CN106682368A - Virtual environment building method based on correlated IED - Google Patents

Virtual environment building method based on correlated IED Download PDF

Info

Publication number
CN106682368A
CN106682368A CN201710080389.9A CN201710080389A CN106682368A CN 106682368 A CN106682368 A CN 106682368A CN 201710080389 A CN201710080389 A CN 201710080389A CN 106682368 A CN106682368 A CN 106682368A
Authority
CN
China
Prior art keywords
ied
virtual
smart machine
association
need
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710080389.9A
Other languages
Chinese (zh)
Other versions
CN106682368B (en
Inventor
董国威
袁则红
汪雷
宋毅
宋根华
徐照民
杨云
付阳
周宗学
赵俊
张炳清
储江龙
邵涤球
邹东升
钱旭军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710080389.9A priority Critical patent/CN106682368B/en
Publication of CN106682368A publication Critical patent/CN106682368A/en
Application granted granted Critical
Publication of CN106682368B publication Critical patent/CN106682368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Selective Calling Equipment (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a virtual environment building method based on correlated IED. The virtual environment building method includes the following steps that S1 intelligent equipment needing to be replaced during change, development and construction or overhaul; S2 the correlated IED of the intelligent equipment needing to be replaced during change, development and construction or overhaul is searched for according to an SCD file; S3 a virtual machine is used for carrying out virtual operation on the correlated IED, and it is ensured that the external characters of the virtual correlated IED are consistent with practical conditions; S4 the virtual machine is used for carrying out virtual operation on the network environment of a transformer substation corresponding to the intelligent equipment needing to be replaced during change, development and construction or overhaul. The virtual environment building method ensures consistency testing environment and the practical environment and has the advantages of being simple in testing method, and tests are real and reliable.

Description

A kind of building method of the virtual environment based on association IED
Technical field
The present invention relates to transformer station's technical field, and in particular to a kind of building method of the virtual environment based on association IED.
Background technology
220kV transformer stations smart machine (protection device, combining unit, intelligent terminal) related to protection generally quantity compared with It is many.In laboratory environments, the reorganization and expansion and maintenance test of similar joint debugging pattern of dispatching from the factory are carried out, it is general to be difficult to satisfy the requirements, need Concentrating the actual association smart machine (association IED) of a large amount of and various models carries out subtest, tests relative complex.
In correlation technique, quote virtual technology carries out virtually, testing so as to simplify to the actual smart machine, but the party Formula is it cannot be guaranteed that the concordance of virtual environment and site environment, and the reliability of test is relatively low.
The content of the invention
For the problems referred to above, the present invention provides a kind of building method of the virtual environment based on association IED.
The purpose of the present invention employs the following technical solutions to realize:
There is provided a kind of building method of the virtual environment based on association IED, comprise the following steps:
S1 determinations change widens or overhauls the smart machine that need to be changed;
S2 changes the association IED for widening or overhauling the smart machine that need to be changed according to SCD file search;
S3 is carried out virtually using virtual machine to associating IED, it is ensured that external behavior and the practical situation one of virtual associated IED Cause;
S4 virtually changes the substation network environment widened or overhaul corresponding to the smart machine that need to be changed using virtual machine.
Preferably, the utilization virtual machine carries out virtually, comprising the following steps to associating IED:
S01 is searched for from the SCD file of transformer station and is changed the association IED for widening or overhauling the smart machine that need to be changed, and shape Into association IED figures;
Process layer external characteristics of the S02 according to association IED figure virtual associateds IED.
Wherein, the process layer external characteristics according to association IED figure virtual associateds IED, comprises the following steps:
S001 widens or overhaul the port that the smart machine that need to change specifies according to association smart machine figure to described changing Send SV, GOOSE signal, can check changes widens or overhaul the smart machine that need to be changed and have correctly received SV, GOOSE signal;
S002 is received to change and is widened or overhaul SV, GOOSE signal that the smart machine that need to be changed sends, and checks SV, GOOSE letter Number traffic model parameter it is whether consistent with the traffic model parameter of virtual association IED;
Change that to widen or overhaul the smart machine that need to be changed be protection device if S003 is described, further virtual combining unit and Intelligent terminal, to protection device protection act performance testing is carried out.
Beneficial effects of the present invention are:Ensure that the concordance of test environment and actual environment, with method of testing it is simple, The true and reliable advantage of test.
Description of the drawings
Using accompanying drawing, the invention will be further described, but the embodiment in accompanying drawing does not constitute any limit to the present invention System, for one of ordinary skill in the art, on the premise of not paying creative work, can be being obtained according to the following drawings Other accompanying drawings.
Fig. 1 is workflow diagram of the present invention based on the building method of the virtual environment of association IED.
Specific embodiment
With the following Examples the invention will be further described.
As shown in figure 1, a kind of building method of the virtual environment based on association IED of the present embodiment, comprises the following steps:
S1 determinations change widens or overhauls the smart machine that need to be changed;
S2 changes the association IED for widening or overhauling the smart machine that need to be changed according to SCD file search;
S3 is carried out virtually using virtual machine to associating IED, it is ensured that external behavior and the practical situation one of virtual associated IED Cause;
S4 virtually changes the substation network environment widened or overhaul corresponding to the smart machine that need to be changed using virtual machine.
Preferably, the utilization virtual machine carries out virtually, comprising the following steps to associating IED:
S01 is searched for from the SCD file of transformer station and is changed the association IED for widening or overhauling the smart machine that need to be changed, and shape Into association IED figures;
Process layer external characteristics of the S02 according to association IED figure virtual associateds IED.
Wherein, the process layer external characteristics according to association IED figure virtual associateds IED, comprises the following steps:
S001 widens or overhaul the port that the smart machine that need to change specifies according to association smart machine figure to described changing Send SV, GOOSE signal, can check changes widens or overhaul the smart machine that need to be changed and have correctly received SV, GOOSE signal;
S002 is received to change and is widened or overhaul SV, GOOSE signal that the smart machine that need to be changed sends, and checks SV, GOOSE letter Number traffic model parameter it is whether consistent with the traffic model parameter of virtual association IED;
Change that to widen or overhaul the smart machine that need to be changed be protection device if S003 is described, further virtual combining unit and Intelligent terminal, to protection device protection act performance testing is carried out.
Wherein, the substation network environment virtually includes:Using the network switch and network analog equipment, by leading Enter SV, GOOSE load of the SCD file to substation network to be simulated.
Preferably, present embodiment ensure that the concordance of test environment and actual environment, virtual machine can be simulated as needed Different smart machines, has the advantages that method of testing is simple, it is true and reliable to test.
Finally it should be noted that above example is only illustrating technical scheme, rather than to present invention guarantor The restriction of shield scope, although having made to explain to the present invention with reference to preferred embodiment, one of ordinary skill in the art should Work as understanding, technical scheme can be modified or equivalent, without deviating from the reality of technical solution of the present invention Matter and scope.

Claims (3)

1. a kind of building method of the virtual environment based on association IED, is characterized in that, comprise the following steps:
S1 determinations change widens or overhauls the smart machine that need to be changed;
S2 changes the association IED for widening or overhauling the smart machine that need to be changed according to SCD file search;
S3 is carried out virtually using virtual machine to associating IED, it is ensured that the external behavior of virtual associated IED is consistent with practical situation;
S4 virtually changes the substation network environment widened or overhaul corresponding to the smart machine that need to be changed using virtual machine.
2. a kind of building method of virtual environment based on association IED according to claim 1, is characterized in that, the profit Carry out virtually, comprising the following steps to associating IED with virtual machine:
S01 is searched for change from the SCD file of transformer station and is widened or overhaul the association IED of the smart machine that need to be changed, and forms pass Connection IED figures;
Process layer external characteristics of the S02 according to association IED figure virtual associateds IED.
3. a kind of building method of virtual environment based on association IED according to claim 2, described according to association IED The process layer external characteristics of figure virtual associated IED, comprises the following steps:
S001 widens or overhaul the port transmission that the smart machine that need to change specifies according to association smart machine figure to described changing SV, GOOSE signal, can check changes widens or overhauls the smart machine that need to be changed and have correctly received SV, GOOSE signal;
S002 is received to change and is widened or overhaul SV, GOOSE signal that the smart machine that need to be changed sends, and checks SV, GOOSE signal Whether traffic model parameter is consistent with the traffic model parameter of virtual association IED;
Change that to widen or overhaul the smart machine that need to be changed be protection device if S003 is described, further virtual combining unit and intelligence Terminal, to protection device protection act performance testing is carried out.
CN201710080389.9A 2017-02-15 2017-02-15 Method for building virtual environment based on associated IED Active CN106682368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710080389.9A CN106682368B (en) 2017-02-15 2017-02-15 Method for building virtual environment based on associated IED

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710080389.9A CN106682368B (en) 2017-02-15 2017-02-15 Method for building virtual environment based on associated IED

Publications (2)

Publication Number Publication Date
CN106682368A true CN106682368A (en) 2017-05-17
CN106682368B CN106682368B (en) 2023-06-09

Family

ID=58860897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710080389.9A Active CN106682368B (en) 2017-02-15 2017-02-15 Method for building virtual environment based on associated IED

Country Status (1)

Country Link
CN (1) CN106682368B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107346917A (en) * 2017-08-10 2017-11-14 嘉兴恒创电力设计研究院有限公司 Secondary device based on virtual machine integrates joint debugging method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5751967A (en) * 1994-07-25 1998-05-12 Bay Networks Group, Inc. Method and apparatus for automatically configuring a network device to support a virtual network
CN104133953A (en) * 2014-07-24 2014-11-05 贵阳供电局 Secondary design system of intelligent substation
US20150341207A1 (en) * 2012-06-29 2015-11-26 Kyland Technology Co. Ltd Configuration information auto-management method based on intelligent substation
CN106327355A (en) * 2016-05-13 2017-01-11 中国电力科学研究院 Secondary equipment simulation and debugging system for transformer substation reconstruction and expansion project and implementation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5751967A (en) * 1994-07-25 1998-05-12 Bay Networks Group, Inc. Method and apparatus for automatically configuring a network device to support a virtual network
US20150341207A1 (en) * 2012-06-29 2015-11-26 Kyland Technology Co. Ltd Configuration information auto-management method based on intelligent substation
CN104133953A (en) * 2014-07-24 2014-11-05 贵阳供电局 Secondary design system of intelligent substation
CN106327355A (en) * 2016-05-13 2017-01-11 中国电力科学研究院 Secondary equipment simulation and debugging system for transformer substation reconstruction and expansion project and implementation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蔡玉朋;于同伟;金世鑫;钱海;: "基于智能变电站SCD文件的二次虚回路的检测方案及应用", no. 2 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107346917A (en) * 2017-08-10 2017-11-14 嘉兴恒创电力设计研究院有限公司 Secondary device based on virtual machine integrates joint debugging method
CN107346917B (en) * 2017-08-10 2019-12-03 嘉兴恒创电力设计研究院有限公司 Secondary device based on virtual machine integrates joint debugging method

Also Published As

Publication number Publication date
CN106682368B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
CN107679281A (en) Intelligent station three-dimensional scenic analogue system and implementation method based on Unity dynamic generations
CN105006017A (en) Simulation method for generating three-dimensional scene based on Unity dynamic technology
CN107819611B (en) Client test method based on IEC61850 multi-server simulation
CN107317399A (en) Intelligent substation visualization is automatic to dot system and method
CN106329720B (en) Detection and debugging method for secondary system of reconstruction and extension project of intelligent substation
CN108646111A (en) A kind of relay protection automatic test approach and system based on 61850 communications
CN107277168A (en) One kind supports the wireless emulation debugging system of high in the clouds multiuser to remotely and method
CN106787199A (en) A kind of portable substation simulated testing system and method
CN103676661B (en) Multifunction emulation verifies system and its emulation verification method
CN113507164A (en) Joint debugging automatic acceptance method based on master station
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN103984335A (en) Testing method and system for power distribution automation system
CN113590471B (en) Communication terminal equipment simulation system and application method thereof
CN106682368A (en) Virtual environment building method based on correlated IED
CN106911498A (en) The method of power distribution network distributed terminal intelligent modeling communication
CN108648549A (en) A kind of the power information acquisition closed-loop simulation system and control method of object-oriented
CN106842986A (en) A kind of minimum virtual test system
CN105406996A (en) Method for intelligent substation station control layer MMS communication simulation
CN108072855A (en) A kind of test device and test system
CN108919004A (en) A kind of distribution power automation terminal protection Model test Method
CN106204326B (en) Power distribution terminal IED equipment detection method for power distribution system
CN112613170B (en) Visual modeling method for virtual and real models of intelligent substation
CN206611240U (en) A kind of reorganization and expansion and the off-line test system of repair apparatus for transformer station
CN106646070A (en) Virtual machine-based small-sized test system for intelligent transformer substation
CN206788279U (en) Simulation test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant