CN106708736A - Production automation testing method and system for communication equipment - Google Patents

Production automation testing method and system for communication equipment Download PDF

Info

Publication number
CN106708736A
CN106708736A CN201611170570.0A CN201611170570A CN106708736A CN 106708736 A CN106708736 A CN 106708736A CN 201611170570 A CN201611170570 A CN 201611170570A CN 106708736 A CN106708736 A CN 106708736A
Authority
CN
China
Prior art keywords
information
test
module
testing
devices under
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611170570.0A
Other languages
Chinese (zh)
Other versions
CN106708736B (en
Inventor
许琦
杨君
甘海慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fiberhome Telecommunication Technologies Co Ltd
Original Assignee
Wuhan FiberHome Networks Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan FiberHome Networks Co Ltd filed Critical Wuhan FiberHome Networks Co Ltd
Priority to CN201611170570.0A priority Critical patent/CN106708736B/en
Publication of CN106708736A publication Critical patent/CN106708736A/en
Application granted granted Critical
Publication of CN106708736B publication Critical patent/CN106708736B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3684Test management for test design, e.g. generating new test cases

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Maintenance And Management Of Digital Transmission (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The invention discloses a production automation testing method and system for communication equipment and relates to the field of communication equipment testing. The method comprises the steps that a server issues station information according to verification information of tested equipment; after test information of the tested equipment is automatically loaded, test information of a corresponding part is loaded according to a specific function needing to be tested in the station information, and a corresponding test is performed automatically; if an anomaly is monitored in the testing process, the abnormal step is stopped, abnormal information is recorded, and execution of the abnormal step is recovered according to the abnormal information; and after the test is completed, test result information is displayed and uploaded to the server. Through the production automation testing method and system, the communication equipment can be tested automatically, test quality is guaranteed while test efficiency is remarkably improved, and the production automation testing method and system are quite practical and suitable for popularization.

Description

For the production automation method of testing and system of communication equipment
Technical field
The present invention relates to communication equipment testing field, and in particular to a kind of production automation test side for communication equipment Method and system.
Background technology
Communication equipment needs to be tested after manufacture, to ensure quality.Existing communication equipment is typically by producing survey Examination personnel's manual test.But, production test personnel to being devices under having impercipient situation, and then may make to go smoothly Dynamic test period is more long, and manual test process is comparatively laborious (such as artificial in a large amount of facility informations for repeating to search ginseng Number information), reduce testing efficiency and quality.
The content of the invention
For defect present in prior art, present invention solves the technical problem that being:Automatically communication equipment is surveyed Examination, the present invention can be while testing efficiency be significantly improved, it is ensured that test quality.
To achieve the above objectives, it is provided by the present invention for the production automation method of testing of communication equipment including following Step:
S1:The check information that will be devices under uploads onto the server, and server is to check information verification by (verification letter Breath passes through if verification if being present in far-end server) after, the station information being devices under is issued according to check information, go to S2;
S2:Automatically load the test information being devices under of advance typing, test information include hardware test information and Continuity testing information, goes to S3;
S3:Test function is determined according to station information;If station information includes hardware test information, S4 is gone to, if station Information includes continuity testing information, goes to S5;
S4:Automatically the hardware test information is loaded, it is automatic to being devices under carrying out hardware according to hardware test information Test, generates test result information after the completion of test, go to S6;
S5:Automatically the continuity testing information is loaded, it is automatic to being devices under carrying out according to continuity testing information Continuity testing, generates test result information after the completion of test, go to S6;
When S4 and/or S5 is performed, the implementation procedure of S4 and/or S5 is monitored, if occurring when monitoring that S4 and/or S5 is performed different Often, then abnormal step is stopped, recording exceptional information recovers the execution of abnormal step according to abnormal information;
S6:Display test result information, test result information is uploaded onto the server.
On the basis of above-mentioned technical proposal, check information described in S1 is input into graphical interfaces, is loaded described in S2 Institute in determining test function, S4 according to station information described in the process of the test information being devices under of advance typing, S3 State the test in the process and test result of hardware testing, the process and test result and S6 of continuity testing described in S5 Object information, shows in graphical interfaces.
On the basis of above-mentioned technical proposal, check information described in S1 includes the sequence information and system that are devices under Identification information and the identity information of production test personnel, sequence information of the server in check information, issue by The station information of test equipment;The server verifies the standard for passing through to check information:Check information is present in server In.
Loaded on the basis of above-mentioned technical proposal, described in S2 advance typing the test information being devices under it Before, it is further comprising the steps of:The test information is verified, verification performs loading test data flow journey again after passing through.
On the basis of above-mentioned technical proposal, the automatic process to being devices under carrying out continuity testing described in S5 In, it is further comprising the steps of:The connecting line being devices under is extracted and connected according to testing requirement.
Compared with prior art, the advantage of the invention is that:
(1) understood referring to S1 to S6, the present invention can be by the way of all-electronin stream, and quick identification is simultaneously intelligently loaded tested The test information of examination equipment, and then automatically to being devices under testing, the workload of production test personnel is not only alleviated, Testing efficiency is improve, and ensure that test quality (i.e. test result accurate and effective).
On this basis, understood referring to S4 to S5, the present invention, being capable of actively monitoring during automatic test is carried out Test whether exception occur, if abnormal can offer occur and pointing out abnormal, termination test and recovering the function of testing, and then ensure The normal operation of automatic test, further increases test quality.
(2) understood referring to S3 to S5, the method for the present invention by hardware testing and can connect that test is separate to be run, therefore In actual use, the present invention can the operation of multithreading many examples, and then effectively release production test human resources, further Improve operating efficiency.
Corresponding to be, system of the invention can dispose (hardware testing mould according to the demand sub-module of test function Block and continuity testing module correspond to 2 different test functions respectively), if producing later stage demand to become on the basis of of the invention During change (such as increase newly test function etc.), the present invention can changes in demand carry out multimode structure (such as according to newly-increased survey The corresponding test module of examination function setting), facilitate the expansion and maintenance in later stage.
(3) understood referring to S1 to S6, the present invention is respectively surveyed in each step automatic testing process there is provided corresponding automation Examination graphical interfaces, production test personnel operate fairly simple and convenient in graphical interfaces;And the present invention is also utilized from dynamic search Draw and simplify test parameter configuration flow with the technique maximized of Intelligent Recognition, and then enable that production test personnel are efficient It is devices under carrying out feature-rich various automatic test to different using the present invention, the execution efficiency of test is higher.
Brief description of the drawings
Fig. 1 be the embodiment of the present invention in for communication equipment production automation method of testing flow chart.
Specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
It is shown in Figure 1, the production automation method of testing for communication equipment in the embodiment of the present invention, including it is following Step:
S1:Production test personnel are input into the check information (order being devices under being devices under on graphical interfaces Information and the identity information of system identification information and production test personnel), far-end server passes through to check information verification After (check information passes through if verification if being present in far-end server), the station letter being devices under is issued according to sequence information Breath (is devices under needing the concrete function of test), goes to S2.
S2:Production test personnel, according to the test information that certain rule input is devices under, survey on graphical interfaces After examination information includes that hardware test information and continuity testing information, test information checking pass through, automatic loading test information turns To S3.
S3:Graphical interfaces to show and determine test function according to station information;If station information includes hardware test information, turn To S4, if station information includes continuity testing information, going to S5, S4 and S5 can be parallel, and even station information includes hard simultaneously Part tests information and continuity testing information, then perform S4 and S5 respectively.
S4:In the test information of S2, the hardware test information being devices under is loaded automatically, according to hardware test information Automatically to being devices under carrying out hardware testing, test process is shown in graphical interfaces, and test result is generated after the completion of test Information, goes to S6.
S5:In the test information of S2, the continuity testing information being devices under is loaded automatically, according to continuity testing Information is automatic to being devices under carrying out continuity testing, extracted according to testing requirement (system is pointed out automatically) in test process and The connecting line being devices under is connected, test process is shown in graphical interfaces, and test result information is generated after the completion of test, turned To S6.
In the implementation procedure (performing the process of S4 and/or S5) of automatic test, by monitoring means such as process interactions, The implementation procedure of automatic test is monitored, if monitoring to occur abnormal (such as system delay machine, test errors etc.), is stopped automatic Change the execution of test, recording exceptional information recovers the execution of automatic test according to abnormal information.
S6:Test result information is shown in graphical interfaces, test result information is uploaded to far-end server.
The production automation test system for communication equipment based on the above method in the embodiment of the present invention, including figure Interface display module, database connection processing module, test equipment information module, test load-on module, hardware test module, company General character test module, exception monitoring processing module and test result display module.
Graphical interfaces display module is used for:Respectively database connection processing module, test equipment information module, test adds Carry module, hardware test module, continuity testing module, exception monitoring processing module and test result display module, there is provided phase The graphical interfaces answered.
Database connection processing module is used for:
(1) (sequence information that is devices under and it is by the check information of being devices under of being input into of production test personnel System identification information and production test personnel identity information) be uploaded to far-end server, receive far-end server return with After the corresponding station information of sequence information in check information, station information is sent to test load-on module.
(2) test result that test result display module sends is uploaded to far-end server.
Test equipment information module is used for:Test information (the hardware survey being devices under to production tester's input Examination information and continuity testing information) verified, after verification passes through, test information is loaded, sent to test load-on module and added Carry pass signal.
Test load-on module is used for:After receiving station information and loading pass signal, test work(is determined according to station information Energy;If station information includes hardware test information, working signal is sent to hardware test module, if station information includes connectedness Test information, working signal is sent to continuity testing module.
Hardware test module is used for:After receiving working signal, monitoring signals are sent to exception monitoring processing module, loading is surveyed Hardware test information in examination facility information module, it is automatic to being devices under carrying out hardware testing according to hardware test information, Test result information after the completion of test is sent to test result display module.
Continuity testing module is used for:After receiving working signal, monitoring signals, loading are sent to exception monitoring processing module Continuity testing information in test equipment information module, it is automatic to being devices under connecting according to continuity testing information Property test, the connecting line that production test personnel extract and connection is devices under is pointed out in test process, after the completion of test Test result information is sent to test result display module.
Exception monitoring processing module is used for:After receiving monitoring signals, by monitoring means such as process interactions, monitoring hardware is surveyed The work of die trial block and/or continuity testing module;If it is different to monitor that hardware test module and/or continuity testing module occur Often, then the work of abnormal module is stopped, recording exceptional information is recovered abnormal module and worked on according to abnormal information.
Test result display module is used for:The test result information that display is received, test result information is sent to data Storehouse connects processing module.
Further, the present invention is not limited to the above-described embodiments, for those skilled in the art, Without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the present invention Protection domain within.The content not being described in detail in this specification belongs to existing skill known to professional and technical personnel in the field Art.

Claims (10)

1. a kind of production automation method of testing for communication equipment, it is characterised in that the method is comprised the following steps:
S1:The check information that will be devices under uploads onto the server, and server passes through (if check information to check information verification It is present in far-end server then verification to pass through) after, the station information being devices under is issued according to check information, go to S2;
S2:Automatically the test information being devices under of advance typing is loaded, test information includes hardware test information and connects Property test information, go to S3;
S3:Test function is determined according to station information;If station information includes hardware test information, S4 is gone to, if station information Including continuity testing information, S5 is gone to;
S4:Automatically the hardware test information is loaded, it is automatic to being devices under carrying out hardware testing according to hardware test information, Test result information is generated after the completion of test, S6 is gone to;
S5:Automatically the continuity testing information is loaded, it is automatic to being devices under connecting according to continuity testing information Property test, test result information is generated after the completion of test, go to S6;
When S4 and/or S5 is performed, the implementation procedure of S4 and/or S5 is monitored, if occurring exception when monitoring that S4 and/or S5 is performed, Then stop abnormal step, recording exceptional information recovers the execution of abnormal step according to abnormal information;
S6:Display test result information, test result information is uploaded onto the server.
2. the production automation method of testing of communication equipment is used for as claimed in claim 1, it is characterised in that:School described in S1 Test information to be input into graphical interfaces, in loading process, the S3 of the test information being devices under of advance typing described in S2 It is described according to station information determine the process and test result of hardware testing described in test function, S4, described in S5 it is connective Test result information in the process and test result and S6 of test, shows in graphical interfaces.
3. the production automation method of testing of communication equipment is used for as claimed in claim 1, it is characterised in that:School described in S1 Testing information includes the identity information of sequence information and system identification information and the production test personnel being devices under, described Sequence information of the server in check information, issues the station information being devices under;The server is to check information Verifying the standard for passing through is:Check information is present in server.
4. the production automation method of testing for communication equipment as described in any one of claims 1 to 3, it is characterised in that: It is further comprising the steps of before the test information being devices under of advance typing is loaded described in S2:To the test information Verified, verification performs loading test data flow journey again after passing through.
5. the production automation method of testing for communication equipment as described in any one of claims 1 to 3, it is characterised in that: Described in S5 it is automatic to being devices under carrying out continuity testing during, it is further comprising the steps of:Pulled out according to testing requirement Go out and connect the connecting line being devices under.
6. a kind of production automation test system for communication equipment for realizing claim 1 to 5 any one methods described, its It is characterised by:The system includes database connection processing module, test equipment information module, test load-on module, hardware testing Module, continuity testing module, exception monitoring processing module and test result display module;
Database connection processing module is used for:
The check information that will be devices under uploads onto the server, and receives station corresponding with the check information letter of server return After breath, station information is sent to test load-on module;The test result that test result display module sends is uploaded to service Device;
Test equipment information module is used for:After loading the test information being devices under of advance typing, to test load-on module Loading pass signal is sent, test information includes hardware test information and continuity testing information;
Test load-on module is used for:After receiving station information and loading pass signal, test function is determined according to station information;If Station information includes hardware test information, and working signal is sent to hardware test module, if station information includes continuity testing Information, working signal is sent to continuity testing module;
Hardware test module is used for:After receiving working signal, monitoring signals are sent to exception monitoring processing module, loading test sets Hardware test information in standby information module, it is automatic to being devices under carrying out hardware testing according to hardware test information, will survey Test result information after the completion of examination is sent to test result display module;
Continuity testing module is used for:After receiving working signal, monitoring signals, loading test are sent to exception monitoring processing module Continuity testing information in facility information module, it is automatic to being devices under carrying out connective survey according to continuity testing information Examination, the test result information after the completion of test is sent to test result display module;
Exception monitoring processing module is used for:After receiving monitoring signals, monitoring hardware test module and/or continuity testing module Work;If it is abnormal to monitor that hardware test module and/or continuity testing module occur, stop the work of abnormal module, note Record abnormal information, recovers abnormal module and works on according to abnormal information;
Test result display module is used for:The test result information that display is received, test result information is sent to database and is connected Connect processing module.
7. the production automation test system of communication equipment is used for as claimed in claim 6, it is characterised in that:The system is also wrapped Graphical interfaces display module is included, it is used for:Respectively database connection processing module, test equipment information module, test loading Module, hardware test module, continuity testing module, exception monitoring processing module and test result display module, there is provided corresponding Graphical interfaces.
8. the production automation test system of communication equipment is used for as claimed in claim 6, it is characterised in that:The database Check information in connection processing module includes the sequence information and system identification information and the production test people that are devices under The identity information of member, the station information is corresponding with the sequence information in check information.
9. the production automation test system for communication equipment as described in any one of claim 6 to 8, it is characterised in that: , it is necessary to the test information before the test information being devices under of the advance typing of the test equipment information module loading Verified, verification performs loading test information workflow again after passing through.
10. the production automation test system for communication equipment as described in any one of claim 6 to 8, it is characterised in that: The continuity testing module is additionally operable to:During continuity testing is carried out, point out to extract and connect what is be devices under Connecting line.
CN201611170570.0A 2016-12-16 2016-12-16 Production automation test method and system for communication equipment Active CN106708736B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611170570.0A CN106708736B (en) 2016-12-16 2016-12-16 Production automation test method and system for communication equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611170570.0A CN106708736B (en) 2016-12-16 2016-12-16 Production automation test method and system for communication equipment

Publications (2)

Publication Number Publication Date
CN106708736A true CN106708736A (en) 2017-05-24
CN106708736B CN106708736B (en) 2020-05-05

Family

ID=58938036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611170570.0A Active CN106708736B (en) 2016-12-16 2016-12-16 Production automation test method and system for communication equipment

Country Status (1)

Country Link
CN (1) CN106708736B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947634A (en) * 2019-02-27 2019-06-28 Oppo广东移动通信有限公司 The input method and electronic device of test result for electronic device
CN112416797A (en) * 2020-12-02 2021-02-26 未来汽车科技(深圳)有限公司 Method and system for automatically alarming and maintaining site when embedded software runs abnormally
CN112948095A (en) * 2021-03-31 2021-06-11 读书郎教育科技有限公司 Device and method for assisting Android terminal in testing on factory assembly line
CN113702726A (en) * 2020-05-21 2021-11-26 株洲中车时代电气股份有限公司 Automatic testing device and method for vehicle-mounted display

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227346A (en) * 2008-02-05 2008-07-23 中兴通讯股份有限公司 Method and apparatus for failure monitoring in the course of communication equipment automatization testing
CN102394797A (en) * 2011-11-16 2012-03-28 深圳市赛格导航科技股份有限公司 Embedded automatic network communication device test method and system
CN103079086A (en) * 2012-12-30 2013-05-01 广东九联科技股份有限公司 Automatic testing system for set-top box
CN103207333A (en) * 2013-03-15 2013-07-17 深圳市三奇科技有限公司 Automatic testing device and method for high-frequency frequency device
CN103699464A (en) * 2013-12-18 2014-04-02 北京星河亮点技术股份有限公司 Communication terminal automatically testing method and device
CN104679631A (en) * 2015-03-23 2015-06-03 重庆蓝岸通讯技术有限公司 Testing method and system for equipment based on Android system
CN104954081A (en) * 2015-05-29 2015-09-30 深圳市共进电子股份有限公司 Electronic device test system and test method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227346A (en) * 2008-02-05 2008-07-23 中兴通讯股份有限公司 Method and apparatus for failure monitoring in the course of communication equipment automatization testing
CN102394797A (en) * 2011-11-16 2012-03-28 深圳市赛格导航科技股份有限公司 Embedded automatic network communication device test method and system
CN103079086A (en) * 2012-12-30 2013-05-01 广东九联科技股份有限公司 Automatic testing system for set-top box
CN103207333A (en) * 2013-03-15 2013-07-17 深圳市三奇科技有限公司 Automatic testing device and method for high-frequency frequency device
CN103699464A (en) * 2013-12-18 2014-04-02 北京星河亮点技术股份有限公司 Communication terminal automatically testing method and device
CN104679631A (en) * 2015-03-23 2015-06-03 重庆蓝岸通讯技术有限公司 Testing method and system for equipment based on Android system
CN104954081A (en) * 2015-05-29 2015-09-30 深圳市共进电子股份有限公司 Electronic device test system and test method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
毛玉书: "面向嵌入式通信设备的Ch自动化测试框架设计"", 《计算机系统应用》 *
郑浩月: ""某通信设备性能测试仪的研究与实现"", 《中国优秀硕士学位论文全文数据库•信息科接辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947634A (en) * 2019-02-27 2019-06-28 Oppo广东移动通信有限公司 The input method and electronic device of test result for electronic device
CN113702726A (en) * 2020-05-21 2021-11-26 株洲中车时代电气股份有限公司 Automatic testing device and method for vehicle-mounted display
CN112416797A (en) * 2020-12-02 2021-02-26 未来汽车科技(深圳)有限公司 Method and system for automatically alarming and maintaining site when embedded software runs abnormally
CN112948095A (en) * 2021-03-31 2021-06-11 读书郎教育科技有限公司 Device and method for assisting Android terminal in testing on factory assembly line

Also Published As

Publication number Publication date
CN106708736B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN106708736A (en) Production automation testing method and system for communication equipment
US9165100B2 (en) Methods and apparatus to map schematic elements into a database
CN102331967B (en) Method for managing chip verification test cases
CN107678960B (en) Intelligent ammeter software black box testing system and method
CN107273280A (en) A kind of log processing method, device, electronic equipment and storage medium
CN106802862A (en) Train operation control system security critical software automatically testing platform
CN102495802B (en) Method and device for testing software system, and computer system
CN111999579B (en) Automatic detection system and method for charging pile
CN103049379B (en) A kind of method of system testing
CN112000557A (en) Automatic testing arrangement of track traffic signal system
CN109656820A (en) Intelligent automation test macro based on CBTC
CN109086197A (en) The acceptance testing method and system of urban track traffic CBTC system
CN103913728B (en) A kind of method of testing based on portable radar comprehensive tester
CN112000558A (en) Method for generating automatic test case of rail transit signal system
CN203534602U (en) Testing equipment suitable for vehicle-mounted navigation multimedia terminal
CN104216823B (en) A kind of automated testing method and master control set
CN112231163A (en) Multifunctional computer detection equipment and operation method thereof
CN114138660A (en) Defect processing method, device, equipment, computer readable storage medium and product
CN102135939A (en) Test case operation dispatching device and method
CN104123212A (en) System test method of USB chip
CN106598793B (en) Test system and test method based on BIOS serial port log data
CN102967839A (en) Detection method and device for online monitoring communication system of transformer substation
CN112101801A (en) Construction quality unified supervision method and system based on Internet of things technology
CN103336741A (en) Method and device for testing stability of operation system of power secondary system
CN104361012B (en) A kind of method of testing and device of city track traffic engineering track data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190114

Address after: 430074 No. 6, High-tech Fourth Road, Donghu High-tech Development Zone, Wuhan City, Hubei Province

Applicant after: Fenghuo Communication Science &. Technology Co., Ltd.

Address before: 430074 No. 67 Guanggu Pioneer Street, Wuhan City, Hubei Province

Applicant before: Wuhan Fenghuo Network Co., Ltd.

GR01 Patent grant
GR01 Patent grant