CN106670747B - A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band - Google Patents

A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band Download PDF

Info

Publication number
CN106670747B
CN106670747B CN201611244157.4A CN201611244157A CN106670747B CN 106670747 B CN106670747 B CN 106670747B CN 201611244157 A CN201611244157 A CN 201611244157A CN 106670747 B CN106670747 B CN 106670747B
Authority
CN
China
Prior art keywords
master cylinder
assembly
strengthener
carried out
manufacturing process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611244157.4A
Other languages
Chinese (zh)
Other versions
CN106670747A (en
Inventor
胡明龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAHENG AUTOMOBILE PARTS CO Ltd WUHU
Original Assignee
HUAHENG AUTOMOBILE PARTS CO Ltd WUHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAHENG AUTOMOBILE PARTS CO Ltd WUHU filed Critical HUAHENG AUTOMOBILE PARTS CO Ltd WUHU
Priority to CN201611244157.4A priority Critical patent/CN106670747B/en
Publication of CN106670747A publication Critical patent/CN106670747A/en
Application granted granted Critical
Publication of CN106670747B publication Critical patent/CN106670747B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60TVEHICLE BRAKE CONTROL SYSTEMS OR PARTS THEREOF; BRAKE CONTROL SYSTEMS OR PARTS THEREOF, IN GENERAL; ARRANGEMENT OF BRAKING ELEMENTS ON VEHICLES IN GENERAL; PORTABLE DEVICES FOR PREVENTING UNWANTED MOVEMENT OF VEHICLES; VEHICLE MODIFICATIONS TO FACILITATE COOLING OF BRAKES
    • B60T13/00Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems
    • B60T13/10Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release
    • B60T13/24Transmitting braking action from initiating means to ultimate brake actuator with power assistance or drive; Brake systems incorporating such transmitting means, e.g. air-pressure brake systems with fluid assistance, drive, or release the fluid being gaseous
    • B60T13/46Vacuum systems
    • B60T13/52Vacuum systems indirect, i.e. vacuum booster units
    • B60T13/565Vacuum systems indirect, i.e. vacuum booster units characterised by being associated with master cylinders, e.g. integrally formed

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Transportation (AREA)
  • Diaphragms And Bellows (AREA)
  • Actuator (AREA)
  • Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)

Abstract

The present invention provides a kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band, including multiple steps such as Master cylinder body manufacture, fluid reservoir installation, front and rear housings field rivetings, and it is aided with performance detection, by completely manufacturing, and it is aided with the detection of the performances such as air-tightness, mobility, manufacture efficiency of the master cylinder with booster assembly is improved, finished product accuracy is improved, and the control cleaned by each node improves product cleannes.

Description

A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band
Technical field
The present invention relates to car brake pump and booster manufacturing field, more particularly to a kind of center valve type master cylinder The double diaphragm strengthener manufacturing process of band.
Background technique
At present when manufacturing brake pump and booster, usually by cutting aluminium embryo, and the portions such as fluid reservoir are installed Part is manufactured, but above-mentioned manufacturing process efficiency is lower, and during the preparation process be easy to appear installation fault lead to air-tightness And illiquidity, the quality of brake pump and booster is influenced, brake pump and booster reduced service life are caused.Therefore it designs A kind of double diaphragm strengthener manufacturing process of complete center valve type master cylinder band are just particularly important.
Summary of the invention
In view of the above-mentioned problems of the prior art, the object of the present invention is to provide a kind of double diaphragms of center valve type master cylinder band Booster manufacturing process by completely manufacturing, and is aided with the detection of the performances such as air-tightness, mobility, improves the system of booster Efficiency is made, finished product accuracy is improved.
The present invention provides a kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band, and the process flow is as follows:
Step 1: carrying out vehicle cylinder mouth and drilling tail end centre bore to blank, and carries out brill fixation hole to it, drill gun aperture, adds Work oil outlet, processing oil cup aperture and limit pin hole, processing plagioclase hole, cylinder diameter rough honing, ball head brush deburring and cylinder holes microhoning Work;
Step 2: cleaning the blank for completing each hole machined, and carries out boring lubricating cup pin hole to it, completes master cylinder system It is standby, and test to Master cylinder body;
Step 3: cleaning Master cylinder body, and cleans to master cylinder piston;
Step 4: oiling is carried out to Master cylinder body internal diameter, and assembles pistons at different levels;
Step 5: rubber seal leakage test and double-opening rubber ring are carried out to Master cylinder body and internal drag is tested;
Step 6: assembly fluid reservoir, and circulation, air seal test and fluid reservoir alarm are detected;
Step 7: indentation lubricating cup straight pin, the printing of Master cylinder body permanent identification, master cylinder assembly are completed;
Step 8: the preceding epithelium of installation, intermediate skeleton and rear epithelium, and work into power bar riveted;Only key assembly is carried out, Riveted is carried out to back casing assembly, and completes rear shell sealing gland, power output bar adjusting screw, smallclothes and the assembly of preceding housing assy, finally Housing assy before riveted;
Step 9: carrying out internal integration to booster, and airtight, discrepancy power test is carried out to it;Power-assisted after detection is qualified Device general assembly terminates;
Step 10: qualified brake master cylinder assy and booster assembly are combined, and to vacuum booster with master cylinder Assembly carries out airtight detection and backlash test, completes the manufacture of vacuum booster with master cylinder assembly.
Further improvement lies in that: 60 DEG C of cleaning temperature when being cleaned in the step 3 to Master cylinder body, scavenging period 20 Minute, and cleaned using ultrasonic wave, ultrasonic cleaning temperature is 55 DEG C.
Further improvement lies in that: in the step 5 side P, S vacuum of rubber seal leakage test be set as- 0.9bar/+0.02 bar, travel settings 36min, push rod pressure are 3.5 ~ 4bar.
Further improvement lies in that: air seal test and fluid reservoir alarm detection measuring air pressure are 2.5- in the step 6 3.5bar, detection time 5s.
The beneficial effects of the present invention are: by completely manufacturing, and it is aided with the detection of the performances such as air-tightness, mobility, it mentions The manufacture efficiency of high booster improves finished product accuracy, and by cleaning repeatedly, improves product cleannes.
Specific embodiment
In order to deepen the understanding of the present invention, the present invention will be described in further detail with reference to the examples below, the embodiment For explaining only the invention, it is not intended to limit the scope of the present invention..
The present embodiment provides a kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band, the process flow is as follows:
Step 1: carrying out vehicle cylinder mouth and drilling tail end centre bore to blank, and carries out brill fixation hole to it, drill gun aperture, adds Work oil outlet, processing oil cup aperture and limit pin hole, processing plagioclase hole, cylinder diameter rough honing, ball head brush deburring and cylinder holes microhoning Work;
Step 2: cleaning the blank for completing each hole machined, and carries out boring lubricating cup pin hole to it, completes master cylinder system It is standby, and test to Master cylinder body;
Step 3: cleaning Master cylinder body, and cleans to master cylinder piston;
Step 4: oiling is carried out to Master cylinder body internal diameter, and assembles pistons at different levels;
Step 5: rubber seal leakage test and double-opening rubber ring are carried out to Master cylinder body and internal drag is tested;
Step 6: assembly fluid reservoir, and circulation, air seal test and fluid reservoir alarm are detected;
Step 7: indentation lubricating cup straight pin, the printing of Master cylinder body permanent identification, master cylinder assembly are completed;
Step 8: the preceding epithelium of installation, intermediate skeleton and rear epithelium, and work into power bar riveted;Only key assembly is carried out, Riveted is carried out to back casing assembly, and completes rear shell sealing gland, power output bar adjusting screw, smallclothes and the assembly of preceding housing assy, finally Housing assy before riveted;
Step 9: carrying out internal integration to booster, and airtight, discrepancy power test is carried out to it;Power-assisted after detection is qualified Device general assembly terminates;
Step 10: qualified brake master cylinder assy and booster assembly are combined, and to vacuum booster with master cylinder Assembly carries out airtight detection and backlash test, completes the manufacture of vacuum booster with master cylinder assembly.
Further improvement lies in that: 60 DEG C of cleaning temperature when being cleaned in the step 3 to Master cylinder body, scavenging period 20 Minute, and cleaned using ultrasonic wave, ultrasonic cleaning temperature is 55 DEG C.
Further improvement lies in that: in the step 5 side P, S vacuum of rubber seal leakage test be set as- 0.91bar, travel settings 36min, push rod pressure are 3.8bar, and the side P, S vacuum leak amount≤20mbar/5s, the side S acts and lets out Leakage quantity≤5mbar/5s.
Further improvement lies in that: air seal test and fluid reservoir alarm detection measuring air pressure are 3bar in the step 6, Detection time is 5s, leakage rate≤0.006bar.
By completely manufacturing, and it is aided with the detection of the performances such as air-tightness, mobility, improves the manufacture efficiency of booster, Finished product accuracy is improved, and by cleaning repeatedly, improves product cleannes.

Claims (4)

1. a kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band, it is characterised in that: the process flow is as follows:
Step 1: vehicle cylinder mouth and drilling tail end centre bore are carried out to blank, and brill fixation hole is carried out to it, drill gun aperture, is processed Hydraulic fluid port, processing oil cup aperture and limit pin hole, processing plagioclase hole cylinder diameter rough honing, ball head brush deburring and cylinder holes microhoning work;
Step 2: cleaning the blank for completing each hole machined, and carries out boring lubricating cup pin hole to it, completes Master cylinder body preparation, And it tests to Master cylinder body;
Step 3: cleaning Master cylinder body, and cleans to master cylinder piston;
Step 4: oiling is carried out to cylinder diameter, and assembles pistons at different levels;
Step 5: rubber seal leakage test and double-opening rubber ring are carried out to Master cylinder body and internal drag is tested;
Step 6: assembly fluid reservoir, and circulation, air seal test and fluid reservoir alarm are detected;
Step 7: indentation lubricating cup straight pin, the printing of master cylinder permanent identification, master cylinder assembly are completed;
Step 8: the preceding epithelium of installation, intermediate skeleton and rear epithelium, and work into power bar riveted;Only key assembly is carried out, to rear Housing assembly carries out riveted, and completes rear shell sealing gland, power output bar adjusting screw, smallclothes and the assembly of preceding housing assy, last riveted Preceding housing assy;
Step 9: carrying out internal integration to product, and airtight, discrepancy power test is carried out to it;Booster assembly after detection is qualified Assembly terminates;
Step 10: qualified brake master cylinder assy and booster assembly are combined, and to vacuum booster with master cylinder assembly Airtight detection and backlash test are carried out, the double diaphragm strengthener manufactures of master cylinder band are completed.
2. the double diaphragm strengthener manufacturing process of a kind of center valve type master cylinder band as described in claim 1, it is characterised in that: described 60 DEG C of cleaning temperature when being cleaned in step 3 to Master cylinder body, scavenging period 20 minutes, and cleaned using ultrasonic wave, surpass Sound wave cleaning temperature is 55 DEG C.
3. the double diaphragm strengthener manufacturing process of a kind of center valve type master cylinder band as described in claim 1, it is characterised in that: described The side P, S vacuum of rubber seal leakage test is set as -0.9bar/+0.02 bar, travel settings 36min in step 5, Push rod pressure is 3.5 ~ 4bar.
4. the double diaphragm strengthener manufacturing process of a kind of center valve type master cylinder band as described in claim 1, it is characterised in that: described Air seal test and fluid reservoir alarm detection measuring air pressure are 2.5-3.5bar, detection time 5s in step 6.
CN201611244157.4A 2016-12-29 2016-12-29 A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band Expired - Fee Related CN106670747B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611244157.4A CN106670747B (en) 2016-12-29 2016-12-29 A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611244157.4A CN106670747B (en) 2016-12-29 2016-12-29 A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band

Publications (2)

Publication Number Publication Date
CN106670747A CN106670747A (en) 2017-05-17
CN106670747B true CN106670747B (en) 2019-11-15

Family

ID=58871886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611244157.4A Expired - Fee Related CN106670747B (en) 2016-12-29 2016-12-29 A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band

Country Status (1)

Country Link
CN (1) CN106670747B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109624953A (en) * 2018-12-29 2019-04-16 芜湖华亨汽车部件有限公司 A kind of plunger typed master cylinder single-iris booster production technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101559554A (en) * 2009-05-31 2009-10-21 芜湖市澳威汽车工业有限公司 Processing technology of brake pump
KR20110089119A (en) * 2011-07-05 2011-08-04 (주) 엠아이디 코리아 Carabiners method of manufacture
CN102248361A (en) * 2011-05-09 2011-11-23 南车戚墅堰机车有限公司 Process method for controlling concentricity error of engine body
CN102489963A (en) * 2011-12-15 2012-06-13 昆山恒源机械制造有限公司 Method for machining automobile brake system calipers
CN104289864A (en) * 2014-08-20 2015-01-21 安庆市天润工程机械有限责任公司 Machining technology of cylinder barrel of steering oil cylinder
CN105690034A (en) * 2016-02-24 2016-06-22 湖南汉星机械制造有限公司 Integral machining technique for left box part and right box part of small gasoline engine box body

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101559554A (en) * 2009-05-31 2009-10-21 芜湖市澳威汽车工业有限公司 Processing technology of brake pump
CN102248361A (en) * 2011-05-09 2011-11-23 南车戚墅堰机车有限公司 Process method for controlling concentricity error of engine body
KR20110089119A (en) * 2011-07-05 2011-08-04 (주) 엠아이디 코리아 Carabiners method of manufacture
CN102489963A (en) * 2011-12-15 2012-06-13 昆山恒源机械制造有限公司 Method for machining automobile brake system calipers
CN104289864A (en) * 2014-08-20 2015-01-21 安庆市天润工程机械有限责任公司 Machining technology of cylinder barrel of steering oil cylinder
CN105690034A (en) * 2016-02-24 2016-06-22 湖南汉星机械制造有限公司 Integral machining technique for left box part and right box part of small gasoline engine box body

Also Published As

Publication number Publication date
CN106670747A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN103528761B (en) Internal expansion block sealing device for hole
CN103452944B (en) A kind of vehicle-mounted single-acting cylinder
CN106670747B (en) A kind of double diaphragm strengthener manufacturing process of center valve type master cylinder band
CN201566605U (en) Brake wheel cylinder assembly
CN106363070B (en) A kind of processing technology of metal bi multiple tube
CN202001531U (en) Plunger-type brake master cylinder
CN104191356B (en) Pressurized sealing water-proof and dust-proof anti-collision grinding head
CN203655980U (en) Spring brake air chamber inner breathing device
CN104129379A (en) Pedal travel simulator for automobile brake system
CN105312852A (en) Machining process of vacuum pump case
CN207584094U (en) A kind of check valve
CN202169941U (en) Internal breathing valve for spring braking air chamber
CN204784864U (en) High -temperature steam pressure -increasing valves
CN203904412U (en) Vibration aging treatment device for shaft part
CN207634774U (en) A kind of two-bit triplet pressure-button valve
CN103711742A (en) Improved structure of air cylinder
CN109624953A (en) A kind of plunger typed master cylinder single-iris booster production technology
CN201615819U (en) Manual air-tightness tester of cylinder cover
CN204077641U (en) A kind of brake system of car pedal stroke simulator
CN103981360B (en) The vibration stress relief treatment method of axial workpiece and device
CN203702939U (en) Breathing structure inside diaphragm type spring braking air chamber of commercial vehicle
CN103758901A (en) Internal respiration structure of diaphragm type spring braking air chamber of brake system of commercial vehicle
CN102563138B (en) Diaphragm type check valve and manufacture method thereof
CN109131285B (en) Plunger type brake pump
CN203892420U (en) Internal breathing type spring cylinder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191115

Termination date: 20211229