CN106655202A - Interruptible-load-based multiple-target overloading assistant decision making method - Google Patents
Interruptible-load-based multiple-target overloading assistant decision making method Download PDFInfo
- Publication number
- CN106655202A CN106655202A CN201710041188.8A CN201710041188A CN106655202A CN 106655202 A CN106655202 A CN 106655202A CN 201710041188 A CN201710041188 A CN 201710041188A CN 106655202 A CN106655202 A CN 106655202A
- Authority
- CN
- China
- Prior art keywords
- interruptible load
- prevention device
- overload prevention
- electromotor
- overload
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 53
- 230000006870 function Effects 0.000 claims abstract description 86
- 238000005520 cutting process Methods 0.000 claims abstract description 13
- 230000002265 prevention Effects 0.000 claims description 122
- 238000009826 distribution Methods 0.000 claims description 45
- 230000008569 process Effects 0.000 claims description 26
- 238000002271 resection Methods 0.000 claims description 18
- 230000008859 change Effects 0.000 claims description 10
- 230000005540 biological transmission Effects 0.000 claims description 8
- 230000004044 response Effects 0.000 claims description 7
- 240000002853 Nelumbo nucifera Species 0.000 claims description 4
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims description 4
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims description 4
- 229910010888 LiIn Inorganic materials 0.000 claims description 3
- 230000009471 action Effects 0.000 claims description 3
- 230000009194 climbing Effects 0.000 claims description 3
- 230000004907 flux Effects 0.000 claims description 3
- XOFYZVNMUHMLCC-ZPOLXVRWSA-N prednisone Chemical compound O=C1C=C[C@]2(C)[C@H]3C(=O)C[C@](C)([C@@](CC4)(O)C(=O)CO)[C@@H]4[C@@H]3CCC2=C1 XOFYZVNMUHMLCC-ZPOLXVRWSA-N 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 238000005457 optimization Methods 0.000 abstract description 6
- 230000009467 reduction Effects 0.000 abstract description 2
- 230000007246 mechanism Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Power Engineering (AREA)
- Control Of Ac Motors In General (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses an interruptible-load-based multiple-target overloading assistant decision making method. Contribution indexes of an interruptible load for reducing two target functions, namely an interruptible load cutting total amount and an interruptible load cutting total number, are respectively computed; a comprehensive contribution index of the interruptible load to the two target functions is computed by utilizing linear weighting factors; the linear weighting factors are divided into different grades; an overloading assistant decision making measure corresponding to each grade of the linear weighting factor is computed; and the final measure is selected via a scheduling operator. By applying the interruptible-load-based multiple-target overloading assistant decision making method, multiple-target optimization can be performed according to the contribution indexes of the interruptible load to the target functions, an effective solution set meeting the computation precision is given out, and coordinate optimization of reduction of the two target functions, namely the interruptible load cutting total amount and the interruptible load cutting total number, is implemented.
Description
Technical field
The present invention relates to a kind of multiple target based on interruptible load transships aid decision-making method, belong to power system automatic
Change technical field.
Background technology
Receiving end grid generator it is standby deficiency in the case of, need by spatial load forecasting to eliminate electrical network in equipment mistake
Carry.Ratio of the extra-high voltage direct-current transmission capacity in receiving-end system scale constantly increases, and direct current locking failure causes high-power punching
Hit, in the presence of system frequency modulation characteristic, generator output increase may cause Section Tidal Current of Power Transmission to get over stability limitation, to load
The scale and response speed of control is put forward higher requirement.
Traditional spatial load forecasting does not account for the practical situation of user side, and the concentration cutting load of extensive indiscriminate property is not
Huge economic losses can be only caused, the acceptance level of user is relatively low under Power Market.Scope is modeled by EMS system
Limit, provincial scheduling institution is difficult to directly perceive the controllable burden capacity in electrical network, can only be according to the ratio for pre-setting each
Share the cutting load amount for eliminating overload between districts and cities, draw road to carry out spatial load forecasting by accident by regional dispatch mechanism.When certain
When regional dispatch mechanism controls amount is not enough, provincial scheduling institution needs the system running state of the execution end that road is drawn according to accident
Aid decision calculating is carried out again, it is impossible to meet rapidity requirement of the complex fault scene to accident handling.
The content of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of multiple target overload auxiliary based on interruptible load is determined
Plan method.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of multiple target based on interruptible load transships aid decision-making method, comprises the following steps,
Step 1, obtains the controllable capacity data of interruptible load and sets up interruptible load and energy at control centre station
The corresponding relation of the medium duty value of management system;
Step 2, if control centre station detects there is overload prevention device under current state, into step 3;Otherwise, terminate
This method;
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing
Itself association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends;
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, and power transfer distribution factor is big
Decision space is added in the interruptible load of setting threshold value;
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount target according to power
Function f1Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2's
Contribution degree index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor;
Wherein, the corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1;
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, calculate respectively each gear linear weighted function because
Son corresponding overload aid decision measure;Overload aid decision measure include needing the interruptible load of excision and with can interrupt
The total flux matched generated power Adjusted Option of load excision;
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there is phase
The difference of adjacent gear interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10;
Step 9, cuts off total amount difference true more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load
Fixed newly-increased gear, return to step 7;
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference,
Variation delta E that interruptible load cuts off total amount is calculated successively for other effective gear nn=E0-EnCut with interruptible load
Except variation delta W of sumn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision
Sum, by the overload aid decision measure that management and running personnel selection is final.
Determine that overload prevention device associates the process of the adjustable space of electromotor and is,
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
3-2) filter out electromotor of the power transfer distribution factor absolute value more than setting threshold value, using the electromotor as
Overload prevention device associates electromotor;
3-3) meet overload prevention device association electromotor of the power transfer distribution factor less than 0 exerts oneself adjustment direction to increase
Power, calculates and increases the adjustable space that overload prevention device of exerting oneself associates electromotor;
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase and exert oneself
Overload prevention device association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be by increasing
Load equipment associates generator output to reduce the overload degree of overload prevention device.
Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load
Duty value distribution factor is shifted to the power of overload prevention device, the power is shifted distribution factor as interruptible load to mistake
The power transfer distribution factor of load equipment.
Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be,
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the control of interruptible load
Performance indications processed;
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device Qj
Load factor, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, by the controlling of interruptible load
Energy index is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree
Index;
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index,
γmax=max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is entered
Row normalized, calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index,
PiFor interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution
Degree index.
The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ,
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2;
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjCan for what is cut off
Interruptible load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power,
For alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformation
Device,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section,
For power allowances of the transmission cross-section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower turn
Move distribution factor;
7-3) maximum of all overload prevention devices correspondence interruptible load resection is examined as interruptible load resection
Consider frequency modulation frequency modulation during frequency modulation frequency modulation association electromotor and interruptible load response condition, to electromotor and do not cut off can in
The active of disconnected load is adjusted, and control measure are checked by AC power flow;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, really
The corresponding overload prevention device Q of absolute value of the minima that fixed all power are more limited the quantityd;
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CACheck for AC power flow secondary
The maximum of number all overload prevention devices correspondence interruptible load resection when being A;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd+ε2, return to step 7-1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd-ε2, return to step 7-
1。
In step 7-3, it is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jSet for overload
Standby association electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ
fAGC, then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and
Terminate adjustment process;Otherwise, simulate frequency modulation frequency modulation course of action frequency modulation frequency modulation is associated electromotor and not cutting off can interrupt it is negative
Lotus is adjusted, and step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For
Frequency modulation frequency modulation associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation association electromotor g ' it is maximum active with
It is current active;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total tune of load in system
Frequency coefficient, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change
Active power coefficient.
Total amount difference is cut off according to interruptible load newly-increased more than the linear weighted function factor region of search determination of computational accuracy ξ
The process of gear be,
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1;
The gear number for 9-2) newly increasingEt、Et+1Be divided into gear for t and t+1 can in
Disconnected load cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
The beneficial effect that the present invention is reached:It is total to reducing interruptible load excision that the present invention calculates respectively interruptible load
The contribution degree index of amount, total two object functions of interruptible load excision, using the linear weighted function factor interruptible load is calculated
Comprehensive contribution degree index to two object functions;The linear weighted function factor is divided into into different gears, each gear line is calculated respectively
Property weighter factor it is corresponding overload aid decision measure, by the measure that management and running personnel selection is final;It is given linear calculating
During spatial load forecasting scheme under weighter factor, distribution factor estimation interruptible load excision is shifted according to the power of interruptible load
Total amount, it is considered to the response condition of frequency modulation frequency modulation association electromotor and interruptible load during frequency modulation frequency modulation, to electromotor and not
Excision the active of interruptible load is adjusted, and gets over limitation to the power of overload prevention device using AC power flow check and is modified,
Approach by inchmeal meets computational accuracy and the aid decision measure of apparatus overload in electrical network can be completely eliminated;Using present invention side
Method, can carry out multiple-objection optimization according to interruptible load to the contribution degree index of object function, be given and meet computational accuracy
Efficient solution set, realizes reducing interruptible load excision total amount and the coordination of total two object functions of interruptible load excision is excellent
Change.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described.Following examples are only used for clearly illustrating the present invention
Technical scheme, and can not be limited the scope of the invention with this.
As shown in figure 1, a kind of multiple target based on interruptible load transships aid decision-making method, its principle is:Can interrupt
Load shifts distribution factor to the power of overload prevention device, reflects the excision interruptible load total to reducing interruptible load excision
The contribution of amount, the capacity of interruptible load reflects the tribute for cutting off the interruptible load to reducing interruptible load excision sum
Offer;Interruptible load can be calculated to reducing interruptible load excision total amount and interruptible load excision using the linear weighted function factor
The comprehensive contribution degree index of sum, the change of the linear weighted function factor reflects different contribution degree indexs in comprehensive contribution degree index
Weight, interruptible load is ranked up by comprehensive contribution degree index, then can be answered by solving different linear weighted function factor pairs
Interruptible load control program can obtain effective solution of Model for Multi-Objective Optimization;Should given linear weighted function factor pair is calculated
Interruptible load control program when, can according to power shift distribution factor estimate interruptible load control problem, by hand over
Stream trend check carrys out Approach by inchmeal and meets computational accuracy and the aid decision measure of apparatus overload in electrical network can be completely eliminated;
Before AC power flow is checked, it is considered to the response condition of electromotor and interruptible load is associated during frequency modulation frequency modulation, to electromotor and
Do not cut off the active of interruptible load to be adjusted, the trend that can simulate system after spatial load forecasting is distributed and guarantees in system
Power-balance;The corresponding interruptible load controlling party of multiple gear linear weighted function factors can simultaneously be calculated by parallel computation
Case, improves the calculating speed of overload aid decision.
Comprise the following steps that:
Step 1, the collection of user side installation data and interruptible load control device in interruptible load, in control centre
Stand and obtain the controllable capacity data of interruptible load and to set up interruptible load corresponding with the medium duty value of EMS
Relation.
, if control centre station detects has overload prevention device under current state, that is, there is alternating current circuit, transformator in step 2
Overload or transmission cross-section get over the situation of stability limitation, then into step 3;Otherwise, method ends.
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing
Itself association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends.
Determine that overload prevention device associates the process of the adjustable space of electromotor and is:
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
3-2) filter out electromotor of the power transfer distribution factor absolute value more than setting threshold value, using the electromotor as
Overload prevention device associates electromotor;
3-3) meet overload prevention device association electromotor of the power transfer distribution factor less than 0 exerts oneself adjustment direction to increase
Power, calculates and increases the adjustable space that overload prevention device of exerting oneself associates electromotor;
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase and exert oneself
Overload prevention device association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be by increasing
Load equipment associates generator output to reduce the overload degree of overload prevention device.
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, and power transfer distribution factor is big
Decision space is added in the interruptible load of setting threshold value.
Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load
Duty value distribution factor is shifted to the power of overload prevention device, the power is shifted distribution factor as interruptible load to mistake
The power transfer distribution factor of load equipment.
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount target according to power
Function f1Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2's
Contribution degree index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index.
Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be:
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the control of interruptible load
Performance indications processed;
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device Qj
Load factor, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, by the controlling of interruptible load
Energy index is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree
Index;
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index,
γmax=max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is entered
Row normalized, calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index,
PiFor interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution
Degree index, the excursion of κ is [0,1].
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor;
Wherein, the corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1.
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, calculate respectively each gear linear weighted function because
Son corresponding overload aid decision measure;Overload aid decision measure include needing the interruptible load of excision and with can interrupt
The total flux matched generated power Adjusted Option of load excision.
The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ:
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2;
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjCan for what is cut off
Interruptible load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power,
For alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformation
Device,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section,
For power allowances of the transmission cross-section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower turn
Move distribution factor;
7-3) maximum of all overload prevention devices correspondence interruptible load resection is examined as interruptible load resection
Consider frequency modulation frequency modulation during frequency modulation frequency modulation association electromotor and interruptible load response condition, to electromotor and do not cut off can in
The active of disconnected load is adjusted, and control measure are checked by AC power flow;
It is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jSet for overload
Standby association electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ
fAGC, then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and
Terminate adjustment process;Otherwise, simulate frequency modulation frequency modulation course of action frequency modulation frequency modulation is associated electromotor and not cutting off can interrupt it is negative
Lotus is adjusted, and step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For
Frequency modulation frequency modulation associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation association electromotor g ' it is maximum active with
It is current active;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total tune of load in system
Frequency coefficient, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change
Active power coefficient;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, really
The corresponding overload prevention device Q of absolute value of the minima that fixed all power are more limited the quantityd;
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CACheck for AC power flow secondary
The maximum of number all overload prevention devices correspondence interruptible load resection when being A;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd+ε2, return to step 7-
1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd-ε2, return to step 7-
1。
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there is phase
The difference of adjacent gear interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10.
Step 9, cuts off total amount difference true more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load
Fixed newly-increased gear, return to step 7.
Total amount difference is cut off according to interruptible load newly-increased more than the linear weighted function factor region of search determination of computational accuracy ξ
The process of gear be:
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1;
The gear number for 9-2) newly increasingEt、Et+1Be divided into gear for t and t+1 can in
Disconnected load cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference,
Variation delta E that interruptible load cuts off total amount is calculated successively for other effective gear nn=E0-EnCut with interruptible load
Except variation delta W of sumn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision
Sum, by the overload aid decision measure that management and running personnel selection is final.
Said method calculates respectively interruptible load to reducing interruptible load excision total amount, interruptible load excision sum
The contribution degree index of two object functions, using the linear weighted function factor comprehensive tribute of the interruptible load to two object functions is calculated
Degree of offering index;The linear weighted function factor is divided into into different gears, the corresponding overload of each gear linear weighted function factor is calculated respectively auxiliary
Policy making steps are helped, by the measure that management and running personnel selection is final;Spatial load forecasting side in the case where the given linear weighted function factor is calculated
During case, distribution factor estimation interruptible load excision total amount is shifted according to the power of interruptible load, it is considered to frequency modulation frequency modulation process
The response condition of middle frequency modulation frequency modulation association electromotor and interruptible load, to electromotor and do not cut off interruptible load it is active enter
Row adjustment, gets over limitation and is modified using AC power flow check to the power of overload prevention device, and Approach by inchmeal meets computational accuracy simultaneously
The aid decision measure of apparatus overload in electrical network can be completely eliminated;Using the inventive method, can be according to interruptible load pair
The contribution degree index of object function carries out multiple-objection optimization, provides the efficient solution set for meeting computational accuracy, realizes that reduction can be interrupted
Load cuts off the coordination optimization of total amount and total two object functions of interruptible load excision.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, on the premise of without departing from the technology of the present invention principle, some improvement and deformation can also be made, these improve and deform
Also should be regarded as protection scope of the present invention.
Claims (7)
1. a kind of multiple target based on interruptible load transships aid decision-making method, it is characterised in that:Comprise the following steps,
Step 1, obtains the controllable capacity data of interruptible load and sets up interruptible load and energy management at control centre station
The corresponding relation of the medium duty value of system;
Step 2, if control centre station detects there is overload prevention device under current state, into step 3;Otherwise, we are terminated
Method;
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing itself
Association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends;
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, power transfer distribution factor is more than and is set
The interruptible load of set threshold value adds decision space;
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount object function f according to power1
Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2Contribution degree
Index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor;Wherein,
The corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1;
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, and each gear linear weighted function factor pair is calculated respectively
The overload aid decision measure answered;The measure of overload aid decision includes needing the interruptible load and and interruptible load of excision
The total flux matched generated power Adjusted Option of excision;
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there are adjacent shelves
The difference of position interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10;
Step 9, cuts off total amount difference and determines newly more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load
The gear of increasing, return to step 7;
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference, for
Other effective gear n calculate successively variation delta E that interruptible load cuts off total amountn=E0-EnIt is total with interruptible load excision
Several variation deltas Wn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision are total
Number, by the overload aid decision measure that management and running personnel selection is final.
2. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists
In:Determine that overload prevention device associates the process of the adjustable space of electromotor and is,
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
Electromotor of the power transfer distribution factor absolute value more than setting threshold value 3-2) is filtered out, using the electromotor as overload
Equipment associates electromotor;
The adjustment direction of exerting oneself for 3-3) meeting overload prevention device association electromotor of the power transfer distribution factor less than 0 is exerted oneself for increasing,
Calculate and increase the adjustable space that overload prevention device of exerting oneself associates electromotor;
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase overload of exerting oneself
Equipment association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be set by increasing overload
It is standby to associate generator output to reduce the overload degree of overload prevention device.
3. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists
In:Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load etc.
Duty value shifts distribution factor to the power of overload prevention device, the power is shifted into distribution factor overload is set as interruptible load
Standby power transfer distribution factor.
4. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists
In:Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be,
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the controlling of interruptible load
Can index;
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device QjLoad
Rate, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, the control performance of interruptible load is referred to
Mark is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree refer to
Mark;
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index, γmax
=max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is returned
One change is processed, and calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index, PiFor
Interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution degree refer to
Mark.
5. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists
In:The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ,
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2;
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjFor interrupting for excision
Load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power, for
Alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformator,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section,For defeated
Power allowances of the electric section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower transfer point
The cloth factor;
7-3) using the maximum of all overload prevention devices correspondence interruptible load resection as interruptible load resection, it is considered to two
The response condition of frequency modulation frequency modulation association electromotor and interruptible load, can interrupt negative to electromotor and not cutting off in secondary frequency-modulating process
The active of lotus is adjusted, and control measure are checked by AC power flow;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, and determines institute
There is the corresponding overload prevention device Q of absolute value of the minima of the out-of-limit amount of powerd;
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CAIt is A to check number of times for AC power flow
The maximum of Shi Suoyou overload prevention devices correspondence interruptible load resection;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd+ε2, return to step 7-1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd-ε2, return to step 7-1.
6. a kind of multiple target based on interruptible load according to claim 5 transships aid decision-making method, and its feature exists
In:In step 7-3, it is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jFor overload prevention device association
Electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ fAGC,
Then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and terminate
Adjustment process;Otherwise, the course of action for simulating frequency modulation frequency modulation associates electromotor to frequency modulation frequency modulation and does not cut off interruptible load
Row adjustment, step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For secondary tune
Frequency associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation associates the maximum active of electromotor g ' and currently has
Work(;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total frequency modulation system of load in system
Number, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change it is active
Coefficient.
7. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists
In:Total amount difference is cut off according to interruptible load and determines newly-increased shelves more than the linear weighted function factor region of search of computational accuracy ξ
Position process be,
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1;
The gear number for 9-2) newly increasingEt、Et+1It is that interrupting for t and t+1 is negative to be divided into gear
Lotus cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710041188.8A CN106655202B (en) | 2017-01-20 | 2017-01-20 | A kind of multiple target overload aid decision-making method based on interruptible load |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710041188.8A CN106655202B (en) | 2017-01-20 | 2017-01-20 | A kind of multiple target overload aid decision-making method based on interruptible load |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106655202A true CN106655202A (en) | 2017-05-10 |
CN106655202B CN106655202B (en) | 2017-12-15 |
Family
ID=58841418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710041188.8A Active CN106655202B (en) | 2017-01-20 | 2017-01-20 | A kind of multiple target overload aid decision-making method based on interruptible load |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106655202B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107423879A (en) * | 2017-06-07 | 2017-12-01 | 国网辽宁省电力有限公司 | A kind of method that controllable burden participates in Automatic Generation Control |
CN108039709A (en) * | 2017-10-23 | 2018-05-15 | 国网能源研究院有限公司 | A kind of management method based on the electric power interruptible load that can interrupt Potential Evaluation |
CN109599875A (en) * | 2018-11-29 | 2019-04-09 | 国电南瑞科技股份有限公司 | A kind of grid equipment overload quick cutting method of load based on supply path |
CN109672225A (en) * | 2018-12-06 | 2019-04-23 | 国网天津市电力公司 | The Automatic Control Strategy of 220kV transformer overload is eliminated in a kind of adjustment |
CN110401208A (en) * | 2019-07-26 | 2019-11-01 | 云南电网有限责任公司 | A kind of intelligent setting method of ac and dc systems high-frequency cutting machine |
CN111525586A (en) * | 2020-05-28 | 2020-08-11 | 国网江苏省电力有限公司 | Power grid load control method, device, equipment and medium |
CN113671313A (en) * | 2021-08-12 | 2021-11-19 | 国网安徽省电力有限公司 | Anti-misoperation method, device and system for remote coordination of low-frequency low-voltage device receiving |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102957147A (en) * | 2012-11-30 | 2013-03-06 | 辽宁省电力有限公司电力科学研究院 | Multi-load characteristic-matched under-frequency load shedding optimal control system and multi-load characteristic-matched under-frequency load shedding optimal control method |
CN105281320A (en) * | 2015-09-16 | 2016-01-27 | 河海大学 | Economical efficiency and load shedding rate fairness coordination emergency load control optimization method |
-
2017
- 2017-01-20 CN CN201710041188.8A patent/CN106655202B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102957147A (en) * | 2012-11-30 | 2013-03-06 | 辽宁省电力有限公司电力科学研究院 | Multi-load characteristic-matched under-frequency load shedding optimal control system and multi-load characteristic-matched under-frequency load shedding optimal control method |
CN105281320A (en) * | 2015-09-16 | 2016-01-27 | 河海大学 | Economical efficiency and load shedding rate fairness coordination emergency load control optimization method |
Non-Patent Citations (2)
Title |
---|
周晓宁等: "《计及负荷转供措施的电网设备过载辅助决策》", 《电力系统保护与控制》 * |
鲍颜红灯: "《电力系统在线安全稳定综合辅助决策》", 《电力系统自动化》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107423879A (en) * | 2017-06-07 | 2017-12-01 | 国网辽宁省电力有限公司 | A kind of method that controllable burden participates in Automatic Generation Control |
CN107423879B (en) * | 2017-06-07 | 2018-08-24 | 国网辽宁省电力有限公司 | A kind of method that controllable burden participates in Automatic Generation Control |
CN108039709A (en) * | 2017-10-23 | 2018-05-15 | 国网能源研究院有限公司 | A kind of management method based on the electric power interruptible load that can interrupt Potential Evaluation |
CN108039709B (en) * | 2017-10-23 | 2020-10-02 | 国网能源研究院有限公司 | Management method of electric interruptible load based on interruptible potential evaluation |
CN109599875A (en) * | 2018-11-29 | 2019-04-09 | 国电南瑞科技股份有限公司 | A kind of grid equipment overload quick cutting method of load based on supply path |
CN109599875B (en) * | 2018-11-29 | 2022-04-19 | 国电南瑞科技股份有限公司 | Power supply path-based power grid equipment overload load rapid removal method |
CN109672225A (en) * | 2018-12-06 | 2019-04-23 | 国网天津市电力公司 | The Automatic Control Strategy of 220kV transformer overload is eliminated in a kind of adjustment |
CN110401208A (en) * | 2019-07-26 | 2019-11-01 | 云南电网有限责任公司 | A kind of intelligent setting method of ac and dc systems high-frequency cutting machine |
CN110401208B (en) * | 2019-07-26 | 2023-05-26 | 云南电网有限责任公司 | Intelligent setting method for high-frequency cutting machine of AC/DC system |
CN111525586A (en) * | 2020-05-28 | 2020-08-11 | 国网江苏省电力有限公司 | Power grid load control method, device, equipment and medium |
CN113671313A (en) * | 2021-08-12 | 2021-11-19 | 国网安徽省电力有限公司 | Anti-misoperation method, device and system for remote coordination of low-frequency low-voltage device receiving |
Also Published As
Publication number | Publication date |
---|---|
CN106655202B (en) | 2017-12-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106655202B (en) | A kind of multiple target overload aid decision-making method based on interruptible load | |
CN103384068B (en) | Transient Security for Power Systems stablizes emergency control strategy of on-line optimized calculation method | |
CN102522747B (en) | Calculation method of power supply capability of power distribution system | |
CN103887810B (en) | Straight-flow system based on short-circuit ratio dynamic tracking continues phase conversion failure judgment method | |
CN107086578A (en) | A kind of region voltage layered distribution type cooperative control system of photovoltaic power distribution network | |
CN107294131A (en) | A kind of new energy power station voltage control system and method based on inverter generator operation as synchronous condenser | |
CN107134785B (en) | Power transmission network voltage coordination optimization control method considering network structure optimization | |
CN110896231B (en) | Distributed photovoltaic capacity receiving calculation method and system for power distribution network in poverty alleviation area | |
CN103514364A (en) | Overloading assistant decision-making computing method of power grid equipment considering load transfer actions | |
CN105046575A (en) | Evaluation method for determining power network equipment utilization rate evaluation indexes | |
CN103904673B (en) | Method for optimizing PI parameter of high-voltage direct-current transmission constant-current controller | |
CN107425527A (en) | A kind of THE UPFC static security prevention and control method | |
CN105406485B (en) | Based on the transformer station's dynamic reactive power optimization method and system for improving bat algorithm | |
CN107025524A (en) | Consider the apparatus overload aid decision-making method of load power supply reliability requirement | |
CN107579530A (en) | The low frequency deloading method and low-frequency load reduction control system of a kind of power network | |
CN103904678A (en) | Method for controlling high-voltage direct-current transmission subsection rate-variable low-voltage current-limiting unit | |
CN104993466A (en) | Cascading fault fast dynamic simulation method applicable to alternating current-direct current power grid | |
CN104485661A (en) | Tidal current automatic regulating method based on node type conversion | |
CN106712042A (en) | Power grid energy conservation and loss reduction control method considering reactive response capability of charging pile | |
CN106570791A (en) | Dynamic adjustment method for structure of regional power grid in allusion to main transformer overload | |
CN105117983B (en) | Consider load and the UPFC installation site optimization methods of new energy randomness | |
CN104485662A (en) | Method of calculating maximum power supply capability of power distribution network during parallel operation of substation | |
CN107067126A (en) | It is a kind of based on power flow transfer than thermally-stabilised key transmission channel recognition method | |
CN107046289B (en) | Power grid steady-state frequency estimation method considering security control strategy and primary frequency modulation characteristic | |
CN103904645B (en) | Phase shifting transformer site selecting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |