CN106684905B - A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic - Google Patents

A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic Download PDF

Info

Publication number
CN106684905B
CN106684905B CN201611044128.3A CN201611044128A CN106684905B CN 106684905 B CN106684905 B CN 106684905B CN 201611044128 A CN201611044128 A CN 201611044128A CN 106684905 B CN106684905 B CN 106684905B
Authority
CN
China
Prior art keywords
wind
fans
group
error
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611044128.3A
Other languages
Chinese (zh)
Other versions
CN106684905A (en
Inventor
曾鉴
唐权
叶希
李婷
王云玲
叶圣永
胥威汀
沈力
陶宇轩
朱觅
李龙源
徐红灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611044128.3A priority Critical patent/CN106684905B/en
Publication of CN106684905A publication Critical patent/CN106684905A/en
Application granted granted Critical
Publication of CN106684905B publication Critical patent/CN106684905B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J3/386
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a kind of wind power plant Dynamic Equivalences for considering wind-powered electricity generation uncertainty in traffic, this method comprises: determining the probability density function and parameter of wind speed and power error in wind-powered electricity generation prediction, more scene sampling are carried out using method of inverting, obtain the sample for obeying Wind turbines prediction probability of error distribution;Establish the sample frequency that every Fans are counted using air speed error and power error as the Two-dimensional Statistical grid of coordinate in statistics grid;Based on improved KL distance, blower is carried out using k-means clustering algorithm and divides group;It is equivalent that single machine is carried out to Wind turbines and collector system in each group;Invention considers wind speed by way of more scenes sampling based on probability distribution and power prediction error is uncertain, there is preferable accuracy in the case where error occurs in wind-powered electricity generation prediction, it can be calculated with better services in the early warning of electric power system dispatching, there is certain engineering application value.

Description

A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic
Technical field
The present invention relates to wind power plant equivalence method research fields, and in particular, to a kind of consideration wind-powered electricity generation uncertainty in traffic Wind power plant Dynamic Equivalence.
Background technique
Large-scale wind power is accessed to bring challenges to all various aspects of operation of power networks, for the dynamic characteristic of wind-electricity integration system It carries out research power grid operation personnel can be helped to carry out risk to estimate and science decision, and then improve the permeability of wind-powered electricity generation.Big In the wind farm grid-connected emulation of type, if modeled to every Wind turbines, not only workload is great, but also will affect calculating Speed, precision and convergence, therefore, it is necessary to study its dynamic equivalent model under the premise of guaranteeing wind power plant output accuracy. In existing research, main wind power plant Dynamic Equivalence has single machine equivalent method, half equivalent method and multimachine equivalent method etc..It is single Machine equivalent method refers to that by Wind turbines equivalences all in wind power plant be 1 machine;Half equivalent method refers to the wind-force for retaining wind turbine Its generator model equivalence is 1 machine by machine part;Multimachine equivalent method refers to Wind turbines according to operating point equivalence Cheng Duotai Machine.Wherein, multimachine equivalent method is because its precision is high, easy-operating advantage is widely adopted.
Wind turbines in wind power plant are divided into multiple groups according to operation characteristic first by multimachine equivalence, then to the wind in each group It is equivalent that motor group carries out single machine.The index that can reflect its operating status, wind speed need to be selected when wind turbine component group, fan rotor turns Speed, Wind turbines state variable, running of wind generating set control area, Wind turbines wind speed, revolving speed, stator voltage, q axis stator electricity Stream and active power, wind speed, revolving speed and propeller pitch angle overall target etc. have been proposed as wind turbine component group index.However, Current wind power plant dynamic equivalent research is based on deterministic data, it is believed that exact figures subject to data used by wind turbine component group According to that is, there is no errors.However in the early warning of electric power system dispatching calculating, wind power plant multimachine Equivalent Model divides group's data will From wind power prediction data, error is inevitable and has randomness.In the case where wind-powered electricity generation predicts accurate scene, use Traditional multimachine Equivalent Model based on deterministic data has higher accuracy;However, most of scenes of wind-powered electricity generation prediction are Inaccuracy, if wind power plant can give simulation calculation band still using the multimachine equivalence method for dividing group based on deterministic data at this time Carry out large error.
In conclusion present inventor has found above-mentioned technology extremely during realizing the present application technical solution It has the following technical problems less:
Conventionally, as most of scenes of wind-powered electricity generation prediction are inaccurate, if wind power plant still uses base at this time Divide the multimachine equivalence method of group in deterministic data, then can bring large error, therefore existing wind power plant etc. to simulation calculation Value method there are accuracys poor, the technical problem for causing simulation calculation error larger.
Summary of the invention
The present invention provides a kind of wind power plant Dynamic Equivalences for considering wind-powered electricity generation uncertainty in traffic, solve existing That there are accuracys is poor for wind power plant equivalence method, and the technical problem for causing simulation calculation error larger is realized in wind power Predict have preferable accuracy can be more preferable in the case where considering wind-powered electricity generation uncertainty in traffic under the scene for error occur Serve the technical effect that the early warning of electric power system dispatching calculates.
In order to solve the above technical problems, this application provides a kind of wind power plant dynamics etc. for considering wind-powered electricity generation uncertainty in traffic Value method includes the following steps: it is improved in that the method is to divide group based on wind-powered electricity generation uncertainty in traffic
A, the probability distribution and its parameter for determining wind speed and power error in wind-powered electricity generation prediction carry out more scenes using method of inverting Sampling obtains the sample for obeying Wind turbines prediction probability of error distribution;
B, it establishes using air speed error and power error as the Two-dimensional Statistical grid of coordinate, counts every Fans in statistics grid Interior sample frequency;
C, improved KL distance, i.e., improved KL divergence (Kullback-Leibler Divergence), KL divergence are based on It is called relative entropy (Relative Entropy), carries out blower using k-means (k- mean value) clustering algorithm and divide group; Kullback-Leibler is English name-to, and the country is referred to as KL divergence,
D, single machine equivalence is carried out to Wind turbines parameter in each group and network parameter.
Further, the step A the following steps are included:
A1, according to priori knowledge or historical forecast error information, determine wind speed error delta in every Fans wind-powered electricity generation prediction vwWith power error Δ PwCumulative distribution function F (Δ vw)、F(ΔPw);
A2, N is generated for every FanssRandom number c between a (0,1), i.e. probability, wherein the wind of same Fans Speed is identical with the random number c of power sample;
A3, equation F (Δ v is solvedw)=c, F (Δ Pw)=c, every available N of FanssGroup includes air speed error Δ vw With power error Δ PwTwo-dimensional array namely each group of two-dimensional array in, include the wind being calculated by the same random number c Fast error delta vwWith power error Δ Pw
Further, the step B includes the following steps:
B1, it is directed to air speed error Δ vwWith power error Δ Pw, its variation range is averagely reasonably divided into Mv、MPIt is a Section, respectively with Δ vwWith Δ PwAs abscissa and ordinate, an available two-dimensional latticed interval range, section It include M in rangev×MPA grid counts the N of every Fans respectivelysSample frequency of the group two-dimensional array in each grid, i-th Sample frequency of the two-dimensional array of Fans in first of grid is Ei(l), l ∈ [1, Mv×MP];
B2, judge whether the sample frequency in each grid is 0, for example 0 one minimum ε of superposition is carried out down if being not 0 One step.
Further, the step C includes the following steps:
C1, select k Fans as initial cluster center;
C2, to any one Fans, calculate its improved KL distance for arriving k cluster centre, which be grouped into apart from most Group where small cluster centre, the improved KL distance calculation formula between the i-th Fans and jth Fans are as follows:
dKL(Ei,Ej)=[DKL(Ei||Ej)+DKL(Ej||Ei)]/2 (1)
Wherein, dKL(Ei,Ej) improved KL distance between the i-th Fans and jth Fans, DKL(Ei||Ej) it is i-th Blower is to the KL distance between jth Fans, DKL(Ej||Ei) it is jth Fans to the KL distance between the i-th Fans, the two Calculation formula are as follows:
Wherein, Ei(l) sample frequency for the two-dimensional array of the i-th Fans in first of grid, EjIt (l) is jth typhoon Sample frequency of the two-dimensional array of machine in first of grid, l ∈ [1, Mv×MP]。
C3, average sample frequency of each blower in statistics grid in group is calculated, it is assumed that there is catwalk blower in k-th group, Average sample frequency in first of grid are as follows:
Wherein, Er(l) sample frequency for the two-dimensional array of r Fans in first of grid, l ∈ [1, Mv×MP]。 And so on, available catwalk blower is in Mv×MPAverage sample frequency E in a gridav_k(l), as new cluster Central value calculates its average sample frequency to k group, obtains k new cluster centre values;
C4, judgement: if all cluster centre values remain unchanged or update times reach the upper limit, turn C5, otherwise return C2;
C5, output cluster result.
Further, the step D includes the following steps:
D1, equivalence is carried out to the Wind turbines parameter in wind turbine group:
It is constant to Wind turbines parameter aggregation based on Wind turbines output characteristics before and after equivalence, to wind-powered electricity generation in wind turbine group Wind speed v, wind sweeping area A, capacity S, active-power P, reactive power Q, the shafting inertia time constant H, axis rigidity system of unit Number K and shafting damped coefficient D parameter carry out according to following formula equivalent respectively:
In formula: nwFor Wind turbines number in wind turbine group;veq、viWind turbines is total respectively in wind turbine group The wind speed of wind speed and i-th Wind turbines;Aeq、AiTotal wind sweeping area of Wind turbines and i-th respectively in wind turbine group The wind sweeping area of Wind turbines;Seq、SiThe appearance of the total capacity of Wind turbines and i-th Wind turbines respectively in wind turbine group Amount;Peq、PiThe active power of total active power of Wind turbines and i-th Wind turbines respectively in wind turbine group;
D2, equivalence is carried out to network parameter:
Equivalence to line impedance is carried out based on the constant principle of voltage loss before and after equivalence, is calculated as follows:
In formula: nwFor Wind turbines number, n in groupfFor Wind turbines number, Z in trunk line type blower branch in wind power plantg For g sections of branch impedances in trunk line type branch;
Equivalent admittance Y over the groundeqIt calculates as follows:
In formula: Y is admittance over the ground.
The excellent effect that technical solution provided by the invention has is:
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The wind power plant Dynamic Equivalence provided by the invention for considering wind-powered electricity generation uncertainty in traffic determines that wind-powered electricity generation predicts apoplexy The probability distribution and its parameter of speed and power error carry out more scene sampling using method of inverting, and obtain obeying Wind turbines prediction The sample of probability of error distribution;It establishes using air speed error and power error as the Two-dimensional Statistical grid of coordinate, counts every Fans Sample frequency in statistics grid;Based on improved KL distance, blower is carried out using k-means clustering algorithm and divides group;According to point Group is as a result, constant to Wind turbines parameter aggregation based on equivalent front and back Wind turbines output characteristics, based on equivalent front and back voltage damage Consume constant principle network parameter is carried out it is equivalent, simulation result show wind power plant Dynamic Equivalence provided by the invention by There is the field of error in consideration wind-powered electricity generation uncertainty in traffic (i.e. the randomness of wind-powered electricity generation prediction error), thus in wind power prediction There is preferable accuracy under scape, can be calculated with better services in the early warning of electric power system dispatching, to raising wind power plant dynamic etc. The security and stability of the accuracy and the operation of wind-electricity integration system that are worth model has certain meaning.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the embodiment of the present invention, constitutes one of the application Point, do not constitute the restriction to the embodiment of the present invention;
Fig. 1 is the flow diagram that the wind power plant Dynamic Equivalence of wind-powered electricity generation uncertainty in traffic is considered in the application.
Specific embodiment
The present invention provides a kind of wind power plant Dynamic Equivalences for considering wind-powered electricity generation uncertainty in traffic, solve existing That there are accuracys is poor for wind power plant equivalence method, and the technical problem for causing simulation calculation error larger is realized in wind power Predict have preferable accuracy can be more preferable in the case where considering wind-powered electricity generation uncertainty in traffic under the scene for error occur Serve the technical effect that the early warning of electric power system dispatching calculates.
The present invention provides a kind of wind power plant Dynamic Equivalence for considering wind-powered electricity generation uncertainty in traffic, flow chart such as Fig. 1 It is shown, include the following steps:
A, the probability distribution and its parameter for determining wind speed and power error in wind-powered electricity generation prediction carry out more scenes using method of inverting Sampling obtains the sample for obeying Wind turbines prediction probability of error distribution
A1, according to priori knowledge or historical forecast error information, determine wind speed error delta in every Fans wind-powered electricity generation prediction vwWith power error Δ PwCumulative distribution function F (Δ vw)、F(ΔPw);
A2, N is generated for every FanssRandom number c between a (0,1), i.e. probability, wherein the wind of same Fans Speed is identical with the random number c of power sample;
A3, equation F (Δ v is solvedw)=c, F (Δ Pw)=c, every available N of FanssGroup includes air speed error Δ vw With power error Δ PwTwo-dimensional array namely each group of two-dimensional array in, include the wind being calculated by the same random number c Fast error delta vwWith power error Δ Pw
B, it establishes using air speed error and power error as the Two-dimensional Statistical grid of coordinate, counts every Fans in statistics grid Interior sample frequency
B1, it is directed to air speed error Δ vwWith power error Δ Pw, its variation range is averagely reasonably divided into Mv、MPIt is a Section, respectively with Δ vwWith Δ PwAs abscissa and ordinate, an available two-dimensional latticed interval range, section It include M in rangev×MPA grid counts the N of every Fans respectivelysSample frequency of the group two-dimensional array in each grid, i-th Sample frequency of the two-dimensional array of Fans in first of grid is Ei(l), l ∈ [1, Mv×MP];
B2, judge whether the sample frequency in each grid is 0, for example 0 one minimum ε of superposition is carried out down if being not 0 One step.
C, it is based on improved KL distance, blower is carried out using k-means clustering algorithm and divides group
C1, select k Fans as initial cluster center;
C2, to any one Fans, calculate its improved KL distance for arriving k cluster centre, which be grouped into apart from most Group where small cluster centre, the improved KL distance calculation formula between the i-th Fans and jth Fans are as follows:
dKL(Ei,Ej)=[DKL(Ei||Ej)+DKL(Ej||Ei)]/2 (15)
Wherein, dKL(Ei,Ej) improved KL distance between the i-th Fans and jth Fans, DKL(Ei||Ej) it is i-th Blower is to the KL distance between jth Fans, DKL(Ej||Ei) it is jth Fans to the KL distance between the i-th Fans, the two Calculation formula are as follows:
Wherein, Ei(l) sample frequency for the two-dimensional array of the i-th Fans in first of grid, EjIt (l) is jth typhoon Sample frequency of the two-dimensional array of machine in first of grid, l ∈ [1, Mv×MP].Each blower is in statistics grid in C3, calculating group In average sample frequency, it is assumed that have catwalk blower in k-th group, the average sample frequency in first of grid are as follows:
Wherein, Er(l) sample frequency for the two-dimensional array of r Fans in first of grid, l ∈ [1, Mv×MP]。
And so on, available catwalk blower is in Mv×MPAverage sample frequency E in a gridav_k(l), as New cluster centre value calculates its average sample frequency to k group, obtains k new cluster centre values;
C4, judgement: if all cluster centre values remain unchanged or update times reach the upper limit, turn C5, otherwise return C2;
C5, output cluster result.
D, single machine equivalence is carried out to Wind turbines parameter in wind turbine group and network parameter
D1, equivalence is carried out to the Wind turbines parameter in wind turbine group:
It is constant to Wind turbines parameter aggregation based on Wind turbines output characteristics before and after equivalence, to wind-powered electricity generation in wind turbine group Wind speed v, wind sweeping area A, capacity S, active-power P, reactive power Q, the shafting inertia time constant H, axis rigidity system of unit Number K and shafting damped coefficient D parameter carry out according to following formula equivalent respectively:
In formula: nwFor Wind turbines number in wind turbine group;veq、viWind turbines is total respectively in wind turbine group The wind speed of wind speed and i-th Wind turbines;Aeq、AiTotal wind sweeping area of Wind turbines and i-th respectively in wind turbine group The wind sweeping area of Wind turbines;Seq、SiThe appearance of the total capacity of Wind turbines and i-th Wind turbines respectively in wind turbine group Amount;Peq、PiThe active power of total active power of Wind turbines and i-th Wind turbines respectively in wind turbine group;
D2, equivalence is carried out to network parameter:
Equivalence to line impedance is carried out based on the constant principle of voltage loss before and after equivalence, is calculated as follows:
In formula: nwFor Wind turbines number, n in groupfFor Wind turbines number, Z in trunk line type blower branch in wind power plantg For g sections of branch impedances in trunk line type branch;
Equivalent admittance Y over the groundeqIt calculates as follows:
In formula: Y is admittance over the ground.
Technical solution in above-mentioned the embodiment of the present application, at least have the following technical effects or advantages:
The wind power plant Dynamic Equivalence provided by the invention for considering wind-powered electricity generation uncertainty in traffic determines that wind-powered electricity generation predicts apoplexy The probability distribution and its parameter of speed and power error carry out more scene sampling using method of inverting, and obtain obeying Wind turbines prediction The sample of probability of error distribution;It establishes using air speed error and power error as the Two-dimensional Statistical grid of coordinate, counts every Fans Sample frequency in statistics grid;Based on improved KL distance, blower is carried out using k-means clustering algorithm and divides group;According to point Group is as a result, constant to Wind turbines parameter aggregation based on equivalent front and back Wind turbines output characteristics, based on equivalent front and back voltage damage Consume constant principle network parameter is carried out it is equivalent, simulation result show wind power plant Dynamic Equivalence provided by the invention by There is the field of error in consideration wind-powered electricity generation uncertainty in traffic (i.e. the randomness of wind-powered electricity generation prediction error), thus in wind power prediction There is preferable accuracy under scape, can be calculated with better services in the early warning of electric power system dispatching, to raising wind power plant dynamic etc. The security and stability of the accuracy and the operation of wind-electricity integration system that are worth model has certain meaning.
Although preferred embodiments of the present invention have been described, it is created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the scope of the invention.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (5)

1. a kind of wind power plant Dynamic Equivalence for considering wind-powered electricity generation uncertainty in traffic, which is characterized in that the wind in the method Motor group is to carry out a point group based on wind-powered electricity generation uncertainty in traffic, is included the following steps:
A, the probability distribution and its parameter for determining wind speed and power error in wind-powered electricity generation prediction carry out more scene pumpings using method of inverting Sample obtains the sample for obeying Wind turbines prediction probability of error distribution;
B, it establishes using air speed error and power error as the Two-dimensional Statistical grid of coordinate, counts every Fans in statistics grid Sample frequency;
C, it is based on improved KL distance, blower is carried out using k-means clustering algorithm and divides group;
D, single machine equivalence is carried out to Wind turbines parameter in each group and network parameter.
2. wind power plant Dynamic Equivalence as described in claim 1, which is characterized in that the step A the following steps are included:
A1, according to preset condition or historical forecast error information, determine wind speed error delta v in every Fans wind-powered electricity generation predictionwAnd function Rate error delta PwCumulative distribution function F (Δ vw)、F(ΔPw);
A2, N is generated for every FanssRandom number c between a 0 to 1, i.e. probability, wherein the wind speed and function of same Fans The random number c of rate sample is identical;
A3, equation F (Δ v is solvedw)=c, F (Δ Pw)=c, every available N of FanssGroup includes air speed error Δ vwAnd power Error delta PwTwo-dimensional array namely each group of two-dimensional array in, include the air speed error being calculated by the same random number c ΔvwWith power error Δ Pw
3. wind power plant Dynamic Equivalence as claimed in claim 2, which is characterized in that the step B includes the following steps:
B1, it is directed to air speed error Δ vwWith power error Δ Pw, its variation range is averagely divided into Mv、MPA section, respectively with ΔvwWith Δ PwAs abscissa and ordinate, a two-dimensional latticed interval range is obtained, includes M in interval rangev×MP A grid counts the N of every Fans respectivelysSample frequency of the group two-dimensional array in each grid, the two-dimensional array of the i-th Fans Sample frequency in first of grid is Ei(l), l ∈ [1, Mv×MP];
B2, judge whether the sample frequency in each grid is 0, if 0 one minimum ε of superposition, if not 0 carries out step C.
4. wind power plant Dynamic Equivalence as claimed in claim 3, which is characterized in that the step C includes the following steps:
C1, select k Fans as initial cluster center;
C2, to any one Fans, calculate its arrive k cluster centre improved KL distance, which is grouped into apart from the smallest Group where cluster centre, the improved KL distance calculation formula between the i-th Fans and jth Fans are as follows:
dKL(Ei,Ej)=[DKL(Ei||Ej)+DKL(Ej||Ei)]/2 (1)
Wherein, dKL(Ei,Ej) improved KL distance between the i-th Fans and jth Fans, DKL(Ei||Ej) it is the i-th Fans To the KL distance between jth Fans, DKL(Ej||Ei) it is jth Fans to the KL distance between the i-th Fans, the meter of the two Calculate formula are as follows:
Wherein, Ei(l) sample frequency for the two-dimensional array of the i-th Fans in first of grid, EjIt (l) is jth Fans Sample frequency of the two-dimensional array in first of grid, l ∈ [1, Mv×MP];
C3, average sample frequency of each blower in statistics grid in group is calculated, it is assumed that have catwalk blower in k-th group, the Average sample frequency E in l gridav_kAre as follows:
Wherein, Er(l) sample frequency for the two-dimensional array of r Fans in first of grid, l ∈ [1, Mv×MP];
And so on, catwalk blower is obtained in Mv×MPAverage sample frequency E in a gridav_k(l), as new cluster Central value calculates its average sample frequency to k group, obtains k new cluster centre values;
C4, judgement: if all cluster centre values remain unchanged or update times reach the upper limit, turn C5, otherwise return to C2;
C5, output cluster result.
5. wind power plant Dynamic Equivalence as described in claim 1, which is characterized in that the step D includes the following steps:
D1, equivalence is carried out to the Wind turbines parameter in each group:
It is constant to Wind turbines parameter aggregation based on Wind turbines output characteristics before and after equivalence, to Wind turbines in wind turbine group Wind speed v, wind sweeping area A, capacity S, active-power P, reactive power Q, shafting inertia time constant H, axis rigidity COEFFICIENT K and Shafting damped coefficient D parameter carries out according to following formula equivalent respectively:
In formula: nwFor Wind turbines number in wind turbine group;veq、viTotal wind speed of Wind turbines respectively in wind turbine group With the wind speed of i-th Wind turbines;Aeq、AiTotal wind sweeping area of Wind turbines and the i-th typhoon electricity respectively in wind turbine group The wind sweeping area of unit;Seq、SiThe capacity of the total capacity of Wind turbines and i-th Wind turbines respectively in wind turbine group; Peq、PiThe active power of total active power of Wind turbines and i-th Wind turbines respectively in wind turbine group;
D2, equivalence is carried out to network parameter:
Equivalence to line impedance is carried out based on the constant principle of voltage loss before and after equivalence, is calculated as follows:
In formula: nwFor Wind turbines number, n in groupfFor Wind turbines number, Z in trunk line type blower branch in wind power plantgIt is dry G sections of branch impedances in wire type branch;
Equivalent admittance Y over the groundeqIt calculates as follows:
In formula: Y is admittance over the ground.
CN201611044128.3A 2016-11-21 2016-11-21 A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic Active CN106684905B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611044128.3A CN106684905B (en) 2016-11-21 2016-11-21 A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611044128.3A CN106684905B (en) 2016-11-21 2016-11-21 A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic

Publications (2)

Publication Number Publication Date
CN106684905A CN106684905A (en) 2017-05-17
CN106684905B true CN106684905B (en) 2019-01-18

Family

ID=58866515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611044128.3A Active CN106684905B (en) 2016-11-21 2016-11-21 A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic

Country Status (1)

Country Link
CN (1) CN106684905B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109002513B (en) * 2018-07-04 2022-07-19 深圳软通动力科技有限公司 Data clustering method and device
CN109146709B (en) * 2018-09-12 2020-10-09 国网辽宁省电力有限公司 Wind power measuring point identification method and device
CN109409575A (en) * 2018-09-27 2019-03-01 贵州电网有限责任公司 Wind power plant group of planes division methods based on Gap Statistic
CN109672221B (en) * 2019-02-26 2022-04-29 西南交通大学 Direct-drive wind power plant dynamic equivalence method for subsynchronous oscillation analysis
CN110659672B (en) * 2019-09-02 2023-09-26 国电新能源技术研究院有限公司 Method and device for predicting step-by-step uncertainty of output of wind turbine generator
CN112232714B (en) * 2020-11-18 2023-06-20 中国科学院电工研究所 Deep learning-based risk assessment method for distribution network under incomplete structural parameters
WO2024031449A1 (en) * 2022-08-10 2024-02-15 四川中电启明星信息技术有限公司 Grid-clustering-based short-term power prediction method for canyon wind power

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103996079A (en) * 2014-05-29 2014-08-20 东南大学 Wind power weighting predication method based on conditional probability
CN105279318A (en) * 2015-09-30 2016-01-27 中国电力科学研究院 Dynamic equivalence method for wind power station of direct drive permanent magnet wind turbine generators

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103996079A (en) * 2014-05-29 2014-08-20 东南大学 Wind power weighting predication method based on conditional probability
CN105279318A (en) * 2015-09-30 2016-01-27 中国电力科学研究院 Dynamic equivalence method for wind power station of direct drive permanent magnet wind turbine generators

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
"A Fuzzy Clustering Algorithm-Based Dynamic Equivalent Modeling Method for Wind Farm With DFIG";Jianxiao Zou,等;《IEEE TRANSACTIONS ON ENERGY CONVERSION》;20151231;第30卷(第4期);第1329-1336页
"基于风电机组输出时间序列数据分群的风电场动态等值";张星,等;《电网技术》;20151031;第39卷(第10期);第2787-2793页

Also Published As

Publication number Publication date
CN106684905A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN106684905B (en) A kind of wind power plant Dynamic Equivalence considering wind-powered electricity generation uncertainty in traffic
Zou et al. A fuzzy clustering algorithm-based dynamic equivalent modeling method for wind farm with DFIG
CN109063276A (en) Wind power plant dynamic equivalent modeling method suitable for long time domain fluctuations in wind speed
CN108649605B (en) DRE grid-connected access capacity planning method based on double-layer scene interval power flow
CN103094920B (en) A kind of equivalence method of direct-drive-type wind turbine generator wind power plant
CN103761349B (en) A kind of wind energy turbine set equivalent modeling method based on Wind turbines probability same tone
CN106130004B (en) A kind of grid entry point new energy comprehensively considering stability characteristic (quality) receives the appraisal procedure of ability
CN103093027B (en) Based on the Power System Analysis method of double-fed fan motor field Equivalent Model
CN106383947B (en) The fast acquiring method of wind power plant current collection network dynamic equivalent parameters
CN107947172B (en) Power system inertia level assessment method based on wide area information
CN101937483A (en) Dynamic equivalence modeling method for double-fed set wind power station based on action condition of pitch angle
CN103942736B (en) A kind of wind power plant multimachine equivalent modeling method
CN105576654B (en) Equivalent method and system for direct-drive wind power plant
CN103219725A (en) Wind power plant equivalent modeling method based on real-time operation data
CN103440405A (en) Method and system for steady-state modeling of wind power plant based on measured data
CN104036073A (en) Double-fed wind power plant dynamic equivalence modeling method suitable for active power characteristic analysis
CN110808608A (en) Method and system for evaluating frequency modulation and voltage regulation capability of large-scale new energy participating receiving-end power grid
CN106849066A (en) A kind of regional wind power prediction method
CN104820741B (en) Take into account the wind power plant Dynamic Equivalence of wind field dispersiveness and unit otherness
CN109409575A (en) Wind power plant group of planes division methods based on Gap Statistic
CN107657116B (en) Method for affine modeling of power curve of wind power plant
CN111460596B (en) Method for acquiring equivalent machine parameters under wind power plant multi-machine equivalence step by step
CN109816261A (en) Marine half direct drive wind power field equivalence method, system and device
CN108493988A (en) A kind of power grid inertia time constant computational methods and system comprising Wind turbines
CN106451527B (en) Double-fed fan motor field group of planes polymerization and system based on rotor current dynamic characteristic

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant