CN106703215A - Fabricated rigid joint beam-column structure - Google Patents

Fabricated rigid joint beam-column structure Download PDF

Info

Publication number
CN106703215A
CN106703215A CN201611125168.0A CN201611125168A CN106703215A CN 106703215 A CN106703215 A CN 106703215A CN 201611125168 A CN201611125168 A CN 201611125168A CN 106703215 A CN106703215 A CN 106703215A
Authority
CN
China
Prior art keywords
reinforcing bar
rigid joint
prefabricated
connecting plate
link slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611125168.0A
Other languages
Chinese (zh)
Inventor
车大桥
陈洪令
成小冬
欧阳征
邹阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hua Gou House Industrial Co Ltd
Original Assignee
Sichuan Hua Gou House Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Hua Gou House Industrial Co Ltd filed Critical Sichuan Hua Gou House Industrial Co Ltd
Priority to CN201611125168.0A priority Critical patent/CN106703215A/en
Publication of CN106703215A publication Critical patent/CN106703215A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses a fabricated rigid joint beam-column structure which comprises a prefabricated column and a prefabricated beam. Inner stirrups are disposed on the prefabricated beam, a hoop, a plurality of connecting grooves and a plurality of connecting plates are disposed on the prefabricated column, the prefabricated beam is disposed in the connecting grooves, and the connecting grooves and the connecting plates are connected with the prefabricated column through the hoop; inner rebars are arranged in the prefabricated beam and stretch out of the prefabricated beam, the inner rebars are connected with one connecting plate, and a laminated layer is arranged on the prefabricated beam and composed of several laminated plates. The fabricated rigid joint beam-column structure has the advantages of being convenient to install, strong in structure and capable of saving materials.

Description

A kind of assembled rigid joint beam column construction
Technical field
The present invention relates to building field, particularly a kind of assembled rigid joint beam column construction.
Background technology
Nowadays, the prefabricated beam column interconnection technique of China's assembled architecture, its evident characteristic is according to American-European and Japanese beam column Interconnection technique is referred to, and assembled architecture is constructed further according to related specifications and its mode for meeting " equivalent cast-in-place ".
On mode of construction, by prefabricated every layer of pillar, then precast beam, prefabricated board etc. are combined, set by in-depth Meter, last cast-in-place node meets " equivalent cast-in-place " in specification in this way.Existing assembled beam-column interconnection technique The factors such as template, situ wet operation, the construction complexity of generation and the no too big difference of traditional cast-in-place building, and it is existing Assembled beam-column interconnection technique causes existing dress by the influence of the factors such as transport, lifting and the increase of part cost of labor With formula beam-to-column joint technology, more traditional cast-in-place building can be sayed without too big advantage on cost.Because present wet trade is more, can wave Take many concrete, while job site is filthy.Due to there is the reason such as Bar Anchorage at node after prior art connection, make Reinforcement constitution is complicated, and great inconvenience is brought to wet trade, the constructional deficiencies such as voids and pits easily occurs.
In sum, cost is the significant obstacle of assembled architecture development at this stage, and only this problem has been obtained fully Solution, be just conducive to the development in an all-round way of building industrialization.
The content of the invention
For the problem that above-mentioned prior art is present, the present invention provides a kind of assembled rigid joint beam column construction.
A kind of assembled rigid joint beam column construction, including:Prefabricated post, precast beam, precast beam are provided with interior stirrup, prefabricated Post is provided with cuff, some link slots, some connecting plates, and precast beam is located in link slot, and link slot and connecting plate pass through cuff It is connected with prefabricated post;Interior reinforcing bar is provided with precast beam, and interior reinforcing bar is stretched out outside precast beam, and interior reinforcing bar and a connecting plate It is connected, precast beam is provided with overlapping layers, and overlapping layers is made up of some superimposed sheets.
Further, also include:Outer reinforcing bar, and outer reinforcing bar is connected with another connecting plate.
Further, some outer stirrups are additionally provided with, each outer stirrup is socketed in the outside of interior reinforcing bar and outer reinforcing bar.
Further, interior reinforcing bar is connected with outer reinforcing bar with cuff.
Further, overlapping layers is located between outer reinforcing bar and precast beam.
Further, link slot is mainly made up of three pieces of splice plates, and opening is located at link slot top.
Further, the top of the connecting plate of link slot both sides is equipped with anti-edge.
Compared with prior art, the invention has the advantages that:
1. cost advantage, this patent eliminates the wet trade mould of key node in existing assembled beam-column interconnection technique Plate, part of nodes anchor bar, greatly reduce wet trade and accordingly reduce the construction period, have for cost Advantage.
2. mode of construction advantage, this patent by and precast beam, the combination of superimposed sheet, node section is turned into one It is overall, the use of template is eliminated, reduce the construction environment that partly similar traditional cast-in-place mode is brought filthy.Prefabricated post can one The secondary prefabricated laminated post of property, reduces every layer and is required for the prefabricated trouble of layering.Meanwhile, the quantity of mounting post is reduced, reduce The part construction period.
3. material economy advantage, for the reduction of wet trade, the concrete of job site is lost there is no all of loss Factory is all concentrated on, by the control of strict production management technology, the loss of concrete is the 63% of situ wet operation.
4. construction quality outward appearance advantage, more existing assembled beam-column interconnection technique, this patent outward appearance is without decoration, clear water Concrete is elegant in appearance.And existing assembled beam-column interconnection technique is poured after needing, and the reason such as Bar Anchorage at node, make steel Muscle construction is complicated, and great inconvenience is brought to wet trade, the appearance of the constructional deficiencies such as voids and pits easily occurs.
5. structural behaviour is strengthened, due to using cuff at precast beam tie point, prefabricated post by curved and being cut property at node Can be fully demonstrated than traditional cast-in-place node advantageously in the requirement of stress《Seismic design provision in building code》In to " strong post is weak The requirement of beam ";And in the place of beam column contact, due to having used junction steel plate, its ultimate shear capacity is cut effect with tradition stirrup Fruit more preferably, and can bear part moment of flexure.
6. cycle saving, in existing assembled beam-column interconnection technique, not only needs to carry out post the peace of three dimensions Position is set, is also required to carry out beam the installation positioning of three dimensions during mounting rail, this brings very in installation Big inconvenience, also slower than traditional construction speed to a certain degree.This patent only needs the installation that three dimensions is carried out to post to position. It is rest directly upon for beam in the space of junction steel plate restriction, without carrying out installation positioning to beam, reduces the construction period.By In part, concrete is all prefabricated in the factory, and only needs part cheek board, and the peace for reducing template is torn open the time, and part concrete The time is poured, there is saving to a certain extent on the construction period.
Brief description of the drawings
Fig. 1 is the structural representation of prefabricated post.
Fig. 2 is the structural representation of precast beam.
Fig. 3 is annexation figure of the invention.
Fig. 4 is overall structure diagram of the invention.
1- connecting plates, the anti-edges of 2-, 3- link slots, stirrup in 4-, reinforcing bar in 5-, 6- prefabricated posts, 7- overlapping layers, 8- is prefabricated Beam, 9- cuffs, the outer reinforcing bars of 10-, the outer stirrups of 11-.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples, and embodiments of the present invention are included but is not limited to The following example.
Embodiment
A kind of assembled rigid joint beam column construction as shown in figures 1-4, including:Prefabricated post 6, precast beam 8, precast beam 8 Interior stirrup 4 is provided with, prefabricated post 6 is provided with some link slots 3 and some connecting plates 1, and prefabricated post 6 is square body, at least one Individual side is provided with link slot 3 and connecting plate 1, in the present embodiment, a He of link slot 3 is equipped with each side of prefabricated post 6 Two connecting plates 1, but it is convenient in order to represent, and Fig. 4 only represents the attachment structure at, wherein, link slot 3 is main by three pieces of spellings Fishplate bar is constituted, and opening is located at the top of link slot 3, and its one end also has an opening, for the ease of placing precast beam 8, link slot 3 Cross section is similar to " U " type, but the turning on base is right angle rather than smooth excessiveness.1 point of connecting plate is upper and lower two pieces, top Connecting plate 1 is that, positioned at the top of link slot 3, the connecting plate 1 of lower section is located in link slot 3, should be partially due to being blocked not in Fig. 1 Show.
Precast beam 8 is located in link slot 3, and interior reinforcing bar 5 is provided with precast beam 8, and specifically, the inner transverse of precast beam 8 sets Interior reinforcing bar 5 is put, in the present embodiment, the quantity of interior reinforcing bar 5 is two, and interior reinforcing bar 5 is stretched out outside precast beam 8, and precast beam 8 is located at In link slot 3, and interior reinforcing bar 5 is connected with a connecting plate 1, specifically, being connected with the connecting plate 1 of lower section by the way of welding Connect, precast beam 8 is provided with overlapping layers 7, overlapping layers 7 is made up of some superimposed sheets, and overlapping layers 7 be located at outer reinforcing bar 10 with it is prefabricated Between beam 8.
In order to strengthen fastness also for easy construction, prefabricated post 6 is provided with cuff 9, and link slot 3 and connecting plate 1 It is connected with prefabricated post 6 by cuff 9, cuff 9 is provided with:Outer reinforcing bar 10, and outer reinforcing bar 10 is connected with another connecting plate 1. Some outer stirrups 11 are additionally provided with the present embodiment, each outer stirrup 11 is socketed in the outside of interior reinforcing bar 5 and outer reinforcing bar 10 so that Each outer stirrup 11 forms a frame, and interior reinforcing bar 5 and outer reinforcing bar 10 are respectively positioned on the inframe.Reinforcing bar 5 in main is bound round by outer stirrup 11 Cause that overall structure is more consolidated with outer reinforcing bar 10, meanwhile, interior reinforcing bar 5 is connected with outer reinforcing bar 10 with cuff 9, specifically, adopting It is connected with the mode of welding.
In the present embodiment, the top of the connecting plate 1 of the both sides of link slot 3 is equipped with instead along 2, instead causes to place folded along 2 structures Plywood more facilitates.
The workflow to the present embodiment described device is described further below:
(1) installation prefabricated post 6, and adjustment perpendicularity etc., is allowed to be fixed on suitable position;
(2) outer reinforcing bar 10 is installed, its position is corresponding with the connecting plate 1 of top, outer stirrup 11 is placed in link slot 3, And also cause that outer stirrup 11 is bound round on outer reinforcing bar 10;
(3) install in precast beam 8 to link slot 3, interior reinforcing bar 5 is corresponding with the connecting plate 1 of lower section, and interior reinforcing bar 5 Outer reinforcing bar 10 is welded with the connecting plate 1 of top and the connecting plate 1 of lower section respectively;
(4) overlapping layers 7 is installed, including superimposed sheet and other prefabricated boards (such as balcony), and adjustment position;
(5) each bean column node and board finish are poured in scene.

Claims (7)

1. a kind of assembled rigid joint beam column construction, including:Prefabricated post (6), precast beam (8), precast beam (8) are provided with interior hoop Muscle (4), it is characterised in that prefabricated post (6) is provided with cuff (9), some link slots (3), some connecting plates (1), precast beam (8) In link slot (3), link slot (3) and connecting plate (1) are connected by cuff (9) with prefabricated post (6);Set in precast beam (8) There is interior reinforcing bar (5), and interior reinforcing bar (5) stretches out precast beam (8) outward, and interior reinforcing bar (5) is connected with a connecting plate (1), in advance Beam (8) processed is provided with overlapping layers (7), and overlapping layers (7) is made up of some superimposed sheets.
2. a kind of assembled rigid joint beam column construction according to claim 1, it is characterised in that also include:Outer reinforcing bar , and outer reinforcing bar (10) is connected with another connecting plate (1) (10).
3. a kind of assembled rigid joint beam column construction according to claim 2, it is characterised in that be additionally provided with some outer hoops Muscle (11), each outer stirrup (11) is socketed in the outside of interior reinforcing bar (5) and outer reinforcing bar (10).
4. a kind of assembled rigid joint beam column construction according to claim 3, it is characterised in that interior reinforcing bar (5) with it is outer Reinforcing bar (10) is connected with cuff (9).
5. a kind of assembled rigid joint beam column construction according to claim 4, it is characterised in that overlapping layers (7) is located at Between outer reinforcing bar (10) and precast beam (8).
6. a kind of assembled rigid joint beam column construction according to Claims 1 to 5 any one, it is characterised in that even Access slot (3) is mainly made up of three pieces of splice plates, and opening is located at link slot (3) top.
7. a kind of assembled rigid joint beam column construction according to claim 6, it is characterised in that link slot (3) both sides Connecting plate (1) top be equipped with it is anti-along (2).
CN201611125168.0A 2016-12-08 2016-12-08 Fabricated rigid joint beam-column structure Pending CN106703215A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611125168.0A CN106703215A (en) 2016-12-08 2016-12-08 Fabricated rigid joint beam-column structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611125168.0A CN106703215A (en) 2016-12-08 2016-12-08 Fabricated rigid joint beam-column structure

Publications (1)

Publication Number Publication Date
CN106703215A true CN106703215A (en) 2017-05-24

Family

ID=58935957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611125168.0A Pending CN106703215A (en) 2016-12-08 2016-12-08 Fabricated rigid joint beam-column structure

Country Status (1)

Country Link
CN (1) CN106703215A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898656A (en) * 2019-03-26 2019-06-18 上海息数建筑科技有限公司 Support frame and the method for making support frame
CN114960974A (en) * 2022-07-12 2022-08-30 中冶赛迪工程技术股份有限公司 Welded joint structure for building

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2466576A1 (en) * 1979-10-03 1981-04-10 Saret Beam to column joint concrete frame - uses steel column sleeve for welded beam end bracket and sleeve grooves form shear key in site concrete
JPH02300439A (en) * 1989-05-13 1990-12-12 Takenaka Komuten Co Ltd Prefabricating method
JPH05311747A (en) * 1992-05-08 1993-11-22 Mitsui Constr Co Ltd Pole-beam structure
JPH06212691A (en) * 1993-01-18 1994-08-02 Shimizu Corp Construction of building
CN103243817A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Fabricated beam-column connecting device
CN203654473U (en) * 2013-11-29 2014-06-18 湖北弘顺钢结构制造有限公司 Connecting joint of rectangular concrete filled steel tubular column and steel reinforced concrete composite beam
CN204326255U (en) * 2014-11-24 2015-05-13 湖北弘顺钢结构制造有限公司 A kind of Reinforced Concrete Composite Beams and steel pipe column connected node
CN204418527U (en) * 2014-10-21 2015-06-24 深圳市绿色建筑产业化研究院有限公司 A kind of punching block shell post for support tie-beam
CN105569191A (en) * 2016-01-23 2016-05-11 安徽鸿路钢结构(集团)股份有限公司 Steel-encased concrete composite beam-steel pipe column connection joint
CN105926771A (en) * 2016-06-17 2016-09-07 中国十七冶集团有限公司 Middle joint connecting structure of assembled integral frame column-beam and construction method of middle joint connecting structure
CN206245491U (en) * 2016-12-08 2017-06-13 四川华构住宅工业有限公司 A kind of assembled rigid joint beam column construction
CN108867889A (en) * 2018-07-04 2018-11-23 重庆大学 A kind of prefabricated reinforced concrete composite beam and steel pipe column connected node and its construction method

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2466576A1 (en) * 1979-10-03 1981-04-10 Saret Beam to column joint concrete frame - uses steel column sleeve for welded beam end bracket and sleeve grooves form shear key in site concrete
JPH02300439A (en) * 1989-05-13 1990-12-12 Takenaka Komuten Co Ltd Prefabricating method
JPH05311747A (en) * 1992-05-08 1993-11-22 Mitsui Constr Co Ltd Pole-beam structure
JPH06212691A (en) * 1993-01-18 1994-08-02 Shimizu Corp Construction of building
CN103243817A (en) * 2013-04-28 2013-08-14 中国十七冶集团有限公司 Fabricated beam-column connecting device
CN203654473U (en) * 2013-11-29 2014-06-18 湖北弘顺钢结构制造有限公司 Connecting joint of rectangular concrete filled steel tubular column and steel reinforced concrete composite beam
CN204418527U (en) * 2014-10-21 2015-06-24 深圳市绿色建筑产业化研究院有限公司 A kind of punching block shell post for support tie-beam
CN204326255U (en) * 2014-11-24 2015-05-13 湖北弘顺钢结构制造有限公司 A kind of Reinforced Concrete Composite Beams and steel pipe column connected node
CN105569191A (en) * 2016-01-23 2016-05-11 安徽鸿路钢结构(集团)股份有限公司 Steel-encased concrete composite beam-steel pipe column connection joint
CN105926771A (en) * 2016-06-17 2016-09-07 中国十七冶集团有限公司 Middle joint connecting structure of assembled integral frame column-beam and construction method of middle joint connecting structure
CN206245491U (en) * 2016-12-08 2017-06-13 四川华构住宅工业有限公司 A kind of assembled rigid joint beam column construction
CN108867889A (en) * 2018-07-04 2018-11-23 重庆大学 A kind of prefabricated reinforced concrete composite beam and steel pipe column connected node and its construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张树仁: "《建筑工程质量事故及施工质量通病——实用防治技术》", 30 June 2011 *
王墨耕: "《新编多层及高层建筑钢筋混凝土结构设计手册》", 31 August 1992 *
谢尊渊: "《建筑施工 第3版》", 31 August 1998 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898656A (en) * 2019-03-26 2019-06-18 上海息数建筑科技有限公司 Support frame and the method for making support frame
CN114960974A (en) * 2022-07-12 2022-08-30 中冶赛迪工程技术股份有限公司 Welded joint structure for building

Similar Documents

Publication Publication Date Title
CN106401036B (en) A kind of assembled steel frame prefabricated concrete floor structure
CN105297887B (en) The D light Steel Structure that two-way continuous twin beams is constituted
CN203654473U (en) Connecting joint of rectangular concrete filled steel tubular column and steel reinforced concrete composite beam
CN103243817B (en) A kind of assembled beam-column attachment means
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN210713255U (en) Assembled prestress superposed beam-column joint for building
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN108756061A (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method
CN108755963A (en) A kind of partial precast assembled steel reinforced concrete giant frame structure and construction method
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN107905363A (en) A kind of full assembly concrete beam column connector and beam-to-column joint method based on energy consumption part and shearing-resistant member
CN106480983A (en) A kind of assembled beam-column hinged joint and its assembling mode
CN108301545A (en) A kind of big module overlapping contignation of the assembled with space truss temporary support
CN102912862A (en) Prefabricated assembly type frame-shear wall-beam plane outer connection structure
CN209817167U (en) Section steel concrete superimposed shear wall
CN112112265A (en) Connecting joint of dry-type connected precast beam column and construction method
CN209799000U (en) High-strength bottom rib anchoring type prefabricated frame beam column joint
CN205954965U (en) Novel node of light -duty floor of steel skeleton
CN108179808A (en) A kind of prefabricated beam column crimping joint strengthening stirrup construction and its construction method
CN106703215A (en) Fabricated rigid joint beam-column structure
CN207032466U (en) A kind of superposed type prefabricated reinforced concrete structure system
CN114232844A (en) Shear wall system of full-assembly type building and wallboard module prefabricating method thereof
CN207646867U (en) A kind of assembled steel tendon concrete frame structure bean column node and its make mold
CN107447873B (en) Device for connecting prefabricated laminated connecting beam and prefabricated shear wall and installation method
CN206245491U (en) A kind of assembled rigid joint beam column construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170524

RJ01 Rejection of invention patent application after publication