CN106678138B - A kind of building pipe of no screw is connected part - Google Patents

A kind of building pipe of no screw is connected part Download PDF

Info

Publication number
CN106678138B
CN106678138B CN201611095908.0A CN201611095908A CN106678138B CN 106678138 B CN106678138 B CN 106678138B CN 201611095908 A CN201611095908 A CN 201611095908A CN 106678138 B CN106678138 B CN 106678138B
Authority
CN
China
Prior art keywords
semi arch
flange
arch shell
pull rod
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611095908.0A
Other languages
Chinese (zh)
Other versions
CN106678138A (en
Inventor
熊静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Yanjiang Pipe Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611095908.0A priority Critical patent/CN106678138B/en
Publication of CN106678138A publication Critical patent/CN106678138A/en
Application granted granted Critical
Publication of CN106678138B publication Critical patent/CN106678138B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • F16B7/0406Clamping or clipping connections for rods or tubes being coaxial

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a kind of building pipes of no screw to be connected part, including tube socket and retaining mechanism, the tube socket includes the first semi arch shell and the second semi arch shell, the first semi arch shell and the opposite installation of the second semi arch shell, and the first semi arch shell and the second semi arch shell are docked by the end that the retaining mechanism mutually tenses to clamp its internal two buildings pipe.The beneficial effects of the invention are as follows:It tenses to be open using retaining mechanism and allows two semi arch shells to clamp its interior architectural applications pipe instead of screw in the prior art and connect, solving the existing screw of screw connection can not rotate, be easily lost the defects of damage and mounting screw are time-consuming and laborious, it reduces labor intensity, improves work efficiency.

Description

A kind of building pipe of no screw is connected part
Technical field
The present invention relates to the present invention relates to construction accessories fields, and in particular to a kind of building pipe of no screw is in succession Fitting.
Background technique
Building pipe docking extension length is needed to use special building pipe and is connected part.Current building pipe is in succession Fitting includes a cross inner core, two semi arch shells, pin and screw composition, its working principle is that being tensed by screw Two semi arch shells realize docking to clamp the end of two building pipes, and above-mentioned building pipe interfacing part haves the defects that as follows:
1, two semi arch shell tensions are clamped by building pipe using screw, since screw gets rusty easily and by mixed mud Bonding, causes screw that can not rotate;
2, during carrying, screw is easy to be damaged, and leads to screw damage or stripped thread;
3, during carrying, screw is easily lost, and leads to the structure that building pipe can not be connected into needs when work;
4, it when connecting building pipe, needs to continue rotary screw, time-consuming and laborious, working efficiency is lower.
Summary of the invention
In conclusion for overcome the deficiencies in the prior art, technical problem to be solved by the invention is to provide a kind of nothings The building pipe of screw is connected part.
The technical solution that the present invention solves above-mentioned technical problem is as follows:A kind of building pipe of no screw is connected part, wraps Tube socket and retaining mechanism are included, the tube socket includes the first semi arch shell and the second semi arch shell, the first semi arch shell Body and the opposite installation of the second semi arch shell, and the first semi arch shell and the second semi arch shell pass through The retaining mechanism mutually tenses to clamp the end docking of its internal two buildings pipe.
The beneficial effects of the invention are as follows:Tensing opening using retaining mechanism allows two semi arch shells to build inside it to clamp Pipe is built to connect instead of screw in the prior art, solve screw connect existing screw can not rotate, be easily lost damage and The defects of mounting screw is time-consuming and laborious reduces labor intensity, and improves work efficiency.
Based on the above technical solution, the present invention can also be improved as follows.
Further, the both ends of the first semi arch shell are equipped with the first flange I and the first flange extended to its two sides II, the both ends of the second semi arch shell are equipped with the second flange I and the second flange II extended to its two sides, and described the One flange I is in the same side with second flange I, and first flange II is in the same side with second flange II;Institute Stating retaining mechanism includes the first retaining mechanism and the second retaining mechanism, and first retaining mechanism tenses I He of the first flange Second flange I, second retaining mechanism tense first flange II and second flange II to make the first half Circular arc shell and the second semi arch shell clamp its internal building pipe.
Further, first locking device includes first connecting rod mechanism and cone-shaped and the first up big and down small pin, The first connecting rod mechanism includes the first fixture block and the first pull rod, and first fixture block is in the first flange I far from second vertically One end of the side of flange I, first pull rod connects first fixture block, and the other end level of first pull rod is successively It is hinged on the side wall of the second semi arch shell after first flange I and second flange I, and described One pull rod is equipped with the bellmouth to match with first pin far from one end of first fixture block, and first pin is downward It is inserted into after the bellmouth of first pull rod and tenses the side of the first semi arch shell and the second semi arch shell;
Second locking device includes second connecting rod mechanism and cone-shaped and the second up big and down small pin, and described second Link mechanism includes the second fixture block and the second pull rod, and second fixture block is in the second flange II far from the first flange II vertically One end of side, second pull rod connects second fixture block, and the other end level of second pull rod sequentially passes through institute It is hinged on the side wall of the first semi arch shell after stating the second flange II and first flange II, and described second draws Bar is equipped with the bellmouth to match with second pin far from one end of second fixture block, and second pin is downwardly into The other side of the first semi arch shell and the second semi arch shell is tensed after the bellmouth of second pull rod.
Beneficial effect using above-mentioned further scheme is:Pin is inserted downwardly into bellmouth to tense two semicircles Arc shell clamps the ends of its internal two buildings pipe, realizes the docking of building pipe.
Further, on the side wall of the first semi arch shell and the upper and lower of the bellmouth of corresponding second pull rod is set There is the first reinforcing rib, first through hole, the taper of the first through hole and second pull rod are equipped on first reinforcing rib The axis in hole is overlapped, and the bellmouth of the first through hole and second pull rod is formed together inserting for the second pin of insertion Hole;
On the side wall of the second semi arch shell and the upper and lower of the bellmouth of corresponding first pull rod is equipped with second Reinforcing rib is equipped with the second through-hole, the axis of second through-hole and the bellmouth of first pull rod on second reinforcing rib Line is overlapped, and the bellmouth of second through-hole and first pull rod is formed together the jack of the first pin of insertion.
Beneficial effect using above-mentioned further scheme is:Reinforce the intensity of semi arch shell, in addition increases pin half-and-half The pulling force of circular arc shell makes to build pipe docking reliably.
Further, the lower end of first pin is equipped with for preventing the first pin from deviating from the first blend stop of its jack, institute The lower end of the second pin is stated equipped with the second blend stop for preventing the second pin from deviating from its jack.
Further, the inner wall of the first semi arch shell or the second semi arch shell is equipped with for blocking building Manage the Semicircular baffle to fall always.
Beneficial effect using above-mentioned further scheme is:It prevents when pipe is built in docking, under upper building pipe Fall and influence to build the mating operation of pipe.
Detailed description of the invention
Fig. 1 is top view of the invention;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is the B view of Fig. 1;
Fig. 4 is the C view of Fig. 1.
In attached drawing, parts list represented by the reference numerals are as follows:
1, the first semi arch shell, the 2, second semi arch shell, the 3, first flange I, the 4, first flange II, the 5, second flange I, the 6, second flange II, the 7, first pin, the 8, first fixture block, the 9, first pull rod, the 10, second pin, the 11, second fixture block, 12, Two pull rods, the 13, first blend stop, the 14, second blend stop, the 15, first reinforcing rib, the 16, second reinforcing rib, 17, baffle.
Specific embodiment
The principle and features of the present invention will be described below with reference to the accompanying drawings, and the given examples are served only to explain the present invention, and It is non-to be used to limit the scope of the invention.
As shown in Figure 1, a kind of building pipe of no screw is connected part, including tube socket and retaining mechanism, the tube socket packet Include the first semi arch shell 1 and the second semi arch shell 2, the first semi arch shell 1 and 2 phase of the second semi arch shell To installation, and the first semi arch shell 1 and the second semi arch shell 2 by the retaining mechanism mutually tense from And clamp the end docking of two building pipes inside it.First semi arch shell, the 1 or described second semi arch shell 2 Inner wall be equipped with for blocking the Semicircular baffle 17 that falls always of building pipe.
The both ends of the first semi arch shell 1 are equipped with the first flange I 3 and the first flange II 4 extended to its two sides, institute The both ends for stating the second semi arch shell 2 are equipped with the second flange I 5 and the second flange II 6 extended to its two sides, and described first Flange I 3 and second flange I 5 are in the same side, and first flange II 4 is in the same side with second flange II 6; The retaining mechanism includes the first retaining mechanism and the second retaining mechanism, and first retaining mechanism tenses first flange I 3 First flange II 4 and second flange II 6 are tensed with second flange I 5, second retaining mechanism to make the Half circular arc shell 1 and the second semi arch shell 2 clamp its internal building pipe.
As shown in Figures 2 and 3, first locking device includes first connecting rod mechanism and cone-shaped and up big and down small first Pin 7, the first connecting rod mechanism include the first fixture block 8 and the first pull rod 9, and first fixture block 8 is in the first flange I vertically 3 sides far from the second flange I 5, one end of first pull rod 9 connect first fixture block 8, first pull rod 9 it is another Outer one end level is hinged to the second semi arch shell 2 after sequentially passing through first flange I 3 and second flange I 5 On side wall, and first pull rod 9 is equipped with the cone to match with first pin 7 far from one end of first fixture block 8 Shape hole, first pin 7, which is downwardly into after the bellmouth of first pull rod 9, tenses the first semi arch shell 1 and the second half The side of circular arc shell 2.On the side wall of the second semi arch shell 2 and the bellmouth of corresponding first pull rod 9 up and down Side is equipped with the second reinforcing rib 16, and the second through-hole is equipped on second reinforcing rib 16, and second through-hole and described first are drawn The axis of the bellmouth of bar 9 is overlapped, and the bellmouth of second through-hole and first pull rod 9 is formed together insertion first The jack of pin 7.The lower end of first pin 7 is equipped with the first blend stop 13 for preventing the first pin 7 from deviating from its jack.
As shown in figure 4, second locking device includes second connecting rod mechanism and cone-shaped and the second up big and down small pin Nail 10, the second connecting rod mechanism include the second fixture block 11 and the second pull rod 12, and second fixture block 11 is convex in second vertically Side of the edge II 6 far from the first flange II 4, one end of second pull rod 12 connect second fixture block 11, and described second draws The other end level of bar 12, which sequentially passes through, is hinged to described the first half after second flange II 6 and first flange II 4 On the side wall of circular arc shell 1, and second pull rod 12 is equipped with and second pin far from one end of second fixture block 11 The bellmouth that nail 10 matches, second pin 10 tense the first semicircle after being downwardly into the bellmouth of second pull rod 12 The other side of arc shell 1 and the second semi arch shell 2.On the side wall of the first semi arch shell 1 and correspond to described second The upper and lower of the bellmouth of pull rod 12 is equipped with the first reinforcing rib 15, and first through hole is equipped on first reinforcing rib 15, described First through hole is overlapped with the axis of the bellmouth of second pull rod 12, and the first through hole and second pull rod 12 Bellmouth is formed together the jack of the second pin 10 of insertion.The lower end of second pin 10 is equipped with for preventing the second pin 10 Deviate from the second blend stop 14 of its jack.
It is described below one and is connected the operating procedure that part gets up building pipe docking by this:
The first semi arch shell 1 and the second semi arch shell 2 are opened first to utmostly so as to smoothly to inserting inside it Enter building pipe, i.e., loosens the first retaining mechanism and the second retaining mechanism, for loosening the first retaining mechanism:First by the first pin Nail 7 proposes a part along the bellmouth of the first pull rod 9 and the through-hole of the first reinforcing rib 15 upwards so that 7 lower end of the first pin compared with Small part moves up, and is opened the first semi arch shell 1 and the second semi arch shell 2 with vacating space, after the completion of aforesaid operations It can the opposite side for opening the first semi arch shell 1 and the second semi arch shell 2.Can equally be loosened in the manner described above Two retaining mechanisms, so as to the other side of opposite the first semi arch of opening shell 1 and the second semi arch shell 2.At this point, It is respectively inserted into a building pipe from the first semi arch shell 1 and 2 both ends of the second semi arch shell, is docked.
After building pipe is inserted into the first semi arch shell 1 and the second semi arch shell 2, need to lock by retaining mechanism The two sides of tight first semi arch shell 1 and the second semi arch shell 2, to tense the first semi arch shell 1 and the second semi arch shell Body 2, so that docking is completed in the end for clamping its internal two buildings pipe.Equally for locking the first retaining mechanism:Directly to It is lower to squeeze into the first pin 7 in the bellmouth of first pull rod 9 and the through-hole of the first reinforcing rib 15 downwards, since the first pin 7 is Up big and down small pyramidal structure can squeeze the first semi arch shell 1 and the second semi arch while the first pin 7 throws jack into The opening of the side both to tense of shell 2.Locking is carried out to the second retaining mechanism according to the method described above and tenses the first semi arch The other side of shell 1 and the second semi arch shell 2 can finally realize the docking of building pipe.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (4)

1. a kind of building pipe of no screw is connected part, which is characterized in that including tube socket and retaining mechanism, the tube socket includes First semi arch shell (1) and the second semi arch shell (2), the first semi arch shell (1) and the second semi arch shell Body (2) is opposite to be installed, and the first semi arch shell (1) and the second semi arch shell (2) pass through the locking machine Structure mutually tenses to clamp the end docking of its internal two buildings pipe;
The both ends of the first semi arch shell (1) are equipped with the first flange I (3) and the first flange II (4) extended to its two sides, The both ends of the second semi arch shell (2) are equipped with the second flange I (5) and the second flange II (6) extended to its two sides, and First flange I (3) and second flange I (5) are in the same side, first flange II (4) and second flange II (6) are in the same side;The retaining mechanism includes the first retaining mechanism and the second retaining mechanism, and first retaining mechanism is drawn Tight first flange I (3) and second flange I (5), second retaining mechanism tension, first flange II (4) and Second flange II (6) is to make the first semi arch shell (1) and the second semi arch shell (2) clamp its internal building Pipe;
First retaining mechanism includes first connecting rod mechanism and cone-shaped and up big and down small the first pin (7), and described first Link mechanism includes the first fixture block (8) and the first pull rod (9), and first fixture block (8) is separate in the first flange I (3) vertically One end of the side of second flange I (5), first pull rod (9) connects first fixture block (8), first pull rod (9) Other end level is hinged to second semi arch after sequentially passing through first flange I (3) and second flange I (5) On the side wall of shell (2), and first pull rod (9) is equipped with and first pin far from one end of first fixture block (8) The bellmouth that nail (7) matches, first pin (7) tense first after being downwardly into the bellmouth of first pull rod (9) The side of semi arch shell (1) and the second semi arch shell (2);
Second retaining mechanism includes second connecting rod mechanism and cone-shaped and up big and down small the second pin (10), and described second Link mechanism includes the second fixture block (11) and the second pull rod (12), and second fixture block (11) is in the second flange II (6) vertically Side far from the first flange II (4), one end of second pull rod (12) connect second fixture block (11), and described second draws The other end level of bar (12) sequentially pass through be hinged to after second flange II (6) and first flange II (4) it is described On the side wall of first semi arch shell (1), and second pull rod (12) is equipped with far from one end of second fixture block (11) The bellmouth to match with second pin (10), second pin (10) are downwardly into the cone of second pull rod (12) The other side of the first semi arch shell (1) and the second semi arch shell (2) is tensed behind shape hole.
2. building pipe according to claim 1 is connected part, which is characterized in that the first semi arch shell (1) On side wall and the upper and lower of the bellmouth of corresponding second pull rod (12) is equipped with the first reinforcing rib (15), reinforces described first Muscle (15) is equipped with first through hole, and the first through hole is overlapped with the axis of the bellmouth of second pull rod (12), and institute The bellmouth for stating first through hole and second pull rod (12) is formed together the jack for being inserted into the second pin (10);
On the side wall of the second semi arch shell (2) and the upper and lower of the bellmouth of corresponding first pull rod (9) is equipped with the Two reinforcing ribs (16) are equipped with the second through-hole, second through-hole and first pull rod (9) on second reinforcing rib (16) The axis of bellmouth be overlapped, and the bellmouth of second through-hole and first pull rod (9) is formed together insertion first The jack of pin (7).
3. building pipe according to claim 1 or 2 is connected part, which is characterized in that the lower end of first pin (7) Equipped with for preventing the first pin (7) from deviating from the first blend stop (13) of its jack, the lower end of second pin (10), which is equipped with, to be used In the second blend stop (14) for preventing the second pin (10) from deviating from its jack.
4. building pipe according to claim 3 is connected part, which is characterized in that the first semi arch shell (1) or The inner wall of the second semi arch shell (2) is equipped with the Semicircular baffle (17) to fall always for blocking building pipe.
CN201611095908.0A 2016-12-02 2016-12-02 A kind of building pipe of no screw is connected part Active CN106678138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611095908.0A CN106678138B (en) 2016-12-02 2016-12-02 A kind of building pipe of no screw is connected part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611095908.0A CN106678138B (en) 2016-12-02 2016-12-02 A kind of building pipe of no screw is connected part

Publications (2)

Publication Number Publication Date
CN106678138A CN106678138A (en) 2017-05-17
CN106678138B true CN106678138B (en) 2018-11-30

Family

ID=58867565

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611095908.0A Active CN106678138B (en) 2016-12-02 2016-12-02 A kind of building pipe of no screw is connected part

Country Status (1)

Country Link
CN (1) CN106678138B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2267296Y (en) * 1996-06-21 1997-11-12 中外合作大连仁发建筑模具有限公司 Clamp for connecting two pipes
CN2856413Y (en) * 2005-10-11 2007-01-10 程刚 Special collar clamp for oil well detection
CN203394749U (en) * 2013-08-21 2014-01-15 三一汽车制造有限公司 Concrete piston connection device and concrete pump
CN103742724A (en) * 2014-01-02 2014-04-23 象山华鹰塑料工程有限公司 Connecting clamp for cooling water pipe of automobile
CN105626862A (en) * 2016-03-30 2016-06-01 永胜机械工业(昆山)有限公司 Quick opening device for pressure container
CN105715886A (en) * 2016-04-22 2016-06-29 安徽捷迅光电技术有限公司 Heavy air pipe hoop

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5408812B2 (en) * 2012-03-16 2014-02-05 株式会社スター精機 Pipe joint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2267296Y (en) * 1996-06-21 1997-11-12 中外合作大连仁发建筑模具有限公司 Clamp for connecting two pipes
CN2856413Y (en) * 2005-10-11 2007-01-10 程刚 Special collar clamp for oil well detection
CN203394749U (en) * 2013-08-21 2014-01-15 三一汽车制造有限公司 Concrete piston connection device and concrete pump
CN103742724A (en) * 2014-01-02 2014-04-23 象山华鹰塑料工程有限公司 Connecting clamp for cooling water pipe of automobile
CN105626862A (en) * 2016-03-30 2016-06-01 永胜机械工业(昆山)有限公司 Quick opening device for pressure container
CN105715886A (en) * 2016-04-22 2016-06-29 安徽捷迅光电技术有限公司 Heavy air pipe hoop

Also Published As

Publication number Publication date
CN106678138A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN108431340A (en) For the connector of connection structure component, the truss for being provided with the connector, correlation technique and purposes
CN104856596B (en) A kind of gondola water faucet peg for improving mounting structure
CN206277093U (en) Steel reinforcement cage spreading abutment sleeve
CN106678138B (en) A kind of building pipe of no screw is connected part
CN207570901U (en) Bellows tension test fixture
CN110273649A (en) A kind of bored concrete pile broaching equipment and reaming construction method
CN206205142U (en) A kind of truss attachment structure
CN206854915U (en) Auxiliary fixing device is welded in a kind of winding pipe enlarging
CN106523491B (en) A kind of building pipe steering linkage member of no screw
CN107061441A (en) A kind of building pipe cross connecting piece without screw
CN105757374B (en) A kind of attachment device
CN209618675U (en) A kind of down tube handling apparatus
CN210577616U (en) Protection device for mounting wire pipe in embedded construction of building electrical casing plugging point positioner
CN204780886U (en) A bayonet joint for joint formula connecting piece
CN203821858U (en) Novel concrete tumbling barrel
CN206555570U (en) Exterior wall reserves sleeve pipe waterproof capping tools
CN205559892U (en) Grease proofing cigarette flows backward device and installation adapter thereof
CN207830692U (en) It is a kind of to extend and natural gas line valve mandril easy to carry
CN207437985U (en) A kind of tobacco factory's equipment cleaning care device
CN206830584U (en) Connecting device
CN207283056U (en) A kind of cable connection auxiliary drawing fixing device
CN207599151U (en) A kind of fixed pneumatic pick rubber hose coupling loosens dynamic set
KR200433131Y1 (en) Terminal for A Elastic String Fixing of Tent Pole
CN205544124U (en) 10 kilovolt fastener for distribution lines
CN208304953U (en) A kind of valve well internal valve apparatus for door-opening

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 225300 building 30, Xianglong home, Mingzhu street, medical high tech Zone, Taizhou City, Jiangsu Province

Patentee after: Xiong Jing

Address before: The Guangxi Zhuang Autonomous Region Laibin City District 546100 Wan Xiang Wai near the village committee Malaysia Village No. 8

Patentee before: Xiong Jing

CP02 Change in the address of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200410

Address after: No.88 Dingsheng Road, Changjiang town (Rugao port area), Rugao City, Nantong City, Jiangsu Province 226532

Patentee after: NANTONG YANJIANG PIPE Co.,Ltd.

Address before: 225300 building 30, Xianglong home, Mingzhu street, medical high tech Zone, Taizhou City, Jiangsu Province

Patentee before: Xiong Jing

TR01 Transfer of patent right