CN106685688A - Cluster computer device synchronous upgrade method - Google Patents

Cluster computer device synchronous upgrade method Download PDF

Info

Publication number
CN106685688A
CN106685688A CN201610849017.3A CN201610849017A CN106685688A CN 106685688 A CN106685688 A CN 106685688A CN 201610849017 A CN201610849017 A CN 201610849017A CN 106685688 A CN106685688 A CN 106685688A
Authority
CN
China
Prior art keywords
upgrade
firmware
equipment
cluster
synchronous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610849017.3A
Other languages
Chinese (zh)
Inventor
瞿翠君
张睿
李建文
徐晓峰
李夏宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN GRANDSTREAM NETWORKS TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN GRANDSTREAM NETWORKS TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN GRANDSTREAM NETWORKS TECHNOLOGY Co Ltd filed Critical SHENZHEN GRANDSTREAM NETWORKS TECHNOLOGY Co Ltd
Priority to CN201610849017.3A priority Critical patent/CN106685688A/en
Publication of CN106685688A publication Critical patent/CN106685688A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0813Configuration setting characterised by the conditions triggering a change of settings
    • H04L41/082Configuration setting characterised by the conditions triggering a change of settings the condition being updates or upgrades of network functionality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates

Abstract

The present invention discloses a cluster computer device synchronous upgrade method. The invention aims to realize the firmware upgrade of all node devices including a master device and slave devices. The method includes the following steps that: upgrade firmware is uploaded to the file system of the master device; the master device is degraded to a slave device after completing firmware upgrade; and at least one slave device is upgraded to master devices and begins local firmware upgrade, and the master devices are degraded to the slave devices after completing the firmware upgrade and begins an upgrade restart process, and the upgrade of all cluster node devices is completed as the previous process. According to the cluster computer device synchronous upgrade method of the invention, the current master device is utilized to complete the synchronous distribution of the upgrade firmware, the completion of the switching of the master device and slave devices and the triggering of a upgrade synchronization process can be realized by means of the control and management of a cluster computer, and therefore, the problems of low flexibility and low efficiency of an existing cluster computer device upgrade mode can be solved.

Description

A kind of PC cluster machine equipment synchronization upgrade method
Technical field
The present invention relates to computer application field, more particularly to the synchronous upgrade technique of PC cluster machine equipment.
Background technology
HA(High Availability, high availability)Cluster(Cluster)System is by one group of physical host node User provides transparent redundant traffic disposal ability, realizes continual offer service.Each physical host is referred to as saved in system Point, each node possesses independent unique host name, and possesses one group of resource of oneself, such as disk, file system, network Address etc..When host node is unavailable in system or cannot process user's request, the Internet resources that the node is provided can turn in time Move on to other physical nodes to process, these are for a user transparent, and user need not be concerned about the transfer of resource, node The operation such as switching, is automatically performed by HA systems.
In actual applications, shared resource is typically by physical disk disk array cabinet or the fast equipment of mirror image using software realization The storage of appearance replicates solution(Such as DRBD).There is the operating right to the resource due to there was only current primary node, other are from section Point directly cannot conduct interviews to it, when needing to upgrade equipment firmware, generally require and first cluster is removed and distinguished It is upgraded, group system is reconfigured and constitute after the completion of upgrading again.The service stopping time certainly will be so caused to increase, And the problem that upgrade job difficulty is big, efficiency is low.
The content of the invention
The present invention provides a kind of PC cluster machine equipment synchronization upgrade method, for being automatically obtained cluster in main equipment and each From the collaboration upgrade function of equipment.
In order to realize presently disclosed technical scheme, a kind of PC cluster machine equipment synchronization upgrade method, bag Include following key step:
Firmware updating is uploaded to main equipment node, by the mirror image transfer function synchronous transfer of mirror image block device to all from equipment Node, realizes the firmware updating synchronized upload of all cluster computer device nodes;Wherein described firmware updating is used for cluster section The application service upgrading of point.
Simultaneously current master needs to judge whether synchronous transfer is completed firmware updating;If not, main equipment node needs Wait is transmitted or transmission time reaches max-timeout duration, and flow process mistake of now upgrading terminates, and notifies upper-layer user Staging error reason.
If it is, main equipment then starts local upgrade flow process, and it is from equipment first to lower one's standard or status before upgrading is restarted.
Methods described also includes:Main equipment carries out judgement to firmware version information to determine locally whether need to start upgrading Flow process.Main equipment lowers one's standard or status operation then for discharging shared resource.
Methods described also includes:It is that from after equipment, other are under management of the equipment in cluster management module that main equipment is lowered one's standard or status Main equipment is promoted as, the read-write operation authority of the related shared resource such as firmware updating is obtained.
Lowering one's standard or status and being promoted for the equipment realize unified management by cluster management module and process.
Continuation offer service after main equipment is promoted as from equipment, and starts local upgrading and judge flow process.If locally reached It is to restart flow process from equipment and equipment then to start local upgrade flow process and lower one's standard or status to promotion condition.The like, Zhi Daosuo There is cluster computer device node to complete updating operation.
Said method also includes:The upgrading that whole clustered node is completed in the presence of cluster management module judges, judges Whether the upgrading flow process of whole cluster is completed.
If it is, whole cluster upgrade flow process terminates.
If it is not, then continuing the upgrading flow process of other nodes.
Said method also includes:All PC cluster machine equipments are completed after upgrading, if need to switch to system initial Host node.
If it is, completing the switching flow of node in the presence of cluster management module.
If it is not, then the service that cluster current master is responsible for current system is provided.
The present invention by the synchronization distribution of firmware updating, and in the presence of cluster management module control device promote and Lower one's standard or status, realize the DFU of whole cluster.Solve existing cluster firmware upgrade mode complicated, the service stopping time is long Problem, improve cluster firmware upgrade maintenance efficiency, reduce maintenance cost.
Description of the drawings
Fig. 1 is the basic framework figure of cluster device node composition in the specific embodiment of the invention;
Fig. 2 is the flow chart one of cluster device synchronization upgrade method in the specific embodiment of the invention;
Fig. 3 is the flowchart 2 of cluster device synchronization upgrade method in the specific embodiment of the invention.
Specific embodiment
With reference to the accompanying drawings and examples the present invention is described in further detail.It is understandable that now described Specific embodiment be used only for explaining the present invention, rather than limitation of the invention.It also should be noted that, for convenience Description, is only illustrated in part rather than the entire infrastructure of correlation of the invention in accompanying drawing.
Fig. 1 is the basic framework figure of cluster device node composition in the specific embodiment of the invention.Fig. 1 shows a base Clustered node framework in this group scheme, mainly by work at present host node device and some from node device and cluster Management module is constituted.Cluster management module realizes the functions such as the lowering one's standard or status, promote of node, node state.Current primary node equipment pair Outer offer service, uses from node device as backup.The main section of any write is capable of achieving under the function of mirror image block device The data of the local file system of point device, while recording in the same manner in other file system from node device. Local host node device keeps real-time synchronization with distance host from the data of node device.Synchronization can only have a node to set Standby to be in Primary states, other are in Secondary states from node device.
Fig. 2 is the flow chart one of cluster device synchronization upgrade method in the specific embodiment of the invention;Fig. 3 is tool of the present invention The flowchart 2 of cluster device synchronization upgrade method in body embodiment.From the two width figure, the synchronization of group scheme of the present invention The flow process of upgrade method, this realizes being described in detail as follows for flow process 100:
Step 1001, starts updating operation, and firmware updating is uploaded to current master file system by WebUI or other modes In.Main equipment judges that the information such as firmware version decide whether to start local firmware upgrade flow process.If local firmware version Consistent with new firmware version, local upgrade flow process is not triggered.
Step 1002, the synchronization distribution of firmware updating, the mirror image that can pass through shared disk array or other software realization is fast Equipment(Such as DRBD)And other transmission means realize the synchronization distribution of firmware.
Step 1003, judges whether synchronous transfer is completed firmware updating, if can be by mirror image block device realized admittedly The synchronization distribution of part, then the file system of distance host also can be synchronously written after local file system completes to write.If By intra-node transport module the transmission of firmware can be realized then by the transmission request and response message of main and subordinate node come really It is calmly all to complete from the firmware synchronous transfer of node.
Above-mentioned transmission request and response message format example are as follows:
Request:
<xml version="1.0" encoding="utf-8" >
<request>
<cmd_type>ImgTrans<cmd_type>
<cmd_id>12300<cmd_id>
<img_hmac>5202A0Ef12345343...<img_hmac>
<source_addr>tcp:192.168.129.2:5068<source_addr>
</request>
Wherein field is explained as follows:
cmd_type:Information order type character string, order receives then to carry out respective handling according to type of message;
cmd_id:Message unique identifier, for distinguishing the uniqueness of each message;
img_hmac:For judging the integrality that firmware is transmitted;
source_addr:Specific firmware obtains address and transport-type;
Response:
<xml version="1.0" encoding="utf-8" >
<response>
<cmd_type>img_trans<cmd_type>
<cmd_id>12300<cmd_id>
<result></result>
<reason></reason>
</response>
Wherein field is explained as follows:
cmd_type:Information order type character string, order receives then to carry out respective handling according to type of message;
cmd_id:Message unique identifier, for distinguishing the uniqueness of each message;
result:For feedback command implementing result;Success:Success, failure:fail;
Reason:It is optional, when firmware obtain failure when feeding back unsuccessful reason.
Step 1004, if firmware bust this or transmission time exceed max-timeout duration, then it is assumed that this firmware point Failure is sent out, then this cluster upgrade failure, and feed back upgrading failure cause to user.
Step 1005, if firmware distribution completes and judges locally to need firmware updating before main equipment, completes upgrading Lower one's standard or status after flow process and be from equipment and start local upgrade and restart flow process.
If main equipment judges that local firmware, without the need for upgrading, only triggers operation of lowering one's standard or status.
Step 1006, in the presence of cluster management module, other certain from equipment will be promoted as main equipment and start this The firmware upgrade on ground judges flow process, and herein firmware upgrade decision logic and step are consistent with step 1005.It is promoted as from equipment Start local firmware upgrade startup firmware upgrade simultaneously after main equipment and restart flow process, and it is from equipment to lower one's standard or status before restarting.
Step 1007, by being progressively promoted as main equipment and completing the upgrading flow process of firmware completing the liter of whole cluster Level, judges whether that all nodes are upgraded in the presence of cluster management module and completes.Select from equipment from multiple during being somebody's turn to do The process for enumerating main equipment is realized by cluster vote by ballot mechanism, similar with general cluster election mechanism.
Step 1008, cluster upgrade success.
Note, above are only presently preferred embodiments of the present invention and institute's application technology principle.Those skilled in the art can manage Solution, the invention is not restricted to described specific embodiment, can carry out for a person skilled in the art various obvious changes, Readjust and substitute without departing from protection scope of the present invention.Therefore, although the present invention is carried out by above example It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also More other Equivalent embodiments can be included, and the scope of the present invention is determined by scope of the appended claims.

Claims (10)

1. a kind of PC cluster machine equipment synchronization upgrade method, to realize that all node devices include main equipment and each from equipment Firmware upgrade, it is characterised in that methods described includes:
In uploading the file system of firmware updating to the main equipment;
It is from equipment that the main equipment is lowered one's standard or status after firmware upgrade is completed;
At least one is promoted as main equipment from equipment, starts local firmware upgrade, and it is, from equipment, and to start to rise to lower one's standard or status after the completion of upgrading Level restarts flow process.
2. synchronous upgrade method according to claim 1, it is characterised in that also include before the main equipment firmware upgrade Following steps:Distribution is synchronized to the firmware updating.
3. synchronous upgrade method according to claim 2, it is characterised in that methods described also includes:In the firmware upgrade Before, judgement is carried out to firmware version information to decide whether to start firmware upgrade, judged result is for otherwise only triggering is lowered one's standard or status Operation.
4. synchronous upgrade method according to claim 3, it is characterised in that the firmware updating synchronization distribution is referred to and passed through Mirror image block device realizes the synchronization distribution of the firmware updating.
5. synchronous upgrade method according to claim 3, it is characterised in that the firmware updating synchronization distribution is referred to and passed through Intra-node transport module is realized, i.e., by the transmission request of master-slave equipment and in response to determining that all synchronous transfers from equipment.
6. the synchronous upgrade method according to claim 4 or 5, its characteristic is that methods described also includes:When the master sets Lattice of making preparation for dropping are from after equipment, also to need the reboot operation for performing device upgrade.
7. synchronous upgrade method according to claim 6, its characteristic is that methods described also includes:It is each in the cluster Perform the upgrading that whole cluster is realized after promote operation and the firmware upgrade successively from equipment.
8. synchronous upgrade method according to claim 7, it is characterised in that participation of the methods described in cluster management module Lower one's standard or status described in lower realization and the management promoted, while finally judging whether that all node devices complete upgrading.
9. synchronous upgrade method according to claim 8, it is characterised in that methods described is elected from multiple from equipment The process of main equipment is realized by cluster vote by ballot mechanism.
10. synchronous upgrade method according to claim 9, it is characterised in that during the firmware updating synchronization distribution, If firmware bust this or transmission time exceed max-timeout duration, then it is assumed that this firmware distribution failure, this cluster liter Level failure.
CN201610849017.3A 2016-09-26 2016-09-26 Cluster computer device synchronous upgrade method Pending CN106685688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610849017.3A CN106685688A (en) 2016-09-26 2016-09-26 Cluster computer device synchronous upgrade method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610849017.3A CN106685688A (en) 2016-09-26 2016-09-26 Cluster computer device synchronous upgrade method

Publications (1)

Publication Number Publication Date
CN106685688A true CN106685688A (en) 2017-05-17

Family

ID=58840013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610849017.3A Pending CN106685688A (en) 2016-09-26 2016-09-26 Cluster computer device synchronous upgrade method

Country Status (1)

Country Link
CN (1) CN106685688A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108882211A (en) * 2018-06-15 2018-11-23 歌尔科技有限公司 A kind of method, system and the TWS earphone of the upgrading of TWS earphone program
CN108881386A (en) * 2018-05-11 2018-11-23 郑州易湃科技有限公司 The remote firmware updating method and remote firmware updating device of communication equipment
CN109068211A (en) * 2018-08-01 2018-12-21 广东思派康电子科技有限公司 A kind of TWS earphone and its computer readable storage medium
CN110572284A (en) * 2019-08-30 2019-12-13 华为技术有限公司 Method, device and system for upgrading virtual network element
CN115150273A (en) * 2022-06-30 2022-10-04 联想(北京)有限公司 Upgrade processing method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6675258B1 (en) * 2000-06-30 2004-01-06 Lsi Logic Corporation Methods and apparatus for seamless firmware update and propagation in a dual raid controller system
CN101369923A (en) * 2008-09-24 2009-02-18 中兴通讯股份有限公司 Method for improving cluster web service performance by using distributed hash table
CN101876910A (en) * 2009-10-28 2010-11-03 创新科存储技术有限公司 Double-controller disk memory array, firmware upgrading method and controller thereof
CN103713925A (en) * 2013-12-26 2014-04-09 北海创新科存储技术有限公司 Method and device for avoiding service interruption of storage array in upgrading process
CN104917792A (en) * 2014-03-12 2015-09-16 上海宝信软件股份有限公司 Democratic and autonomous cluster management method and system
CN105337904A (en) * 2014-08-05 2016-02-17 杭州华三通信技术有限公司 Controller cluster upgrading method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6675258B1 (en) * 2000-06-30 2004-01-06 Lsi Logic Corporation Methods and apparatus for seamless firmware update and propagation in a dual raid controller system
CN101369923A (en) * 2008-09-24 2009-02-18 中兴通讯股份有限公司 Method for improving cluster web service performance by using distributed hash table
CN101876910A (en) * 2009-10-28 2010-11-03 创新科存储技术有限公司 Double-controller disk memory array, firmware upgrading method and controller thereof
CN103713925A (en) * 2013-12-26 2014-04-09 北海创新科存储技术有限公司 Method and device for avoiding service interruption of storage array in upgrading process
CN104917792A (en) * 2014-03-12 2015-09-16 上海宝信软件股份有限公司 Democratic and autonomous cluster management method and system
CN105337904A (en) * 2014-08-05 2016-02-17 杭州华三通信技术有限公司 Controller cluster upgrading method and device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108881386A (en) * 2018-05-11 2018-11-23 郑州易湃科技有限公司 The remote firmware updating method and remote firmware updating device of communication equipment
CN108882211A (en) * 2018-06-15 2018-11-23 歌尔科技有限公司 A kind of method, system and the TWS earphone of the upgrading of TWS earphone program
WO2019237458A1 (en) * 2018-06-15 2019-12-19 歌尔科技有限公司 Method and system for upgrading program of tws headset, and tws headset
US11368777B2 (en) 2018-06-15 2022-06-21 Goertek Technology Co., Ltd. Method and system for upgrading program of TWS headset, and TWS headset
CN109068211A (en) * 2018-08-01 2018-12-21 广东思派康电子科技有限公司 A kind of TWS earphone and its computer readable storage medium
CN110572284A (en) * 2019-08-30 2019-12-13 华为技术有限公司 Method, device and system for upgrading virtual network element
CN110572284B (en) * 2019-08-30 2022-05-13 华为云计算技术有限公司 Method, device and system for upgrading virtual network element
CN115150273A (en) * 2022-06-30 2022-10-04 联想(北京)有限公司 Upgrade processing method and device

Similar Documents

Publication Publication Date Title
CN106685688A (en) Cluster computer device synchronous upgrade method
CN101390336B (en) Disaster recovery architecture
US20090113034A1 (en) Method And System For Clustering
US8032786B2 (en) Information-processing equipment and system therefor with switching control for switchover operation
KR20110044858A (en) Maintain data indetermination in data servers across data centers
CN102214128A (en) Repurposable recovery environment
CN105677380B (en) Method and device for board-by-board upgrading of double master control isolations
JP6905161B2 (en) Management methods, systems, and devices for master and standby databases
CN101621397A (en) Distributed network management system, and maintenance and management method thereof
CN106605217B (en) For the method and system for being moved to another website from a website will to be applied
CN103024065A (en) System configuration management method for cloud storage system
CN105701159A (en) Data synchronization device and method
CN103902405A (en) Quasi-continuity data replication method and device
CN103761131A (en) Multi-board-card automatic updating method and system based on internal storage sharing
CN110635941A (en) Database node cluster fault migration method and device
CN101155015A (en) Synchronization method for data and condition between host computer and standby computer
CN112052127B (en) Data synchronization method and device for dual-computer hot standby environment
CN104281631A (en) Distributed database system and data synchronization method and nodes thereof
CN103853623A (en) Data migration method and device
CN110489491B (en) Full data synchronization device suitable for A/B network double clusters
US20090106781A1 (en) Remote call handling methods and systems
CN101155061B (en) Master/standby control method
CN115292408A (en) Master-slave synchronization method, device, equipment and medium for MySQL database
CN115248720A (en) Storage system, storage node virtual machine recovery method, and recording medium
CN114297296A (en) Server active-standby switching system for broadcasting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170517

WD01 Invention patent application deemed withdrawn after publication