CN106711925A - Wind farm single circuit outgoing line self-adaptive three-phase recloser and method thereof - Google Patents
Wind farm single circuit outgoing line self-adaptive three-phase recloser and method thereof Download PDFInfo
- Publication number
- CN106711925A CN106711925A CN201611222877.0A CN201611222877A CN106711925A CN 106711925 A CN106711925 A CN 106711925A CN 201611222877 A CN201611222877 A CN 201611222877A CN 106711925 A CN106711925 A CN 106711925A
- Authority
- CN
- China
- Prior art keywords
- phase
- wind power
- power plant
- load
- circuit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/02—Details
- H02H3/06—Details with automatic reconnection
- H02H3/066—Reconnection being a consequence of eliminating the fault which caused disconnection
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/02—Details
- H02H3/027—Details with automatic disconnection after a predetermined time
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H3/00—Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
- H02H3/02—Details
- H02H3/05—Details with means for increasing reliability, e.g. redundancy arrangements
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Wind Motors (AREA)
Abstract
The invention belongs to the wind power generation technology field, especially relates to a wind farm single circuit outgoing line self-adaptive three-phase reclosing strategy. According to the strategy, after the tripping of the three phases of the wind farm single circuit outgoing line, time of maintaining the transient stability of the wind farm is prolonged; and at the same time, the fault property of the outgoing line is determined: when the fault is transient, and disappears, a circuit is reclosed by a reclosing motion; when the fault is permanent, a recloser is locked, and the line is not superposed. Under a precondition of prolonging the transient stablility time of the wind farm, the rapid determining of the fault property of the outgoing line of the wind farm is realized, and superposition success rate after the tripping of the three phases of the wind farm outgoing line is effectively improved, and therefore second impact on a system caused by the superposition with the permanent fault and the existing transient fault is prevented.
Description
Technical field
The invention belongs to technical field of wind power generation, more particularly to a kind of wind power plant list loopback outlet self adaptation three coincides
Lock.
Background technology
Away from load center, wind-powered electricity generation place generates electricity can be collected to wind power plant submitting line to China's wind power resources through collecting electric line
(110kV~330kV) delivers to load center in sending into power network afterwards through higher voltage grade (750kV) transmission line of electricity.This energy
Mode of movement is caused:(1) wind power plant is without local load or the only load with very little;(2) it is generally single time that wind power plant sends out line.
Wind power plant is designed according to the principle of maximal power tracing, and the ability without fast frequency hopping and pressure regulation.Institute
So that once by three-phase tripping, the substantial amounts of active surplus of wind power plant will make wind power plant because of frequency and voltage for wind power plant list loopback outlet
Out-of-limit rapid unstability, the successful possibility of wind farm side synchronous recloser is extremely low.If wind power plant can not successfully overlap, need to be through event
Barrier positions the process such as grid-connected once again with treatment, inspection verification, reporting scheduling can be grid-connected once again.This process at least needs consuming 48
Hour, the economic loss that will cause can not ignore to wind power plant.
At present, the coincidence strategy after wind power plant list loopback outlet three-phase tripping is:Wind farm side is abandoned using the inspection same period
Coincidence system, then by the way of " inspection bus have pressure without line ball road ", that is, treat that Wind turbines all cut machine in wind power plant
After can overlap.It is again grid-connected time-consuming that although this mode effectively reduces wind power plant, but still fails to reach maintenance wind power plant
Power supply reliability purpose;The method does not make differentiation before coincidence to line fault property, once coincide with permanent
Failure or the transient fault for not yet disappearing, it will secondary pulse is caused to system.
The content of the invention
The present invention is directed to problem above, it is proposed that a kind of wind power plant list loopback outlet self adaptation three_phase reclosing strategy;Should
Can be after wind power plant list loopback outlet three-phase tripping, extension wind power plant maintains the temporarily steady time to strategy;Meanwhile, judge to send out line
Nature of trouble:Failure is instantaneity and when having disappeared, and reclosing is acted coincidence circuit, failure for it is permanent when, locking weight
Close a floodgate, misaligned circuit.The present invention realizes wind power plant and sends out line nature of trouble on the premise of wind power plant temporary stability time is extended
Quick, effectively increase the successful reclosing rate after wind power plant sends out line three-phase tripping, and avoid coincide with it is permanent
The secondary pulse that failure or the transient fault for not yet disappearing are caused to system.
The present invention proposes a kind of wind power plant list loopback outlet self adaptation three_phase reclosing strategy, and particular content is as follows:
Appropriate substitutional load is installed additional in wind power plant outlet main transformer low-pressure side, cut-out blower fan when necessary, so that
Extension isolated network containing wind power plant maintains the temporarily steady time, is to overlap the wind farm side inspection same period to gain time;Line wind is sent out in wind power plant
Electric field side installs charging capacitor additional, sends out line three-phase tripping, is put into after constant time lag, by detecting that charging capacitor voltage change is special
Property, whether cycle criterion line fault disappear, and transient fault disappearance rear allows to overlap, before failure vanishes and permanent fault
It is misaligned, with the secondary pulse for avoiding reclosing failure from causing.
Implement step as follows:
1) after wind power plant sends out line three-phase tripping, substitutional load is put into.Substitutional load is variable resistor, its capacity PRmax,
According to the average annual P that exerts oneself of wind power plantWWith local average annual load PLDifference set substitutional load size, i.e.,:
PRmax=PW-PL (1)
After wind power plant sends out the tripping operation of line three-phase, if sending out line transimission power P before failure0≤PRmax, put into substitutional load
The stabilization of wind farm side is maintained, the substitutional load capacity for now accessing is:
PR=P0 (2)
If sending out line transimission power P before failure0>PRmax, throw the substitutional load P of maximum capacityR.max, while wind power plant cuts off
It is P to exert oneselfWCPart fan capacity access substitutional load capacity be:
PR=PRmax=P0-PWC (3)
2) the reason for judging circuit breaker trip, if jump, then cuts off substitutional load step by step after quick coincidence;If artificial
Operation, then misaligned circuit, cuts off substitutional load.Otherwise it is transferred to 3).
3) the circuit blow-out time is taken into account, time delay 0.5s accesses the three-phase charging capacitor for filling different voltages, connecting duration Δ t is
0.1s。
4) based on each phase capacitance voltage value, judge whether circuit recovers normal condition.During electric capacity is accessed, if three-phase charges
Three-phase voltage decay is no more than setting valve at capacitance voltage, that is, capacitance connection, then judge line fault as instantaneity and disappeared
Lose, i.e.,:
In formula (4), uX(tN) for charging capacitor access during electric capacity access point each phase voltage;X=A, B, C;tNIt is electric capacity
N-th turn-on time;Δ t is the duration of one-time detection;K is the setting valve close to zero.After being disappeared because of oscillation circuit, voltage pulsation
Very little, k values take 3% in the present invention.If three-phase voltage at least is in mutually attenuation characteristic, judge that circuit does not recover normal also.
If failure vanishes, after excision charging capacitor, circuit overlaps.If circuit does not recover normal yet, capacitance switch is disconnected, it is right
Each phase electric capacity recharges 0.2s.Return perform 3)~4).
If 5) circuit does not recover normal yet after 5 judgement cycles, judge that circuit occurs permanent fault, it is misaligned, cut
Except substitutional load, wind power plant is out of service.
The substitutional load that the present invention is used be can switching capacity step by step air-cooled resistor box, charging capacitor is
BMSJ1.14-15-3 type three phase capacitances, dc source is BTK-12001 type high-voltage dc stabilization pressuring powers.
It is characteristic of the invention that:Propose a kind of wind power plant list loopback outlet self adaptation three_phase reclosing strategy.The strategy leads to
Cross in wind power plant outlet main transformer input substitutional load, cut-out blower fan when necessary, so as to extend the dimension of isolated network containing wind power plant
The temporarily steady time is held, is to overlap the wind farm side inspection same period to gain time;Line wind farm side is sent out in wind power plant install charging capacitor additional,
Line three-phase tripping is sent out, is put into after constant time lag, by detecting charging capacitor voltage change characteristic, cycle criterion line fault
Whether disappear, transient fault disappearance rear allows to overlap, before failure vanishes and permanent fault is misaligned, lost with avoiding overlapping
Lose the secondary pulse for causing.
Brief description of the drawings
Fig. 1 is the on-position figure of charging capacitor of the invention and substitutional load.
Wherein A wind power plants;B main transformers;C electric capacity;D breakers;E batteries;R substitutional loads;On-load switch Kr;Capacitance switch
Kc;Battery switch Kb。
Fig. 2 is operational flowchart of the invention.
Fig. 3 is during wind power plant sends out line A phase ground-fault conditions, input charging capacitor, to send out each phase voltage curve of line
Figure.
Fig. 4 is during wind power plant sends out line AB double earthfault states, input charging capacitor, to send out each phase voltage of line bent
Line chart.
Fig. 5 is during wind power plant sends out line three-phase ground malfunction, input charging capacitor, to send out each phase voltage curve of line
Figure.
Fig. 6 is during wind power plant sends out line AB two-phase short-circuit fault states, input charging capacitor, to send out each phase voltage of line bent
Line chart.
Fig. 7 is during wind power plant sends out line three phase short circuit fault state, input charging capacitor, to send out each phase voltage curve of line
Figure.
Fig. 8 is after wind power plant sends out line failure vanishes, during input charging capacitor, to send out each phase voltage curve map of line.
Fig. 9 is that wind power plant is sent out line and exerted oneself during more than substitutional load capacity, reclosing strategy of the present invention and traditional plan that overlaps
Omit wind power plant exit potential comparison diagram.
Figure 10 is that wind power plant is sent out line and exerted oneself during less than or equal to substitutional load capacity, reclosing strategy of the present invention and tradition weight
Close tactful wind power plant exit potential comparison diagram.
Specific embodiment
The present invention proposes a kind of wind power plant list loopback outlet self adaptation three_phase reclosing and its method, and particular content is such as
Under:
Appropriate substitutional load is installed additional in wind power plant outlet main transformer low-pressure side, cut-out blower fan when necessary, so that
Extension isolated network containing wind power plant maintains the temporarily steady time, is to overlap the wind farm side inspection same period to gain time;Line wind is sent out in wind power plant
Electric field side installs charging capacitor additional, sends out line three-phase tripping, is put into after constant time lag, by detecting that charging capacitor voltage change is special
Property, whether cycle criterion line fault disappear, and transient fault disappearance rear allows to overlap, before failure vanishes and permanent fault
It is misaligned, with the secondary pulse for avoiding reclosing failure from causing.
Implement step as follows:
1) after wind power plant sends out line three-phase tripping, substitutional load is put into.Substitutional load is variable resistor, its capacity PRmax,
According to the average annual P that exerts oneself of wind power plantWWith local average annual load PLDifference set substitutional load size, i.e.,:
PRmax=PW-PL (1)
After wind power plant sends out the tripping operation of line three-phase, if sending out line transimission power P before failure0≤PRmax, put into substitutional load
The stabilization of wind farm side is maintained, the substitutional load capacity for now accessing is:
PR=P0 (2)
If sending out line transimission power P before failure0>PRmax, throw the substitutional load P of maximum capacityR.max, while wind power plant cuts off
It is P to exert oneselfWCPart fan capacity access substitutional load capacity be:
PR=PRmax=P0-PWC (3)
2) the reason for judging circuit breaker trip, if jump, then cuts off substitutional load step by step after quick coincidence;If artificial
Operation, then misaligned circuit, cuts off substitutional load.Otherwise it is transferred to 3).
3) the circuit blow-out time is taken into account, time delay 0.5s accesses the three-phase charging capacitor for filling different voltages, connecting duration Δ t is
0.1s。
4) based on each phase capacitance voltage value, judge whether circuit recovers normal condition.During electric capacity is accessed, if three-phase charges
Three-phase voltage decay is no more than setting valve at capacitance voltage, that is, capacitance connection, then judge line fault as instantaneity and disappeared
Lose, i.e.,:
In formula (4), uX(tN) for charging capacitor access during electric capacity access point each phase voltage;X=A, B, C;tNIt is electric capacity
N-th turn-on time;Δ t is the duration of one-time detection;K is the setting valve close to zero.After being disappeared because of oscillation circuit, voltage pulsation
Very little, k values take 3% in the present invention.If three-phase voltage at least is in mutually attenuation characteristic, judge that circuit does not recover normal also.
If failure vanishes, after excision charging capacitor, circuit overlaps.If circuit does not recover normal yet, capacitance switch is disconnected, it is right
Each phase electric capacity recharges 0.2s.Return perform 3)~4).
If 5) circuit does not recover normal yet after 5 judgement cycles, judge that circuit occurs permanent fault, it is misaligned, cut
Except substitutional load, wind power plant is out of service.
Implement detailed description as follows:
According to charging capacitor shown in Fig. 1 and the on-position of substitutional load, accessed Xinjiang 49.5MW wind power plants and sent out
Line relevant position.The wind-powered electricity generation place generates electricity can be sent out through 35/220kV main transformers by single loop line that length is 100km.The wind power plant
It is average annual exert oneself with the local difference about wind power plant EIAJ of load every year 65%, the choosing of substitutional load capacity as previously described
Take method, it is considered to which certain nargin, the maximum capacity for setting substitutional load is 33MW.If sending out line midpoint during 1.5s to break down,
A length of 0.7s during failure.
Send out line three-phase during 1.51s to trip and access substitutional load, 2.01s charging capacitors are accessed, a length of 0.1s during access.
Be grounded when fault type is respectively A phases, AB two phase grounds, three-phase ground, AB line to line fault, three-phase short circuit metal failure and these
When fault resistance is 100 Ω and these fault resistances are 100 Ω, 2.01s~2.11s is accessed charge for the first time
During electric capacity, the relaxation phenomenon that faulted phase voltage takes a different form;Relatively, perfect phase voltage and relaxation phenomenon, base do not occur
Originally remain unchanged.During 2.31s~2.41s accesses charging capacitor second, three-phase voltage remains unchanged substantially.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than is limited;Although with reference to foregoing reality
Example is applied to be described in detail the present invention, for the person of ordinary skill of the art, still can be to foregoing implementation
Technical scheme described in example is modified, or carries out equivalent to which part technical characteristic;And these are changed or replace
Change, do not make the spirit and scope of the essence disengaging claimed technical solution of the invention of appropriate technical solution.
Claims (4)
1. a kind of wind power plant list loopback outlet self adaptation three_phase reclosing, it is characterised in that export main transformer low-pressure side in wind power plant
Install substitutional load additional, substitutional load is by on-load switch control;Line wind farm side is sent out in wind power plant install charging capacitor, installation position additional
Put and sending on the inside of wire-outgoing breaker, by capacitance switch control, charging capacitor is pre-charged charging capacitor before accessing by dc source, is sent
Access charging capacitor in outlet three-phase tripping rear.
2. a kind of wind power plant list loopback outlet self adaptation three_phase reclosing according to claim 1, application method step is as follows:
1) after wind power plant sends out line three-phase tripping, substitutional load is put into.Substitutional load is variable resistor, its capacity PRmax, according to wind
The average annual P that exerts oneself of electric fieldWWith local average annual load PLDifference set substitutional load size, i.e.,:
PRmax=PW-PL (1)
After wind power plant sends out the tripping operation of line three-phase, if sending out line transimission power P before failure0≤PRmax, input substitutional load can maintenance
The stabilization of wind farm side, the substitutional load capacity for now accessing is:
PR=P0 (2)
If sending out line transimission power P before failure0>PRmax, throw the substitutional load P of maximum capacityR.max, while wind power plant excision is exerted oneself
It is PWCPart fan capacity access substitutional load capacity be:
PR=PRmax=P0-PWC (3)
2) the reason for judging circuit breaker trip, if jump, then cuts off substitutional load step by step after quick coincidence;If artificial behaviour
Make, then misaligned circuit, cut off substitutional load.Otherwise it is transferred to 3).
3) the circuit blow-out time is taken into account, time delay 0.5s accesses the three-phase charging capacitor for filling different voltages, connecting duration Δ t is
0.1s。
4) based on each phase capacitance voltage value, judge whether circuit recovers normal condition.During electric capacity is accessed, if three-phase charging capacitor
Three-phase voltage decay is no more than setting valve at voltage, that is, capacitance connection, then judge line fault as instantaneity and disappeared,
I.e.:
In formula (4), uX(tN) for charging capacitor access during electric capacity access point each phase voltage;X=A, B, C;tNIt is electric capacity N
Secondary turn-on time;Δ t is the duration of one-time detection;K is the setting valve close to zero.After being disappeared because of oscillation circuit, voltage pulsation is very
Small, k values take 3% in the present invention.If three-phase voltage at least is in mutually attenuation characteristic, judge that circuit does not recover normal also.
If failure vanishes, after excision charging capacitor, circuit overlaps.If circuit does not recover normal yet, capacitance switch is disconnected, to each phase
Electric capacity recharges 0.2s.Return perform 3)~4).
If 5) circuit does not recover normal yet after 5 judgement cycles, judge that circuit occurs permanent fault, misaligned, excision is replaced
For load, wind power plant is out of service.
3. a kind of wind power plant list loopback outlet self adaptation three_phase reclosing according to claim 1, it is characterised in that substitute
Load be can switching capacity step by step air-cooled resistor box.
4. a kind of wind power plant list loopback outlet self adaptation three_phase reclosing according to claim 1, it is characterised in that charge
Electric capacity is BMSJ1.14-15-3 type three phase capacitances, and dc source is BTK-12001 type high-voltage dc stabilization pressuring powers.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611222877.0A CN106711925B (en) | 2016-12-27 | 2016-12-27 | self-adaptive three-phase reclosing lock for single loop outgoing line of wind power plant and method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611222877.0A CN106711925B (en) | 2016-12-27 | 2016-12-27 | self-adaptive three-phase reclosing lock for single loop outgoing line of wind power plant and method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106711925A true CN106711925A (en) | 2017-05-24 |
CN106711925B CN106711925B (en) | 2019-12-10 |
Family
ID=58903455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611222877.0A Expired - Fee Related CN106711925B (en) | 2016-12-27 | 2016-12-27 | self-adaptive three-phase reclosing lock for single loop outgoing line of wind power plant and method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106711925B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108390352A (en) * | 2018-04-23 | 2018-08-10 | 新疆大学 | A kind of wind-powered electricity generation submitting line fault nature examination method and system |
CN112260236A (en) * | 2020-09-17 | 2021-01-22 | 湘潭大学 | Three-phase self-adaptive reclosing method and device |
CN114079274A (en) * | 2021-09-29 | 2022-02-22 | 华电电力科学研究院有限公司 | Reclosing method of wind power plant current collection circuit based on wireless differential protection |
CN114465196A (en) * | 2022-02-25 | 2022-05-10 | 南京理工大学 | Line superposition method suitable for wind power plant to access power distribution network |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103208851A (en) * | 2013-04-16 | 2013-07-17 | 安徽理工大学 | Vertical-axis wind power converter device |
-
2016
- 2016-12-27 CN CN201611222877.0A patent/CN106711925B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103208851A (en) * | 2013-04-16 | 2013-07-17 | 安徽理工大学 | Vertical-axis wind power converter device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108390352A (en) * | 2018-04-23 | 2018-08-10 | 新疆大学 | A kind of wind-powered electricity generation submitting line fault nature examination method and system |
CN108390352B (en) * | 2018-04-23 | 2019-09-03 | 新疆大学 | A kind of wind-powered electricity generation submitting line fault nature examination method and system |
CN112260236A (en) * | 2020-09-17 | 2021-01-22 | 湘潭大学 | Three-phase self-adaptive reclosing method and device |
CN114079274A (en) * | 2021-09-29 | 2022-02-22 | 华电电力科学研究院有限公司 | Reclosing method of wind power plant current collection circuit based on wireless differential protection |
CN114079274B (en) * | 2021-09-29 | 2023-08-22 | 华电电力科学研究院有限公司 | Wind power plant current collection circuit reclosing method based on wireless differential protection |
CN114465196A (en) * | 2022-02-25 | 2022-05-10 | 南京理工大学 | Line superposition method suitable for wind power plant to access power distribution network |
Also Published As
Publication number | Publication date |
---|---|
CN106711925B (en) | 2019-12-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
El Moursi et al. | A parallel capacitor control strategy for enhanced FRT capability of DFIG | |
CN108964073B (en) | Phase modulator-based multi-target reactive voltage coordination control method and system | |
CN103001195B (en) | The relay protecting method of failure in transformer dead zone and the circuit breaker tripping of fault side | |
CN101183781B (en) | Shunt inductance current-limiting breaker | |
CN101950958B (en) | Capacitance-adjusting type arc suppression coil complete device and operation mod of same | |
CN106711925A (en) | Wind farm single circuit outgoing line self-adaptive three-phase recloser and method thereof | |
CN102170135A (en) | 35KV large capacity reactive compensation and harmonic suppression integrated system and control method thereof | |
Wang et al. | Three-phase adaptive auto-reclosing for single outgoing line of wind farm based on active detection from STATCOM | |
CN105425063A (en) | New island protection control method based on wide area information | |
US11870243B2 (en) | Method of controlling a renewable power generation plant | |
Bagriyanik et al. | The effect of fault current limiters on distribution systems with wind turbine generators | |
Ansari et al. | MATLAB simulation of FRT techniques for DFIG-based wind farms | |
Sham et al. | Development of adaptive distance relay for STATCOM connected transmission line | |
Tian et al. | Transient stability and FRT technologies of different synchronous wind turbine | |
CN103166237A (en) | Weak tie receiving end small electric grid tie line high resistance compensation method | |
Yan et al. | Process and Protection Action of Commissioning Fault of Offshore Wind Farm Grid-Connected Transmission Lines | |
CN109861188B (en) | Grounding protection method and system based on centralized new energy grid-connected mode | |
Shi et al. | Detection of feeder open phase events using smart inverters | |
LIANG et al. | Research on phase-by-phase adaptive reclosing sequence for transmission lines | |
Dong et al. | The offline accident of the large-scale wind generator system and its protection & control scheme | |
CN107317309A (en) | A kind of earthing mode Collaborative Control conversion method and system based on GOOSE | |
Boukhris et al. | Low voltage ride-through capability enhancement of doubly fed induction generator based wind turbines under voltage dips | |
CN202772666U (en) | Electric energy extracting device applying to network distribution | |
McGuinness et al. | Greenstart: Protection challenges with integrating wind power parks into system restoration | |
Liu et al. | The Protection and Coordinated Control Study of VSC-HVDC Access System for Large-Scale Offshore Wind Power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191210 Termination date: 20201227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |