CN106679084B - A kind of method of the strainer prompt replacement of fresh air system - Google Patents
A kind of method of the strainer prompt replacement of fresh air system Download PDFInfo
- Publication number
- CN106679084B CN106679084B CN201611225652.0A CN201611225652A CN106679084B CN 106679084 B CN106679084 B CN 106679084B CN 201611225652 A CN201611225652 A CN 201611225652A CN 106679084 B CN106679084 B CN 106679084B
- Authority
- CN
- China
- Prior art keywords
- strainer
- weight
- fresh air
- value
- electric current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
- F24F11/32—Responding to malfunctions or emergencies
- F24F11/39—Monitoring filter performance
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Atmospheric Sciences (AREA)
- Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
- Filtering Of Dispersed Particles In Gases (AREA)
Abstract
The invention discloses a kind of methods of the strainer of fresh air system prompt replacement, method of the invention is according to the specifications of different strainers, electric current, voltage and the power signal of the strainer in the process of running are associated with the weight parameter of strainer, and construct corresponding functional relation;So that strainer is in the process of running, according to obtained electric current, voltage or power signal, the weight parameter of strainer can be directly obtained, is compared by the ultimate load of the weight parameter and strainer, accurate data facilitates operator precisely to determine whether strainer needs replacing;Do not need to add extra detection device in method of the invention, reduce fresh air system purchase and installation cost.
Description
Technical field
The present invention relates to the auxiliary operation system field of fresh air system more particularly to a kind of screen replacings of fresh air system
Reminding method.
Background technique
Fresh air system in the process of running, is required to filter out the granule foreign in air by strainer, since gas is to hold
It is continuous by strainer, therefore a large amount of granule foreign can be assembled on the position of strainer.These granule foreigns gather it is more after, meeting
Opening of sieve is blocked, the normal work of strainer is influenced, will lead to the ventilatory capacity decline of fresh air system under serious conditions, single unit system
Intercourse meeting degradation;At this time, it is necessary to which operator carries out replacement sieving operation.
Therefore, for fresh air system, it is main in fresh air system operational process for how reminding operator to replace strainer
One of ask a question, there are a variety of reminding methods on the market at present, one is correlation detector detections, when detector detects fresh air
When containing impurity in the wind of system discharge, then prompting changing filtering net;This method is led firstly the need of other detection devices are installed additional
The erection increased costs of fresh air system are caused, and the impurity that detector detects is not necessarily as caused by filter net jam, is also had
May be in fresh air system other assemblies failure cause, precision is not high;Another kind is judged by air quantity or power detection
What whether strainer needed replacing, still, in the process of running due to blower, electric current, the electricity of filter net jam meeting combined influence blower
The factors such as pressure, power and ventilation quantity, are the comprehensive functions by many factors, whether judge strainer only by single data
It needs to detect, it is evident that precision is inadequate;Moreover, the case where being detected by these equipment, is the working condition of blower reaction,
For the dust load situation of strainer itself, these data are all the data of side reaction, and being by these equipment cannot be accurate
It obtains.
Summary of the invention
In view of the above problems, convenient precisely judge that strainer is born it is an object of that present invention to provide a kind of easy to operate
Carry situation, the method for the strainer prompt replacement of low-cost fresh air system.
In order to achieve the above object, The technical solution adopted by the invention is as follows: a kind of strainer of fresh air system prompts replacement
Method, the method the following steps are included:
1) strainer for selecting fixed specification, when strainer zero load, the weight for detecting strainer is Q0, work is carried out using the strainer
Make, measurement strainer work stylish wind system wind-force electrical machinery speed electric V0, electric current I0And power P0;
2) strainer in step 1) is selected, when the strainer full load, the weight for detecting strainer is Q1, carried out using the strainer
Work, measurement strainer work stylish wind system wind-force electrical machinery speed electric V1, electric current I1And power P1;
3) according to step 1), 2) in as a result, obtaining the strainer in unloaded and full load, the variation range of the weight of strainer
Q0~Q1, the variation range V of speed electric1~V0, the variation range I of electric current1~I0With the variation range P of power1~P0;
4) to weight range Q0~Q1Interior multiple strainers are tested, and measure tune corresponding to different strainer weight respectively
Fast voltage, electric current and power, are computed, and respectively obtain the functional relation of speed electric and weight, the function pass of electric current and weight
System, the functional relation of power and weight;
5) the relevant functional relation of three weight obtained in step 4) is imported into central processing unit, which is filled
Enter fresh air system, starts to work normally, real-time detection speed electric Va, electric current Ia and power P a in the course of work;
6) central processing unit is according to speed electric Va, electric current Ia and the power P a of the measurement in 5), according to respective function
Relationship obtains the corresponding weight Qva of speed electric, the corresponding weight Qia of electric current and the corresponding weight Qpa of power respectively;
7) by Qva, Qia and Qpa three respectively with Q1It compares, when any one value is greater than or equal to Q in three1When,
Central processing unit issues warning signal, and operator is reminded to replace strainer;
8) by Qva, Qia and Qpa three respectively with Q1It compares, when three is respectively less than Q1When, strainer is calculated by formula
Load capacity F,, obtained load capacity is passed through aobvious
Showing device is shown, the pot life of operator's strainer is reminded.
When fresh air system of the present invention uses direct current generator as wind drive, data obtained in step 6) are
Va, Ia and Pa, the strainer weight further obtained are Qva, Qia and Qpa.: blower is in negative pressure or under tending to vacuum environment, rotation
Resistance reduces, and revolving speed can become faster, but when rotation speed of fan is faster than direct current generator setting speed, voltage can be reduced voluntarily, to reduce
Rotation speed of fan.
When fresh air system of the present invention uses alternating current generator as wind drive, speed electric will not change,
Data obtained in step 6) are Va and Pa, and the strainer weight further obtained is Qva and Qpa;Alternating current generator does not have revolving speed anti-
Feedback signal line can not obtain tach signal, the variation that can also reduce with regard to speed electric is not present, and after filter net jam, blower is negative
Pressure tends under vacuum environment, and rotary resistance reduces, and revolving speed can become faster, but without detection signal output.
When direct current generator of the present invention is as wind drive, the value of Va and the value of Qva are in inverse ratio, the value and Qia of Ia
Value be in inverse ratio, the value of the value of Pa and Qpa are in inverse ratio.
When alternating current generator of the present invention is as wind drive, the value of Ia and the value of Qia are in inverse ratio, the value and Qpa of Pa
Value be in inverse ratio.
The present invention has the advantages that not needing to add extra detection device in method of the invention, fresh air system is reduced
System purchase and installation cost;Simultaneously, according to the specification of different strainers, by electric current, the tune of the strainer in the process of running
Fast voltage and power signal associate with the weight parameter of strainer, and construct corresponding functional relation;So that strainer is being transported
During row, according to obtained electric current, speed electric or power signal, the weight parameter of strainer can be directly obtained, by this
Weight parameter and the ultimate load of strainer compare, and judge whether strainer needs replacing, and the data are the most accurate.
It under normal circumstances, is whole by the associated strainer weight parameter of the electric current, speed electric or power signal that measure
When being greater than or being largely greater than the ultimate load of strainer, strainer just can be carried out replacement operation;But when wherein one group of data
When obtained strainer weight is greater than ultimate load, in order to avoid strainer excessive load, operator can directly be carried out
Replacement.More preferably function is for it, and when three is the optimum load amount for reaching strainer, the reality of strainer can directly be calculated
Border load capacity F, the data are percentages show, can be convenient the loading condition that operator directly judges strainer, soon
Before reaching ultimate load, reminds, be convenient for changing in time.
Specific embodiment
The present invention is described in further detail With reference to embodiment.
Embodiment 1: a kind of method (DC driven) of the strainer prompt replacement of fresh air system, the method includes following
Step:
1) strainer for selecting fixed specification, when strainer zero load, the weight for detecting strainer is Q0=400g, using the strainer
Work, measurement strainer work stylish wind system wind-force electrical machinery speed electric V0=5V, electric current I0=0.145A and P0=
45W。
2) strainer in step 1) is selected, when the strainer full load, the weight for detecting strainer is Q1=500g, using the filter
Net works, measurement strainer work stylish wind system wind-force electrical machinery speed electric V1=2V, electric current I1=0.130A and P1=
39.7W。
3) according to step 1), 2) in as a result, obtaining the strainer in unloaded and full load, the variation range of the weight of strainer
Q0~Q1, the variation range V of speed electric1~V0, the variation range I of electric current1~I0With the variation range P of power1~P0。
4) to weight range Q0~Q1Interior multiple strainers are tested, and measure tune corresponding to different strainer weight respectively
Fast voltage, electric current and power, are computed, and respectively obtain the functional relation of speed electric and weight, the function pass of electric current and weight
System, the functional relation of power and weight.
5) the relevant functional relation of three weight obtained in step 4) is imported into central processing unit, which is filled
Enter fresh air system, starts to work normally, real-time detection speed electric Va=2.3V, electric current Ia=0.143A and power in the course of work
Pa=44.2W。
6) central processing unit according to speed electric Va=2.3V, electric current Ia=0.143A and the power P a of the measurement in 5)=
44.2W obtains the corresponding weight Qva=406.5g of speed electric, the corresponding weight of electric current according to respective functional relation respectively
Qia=407g and corresponding weight Qpa=the 407.2g of power.
7) by Qva=406.5g, Qia=407g and Qpa=407.2g three respectively with Q1=500g is compared, through judging three
Person is respectively less than Q1, therefore the load capacity of strainer is calculated;Load capacity F=7% that strainer is calculated by formula, it is negative by what is obtained
Carrying capacity is shown by display device, reminds the pot life of operator's strainer.
Embodiment 2: a kind of method (exchange driving) of the strainer prompt replacement of fresh air system, the method includes following
Step:
1) strainer for selecting fixed specification, when strainer zero load, the weight for detecting strainer is Q0=400g, using the strainer
Work, measurement strainer work stylish wind system wind-force electrical machinery electric current I0=0.410A and power P0=90W。
2) strainer in step 1) is selected, when the strainer full load, the weight for detecting strainer is Q1=500g, using the filter
Net works, measurement strainer work stylish wind system wind-force electrical machinery electric current I1=0.282A and power P1=60W。
3) according to step 1), 2) in as a result, obtaining the strainer in unloaded and full load, the variation range of the weight of strainer
Q0~Q1, the variation range I of electric current1~I0With the variation range P of power1~P0。
4) to weight range Q0~Q1Interior multiple strainers are tested, and measure tune corresponding to different strainer weight respectively
Fast voltage, electric current and power, are computed, and respectively obtain the functional relation of speed electric and weight, the function pass of electric current and weight
System, the functional relation of power and weight.
5) the relevant functional relation of three weight obtained in step 4) is imported into central processing unit, which is filled
Enter fresh air system, starts to work normally, real-time detection electric current Ia=0.311A and power P a=67.8W in the course of work.
6) central processing unit is according to the electric current Ia=0.311A and power P a=67.8W of the measurement in 5), according to respective letter
Number relationship obtains the corresponding weight Qia=429g of electric current and the corresponding weight Qpa=429g of power respectively.
7) by Qia=429.1g and Qpa=429.3g three respectively with Q1=500g is compared, and is judged both to be less than
Q1, therefore the load capacity of strainer is calculated;Load capacity F=29% that strainer is calculated by formula, obtained load capacity is led to
It crosses display device to be shown, reminds the pot life of operator's strainer.
Embodiment 3: performance comparison examination is carried out using the strainer of different size according to the technical solution in Examples 1 and 2
It tests, obtained result is as shown in the table:
1 strainer zero load of table and fully loaded voltage change range
Table 2 is after operating method processing of the invention to the judging result of screen replacing
。
From the data in above-mentioned two table: by means of the present invention, no matter fresh air system is using exchange
Electric drive or DC powered, according to the speed electric, electric current and power of practical measurement during fan operation, according to storage
Functional relation calculated, the actual weight of strainer is calculated, the negative of strainer may determine that according to the actual weight of strainer
Load rate judges whether strainer needs replacing in time, and detection data is accurate, and operator is facilitated to replace in time.
It should be noted that above-mentioned is only presently preferred embodiments of the present invention, protection model not for the purpose of limiting the invention
It encloses, any combination or equivalents made on the basis of the above embodiments all belong to the scope of protection of the present invention.
Claims (5)
1. a kind of method of the strainer prompt replacement of fresh air system, which is characterized in that the method the following steps are included:
1) strainer for selecting fixed specification, when strainer zero load, the weight for detecting strainer is Q0, worked, surveyed using the strainer
Determine strainer work stylish wind system wind-force electrical machinery speed electric V0, electric current I0And power P0;
2) strainer in step 1) is selected, when the strainer full load, the weight for detecting strainer is Q1, it is worked using the strainer,
Measurement strainer work stylish wind system wind-force electrical machinery speed electric V1, electric current I1And power P1;
3) according to step 1), 2) in as a result, obtaining the strainer in unloaded and full load, the variation range Q of the weight of strainer0~
Q1, the variation range V of speed electric1~V0, the variation range I of electric current1~I0With the variation range P of power1~P0;
4) to weight range Q0~Q1Interior multiple strainers are tested, and measure the electricity of speed regulation corresponding to different strainer weight respectively
Pressure, electric current and power, are computed, respectively obtain the functional relation of speed electric and weight, the functional relation of electric current and weight, function
The functional relation of rate and weight;
5) the relevant functional relation of three weight obtained in step 4) is imported into central processing unit, which is packed into new
Wind system starts to work normally, real-time detection speed electric Va, electric current Ia and power P a in the course of work;
6) central processing unit is according to speed electric Va, electric current Ia and the power P a of the measurement in 5), according to respective functional relation
The corresponding weight Qva of speed electric, the corresponding weight Qia of electric current and the corresponding weight Qpa of power are obtained respectively;
7) by Qva, Qia and Qpa three respectively with Q1It compares, when any one value is greater than or equal to Q in three1When, center
Processor issues warning signal, and operator is reminded to replace strainer;
8) by Qva, Qia and Qpa three respectively with Q1It compares, when three is respectively less than Q1When, the negative of strainer is calculated by formula
Carrying capacity F,, obtained load capacity is passed through into display dress
It sets and is shown, remind the pot life of operator's strainer.
2. the method for the strainer prompt replacement of fresh air system according to claim 1, which is characterized in that the fresh air system
When system uses direct current generator as wind drive, data obtained in step 6) are Va, Ia and Pa, the strainer weight further obtained
Amount is Qva, Qia and Qpa.
3. the method for the strainer prompt replacement of fresh air system according to claim 1, which is characterized in that the fresh air system
When system uses alternating current generator as wind drive, speed electric will not change, and data obtained in step 6) are Ia and Pa,
The strainer weight further obtained is Qia and Qpa.
4. the method for the strainer prompt replacement of fresh air system according to claim 2, which is characterized in that the direct current
When machine is as wind drive, the value of Va and the value of Qva are in inverse ratio, and the value of Ia and the value of Qia are in inverse ratio, the value of Pa and the value of Qpa
In inverse ratio.
5. the method for the strainer prompt replacement of fresh air system according to claim 3, which is characterized in that the alternating current
When machine is as wind drive, the value of Ia and the value of Qia are in inverse ratio, and the value of Pa and the value of Qpa are in inverse ratio.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611225652.0A CN106679084B (en) | 2016-12-27 | 2016-12-27 | A kind of method of the strainer prompt replacement of fresh air system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611225652.0A CN106679084B (en) | 2016-12-27 | 2016-12-27 | A kind of method of the strainer prompt replacement of fresh air system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106679084A CN106679084A (en) | 2017-05-17 |
CN106679084B true CN106679084B (en) | 2019-09-10 |
Family
ID=58871629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611225652.0A Active CN106679084B (en) | 2016-12-27 | 2016-12-27 | A kind of method of the strainer prompt replacement of fresh air system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106679084B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108889060B (en) * | 2018-05-28 | 2021-04-06 | 北京小米移动软件有限公司 | Method and device for detecting filter element |
CN110030662A (en) * | 2019-03-22 | 2019-07-19 | 青岛海尔空调器有限总公司 | Air conditioner indoor unit filter gauze cleaning system for prompting and its method and air conditioner |
CN110160211A (en) * | 2019-04-28 | 2019-08-23 | 青岛海尔空调器有限总公司 | Air conditioner indoor unit filter gauze cleaning system for prompting and its method and air conditioner |
CN110260465A (en) * | 2019-07-22 | 2019-09-20 | 珠海格力电器股份有限公司 | Airflow filtering component filth blockage detection device and method and air conditioning equipment |
CN111998490B (en) * | 2020-09-02 | 2021-08-10 | 浙江美臣环境科技有限公司 | Intelligent interconnected fresh air system |
CN112628938A (en) * | 2020-12-24 | 2021-04-09 | 珠海格力电器股份有限公司 | Filter screen filth blockage detection equipment, method and device, electronic equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203869253U (en) * | 2013-11-21 | 2014-10-08 | 广东美的制冷设备有限公司 | Air conditioner and filth blockage detection control device thereof |
CN104949293A (en) * | 2015-07-23 | 2015-09-30 | 珠海市威士茂工业产品设计有限公司 | Air purifier capable of automatically judging service life of filter screen and automatic service life judgment method for filter screen of air purifier |
CN105841295A (en) * | 2016-03-28 | 2016-08-10 | 海信(山东)空调有限公司 | Filter screen service life detecting method and device |
CN105864973A (en) * | 2016-04-14 | 2016-08-17 | 常州绿谷物联网科技有限公司 | Air resistance recognition method for fresh air purification system and device thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6993414B2 (en) * | 2003-12-18 | 2006-01-31 | Carrier Corporation | Detection of clogged filter in an HVAC system |
-
2016
- 2016-12-27 CN CN201611225652.0A patent/CN106679084B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203869253U (en) * | 2013-11-21 | 2014-10-08 | 广东美的制冷设备有限公司 | Air conditioner and filth blockage detection control device thereof |
CN104949293A (en) * | 2015-07-23 | 2015-09-30 | 珠海市威士茂工业产品设计有限公司 | Air purifier capable of automatically judging service life of filter screen and automatic service life judgment method for filter screen of air purifier |
CN105841295A (en) * | 2016-03-28 | 2016-08-10 | 海信(山东)空调有限公司 | Filter screen service life detecting method and device |
CN105864973A (en) * | 2016-04-14 | 2016-08-17 | 常州绿谷物联网科技有限公司 | Air resistance recognition method for fresh air purification system and device thereof |
Also Published As
Publication number | Publication date |
---|---|
CN106679084A (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106679084B (en) | A kind of method of the strainer prompt replacement of fresh air system | |
CN104317316B (en) | Control method and system based on bin-level | |
CN109008801A (en) | Electric appliance filter screen replacement detection method and system, air intake calculation method and dust collector | |
CN103486068B (en) | The control detecting method of intelligent fan and device, intelligent fan | |
CN106369749A (en) | Method for determining residual time for cleaning filter screen, air supply equipment and control method thereof | |
CN104807131B (en) | Fan control method and system for air conditioner indoor unit | |
CN107328024A (en) | Screen pack stopping state detection method and air cleaning facility | |
CN106523336A (en) | Air compression system group control method | |
CN108825545B (en) | Fan detection method, device and system and air conditioning equipment | |
CN108679769A (en) | The air quantity control method and device of fresh air system | |
CN108836628B (en) | Sensorless respirator and constant air output control method thereof | |
CN103913706B (en) | The method of a kind of electric quantity of lithium battery detection and device thereof | |
CN205002413U (en) | Intelligent gas heater | |
CN110513828B (en) | Purifier filter screen condition detection method and device, control equipment and purifier | |
CN101227079A (en) | Protector special for digital type compressor | |
CN109212135A (en) | Public place air environment monitoring display system | |
CN112328033A (en) | Automatic fan control method in BMC and related equipment | |
JP6646416B2 (en) | Rotating machine short circuit diagnosis apparatus and rotating machine short circuit diagnosis method | |
CN111287914A (en) | Fan monitoring device and method | |
CN109567671A (en) | Dust collector airflow detection device and method and dust collector | |
CN113007870B (en) | Air conditioner detection method, device and system | |
CN205643570U (en) | Controllable silicon rectifier device's of three -phase fault diagnostic | |
CN114754476A (en) | Air conditioner breathing control device and method and air conditioner system | |
CN209117763U (en) | A kind of super capacitor volume test device of wind power pitch-controlled system | |
CN110986271B (en) | Air conditioner filter screen filth blockage detection method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |