CN106677736A - Movable shaft dynamic water exploration and plugging device - Google Patents

Movable shaft dynamic water exploration and plugging device Download PDF

Info

Publication number
CN106677736A
CN106677736A CN201710037084.XA CN201710037084A CN106677736A CN 106677736 A CN106677736 A CN 106677736A CN 201710037084 A CN201710037084 A CN 201710037084A CN 106677736 A CN106677736 A CN 106677736A
Authority
CN
China
Prior art keywords
packer
oil pipe
shaft dynamic
pit shaft
blocking device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710037084.XA
Other languages
Chinese (zh)
Inventor
祝昱
祝长友
张荣荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Win Win Petroleum Technology Co Ltd
Original Assignee
Tianjin Win Win Petroleum Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Win Win Petroleum Technology Co Ltd filed Critical Tianjin Win Win Petroleum Technology Co Ltd
Priority to CN201710037084.XA priority Critical patent/CN106677736A/en
Publication of CN106677736A publication Critical patent/CN106677736A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • E21B33/126Packers; Plugs with fluid-pressure-operated elastic cup or skirt
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a movable shaft dynamic water exploration and plugging device which comprises a sleeve, an oil tube and an injection pump. The oil tube is coaxially installed in the sleeve. The injection pump is installed on the upper portion inside the oil tube. An upper external packer and a lower external packer are vertically and fixedly arranged in the middle of the outer edge of the oil tube in reversed directions. An upper internal packer and a lower internal packer are fixedly and symmetrically installed at the outer edge of the portion, located between the upper external packer and the lower external packer, of the oil tube and are arranged oppositely. A pair of by-pass ports are formed in the wall of the portion, located between the upper internal packer and the lower internal packer, of the oil tube. The outer edge of the upper external packer, the outer edge of the lower external packer, the outer edge of the upper internal packer and the outer edge of the lower internal packer all make contact with the inner wall of the sleeve. Perforated holes are formed in the middle of the sleeve. A cup packer and the injection pump form a water exploration unit, and both water exploration and water plugging can be achieved by a primary tubular column. The lifting-type movable tubular column water exploration and plugging device is aligned with a well section of a stratum fast, and is convenient and easy to use and high in practicability.

Description

Portable pit shaft dynamic water detection water blocking device
Technical field
The invention belongs to oil extraction in oil field technical field, is a kind of portable pit shaft water detection water blocking device specifically.
Background technology
It is increasingly finer to oil reservoir description as In Oil Field Exploration And Development technology is improved constantly, particularly to the water outlet in oil field Layer description lacks visual understanding.If with layer being water layer in upper or oil reservoir upper with water, tiny short layer is even more and is difficult to confirm. it is right In mixed layer exploitation, the water velocity that all huge discharge extract, but water layer at present goes out is fast, and the oil flow rate degree of oil reservoir is slow, and water layer pressure Power is high, and formation pressure is low, and water is pushed back force feed layer again, and water enters polluted reservoir after oil reservoir, oil and can't get out, water detection water blockoff into For link important in oil recovery process.There is presently no a set of intuitively water detection water blocking device for scene application.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of portable pit shaft dynamic easy to use is looked for Water blocking water installations.
What the solution of the present invention was realized in:
A kind of portable pit shaft dynamic water detection water blocking device, including sleeve pipe, oil pipe and ejector pump, it is coaxial in described sleeve pipe Oil pipe is installed, the oil pipe internal upper part installs ejector pump, the outer rim middle part of the oil pipe is fixedly mounted with upper and lower spaced upper external packer With lower external packer, external packer is opening up on this, lower external packer it is opening down, between the upper and lower external packer Oil pipe outer rim be fixedly mounted with symmetrically arranged interior packer and lower interior packer, two upper and lower interior packers are oppositely arranged, A pair of by-pass prots, the upper and lower external packer and upper and lower interior packer are formed with tubing wall between the upper and lower interior packer Outer rim it is in sealing contact with internal surface of sleeve pipe, certain gap is left between the edge of the upper and lower interior packer, in described sleeve pipe Portion is provided with multigroup spaced perforation for leading to stratum.
And, the upper and lower external packer is leather cup structure made by elastomeric material, and the upper and lower interior packer is similarly Leather cup structure made by rubber.
And, bottom in the oil pipe is installed and the steel ball for moving up and down is installed in ball seat, the ball seat, the ball seat it is upper, Diameter of the diameter of bottom less than steel ball.
And, the bottom of the oil pipe is bell-mouth structure of air.
And, the upper external packer, lower external packer, upper interior packer and lower interior packer are spaced two It is individual.
And, hydraulic anchor is installed at the oil pipe top.
And, the model PSB-60 type of the ejector pump.
And, the distance between described upper and lower external packer is 30cm.
Advantages of the present invention and good effect are:
1st, water detection device is constituted by the packer of leather cup structure and ejector pump, one time tubing string is completed, not only can water detection but also can Water blockoff.
2nd, pulling movable tubing string water detection water blocking device rapid alignment stratum well section, facilitates simple and direct, practical.
3rd, the separating surface of water layer, oil reservoir, convenient to operation, raising work can be quickly and accurately found out by this device Efficiency.
Description of the drawings
Fig. 1 is the sectional view of the present invention;
Fig. 2 is the working state schematic representation of the present invention;
Fig. 3 is water blockoff structure chart of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and by specific embodiment the invention will be further described.
A kind of portable pit shaft dynamic water detection water blocking device, as shown in figure 1, including sleeve pipe 2, oil pipe 1 and ejector pump 3, Oil pipe is co-axially mounted in described sleeve pipe, the oil pipe internal upper part installs ejector pump, the outer rim middle part of the oil pipe is fixedly mounted with upper and lower interval and sets The upper external packer 4 put and lower external packer 8, the upper and lower external packer be leather cup structure made by elastomeric material, covering on this Every the opening up of device, lower external packer it is opening down, the oil pipe outer rim between the upper and lower external packer is fixedly mounted with and is symmetrical arranged Upper interior packer 5 and lower interior packer 7, the upper and lower interior packer is similarly leather cup structure made by rubber, this two it is upper, The leather cup opening of packer is oppositely arranged in lower, is formed with a pair of by-pass prots 6 on the tubing wall between the upper and lower interior packer, institute The outer rim for stating upper and lower external packer and upper and lower interior packer is in sealing contact with internal surface of sleeve pipe, the side of the upper and lower interior packer Certain gap is left between edge, described sleeve pipe middle part is provided with multigroup spaced perforation 13 for leading to stratum.
In the present embodiment, the bottom in the oil pipe is installed and the steel ball 9 that can be moved up and down is installed in ball seat 10, the ball seat, The diameter of the upper and lower part of the ball seat prevents steel ball from deviating from less than the diameter of steel ball.
The bottom of the oil pipe is the structure of horn mouth 11, for fish finding top.
The upper external packer, lower external packer, upper interior packer and lower interior packer are spaced two, have Effect improves sealing property.
Hydraulic anchor 14 is installed at the oil pipe top, and its effect is to fix oil pipe, prevents oil pipe from sliding.
The effect of the steel ball is the sealing property of the lower external packer of detection, because oil pipe is longer and in the process of plug-in-sleeve In rub always with internal surface of sleeve pipe, if lower external packer is poorly sealed, the possible tubing string is done over again.
The model PSB-60 type of ejector pump.
The distance between upper and lower external packer A is 30cm, and the length at A ends can be adjusted according to practical situation.
The present invention using method be:
Oil pipe is slowly lowered into packer in sleeve pipe and passes through perforation 13, then slowly lifts oil pipe, treats packer A alignedly After layer, start ejector pump and start working so that negative pressure is produced in oil pipe, when upper external packer 4 and lower external packer 8 alignment perforation During well section position, then the liquid of jacket exterior is sucked in oil pipe, as shown in Fig. 2 the direction of arrow is the flow direction of liquid in Fig. 2, The liquid in oil pipe is retracted in ground tanks by ejector pump, staff can conveniently learn be extracted into herein be oil or Water.
If oil reservoir, lifting oil pipe can be continued up, carry out water detection, paragraph by paragraph test.
The water blockoff flow process of this device is:
Ejector pump pump core is washed out, blocking agent is clamp-oned from oil pipe, by by-pass prot 6, in upper interior packer 5 and lower interior packer In the presence of 7, pressure-bearing blocking agent is squeezed into bottom water blockoff, and the direction of arrow is water shutoff agent water blockoff direction in Fig. 3.
It is emphasized that embodiment of the present invention is illustrative, rather than it is determinate, therefore present invention bag The embodiment for being not limited to described in specific embodiment is included, it is every by those skilled in the art's technology according to the present invention scheme The other embodiment for drawing, also belongs to the scope of protection of the invention.

Claims (8)

1. a kind of portable pit shaft dynamic water detection water blocking device, including sleeve pipe, oil pipe and ejector pump, coaxially pacify in described sleeve pipe Charge of oil pipe, the oil pipe internal upper part installs ejector pump, it is characterised in that:The outer rim middle part of the oil pipe is fixedly mounted with upper and lower spaced Upper external packer and lower external packer, external packer is opening up on this, lower external packer it is opening down, this is upper and lower outer Oil pipe outer rim between packer is fixedly mounted with symmetrically arranged interior packer and lower interior packer, this two upper and lower interior packers Be oppositely arranged, be formed with a pair of by-pass prots on the tubing wall between the upper and lower interior packer, the upper and lower external packer and it is upper, The outer rim of packer is in sealing contact with internal surface of sleeve pipe in lower, and certain gap is left between the edge of the upper and lower interior packer, Described sleeve pipe middle part is provided with multigroup spaced perforation for leading to stratum.
2. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:The upper and lower covering It is leather cup structure made by elastomeric material every device, the upper and lower interior packer is similarly leather cup structure made by rubber.
3. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:Under in the oil pipe Portion installs and the steel ball for moving up and down is installed in ball seat, the ball seat, and the diameter of the upper and lower part of the ball seat is less than the diameter of steel ball.
4. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:The lower end of the oil pipe Portion is bell-mouth structure of air.
5. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:The upper outer packing Device, lower external packer, upper interior packer and lower interior packer are spaced two.
6. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:Oil pipe top peace Dress hydraulic anchor.
7. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:The type of the ejector pump Number be PSB-60 types.
8. portable pit shaft dynamic water detection water blocking device according to claim 1, it is characterised in that:The upper and lower covering Every the distance between device be 30cm.
CN201710037084.XA 2017-01-19 2017-01-19 Movable shaft dynamic water exploration and plugging device Pending CN106677736A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710037084.XA CN106677736A (en) 2017-01-19 2017-01-19 Movable shaft dynamic water exploration and plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710037084.XA CN106677736A (en) 2017-01-19 2017-01-19 Movable shaft dynamic water exploration and plugging device

Publications (1)

Publication Number Publication Date
CN106677736A true CN106677736A (en) 2017-05-17

Family

ID=58860659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710037084.XA Pending CN106677736A (en) 2017-01-19 2017-01-19 Movable shaft dynamic water exploration and plugging device

Country Status (1)

Country Link
CN (1) CN106677736A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397160A (en) * 2018-03-17 2018-08-14 赵金庭 Floating production technique tubing string
CN112983335A (en) * 2021-03-09 2021-06-18 大庆市天德忠石油科技有限公司 Water plugging matching combination tool
CN113107473A (en) * 2021-04-01 2021-07-13 陕西靖瑞能源科技股份有限公司 Intelligent water finding and blocking method and system for horizontal well

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4082298A (en) * 1975-11-19 1978-04-04 Lawrence Sanford Inflatable packer and valve mechanism therefor
CN2089524U (en) * 1990-07-18 1991-11-27 大港石油管理局钻采工艺研究院 Underwell jet pump sampler
CN2479211Y (en) * 2001-05-17 2002-02-27 新疆石油管理局采油工艺研究院 Water finding pipe string
CN1490494A (en) * 2003-09-19 2004-04-21 吴孝喜 Cavity water sampling and generating method for oil well in production
CN1936269A (en) * 2006-10-17 2007-03-28 新疆石油管理局采油工艺研究院 Three-layer water-searching pipe column for oil-pumping well in oil field and water-searching method
CN101012737A (en) * 2007-02-08 2007-08-08 兰群 Switch of output increasing, water searching and blocking method for oil well in production
US20090084550A1 (en) * 2007-10-01 2009-04-02 Baker Hughes Incorporated Water Swelling Rubber Compound for Use In Reactive Packers and Other Downhole Tools
CN201546710U (en) * 2009-11-04 2010-08-11 中国石油天然气股份有限公司 Segmented water exploration test pipe column for casing completion horizontal well
CN201778767U (en) * 2010-06-25 2011-03-30 中国石油天然气股份有限公司 Integrated pipe column for finding water, blocking water, acidifying and breaking blockage
CN102587896A (en) * 2012-03-15 2012-07-18 中国石油天然气股份有限公司 Mechanical water-finding water-plugging channeling-checking composite pipe column
CN202348249U (en) * 2011-11-23 2012-07-25 西安思坦仪器股份有限公司 Underground layered oil extraction controlling device
CN102953725A (en) * 2012-11-16 2013-03-06 中国石油天然气股份有限公司 Horizontal well logging dynamic lifting device
CN104121013A (en) * 2013-04-25 2014-10-29 中国石油化工股份有限公司 Water exploration device for horizontal well and method for determining water outlet position through water exploration device
CN204371316U (en) * 2014-12-15 2015-06-03 中国石油天然气股份有限公司 Horizontal well water exploration pipe column for industrial machine swabbing and draining
CN104963662A (en) * 2015-06-11 2015-10-07 中国石油天然气股份有限公司 Oil well throttling self-regulation water pipe column and regulation method
CN204827341U (en) * 2015-06-24 2015-12-02 天津福民石油机械设备技术有限公司 Crowded plugging device of annotating
CN205225206U (en) * 2015-12-10 2016-05-11 陕西华晨石油科技有限公司 A pumping device for beam -pumping unit well surveying well
CN206409209U (en) * 2017-01-19 2017-08-15 天津昱利赢石油科技有限公司 A kind of dynamic water detection water blocking device of portable pit shaft

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4082298A (en) * 1975-11-19 1978-04-04 Lawrence Sanford Inflatable packer and valve mechanism therefor
CN2089524U (en) * 1990-07-18 1991-11-27 大港石油管理局钻采工艺研究院 Underwell jet pump sampler
CN2479211Y (en) * 2001-05-17 2002-02-27 新疆石油管理局采油工艺研究院 Water finding pipe string
CN1490494A (en) * 2003-09-19 2004-04-21 吴孝喜 Cavity water sampling and generating method for oil well in production
CN1936269A (en) * 2006-10-17 2007-03-28 新疆石油管理局采油工艺研究院 Three-layer water-searching pipe column for oil-pumping well in oil field and water-searching method
CN101012737A (en) * 2007-02-08 2007-08-08 兰群 Switch of output increasing, water searching and blocking method for oil well in production
US20090084550A1 (en) * 2007-10-01 2009-04-02 Baker Hughes Incorporated Water Swelling Rubber Compound for Use In Reactive Packers and Other Downhole Tools
CN201546710U (en) * 2009-11-04 2010-08-11 中国石油天然气股份有限公司 Segmented water exploration test pipe column for casing completion horizontal well
CN201778767U (en) * 2010-06-25 2011-03-30 中国石油天然气股份有限公司 Integrated pipe column for finding water, blocking water, acidifying and breaking blockage
CN202348249U (en) * 2011-11-23 2012-07-25 西安思坦仪器股份有限公司 Underground layered oil extraction controlling device
CN102587896A (en) * 2012-03-15 2012-07-18 中国石油天然气股份有限公司 Mechanical water-finding water-plugging channeling-checking composite pipe column
CN102953725A (en) * 2012-11-16 2013-03-06 中国石油天然气股份有限公司 Horizontal well logging dynamic lifting device
CN104121013A (en) * 2013-04-25 2014-10-29 中国石油化工股份有限公司 Water exploration device for horizontal well and method for determining water outlet position through water exploration device
CN204371316U (en) * 2014-12-15 2015-06-03 中国石油天然气股份有限公司 Horizontal well water exploration pipe column for industrial machine swabbing and draining
CN104963662A (en) * 2015-06-11 2015-10-07 中国石油天然气股份有限公司 Oil well throttling self-regulation water pipe column and regulation method
CN204827341U (en) * 2015-06-24 2015-12-02 天津福民石油机械设备技术有限公司 Crowded plugging device of annotating
CN205225206U (en) * 2015-12-10 2016-05-11 陕西华晨石油科技有限公司 A pumping device for beam -pumping unit well surveying well
CN206409209U (en) * 2017-01-19 2017-08-15 天津昱利赢石油科技有限公司 A kind of dynamic water detection water blocking device of portable pit shaft

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐仁栋: "《井下作业班长》", 30 May 1993, 石油工业出版社 *
崔文昊: "低渗透油田水平井高效找水技术研究与应用", 《石油化工应用> *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108397160A (en) * 2018-03-17 2018-08-14 赵金庭 Floating production technique tubing string
CN112983335A (en) * 2021-03-09 2021-06-18 大庆市天德忠石油科技有限公司 Water plugging matching combination tool
CN112983335B (en) * 2021-03-09 2021-12-14 大庆市天德忠石油科技有限公司 Water plugging matching combination tool
CN113107473A (en) * 2021-04-01 2021-07-13 陕西靖瑞能源科技股份有限公司 Intelligent water finding and blocking method and system for horizontal well
CN113107473B (en) * 2021-04-01 2024-02-13 陕西靖瑞能源科技股份有限公司 Intelligent water shutoff finding method and system for horizontal well

Similar Documents

Publication Publication Date Title
CN103452525B (en) Gas takes out fixed stopper and using method thereof
CN106837294B (en) Super-hydrophobic downhole separation system and its single-well injection-production process pipe string
CN106677736A (en) Movable shaft dynamic water exploration and plugging device
CN106050199A (en) Synthetic drainage and gas production device and method
CN104481489B (en) Coiled tubing fracturing and well completion integrated process method for gas well vertical well
CN205330612U (en) Hole sealing device for gas extraction
CN104121013A (en) Water exploration device for horizontal well and method for determining water outlet position through water exploration device
CN204753611U (en) Deep basal pit pressure -bearing water precipitation gas well gas bag plugging device
CN104120997A (en) Pipe string for horizontal well
CN112253070A (en) Method for eliminating outburst by sectional seam-making and coal-washing of horizontal well in linkage mode of top and bottom of thick coal seam
CN203948037U (en) Sectional quantitative injection pipe column
CN208456572U (en) Packaged type hydraulic fracturing and injection hole sealing integrated apparatus
CN206409209U (en) A kind of dynamic water detection water blocking device of portable pit shaft
CN204252929U (en) Oil production water shutoff pipe column
CN207004498U (en) Infinite stages switching sliding sleeve fracturing tool
CN203214025U (en) Layered oil extraction pipe string
CN104632195B (en) Gas lift flow aiding horizontal well water exploration pipe column and method
CN203420679U (en) Large-displacement composite lifting system for deep well and ultra-deep well
CN206158709U (en) Support formula water injection string
CN204175273U (en) Fracturing sucker-rod pump integrated tubular column
CN204041042U (en) A kind of coiled tubing drag fracturing tubing string
CN109296336B (en) Sliding sleeve type blocking device and method for speed pipe column
CN204040992U (en) Pipe string for horizontal well
CN209277931U (en) A kind of this coal bed gas extraction of underground coal mine drilling integrated apparatus
CN210087293U (en) Throwing type soluble bridge plug and well cementation sliding sleeve matched with bridge plug for use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170517