CN106677391A - Composite full-implicit frame heat insulation curtain wall - Google Patents

Composite full-implicit frame heat insulation curtain wall Download PDF

Info

Publication number
CN106677391A
CN106677391A CN201611249576.7A CN201611249576A CN106677391A CN 106677391 A CN106677391 A CN 106677391A CN 201611249576 A CN201611249576 A CN 201611249576A CN 106677391 A CN106677391 A CN 106677391A
Authority
CN
China
Prior art keywords
wall
curtain wall
safety glass
aluminium alloy
alloy bone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611249576.7A
Other languages
Chinese (zh)
Other versions
CN106677391B (en
Inventor
雷忠平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Kelante Aluminum Industry Co ltd
Original Assignee
Anhui Ke Lante Aluminum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Ke Lante Aluminum Co Ltd filed Critical Anhui Ke Lante Aluminum Co Ltd
Priority to CN201611249576.7A priority Critical patent/CN106677391B/en
Publication of CN106677391A publication Critical patent/CN106677391A/en
Application granted granted Critical
Publication of CN106677391B publication Critical patent/CN106677391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/967Details of the cross-section of the mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a composite full-implicit frame heat insulation curtain wall which comprises an aluminum alloy keel. An inner groove cavity is formed in the bottom of a bottom rack of the aluminum alloy keel in an upward concave mode. A rectangular cavity of the inner groove cavity is internally provided with a force application strip-shaped block. An outer thread is arranged on the outer side wall of a screw body of a lifting screw, and the screw body of the lifting screw is sleeved with an adjustment nut. Sealing filling adhesives and aluminum seal parting strips are arranged at the positions, at the left end and the right end of an inverted T-shaped mounting clamping block, in an interlayer inner cavity of a tempered glass body. Rapid cooling strips are inserted between upper triangular clamping grooves and lower triangular clamping grooves corresponding to the upper triangular clamping grooves. An auxiliary steel skeleton is further arranged outside the rack of the aluminum alloy keel. By adoption of the composite full-implicit frame heat insulation curtain wall, the problem that traditional tempered glass cannot be stably clamped by a whole curtain wall in the construction process is quite well solved, the use safety is ensured, the composited keel rack is more convenient to mount and dismount, and the working efficiency is further improved.

Description

The compound complete hidden frame heat-insulating curtain wall of one kind
Technical field
The present invention relates to building curtain wall correlative technology field, specifically a kind of compound complete hidden frame heat-insulating curtain wall.
Background technology
Curtain wall is the Light Wall with decorative effect that modern large-scale and skyscraper is commonly used, and it is by panel and supporting knot Structure system composition, there can be certain displacement ability with respect to agent structure or itself have certain deformability, do not undertake agent structure The building external envelope structure for being acted on or decorative structure;Curtain wall is replaced using various powerful, slim and graceful, attractive in appearance construction materials The exterior wall engineering method that traditional masonry or window wall are combined, is to be enclosed in the periphery of main structure and to reach whole building attractive in appearance, is used Function perfects and safe exterior wall engineering method.In short, being that building is put on into a beautiful coat.But traditional building curtain Wall in installation process, the relatively complicated complexity of the course of work, it is difficult to ensure that safety glass whole curtain wall clamping in work progress Stability problem, once fixed stock is qualified, will likely result in the security performance during use, initiation potential, and in curtain wall During prolonged use, the amount of heat saved bit by bit in its inner chamber is difficult to distribute, and causes the temperature of whole glass fast The rising of speed, on its standard value, the service life for causing glass is severely impacted, if using the curtain of complex form The same disassembly efficiency of wall construction is a problem, and using effect is bad, needs to be improved.
The content of the invention
It is an object of the invention to provide a kind of compound complete hidden frame heat-insulating curtain wall, to solve above-mentioned background technology in propose Problem.
For achieving the above object, the present invention provides following technical scheme:
The compound complete hidden frame heat-insulating curtain wall of one kind, including aluminium alloy bone dragon, the bottom support body bottom of the aluminium alloy bone dragon to The upper longitudinal section for having indent vallecular cavity, the upper cavity of the indent vallecular cavity that is recessed is set to rectangular shape, the square of the indent vallecular cavity Shape inside cavity is provided with force bar blocks, and the block lower surface central position of the force bar blocks is fixedly installed downwards Lifting screw, is provided with external screw thread and regulation is arranged with the body of rod of lifting screw on the body of rod lateral wall of the lifting screw Nut, offers the female thread being mutually adapted with external screw thread on the through hole medial wall of the adjusting nut, the adjusting nut More than the nose-circle diameter length of round platform, this lower section of the aluminium alloy bone dragon is provided with safety glass body, institute to diameter length State and containing cavity is offered on the underface glass plate of lifting screw on safety glass body and in the inside of containing cavity to tempering glass Inverted T-shaped is provided with the interlayer of glass body fixture block is installed, the body of rod bottom insertion inverted T-shaped of the lifting screw is installed in fixture block, Cushion seal pad is additionally provided with position between the downside wall and the upper surface of safety glass body of the aluminium alloy bone dragon, it is described Sealing filling glue and aluminum envelope are provided with the interlayer inner chamber of safety glass body, at the left and right end positions of inverted T-shaped installation fixture block Parting bead, the inverted T-shaped install the downside wall of fixture block and, be also horizontally disposed between the interlayer downside wall of safety glass body and have upper peace Be installed plate, and at the underface opening for installing clamp on the downside wall of the safety glass body in correspondence lower installation is fixedly installed The plate body both sides of clamp, the upper installation clamp and lower installation clamp offer respectively a triangle draw-in groove, the triangle card of top Quick heat radiating bar is inserted between groove and the triangle draw-in groove of its corresponding lower section, the quick heat radiating bar in left side and the quick of right side dissipate Also it is disposed with three groups of strengthened connection bars between hot bar from top to bottom, outside the support body of the aluminium alloy bone dragon steel is additionally provided with System auxiliary skeleton, the steel aids in also being extended internally on top side inwall, inner left wall and the right side inwall of skeleton fixed pre- Tight frame, both sides plate body and the side wall corresponding position of aluminium alloy bone dragon of the fixed pretension frame are consolidated both by fastening bolt It is scheduled on together.
As further scheme of the invention:The lower chamber longitudinal section of the indent vallecular cavity is set to truncated conical shape and round platform Top circular diameter length it is long less than bottom circular diameter.
As further scheme of the invention:The inverted T-shaped install the block upper end of fixture block cave inward have blind hole and The female thread being mutually adapted with external screw thread is provided with the medial wall of blind hole.
As further scheme of the invention:The bottom fixed board of the fixed pretension frame outside imperial with aluminium alloy bone Damping pad is also placed between wall.
As further scheme of the invention:The damping pad is made using elastomeric material.
Compared with prior art, the invention has the beneficial effects as follows:The present invention is by the way that traditional aluminium alloy bone dragon is modified to Form with indent vallecular cavity and in the lumen adaptation have additional force bar blocks and lifting screw, when whole part is according to predetermined Orientation installation after, master worker can be by constantly rotating adjusting nut, because adjusting nut is that adaptation is set in On lifting screw, and the bottom of lifting screw has insertion inverted T-shaped to install in fixture block, you can so that lifting screw is constantly declining While drag force bar blocks slowly move down, and due to exert a force bar blocks just be arranged on rectangle cavity in, you can Aluminium alloy bone dragon is driven to realize downward slow movement, until adjusting nut moves to two medial walls for being just stuck in round platform inner chamber Upper stopping, and then whole aluminium alloy bone dragon completely can be fixed the safety glass body of lower section, solve well Traditional safety glass unstable problem of whole curtain wall clamping in work progress, it is ensured that safety in utilization;And in left and right The quick heat radiating bar and three groups of strengthened connection bars that both sides are set up can also be to producing in curtain wall inner chamber during long-time use Amount of heat played the effect sufficiently remove, it is to avoid the dress that traditional approach not distributed not go out and caused because of the amount of heat saved bit by bit The damage put, effectively extends the service life of whole curtain wall;Simultaneously in the form of steel combined with aluminum is fixed, not only further solve The not high problem of the stability maintenance of conventional curtain wall of having determined, and the keel shoe enhanced convenience installing/dismounting after being combined is caused, Work efficiency is further strengthened, and using effect is more excellent, meets higher current curtain wall use requirement.
Description of the drawings
Fig. 1 is a kind of structural representation of compound complete hidden frame heat-insulating curtain wall.
In figure:1- aluminium alloys bone dragon, 2- indent vallecular cavities, 3- force bar blocks, 4- lifting screws, 5- adjusting nuts, 6- delays Sealing gasket is rushed, 7- inverted T-shapeds install fixture block, and 8- sealing filling glue, 9- aluminum packing bar to be installed on 10- and install clamp under clamp, 11-, 12- triangle draw-in grooves, 13- quick heat radiating bars, 14- strengthened connection bars, 15- safety glass bodies, 16- steels auxiliary skeleton, 17- is solid Determine pretension frame, 18- damping pads, 19- fastening bolts.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Fig. 1 is referred to, in the embodiment of the present invention, including aluminium alloy bone dragon 1, the bottom support body bottom of the aluminium alloy bone dragon 1 Portion is recessed upwards indent vallecular cavity 2, and the longitudinal section of the upper cavity of the indent vallecular cavity 2 is set to rectangular shape, the inner groovy The lower chamber longitudinal section in chamber 2 is set to truncated conical shape and the top circular diameter length of round platform is long less than bottom circular diameter, the indent The rectangular cavities of vallecular cavity 2 be internally provided with force bar blocks 3, it is described force bar blocks 3 block lower surface central position to Under be fixedly installed lifting screw 4, external screw thread is provided with the body of rod lateral wall of the lifting screw 4 and in lifting screw 4 Adjusting nut 5 is arranged with the body of rod, the interior spiral shell being mutually adapted with external screw thread is offered on the through hole medial wall of the adjusting nut 5 Stricture of vagina, the diameter length of the adjusting nut 5 sets more than the nose-circle diameter length of round platform below this of the aluminium alloy bone dragon 1 Safety glass body 15 is equipped with, containing cavity is offered on the underface glass plate of lifting screw 4 on the safety glass body 15 And inverted T-shaped installation fixture block 7 is provided with interlayer of the inside of containing cavity to safety glass body 15, the inverted T-shaped installs card The block upper end of block 7 caves inward and blind hole and the female thread being mutually adapted with external screw thread is provided with the medial wall of blind hole, The body of rod bottom insertion inverted T-shaped of the lifting screw 4 is installed in fixture block 7, the downside wall and safety glass of the aluminium alloy bone dragon 1 Cushion seal pad 6 is additionally provided between the upper surface of body 15 at position, in the interlayer inner chamber of the safety glass body 15, is fallen T-shaped is installed and sealing filling glue 8 and aluminum packing bar 9 is provided with the left and right end positions of fixture block 7, and the inverted T-shaped installs fixture block 7 Downside wall and, be also horizontally disposed between the interlayer downside wall of safety glass body 15 and have upper installation clamp 10, the safety glass Lower installation clamp 11, the upper peace are fixedly installed at the underface opening for installing clamp 10 on the downside wall of body 15 in correspondence Be installed plate 10 and the lower plate body both sides for installing clamp 11 offer respectively a triangle draw-in groove 12, the triangle draw-in groove 12 of top and its Quick heat radiating bar 13 is inserted between the triangle draw-in groove 12 of corresponding lower section, the quick heat radiating bar 13 in left side and the quick of right side dissipate Three groups of strengthened connection bars 14 are also disposed between hot bar 13 from top to bottom, so by the way that traditional aluminium alloy bone dragon 1 is changed Enter into the form with indent vallecular cavity 2 and in the lumen adaptation has additional force bar blocks 3 and lifting screw 4, work as whole part After predetermined orientation installation, master worker can be by constantly rotating adjusting nut 5, because adjusting nut 5 is Adaptation is set on lifting screw 4, and the bottom of lifting screw 4 has insertion inverted T-shaped to install in fixture block 7, you can so that lifting Screw rod 4 drags force bar blocks 3 while constantly declining and slowly moves down, and because the bar blocks 3 that exert a force just are installed In rectangle cavity, you can drive aluminium alloy bone dragon 1 to realize downward slow movement, until adjusting nut 5 is moved to and just blocked Stop on two medial walls of round platform inner chamber, and then enable whole aluminium alloy bone dragon 1 completely by the safety glass of lower section Body 15 is fixed, and solves the problems, such as that traditional safety glass whole curtain wall clamping in work progress is unstable well, is protected Safety in utilization is demonstrate,proved;And the quick heat radiating bar 13 set up in the left and right sides and three groups of strengthened connection bars 14 can also to it is long when Between the amount of heat that produces in curtain wall inner chamber during use played the effect sufficiently remove, it is to avoid traditional approach is big because what is saved bit by bit The damage of the device that calorimetric amount is not distributed not go out and caused, effectively extends the service life of whole curtain wall.
Steel auxiliary skeleton 16 is additionally provided with outside the support body of the aluminium alloy bone dragon 1, the steel auxiliary skeleton 16 Also extending internally on top side inwall, inner left wall and right side inwall has fixed pretension frame 17, the both sides of the fixed pretension frame 17 Plate body is fixed together both by fastening bolt 19 with the side wall corresponding position of aluminium alloy bone dragon 1, the fixed pretension Damping pad 18 is also placed between the bottom fixed board of frame 17 and the lateral wall of aluminium alloy bone dragon 1, the damping pad 18 is adopted Made with elastomeric material, so aid in skeleton 16 by having additional steel in the outside of traditional aluminium alloy bone dragon 1, it is multiple using steel aluminum Fixed form is closed, not only further solves the problems, such as that the stability maintenance of conventional curtain wall is not high, and after causing to be combined Keel shoe enhanced convenience installing/dismounting, work efficiency is further strengthened, and using effect is more excellent, meets the higher modern times Curtain wall use requirement.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of spirit or essential attributes without departing substantially from the present invention, the present invention can be in other specific forms realized.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as and limit involved claim.
Moreover, it will be appreciated that although this specification is been described by according to embodiment, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of description is only that for clarity those skilled in the art should Using description as an entirety, the technical scheme in each embodiment can also Jing it is appropriately combined, form those skilled in the art Understandable other embodiment.

Claims (5)

1. a kind of compound complete hidden frame heat-insulating curtain wall, including aluminium alloy bone dragon (1), it is characterised in that aluminium alloy bone dragon (1) The longitudinal section that bottom support body bottom up depression has indent vallecular cavity (2), the upper cavity of the indent vallecular cavity (2) is set to rectangle shape Shape, the rectangular cavities of the indent vallecular cavity (2) are internally provided with force bar blocks (3), under the block of force bar blocks (3) It is fixedly installed lifting screw (4) at face center position downwards, is provided with the body of rod lateral wall of the lifting screw (4) outer Screw thread and adjusting nut (5) is arranged with the body of rod of lifting screw (4), is opened on the through hole medial wall of the adjusting nut (5) The female thread being mutually adapted with external screw thread is provided with, the diameter length of the adjusting nut (5) is long more than the top circular diameter of round platform Degree, this lower section of aluminium alloy bone dragon (1) is provided with safety glass body (15), lifts on the safety glass body (15) Containing cavity is offered on the underface glass plate of screw rod (4) and in interlayer of the inside of containing cavity to safety glass body (15) It is provided with inverted T-shaped and fixture block (7) is installed, the body of rod bottom insertion inverted T-shaped of the lifting screw (4) is installed in fixture block (7), the aluminum Cushion seal pad (6) is additionally provided with position between the alloy bone dragon downside wall of (1) and the upper surface of safety glass body (15), In the interlayer inner chamber of the safety glass body (15), inverted T-shaped installs and is provided with sealing and fills out at the left and right end positions of fixture block (7) Fill glue (8) and aluminum packing bar (9), the inverted T-shaped installs the downside wall of fixture block (7) and, the bottom of intermediate layer of safety glass body (15) Also being horizontally disposed between the wall of side has upper installation clamp (10), installs card on the downside wall of the safety glass body (15) in correspondence Lower installation clamp (11), upper installation clamp (10) and lower installation clamp are fixedly installed at the underface opening of plate (10) (11) plate body both sides offer respectively a triangle draw-in groove (12), the triangle draw-in groove (12) of top and the three of its corresponding lower section Quick heat radiating bar (13), the quick heat radiating bar (13) in left side and the quick heat radiating bar (13) on right side are inserted between angle draw-in groove (12) Between be also disposed with three groups of strengthened connection bars (14) from top to bottom, also set up outside the support body of aluminium alloy bone dragon (1) There is steel to aid in skeleton (16), the steel to aid in also inside on top side inwall, inner left wall and the right side inwall of skeleton (16) It is extended with fixed pretension frame (17), the both sides plate body position corresponding with the side wall of aluminium alloy bone dragon (1) of the fixed pretension frame (17) The place of putting is fixed together both by fastening bolt (19).
2. one kind according to claim 1 is combined complete hidden frame heat-insulating curtain wall, it is characterised in that the indent vallecular cavity (2) Lower chamber longitudinal section is set to truncated conical shape and the top circular diameter length of round platform is long less than bottom circular diameter.
3. one kind according to claim 1 is combined complete hidden frame heat-insulating curtain wall, it is characterised in that the inverted T-shaped installs fixture block (7) block upper end caves inward and blind hole and the female thread being mutually adapted with external screw thread is provided with the medial wall of blind hole.
4. one kind according to claim 1 is combined complete hidden frame heat-insulating curtain wall, it is characterised in that the fixed pretension frame (17) Bottom fixed board and aluminium alloy bone dragon (1) lateral wall between be also placed with damping pad (18).
5. one kind according to claim 1 is combined complete hidden frame heat-insulating curtain wall, it is characterised in that the damping pad (18) is adopted Made with elastomeric material.
CN201611249576.7A 2016-12-29 2016-12-29 A kind of compound complete hidden frame heat-insulating curtain wall Active CN106677391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611249576.7A CN106677391B (en) 2016-12-29 2016-12-29 A kind of compound complete hidden frame heat-insulating curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611249576.7A CN106677391B (en) 2016-12-29 2016-12-29 A kind of compound complete hidden frame heat-insulating curtain wall

Publications (2)

Publication Number Publication Date
CN106677391A true CN106677391A (en) 2017-05-17
CN106677391B CN106677391B (en) 2019-01-18

Family

ID=58872136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611249576.7A Active CN106677391B (en) 2016-12-29 2016-12-29 A kind of compound complete hidden frame heat-insulating curtain wall

Country Status (1)

Country Link
CN (1) CN106677391B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2918584Y (en) * 2006-06-27 2007-07-04 深圳市三鑫特种玻璃技术股份有限公司 Vertical compression type Concealed frame glass curtain wall without attach frame
KR101056746B1 (en) * 2011-05-26 2011-08-12 주식회사 테크론 The adiabatic structures and methodes of the glass curtain wall
CN102776971A (en) * 2012-08-06 2012-11-14 浙江宝业幕墙装饰有限公司 Curtain wall
CN102900182A (en) * 2012-10-30 2013-01-30 湖南省金为型材有限公司 Connecting component for mounting curtain wallboard
CN204804123U (en) * 2015-07-16 2015-11-25 北京格雷泰科建筑技术有限公司 Sealed is latent frame curtain entirely
CN204898970U (en) * 2015-08-31 2015-12-23 王宇轩 Sealed fire prevention heat preservation curtain

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2918584Y (en) * 2006-06-27 2007-07-04 深圳市三鑫特种玻璃技术股份有限公司 Vertical compression type Concealed frame glass curtain wall without attach frame
KR101056746B1 (en) * 2011-05-26 2011-08-12 주식회사 테크론 The adiabatic structures and methodes of the glass curtain wall
CN102776971A (en) * 2012-08-06 2012-11-14 浙江宝业幕墙装饰有限公司 Curtain wall
CN102900182A (en) * 2012-10-30 2013-01-30 湖南省金为型材有限公司 Connecting component for mounting curtain wallboard
CN204804123U (en) * 2015-07-16 2015-11-25 北京格雷泰科建筑技术有限公司 Sealed is latent frame curtain entirely
CN204898970U (en) * 2015-08-31 2015-12-23 王宇轩 Sealed fire prevention heat preservation curtain

Also Published As

Publication number Publication date
CN106677391B (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN207314606U (en) A kind of building curtain wall
CN206090979U (en) Circular arc curtain installation aluminum plate
CN212506830U (en) Building external wall insulation board mounting structure
CN112942643A (en) Stable aluminum plate curtain wall
CN111335524B (en) Fixed frame wall-hung connecting structure of glass curtain wall convenient to dismouting
CN102493579A (en) Glass curtain wall structure for indoor maintenance and change
CN106677391A (en) Composite full-implicit frame heat insulation curtain wall
CN202416636U (en) Curtain wall installed outdoors and replaced indoors
CN105040870B (en) Curved surface curtain wall system formed by broken line unit
CN204456554U (en) Fixture type glass wing is chosen outside curtain wall
CN204703696U (en) A kind of Novel hollow glass being provided with molecular sieve plug
CN208870244U (en) A kind of glass curtain wall bracing structure
CN211690968U (en) Composite curtain wall structure
CN205276617U (en) Thin steel erects bright violently latent insulating glass curtain wall
CN207177007U (en) A kind of bright frame decorative strip installing structure of building curtain wall
CN207079781U (en) A kind of Combined marble frame curtain wall
CN202299336U (en) Assembly-type aluminium alloy outer decorative strip
CN207633592U (en) Curtain wall decorative strip system
CN202787580U (en) Exposed-frame glass curtain wall
CN209620298U (en) Built-in type thermal insulation outer wall structure
CN206616744U (en) Energy-saving curtain wall
CN205907866U (en) Energy -conserving exposed frame curtain wall
CN204401837U (en) A kind of bright frame glass curtain wall mounting structure
CN104196157A (en) Vertical column for glass curtain wall
CN103343585A (en) Built-in auxiliary frame installation system of hollow glass

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A kind of composite full hidden frame thermal insulation curtain wall

Effective date of registration: 20201207

Granted publication date: 20190118

Pledgee: Industrial and Commercial Bank of China Limited Guangde sub branch

Pledgor: ANHUI LANT ALUMINUM Co.,Ltd.

Registration number: Y2020980008861

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220921

Granted publication date: 20190118

Pledgee: Industrial and Commercial Bank of China Limited Guangde sub branch

Pledgor: ANHUI LANT ALUMINUM Co.,Ltd.

Registration number: Y2020980008861

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A composite fully hidden frame thermal insulation curtain wall

Effective date of registration: 20220921

Granted publication date: 20190118

Pledgee: Industrial and Commercial Bank of China Limited Guangde sub branch

Pledgor: ANHUI LANT ALUMINUM Co.,Ltd.

Registration number: Y2022990000655

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: 242000 No. 12, Guohua Road, Guangde Economic Development Zone, Xuancheng City, Anhui Province

Patentee after: Anhui Kelante Aluminum Industry Co.,Ltd.

Address before: 242200 Guangde Economic Development Zone, Xuancheng City, Anhui Province

Patentee before: ANHUI LANT ALUMINUM Co.,Ltd.

CP03 Change of name, title or address