (en) Power distribution network area management method and system
CN113013880A (en) Fault processing method based on 5G communication module distribution line
CN102332710A (en) High-performance voltage timelike distribution automation terminal
CN109617238A (en) A kind of feeder automation remote terminal unit of tape test function
CN113013851B (en) Distributed intelligent power distribution automation system
Yip et al. Fast self-healing control of faults in MV networks using distributed intelligence
CN109510192B (en) Power distribution network and self-healing method thereof
CN103872661B (en) Network type protection method based on open-loop mode operation of power network
CN202550668U (en) Distributed power distribution network management terminal
CN109613394A (en) A kind of intelligent distribution making alive time type fault section method of discrimination on the spot
CN213754084U (en) Dual-power supply system adopting power supplies with different grounding modes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant