CN106711996A - Bus voltage failure fault power supply recovery and switching operation sequence generating method - Google Patents
Bus voltage failure fault power supply recovery and switching operation sequence generating method Download PDFInfo
- Publication number
- CN106711996A CN106711996A CN201611067007.0A CN201611067007A CN106711996A CN 106711996 A CN106711996 A CN 106711996A CN 201611067007 A CN201611067007 A CN 201611067007A CN 106711996 A CN106711996 A CN 106711996A
- Authority
- CN
- China
- Prior art keywords
- load
- queue
- contact element
- switching operation
- loading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/001—Methods to deal with contingencies, e.g. abnormalities, faults or failures
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a bus voltage failure fault power supply recovery and switching operation sequence generating method, which comprises the steps of establishing a CSP model of a power distribution network, and adopting a dynamic asynchronous backtracking algorithm to look for a method which satisfies a constrained relationship and loads a load to a contact element with an optimized target function, generating a switching operation sequence generating method based on the contact elements through comparing variation of loading methods of the contact elements before and after power supply recovery, and supplying an obtained switching operation sequence result to an operation command system for a dispatcher to perform decision execution or automatic execution, so that the power supply recovery speed is faster. The bus voltage failure fault power supply recovery and switching operation sequence generating method adopts the switching operation sequence generating method based on the variation of the loading methods of the contact elements before and after power supply recovery, is simple and easy in operation, cannot cause the situations that the power supply recovery requirements are not satisfied due to feeder overload or closed loop and the like, is feasible in the existing power distribution network structure, is convenient for implementation, and facilitates the dispatcher to transfer the loads quickly and safely when large-area power outage such as bus voltage failure occurs.
Description
Technical field:
The recovery process powered during the large-area power-cuts caused the present invention relates to a kind of power distribution network bus loss of pressure and power supply
Recover the generation method of switching operation, belong to field of feeder automation.
Background technology:
With the development and growth in the living standard of social economy, people are increasingly strong to the dependence of electric energy, to power supply
The requirement of reliability is also improved constantly, and power distribution network scale is big and wiring is complicated, and the system failure caused by accidentalia is to be difficult to
Avoid.The failure that power distribution network takes place frequently is this kind of microvariations of feeder fault, for this microvariations, if dispatcher turns by rule of thumb
Move non-faulting dead electricity load and typically do not result in more major break down, the success rate of transfer load is also higher, but as bus loss of pressure
Though this large area blackout takes place frequently unlike feeder fault, there is generation every year substantially, only process by rule of thumb often
Misoperation can be caused to cause feeder line overload or cause the greater area of loss of power accident to occur, and can only made by rule of thumb
Obtain fault handling time long, cause more economic losses, it is therefore necessary to which the power supply for studying bus loss of pressure failure afterload is extensive
Compound method simultaneously generates sequence of switching operations.
The service restoration of power distribution network refers to how to be realized to non-faulting power supply interrupted district on the basis of fault location and isolation
Service restoration optimization problem.Power distribution network service restoration is substantially exactly the network reconfiguration after breaking down, and is to position simultaneously
After having isolated failure, on the premise of the various constraints of power distribution network are met, by changing contact element and block switch in network
Folding condition, finds for the optimal service restoration method of one or several object functions.
For this problem of power distribution network service restoration, the solution that can be taken has a lot, for example:Use heuristic search
Method finds recovery scheme;Fuzzy evaluation is carried out to candidate scheme with the method for fuzzy mathematics;With genetic algorithm, simulated annealing
The intelligent algorithms such as method, expert system approach carry out optimizing;Service restoration can also be realized using multi-agent technology.And it is directed to large area
The research of this service restoration problem that has a power failure is fewer, and existing method has mathematical optimization technique, genetic algorithm, multiple agent to be immunized
Algorithm, tabu search algorithm etc., more have document to consider after distributed power source is accessed service restoration after power distribution network large-area power-cuts
Method.Tabu search algorithm to initial value, Tabu Length, candidate solution number have very strong dependence, operation result it is possible to
Fall into local optimum, it is impossible to ensure that one surely obtains globally optimal solution.Genetic algorithm is also easy to produce substantial amounts of infeasible solution, for matching somebody with somebody
Network optimization quality reconstruction preferably, but is not very applicable for wide-area failures load restoration problem.The present invention is used
Service restoration method based on CSP models, using asynchronous backtracking algorithm optimizing, while the significance level of load is considered, finally
For the ease of dispatcher's fast and safely transfer load, the invention provides a kind of switching operation generation method.
The content of the invention:
The technical problems to be solved by the invention are:There is provided it is a kind of based on CSP models and consider load significance level and
The bus loss of pressure failure service restoration and switching operation generation method of contact element loading load method change, are easy to scheduling
Personnel's quick and safe transfer load in this large-area power-cuts of generation bus loss of pressure.
The present invention is for the technical solution adopted for solving the technical problem:
A kind of bus loss of pressure failure service restoration and switching operation generation method, load restoration is reducing loss of outage
Maximum turns to object function, and power distribution network reconfiguration result is presented in the form of contact element loading load method change, switching manipulation
Order specifically includes following steps to be generated based on the change of contact element loading load method before and after service restoration:
A, the network parameter for reading distribution system:
Using simplified model of distribution networks, will power distribution network regard a kind of figure as, the feeder switch along distribution line is regarded as
The summit of figure, the feeder line between two summits, in order to calculate simplicity, ignores three-phase imbalance factor, it is assumed that distribution as the side of figure
Online voltage is equal everywhere, and the line load electric current for representing phase reflects, sets up the data structure of representation system network parameter, i.e.,
The matrix D description of the row of N rows 8 is defined, i.e.,:
Wherein, di1The sequence number on (i=1,2 ... N) description side;di2~di4The sequence number of the node that description connects with the side, T
The side connects with three nodes when connecing;di5~di7Be with this while adjoining while sequence number, T connect it is corresponding abutted while with three,
di8The payload on the side is represented, is represented with the electric current for representing phase;Idle element is -1 in D matrix;
B, bus loss of pressure judge and isolated fault that each contact element loads the mode of load after preservation failure cut-out:
If certain voltage of bus is dropped to by normal value is approximately 0, and the electric current of the N number of source point being connected with the bus or
The voltage and current of the chopped-off head switch of the corresponding distribution line of person is dropped to by normal value and is approximately 0, then can determine whether to be bus loss of pressure,
General N desirable 2~5;Bus breaks down, and system automatically cuts off the source point breaker isolated fault being connected with the bus, while
The information of the load that other contact elements that preservation is connected with cut off feeder line are loaded;
C, distribution network load service restoration optimization is carried out, show that each contact element after recovering loads the mode of load:
Power distribution network constraint satisfaction problemx CSP models are built, CSP models are described as a triple P=(X, D, C), and X is change
Quantity set, is denoted here as contact element collection;D is the cartesian product of the domain of definition of each element in X, DiRepresent i-th contact
Element loads the mode collection of load, and it is node that each way is all used to switch, and load is the load tree representation on side;C is constraint
Collection, service restoration scheme must is fulfilled for constraining C, and distribution network load is recovered must to be fulfilled for following constraint:
(1) node voltage is in allowed band;
(2) contact element load is no more than rated value;
(3) radiation net mode operation;
(1) (2) are constrained in the domain of definition internal inspection of variable and is met, constraint (3) is equivalent to each load by a connection
Network power elements, i.e., the load that any two contact elements are loaded does not have identical element, using matrix R as shown belowijCome
Represent the restriction relation between two contact elements:
Wherein, the mode that the mode of the loading load of contact element i has m kinds, the loading load of contact element j has n kinds, unit
A is taken when in the pth kind loading load method of part i and the q kinds loading load method of element j without identical elementpqIt is 1, comprising phase
Value is 0 during with element;
RijIn matrix element can not arbitrarily arrange, the mode of all loading loads in each contact element is first pressed into mesh
Scalar functions are arranged from big to small, and are numbered in this order and then drawn constraint matrix;Consider that object function has a power failure for maximum reduction
Economic loss, that is, the corresponding total interruption cost of load for being loaded is maximum, and formula is:
Wherein, NiIt is the number of the load of contact element i loadings;kbFor the corresponding unit loss of outage of b-th load takes
With although some sensitive users unit interruption costs less, belong to sensitiveness load, power failure will also result in big shadow
Ring, this seasonal k*kbInstead of kb, k takes 3~5;pbIt is b-th size of load, is reflected with electric current;
After establishing constraint satisfaction problemx model, then need to carry out the search of optimal solution, algorithm is recalled using dynamic asynchronous
Scan for, find out the confession of the corresponding loss of outage maximum of load for not only meeting constraints but also causing total contact element loading
Electric recovery scheme, show that the contact element after optimization loads the mode of load;
D, the change for loading load method by contrasting each contact element before and after power distribution network service restoration draw service restoration
The switching operation of process;
Switching operation should meet claimed below:
(1) operating process keeps the operation of network radiation mode;
(2) overload is not produced in operating process;
(3) the big load of loss of outage should be as early as possible reverted in operating process to power.
In step " D ", the switching operation of the service restoration process, what it was generated comprises the following steps that:
The first step:A contact element is taken out from variables set X, by the load pair of contact element loading before service restoration
The sequence number on the side answered is put into queue FBIn, the sequence number on the corresponding side of load of contact element loading is put into queue after service restoration
FAIn, contrast FBAnd FA, the load tree of the contact element institute band and the excision from the load tree are newly accessed after drawing service restoration
Feeder load, queue F is put into by the sequence number on the new corresponding side of feeder load for accessing load treeinIn, will be cut off from load tree
The sequence number on the corresponding side of feeder load be put into queue FoutIn;
Second step:By queue FinAnd FoutIn element by connected mode classify, if Fin(Fout) in element and the queue
The element all without syntople, is then put into queue F by other either elementsin1(Fout1) in;Other are had the element of syntople
It is divided into different load strings, and regards each load string as an entirety and is put into queue Fin2(Fout2) in, between different load string
Without syntople;By Fin1And Fin2In element by power failure economic loss expense from big to small in respective queue arrange, Fout1
And Fout2In element by power failure economic loss expense from small to large in respective queue arrange;
By load is accessed after first excision load, first simple rear complicated, important load is first accessed and cut off afterwards switching operation
Principle carry out, so first cut-out queue F successivelyout1And Fout2In corresponding load, then access Fin1And Fin2In it is corresponding negative
Lotus;
3rd step:For Fout1In the load that should cut off, take out a load element, find out side corresponding with load phase
Adjacent FBIn side, and switch sequence number between the two is put into disconnection switch queue S;
4th step:The 3rd step is repeated until Fout1It is sky;
5th step:For Fout2In load string, find out the F adjacent with the side of the load stringBIn side, and by they
Between switch sequence number be put into disconnection switch queue S;
6th step:The 5th step is repeated until Fout2It is sky;
7th step:Fin1And Fin2In element in order and by the 3rd to the 6th step method, by switch to be closed
Sequence number is put into closure switch queue T, while other peripheries for being in closure state of the element in addition to T breaker in middle are opened
Sequence number is closed to be put into disconnection switch queue S;
The disconnection switch queue S and closure switch queue T based on the contact element can be so generated, if in switching manipulation
On off state is at required state before the procedure, then maintained switch state is constant;
8th step:If X is not empty, the first step is returned.
Described contact element is the element of the energy load fault region load of normal operation.
Positive beneficial effect of the invention is as follows:
1st, the present invention uses the service restoration method based on CSP models, simple and be easy to software realization, using asynchronous
Backtracking algorithm optimizing, while considering the significance level of load, is easy to dispatcher's fast and safely transfer load, makes service restoration
Speed it is faster.
2nd, the present invention considers the significance level of load, and target is minimised as with the economic loss caused by having a power failure, while
Consider the influence of sensitiveness Load on Electric Power Grid work.
3rd, the present invention is using the switching operation life based on contact element loading load method change before and after service restoration
It is simple to operation into method, and the situation that feeder line overload or closed loop etc. are unsatisfactory for service restoration requirement will not occur.
Brief description of the drawings:
Fig. 1 is the particular flow sheet of service restoration after bus loss of pressure failure of the present invention;
Fig. 2 is switching operation product process figure of the present invention;
Fig. 3 is the test case in embodiments of the invention.
Specific embodiment:
(referring to Fig. 1~Fig. 3) is made further explanation and description to the present invention with reference to the accompanying drawings and examples:
Embodiment:A kind of bus loss of pressure failure service restoration and switching operation generation method, load restoration is reducing
Loss of outage maximum turns to object function, and power distribution network reconfiguration result is presented in the form of contact element loading load method change,
Switching operation is specifically included following several by being generated based on the change of contact element loading load method before and after service restoration
Individual step:
A, the network parameter for reading distribution system:
Test case as shown in Figure 3, the line load electric current reflection for representing phase, sets up the number of representation system network parameter
According to structure, i.e. the matrix D of the row of 12 row 8, i.e.,
Wherein, di1The sequence number on (i=1,2 ... N) description side;di2~di4The sequence number of the node that description connects with the side, T
The side connects with three nodes when connecing;di5~di7Be with this while adjoining while sequence number, T connect it is corresponding abutted while with three,
di8The payload on the side is represented, is represented with the electric current for representing phase;Idle element is -1 in D matrix;
B, bus loss of pressure judge and isolated fault that each contact element loads the mode of load after preservation failure cut-out:
If certain voltage of bus is dropped to by normal value is approximately 0, and the electric current of the N number of source point being connected with the bus or
The voltage and current of the chopped-off head switch of the corresponding distribution line of person is dropped to by normal value and is approximately 0, then can determine whether bus loss of pressure, one
As N desirable 2~5, bus-bar fault occurs, and system automatically cuts off the source point breaker isolated fault being connected with the bus, while guarantor
Deposit the information of the load that other contact elements being connected with cut off feeder line are loaded;Assuming that bus 101 breaks down, breaker
S1 disconnects, and preserves the sequence number on the corresponding side of load of contact element S2 and S3 institutes band, the mode of S2 loading loads for (8,7,6,
5), S3's is (12,10,11);
C, distribution network load service restoration optimization is carried out, show that each contact element after recovering loads the mode of load:
Power distribution network constraint satisfaction problemx CSP models are built, CSP models are described as a triple P=(X, D, C).X is change
Quantity set, is denoted here as S2 and S3;D is the cartesian product of the domain of definition of each element in X, DiRepresent i-th contact element
The mode collection of load is loaded, it is node that each way is all used to switch, and load is the load tree representation on side;C is constraint set, is supplied
Electric recovery scheme must is fulfilled for constraining C, and distribution network load is recovered must to be fulfilled for following constraint:
(1) node voltage is in allowed band;
(2) contact element load is no more than rated value;
(3) radiation net mode operation;
(1) (2) are constrained in the domain of definition internal inspection of variable and is met, constraint (3) is equivalent to each load by a connection
Network power elements, i.e., the load that any two contact elements are loaded does not have identical element, using matrix R as shown belowijCome
Represent the restriction relation between two contact elements:
Wherein, the mode that the mode of the loading load of contact element i has m kinds, the loading load of contact element j has n kinds, unit
A is taken when in the pth kind loading load method of part i and the q kinds loading load method of element j without identical elementpqIt is 1, comprising phase
Value is 0 during with element;
RijIn matrix element can not arbitrarily arrange, the mode of all loading loads in each contact element is first pressed into mesh
Scalar functions are arranged from big to small, and are numbered in this order and then drawn constraint matrix;Consider that object function has a power failure for maximum reduction
Economic loss, that is, the corresponding total interruption cost of load for being loaded is maximum, and formula is:
Wherein, NiIt is the number of the load of contact element i loadings;kbFor the corresponding unit loss of outage of b-th load takes
With although some sensitive users unit interruption costs less, belong to sensitiveness load, power failure will also result in big shadow
Ring, this seasonal k*kbInstead of kb, k takes 3~5;pbIt is b-th size of load, is reflected with electric current;
In figure 3, feeder line capacity be 300A, while limit the feeder load of loading more than in the case of 200A, S2's
Domain of definition is { (8,7,6,5,4), (8,7,5,4,3), (8,7,5,4), (8,7,6,5) }, the domain of definition of S3 for (12,10,9,
3,2), (12,10,9,3,4), (12,10,11,9), (12,10,9,3), (12,10,9), (12,10,11) }, according to target
Function is arranged from big to small, by the constraint matrix between this generation S2 and S3 that puts in order:
After establishing constraint satisfaction problemx model, then need to carry out the search of optimal solution, algorithm is recalled using dynamic asynchronous
Scan for, find out and not only meet constraints but also cause that the corresponding loss of outage of load of total contact element loading is maximum (i.e.
The interruption cost of reduction is minimum) service restoration scheme, draw optimization after contact element load load mode;Such as R23
The element of middle the first row first row meets the maximum load load method for requiring and all taking contact element, then the loading that S2 is used is born
The mode of lotus is (8,7,6,5,4), and S3's is (12,10,9,3,2);
D, the change for loading load method by contrasting each contact element before and after power distribution network service restoration draw service restoration
The switching operation of process;
The step of specific service restoration switching operation is generated is as follows:
The first step:An element is taken out from variables set X, the load of contact element loading before service restoration is corresponding
The sequence number on side is put into queue FBIn, the sequence number on the corresponding side of load of contact element loading is put into queue F after service restorationAIn,
Contrast draw newly access the contact element institute on-load tree after service restoration with the feeder load cut off from load tree, will be newly
The sequence number for accessing the corresponding side of feeder load of load tree is put into queue FinIn, the feeder load correspondence that will be cut off from load tree
The sequence number on side be put into queue FoutIn;For element S in X 2, FBIt is (8,7,6,5), FAIt is (8,7,6,5,4) to put sequence number 4
Enqueue FinIn;
Second step:By queue FinAnd FoutIn element by connected mode classify, if Fin(Fout) in element and the queue
The element all without syntople, is then put into queue F by other either elementsin1(Fout1) in, other are had the element of syntople
It is divided into different load strings and regards each load string as an entirety and is put into queue Fin2(Fout2) in, between different load string
Without syntople;By Fin1And Fin2In element by power failure economic loss expense from big to small in respective queue arrange, Fout1
And Fout2In element by power failure economic loss expense from small to large in respective queue arrange;
By load is accessed after first excision load, first simple rear complicated, important load " is first accessed and broken afterwards switching operation
Open " principle carry out, so first cut-out queue F successivelyout1And Fout2In corresponding load, then access Fin1And Fin2Middle correspondence
Load;
3rd step:For Fout1In the load that should cut off, take out a load element, find out side corresponding with load phase
Adjacent FBIn side, and switch sequence number between the two is put into disconnection switch queue S;
4th step:The 3rd step is repeated until Fout1It is sky;
5th step:For Fout2In load string, find out the F adjacent with the side of the load stringBIn side, and by they
Between switch sequence number be put into disconnection switch queue S;
6th step:The 5th step is repeated until Fout2It is sky;
7th step:Fin1And Fin2In element in order and by the 3rd to the 6th step method method by switch to be closed
Sequence number be put into closure switch queue T, while by the element in addition to T breaker in middle other be in closure state peripheries
Switch is put into disconnection switch queue S;Generation queue S is (4), and T is (6);
The disconnection switch queue S and closure switch queue T based on the contact element can be so generated, if in switching manipulation
On off state is at required state before the procedure, then maintained switch state is constant;
8th step:If X is not empty, the first step is returned.
Continuation is operated to the element S 3 in variables set and X, and generation queue S is (2,12,4), and T is (11), because switch 4 exists
Disconnected in the operation of S2, then kept 4 on off states constant in this operation, also will this it is to be broken switch sequence number delete
Remove, obtain S for (2,12);
Above-described embodiment is the present invention preferably implementation method, but embodiments of the present invention are not by above-described embodiment
Limitation, other it is any without departing from Spirit Essence of the invention and the change, modification, replacement made under principle, combine, simplification,
Equivalent substitute mode is should be, is included in protection scope of the present invention.
Claims (3)
1. a kind of bus loss of pressure failure service restoration and switching operation generation method, it is characterised in that:Load restoration is subtracting
Few loss of outage maximum turns to object function, and power distribution network reconfiguration result is in the form of contact element loading load method change
It is existing, switching operation being generated based on the change of contact element loading load method before and after service restoration, specifically include with
Under several steps:
A, the network parameter for reading distribution system:
Using simplified model of distribution networks, will power distribution network regard a kind of figure as, the feeder switch along distribution line regards figure as
Summit, the feeder line between two summits, in order to calculate simplicity, ignores three-phase imbalance factor, it is assumed that on power distribution network as the side of figure
Voltage is equal everywhere, and the line load electric current for representing phase reflects, sets up the data structure of representation system network parameter, that is, define
The matrix D description of the row of N rows 8, i.e.,:
Wherein, di1The sequence number on (i=1,2 ... N) description side;di2~di4The sequence number of the node that description connects with the side, when T connects
The side connects with three nodes;di5~di7Be with this while adjoining while sequence number, T connect it is corresponding abutted while with three, di8Table
Show the payload on the side, represented with the electric current for representing phase;Idle element is -1 in D matrix;
B, bus loss of pressure judge and isolated fault that each contact element loads the mode of load after preservation failure cut-out:
If certain voltage of bus is dropped to by normal value is approximately 0, and the N number of source point being connected with the bus electric current or phase
The voltage and current for answering the chopped-off head of distribution line to switch is dropped to by normal value and is approximately 0, then can determine whether to be bus loss of pressure, typically
N desirable 2~5;Bus breaks down, and system automatically cuts off the source point breaker isolated fault being connected with the bus, while preserving
The information of the load that other contact elements being connected with cut off feeder line are loaded;
C, distribution network load service restoration optimization is carried out, show that each contact element after recovering loads the mode of load:
Power distribution network constraint satisfaction problemx CSP models are built, CSP models are described as a triple P=(X, D, C), and X is variable
Collection, is denoted here as contact element collection;D is the cartesian product of the domain of definition of each element in X, DiRepresent i-th contact unit
Part loads the mode collection of load, and it is node that each way is all used to switch, and load is the load tree representation on side;C is constraint set,
Service restoration scheme must is fulfilled for constraining C, and distribution network load is recovered must to be fulfilled for following constraint:
(1) node voltage is in allowed band;
(2) contact element load is no more than rated value;
(3) radiation net mode operation;
(1) (2) are constrained in the domain of definition internal inspection of variable and is met, constraint (3) is equivalent to each load by a contact unit
Part is powered, i.e., the load that any two contact elements are loaded does not have identical element, using matrix R as shown belowijTo represent
Restriction relation between two contact elements:
Wherein, the mode that the mode of the loading load of contact element i has m kinds, the loading load of contact element j has n kinds, element i
The loading of pth kind load method and element j q kinds loading load method in without identical element when take apqIt is 1, comprising identical unit
Value is 0 when plain;
RijIn matrix element can not arbitrarily arrange, first by the mode of all loading loads in each contact element according to target letter
Number is arranged from big to small, and is numbered in this order and then drawn constraint matrix;Consider that object function is economical for maximum reduction has a power failure
Loss, that is, the corresponding total interruption cost of load for being loaded is maximum, and formula is:
Wherein, NiIt is the number of the load of contact element i loadings;kbIt is the corresponding unit interruption cost of b-th load, one
Although a little sensitive users unit interruption costs are less, belong to sensitiveness load, power failure will also result in big influence, at this moment
Make k*kbInstead of kb, k takes 3~5;pbIt is b-th size of load, is reflected with electric current;
After establishing constraint satisfaction problemx model, then need to carry out the search of optimal solution, carried out using dynamic asynchronous backtracking algorithm
Search, finds out and not only meets constraints but also cause that the maximum power supply of the corresponding loss of outage of load of total contact element loading is extensive
Compound case, show that the contact element after optimization loads the mode of load;
D, the change for loading load method by contrasting each contact element before and after power distribution network service restoration draw service restoration process
Switching operation;
Switching operation should meet claimed below:
(1) operating process keeps the operation of network radiation mode;
(2) overload is not produced in operating process;
(3) the big load of loss of outage should be as early as possible reverted in operating process to power.
2. bus loss of pressure failure service restoration according to claim 1 and switching operation generation method, its feature exist
In:In step " D ", the switching operation of the service restoration process, what it was generated comprises the following steps that:
The first step:A contact element is taken out from variables set X, the load of contact element loading before service restoration is corresponding
The sequence number on side is put into queue FBIn, the sequence number on the corresponding side of load of contact element loading is put into queue F after service restorationAIn,
Contrast FBAnd FA, the load tree of the contact element institute band and the feeder line cut off from the load tree are newly accessed after drawing service restoration
Load, queue F is put into by the sequence number on the new corresponding side of feeder load for accessing load treeinIn, the feedback that will be cut off from load tree
The sequence number on the corresponding side of specific electric load is put into queue FoutIn;
Second step:By queue FinAnd FoutIn element by connected mode classify, if Fin(Fout) in element and the queue other
The element all without syntople, is then put into queue F by either elementin1(Fout1) in;Other elements for having syntople are divided into
Different load strings, and regard each load string as an entirety and be put into queue Fin2(Fout2) in, without neighbour between different load string
Connect relation;By Fin1And Fin2In element by power failure economic loss expense from big to small in respective queue arrange, Fout1And Fout2
In element by power failure economic loss expense from small to large in respective queue arrange;
By load is accessed after first excision load, first simple rear complicated, important load first accesses the original for cutting off afterwards to switching operation
Then carry out, so first cutting off queue F successivelyout1And Fout2In corresponding load, then access Fin1And Fin2In corresponding load;
3rd step:For Fout1In the load that should cut off, take out a load element, find out side corresponding with the load adjacent
FBIn side, and switch sequence number between the two is put into disconnection switch queue S;
4th step:The 3rd step is repeated until Fout1It is sky;
5th step:For Fout2In load string, find out the F adjacent with the side of the load stringBIn side, and by between them
Switch sequence number be put into disconnection switch queue S;
6th step:The 5th step is repeated until Fout2It is sky;
7th step:Fin1And Fin2In element in order and by the 3rd to the 6th step method, by the sequence number of switch to be closed
It is put into closure switch queue T, while other peripheries for being in closure state of the element in addition to T breaker in middle are switched into sequence
Number it is put into disconnection switch queue S;
The disconnection switch queue S and closure switch queue T based on the contact element can be so generated, if being switched in switching manipulation
State is at required state before the procedure, then maintained switch state is constant;
8th step:If X is not empty, the first step is returned.
3. bus loss of pressure failure service restoration according to claim 1 and switching operation generation method, its feature exist
In:Described contact element is the element of the energy load fault region load of normal operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611067007.0A CN106711996B (en) | 2016-11-28 | 2016-11-28 | A kind of bus loss of pressure failure service restoration and switching operation generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611067007.0A CN106711996B (en) | 2016-11-28 | 2016-11-28 | A kind of bus loss of pressure failure service restoration and switching operation generation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106711996A true CN106711996A (en) | 2017-05-24 |
CN106711996B CN106711996B (en) | 2019-08-20 |
Family
ID=58934965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611067007.0A Active CN106711996B (en) | 2016-11-28 | 2016-11-28 | A kind of bus loss of pressure failure service restoration and switching operation generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106711996B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110276475A (en) * | 2019-05-23 | 2019-09-24 | 温州大学 | A kind of Optimal Configuration Method of circuit breaker automation Assembling Production |
CN111638421A (en) * | 2020-05-20 | 2020-09-08 | 国网河北省电力有限公司电力科学研究院 | Method for positioning fault section of power distribution network containing distributed power generation grid connection |
CN114142439A (en) * | 2021-11-18 | 2022-03-04 | 广东电网有限责任公司电力调度控制中心 | Power restoration method based on station bus voltage loss |
CN114662859A (en) * | 2022-02-28 | 2022-06-24 | 云南电网有限责任公司 | Method for evaluating reliability index improvement effect of grid structure on power distribution network |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61214725A (en) * | 1985-03-15 | 1986-09-24 | 株式会社日立製作所 | Automatic bus restoring apparatus |
CN102904256A (en) * | 2012-10-23 | 2013-01-30 | 广东电网公司电力调度控制中心 | Method and system for rapid self-healing of power grid |
CN103457250A (en) * | 2013-08-07 | 2013-12-18 | 国家电网公司 | Power distribution network power supply recovery method based on root tree cutting |
CN103474989A (en) * | 2013-09-13 | 2013-12-25 | 国家电网公司 | Network reconstruction method based on sensitivity analysis |
CN105977970A (en) * | 2016-06-20 | 2016-09-28 | 浙江大学 | Distributed power-containing distribution network intelligent fault recovery method |
-
2016
- 2016-11-28 CN CN201611067007.0A patent/CN106711996B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61214725A (en) * | 1985-03-15 | 1986-09-24 | 株式会社日立製作所 | Automatic bus restoring apparatus |
CN102904256A (en) * | 2012-10-23 | 2013-01-30 | 广东电网公司电力调度控制中心 | Method and system for rapid self-healing of power grid |
CN103457250A (en) * | 2013-08-07 | 2013-12-18 | 国家电网公司 | Power distribution network power supply recovery method based on root tree cutting |
CN103474989A (en) * | 2013-09-13 | 2013-12-25 | 国家电网公司 | Network reconstruction method based on sensitivity analysis |
CN105977970A (en) * | 2016-06-20 | 2016-09-28 | 浙江大学 | Distributed power-containing distribution network intelligent fault recovery method |
Non-Patent Citations (2)
Title |
---|
张璇: "配电网自愈控制及优化策略研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 * |
王增平 等: "含分布式电源的配电网大面积断电供电恢复策略", 《中国电机工程学报》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110276475A (en) * | 2019-05-23 | 2019-09-24 | 温州大学 | A kind of Optimal Configuration Method of circuit breaker automation Assembling Production |
CN111638421A (en) * | 2020-05-20 | 2020-09-08 | 国网河北省电力有限公司电力科学研究院 | Method for positioning fault section of power distribution network containing distributed power generation grid connection |
CN111638421B (en) * | 2020-05-20 | 2022-05-31 | 国网河北省电力有限公司电力科学研究院 | Method for positioning fault section of power distribution network containing distributed power generation grid connection |
CN114142439A (en) * | 2021-11-18 | 2022-03-04 | 广东电网有限责任公司电力调度控制中心 | Power restoration method based on station bus voltage loss |
CN114142439B (en) * | 2021-11-18 | 2023-12-01 | 广东电网有限责任公司电力调度控制中心 | Power restoration method based on station bus voltage loss |
CN114662859A (en) * | 2022-02-28 | 2022-06-24 | 云南电网有限责任公司 | Method for evaluating reliability index improvement effect of grid structure on power distribution network |
CN114662859B (en) * | 2022-02-28 | 2024-05-24 | 云南电网有限责任公司 | Evaluation method for improving effect of grid structure on reliability index of power distribution network |
Also Published As
Publication number | Publication date |
---|---|
CN106711996B (en) | 2019-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106711996A (en) | Bus voltage failure fault power supply recovery and switching operation sequence generating method | |
Li et al. | Distribution system restoration with microgrids using spanning tree search | |
Abdelaziz et al. | Distribution system reconfiguration using a modified Tabu Search algorithm | |
Zhang et al. | Reliability-oriented distribution network reconfiguration considering uncertainties of data by interval analysis | |
CN104578427B (en) | Fault self-healing method for power distribution network containing microgrid power source | |
Huang et al. | Application of artificial bee colony-based optimization for fault section estimation in power systems | |
CN106786774B (en) | A kind of micro-capacitance sensor failure reconfiguration method and system based on expert system | |
CN103138227B (en) | Power distribution network fast power restoration method containing distributed power connected grid | |
González et al. | Reconfiguration of large-scale distribution networks for planning studies | |
CN110988596A (en) | Novel active power distribution network fault section positioning method | |
WO2022179017A1 (en) | Power distribution network cyber-physical component modeling method and system | |
CN109787224A (en) | Method for generating regional power grid load transfer strategy for preventing cascading overload | |
CN111474444A (en) | Line fault power restoration decision method based on knowledge graph | |
CN110148937A (en) | A kind of large-area power-cuts event intelligence deduction method based on Bayesian network | |
CN105977970B (en) | A kind of power distribution network intelligent trouble restoration methods containing distributed generation resource | |
Abd El-Hamed et al. | Self-healing restoration of a distribution system using hybrid Fuzzy Control/Ant-Colony Optimization Algorithm | |
CN107294086A (en) | The service restoration method realized based on network equivalent and parallelization | |
Nagata et al. | An autonomous agent for power system restoration | |
CN115115131A (en) | Multi-center power system fault prediction method and system based on transfer learning | |
CN115549075A (en) | Power supply recovery method and system for power distribution network containing micro-grid | |
CN112436507A (en) | Method for locally correcting Jacobian matrix in large power grid load flow calculation | |
Gao et al. | An Assistant Decision-Making Method for Power Grid Contingency Management Based on Case-Based Reasoning | |
CN111917115A (en) | Automatic supply transfer scheme compiling method for distribution network self-service power failure plan balance | |
Fukunaga et al. | A decentralized power system restoration by means of multi-agent approach | |
Gomes et al. | A Bi-level Model for the Resilient Operation of Distribution Systems using a Matheuristic Nested Decomposition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |