CN106655202A CN201710041188.8A CN201710041188A CN106655202A CN 106655202 A CN106655202 A CN 106655202A CN 201710041188 A CN201710041188 A CN 201710041188A CN 106655202 A CN106655202 A CN 106655202A
Authority
CN
China
Prior art keywords
interruptible load
prevention device
overload prevention
electromotor
overload
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710041188.8A
Other languages
Chinese (zh)
Other versions
CN106655202B (en
Inventor
徐伟
李群
袁宇波
杨君军
刘韶峰
李虎成
胡昊明
赵静波
夏小琴
许晓彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Nari Technology Co Ltd
Nanjing NARI Group Corp
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Nari Technology Co Ltd
Nanjing NARI Group Corp
Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Nari Technology Co Ltd, Nanjing NARI Group Corp, Electric Power Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710041188.8A priority Critical patent/CN106655202B/en
Publication of CN106655202A publication Critical patent/CN106655202A/en
Application granted granted Critical
Publication of CN106655202B publication Critical patent/CN106655202B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Power Engineering (AREA)
  • Control Of Ac Motors In General (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an interruptible-load-based multiple-target overloading assistant decision making method. Contribution indexes of an interruptible load for reducing two target functions, namely an interruptible load cutting total amount and an interruptible load cutting total number, are respectively computed; a comprehensive contribution index of the interruptible load to the two target functions is computed by utilizing linear weighting factors; the linear weighting factors are divided into different grades; an overloading assistant decision making measure corresponding to each grade of the linear weighting factor is computed; and the final measure is selected via a scheduling operator. By applying the interruptible-load-based multiple-target overloading assistant decision making method, multiple-target optimization can be performed according to the contribution indexes of the interruptible load to the target functions, an effective solution set meeting the computation precision is given out, and coordinate optimization of reduction of the two target functions, namely the interruptible load cutting total amount and the interruptible load cutting total number, is implemented.

Description

A kind of multiple target based on interruptible load transships aid decision-making method
Technical field
The present invention relates to a kind of multiple target based on interruptible load transships aid decision-making method, belong to power system automatic Change technical field.
Background technology
Receiving end grid generator it is standby deficiency in the case of, need by spatial load forecasting to eliminate electrical network in equipment mistake Carry.Ratio of the extra-high voltage direct-current transmission capacity in receiving-end system scale constantly increases, and direct current locking failure causes high-power punching Hit, in the presence of system frequency modulation characteristic, generator output increase may cause Section Tidal Current of Power Transmission to get over stability limitation, to load The scale and response speed of control is put forward higher requirement.
Traditional spatial load forecasting does not account for the practical situation of user side, and the concentration cutting load of extensive indiscriminate property is not Huge economic losses can be only caused, the acceptance level of user is relatively low under Power Market.Scope is modeled by EMS system Limit, provincial scheduling institution is difficult to directly perceive the controllable burden capacity in electrical network, can only be according to the ratio for pre-setting each Share the cutting load amount for eliminating overload between districts and cities, draw road to carry out spatial load forecasting by accident by regional dispatch mechanism.When certain When regional dispatch mechanism controls amount is not enough, provincial scheduling institution needs the system running state of the execution end that road is drawn according to accident Aid decision calculating is carried out again, it is impossible to meet rapidity requirement of the complex fault scene to accident handling.
The content of the invention
In order to solve above-mentioned technical problem, the invention provides a kind of multiple target overload auxiliary based on interruptible load is determined Plan method.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of multiple target based on interruptible load transships aid decision-making method, comprises the following steps,
Step 1, obtains the controllable capacity data of interruptible load and sets up interruptible load and energy at control centre station The corresponding relation of the medium duty value of management system;
Step 2, if control centre station detects there is overload prevention device under current state, into step 3;Otherwise, terminate This method;
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing Itself association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends;
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, and power transfer distribution factor is big Decision space is added in the interruptible load of setting threshold value;
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount target according to power Function f1Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2's Contribution degree index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor; Wherein, the corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1;
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, calculate respectively each gear linear weighted function because Son corresponding overload aid decision measure;Overload aid decision measure include needing the interruptible load of excision and with can interrupt The total flux matched generated power Adjusted Option of load excision;
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there is phase The difference of adjacent gear interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10;
Step 9, cuts off total amount difference true more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load Fixed newly-increased gear, return to step 7;
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference, Variation delta E that interruptible load cuts off total amount is calculated successively for other effective gear nn=E0-EnCut with interruptible load Except variation delta W of sumn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision Sum, by the overload aid decision measure that management and running personnel selection is final.
Determine that overload prevention device associates the process of the adjustable space of electromotor and is,
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
3-2) filter out electromotor of the power transfer distribution factor absolute value more than setting threshold value, using the electromotor as Overload prevention device associates electromotor;
3-3) meet overload prevention device association electromotor of the power transfer distribution factor less than 0 exerts oneself adjustment direction to increase Power, calculates and increases the adjustable space that overload prevention device of exerting oneself associates electromotor;
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase and exert oneself Overload prevention device association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be by increasing Load equipment associates generator output to reduce the overload degree of overload prevention device.
Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load Duty value distribution factor is shifted to the power of overload prevention device, the power is shifted distribution factor as interruptible load to mistake The power transfer distribution factor of load equipment.
Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be,
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the control of interruptible load Performance indications processed;
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device Qj Load factor, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, by the controlling of interruptible load Energy index is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree Index;
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index, γmax=max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is entered Row normalized, calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index, PiFor interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution Degree index.
The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ,
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjCan for what is cut off Interruptible load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power, For alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformation Device,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section, For power allowances of the transmission cross-section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower turn Move distribution factor;
7-3) maximum of all overload prevention devices correspondence interruptible load resection is examined as interruptible load resection Consider frequency modulation frequency modulation during frequency modulation frequency modulation association electromotor and interruptible load response condition, to electromotor and do not cut off can in The active of disconnected load is adjusted, and control measure are checked by AC power flow;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, really The corresponding overload prevention device Q of absolute value of the minima that fixed all power are more limited the quantityd
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CACheck for AC power flow secondary The maximum of number all overload prevention devices correspondence interruptible load resection when being A;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7-1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7- 1。
In step 7-3, it is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jSet for overload Standby association electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ fAGC, then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and Terminate adjustment process;Otherwise, simulate frequency modulation frequency modulation course of action frequency modulation frequency modulation is associated electromotor and not cutting off can interrupt it is negative Lotus is adjusted, and step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For Frequency modulation frequency modulation associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation association electromotor g ' it is maximum active with It is current active;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total tune of load in system Frequency coefficient, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change Active power coefficient.
Total amount difference is cut off according to interruptible load newly-increased more than the linear weighted function factor region of search determination of computational accuracy ξ The process of gear be,
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1
The gear number for 9-2) newly increasingEt、Et+1Be divided into gear for t and t+1 can in Disconnected load cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
The beneficial effect that the present invention is reached:It is total to reducing interruptible load excision that the present invention calculates respectively interruptible load The contribution degree index of amount, total two object functions of interruptible load excision, using the linear weighted function factor interruptible load is calculated Comprehensive contribution degree index to two object functions;The linear weighted function factor is divided into into different gears, each gear line is calculated respectively Property weighter factor it is corresponding overload aid decision measure, by the measure that management and running personnel selection is final;It is given linear calculating During spatial load forecasting scheme under weighter factor, distribution factor estimation interruptible load excision is shifted according to the power of interruptible load Total amount, it is considered to the response condition of frequency modulation frequency modulation association electromotor and interruptible load during frequency modulation frequency modulation, to electromotor and not Excision the active of interruptible load is adjusted, and gets over limitation to the power of overload prevention device using AC power flow check and is modified, Approach by inchmeal meets computational accuracy and the aid decision measure of apparatus overload in electrical network can be completely eliminated;Using present invention side Method, can carry out multiple-objection optimization according to interruptible load to the contribution degree index of object function, be given and meet computational accuracy Efficient solution set, realizes reducing interruptible load excision total amount and the coordination of total two object functions of interruptible load excision is excellent Change.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings the invention will be further described.Following examples are only used for clearly illustrating the present invention Technical scheme, and can not be limited the scope of the invention with this.
As shown in figure 1, a kind of multiple target based on interruptible load transships aid decision-making method, its principle is:Can interrupt Load shifts distribution factor to the power of overload prevention device, reflects the excision interruptible load total to reducing interruptible load excision The contribution of amount, the capacity of interruptible load reflects the tribute for cutting off the interruptible load to reducing interruptible load excision sum Offer;Interruptible load can be calculated to reducing interruptible load excision total amount and interruptible load excision using the linear weighted function factor The comprehensive contribution degree index of sum, the change of the linear weighted function factor reflects different contribution degree indexs in comprehensive contribution degree index Weight, interruptible load is ranked up by comprehensive contribution degree index, then can be answered by solving different linear weighted function factor pairs Interruptible load control program can obtain effective solution of Model for Multi-Objective Optimization;Should given linear weighted function factor pair is calculated Interruptible load control program when, can according to power shift distribution factor estimate interruptible load control problem, by hand over Stream trend check carrys out Approach by inchmeal and meets computational accuracy and the aid decision measure of apparatus overload in electrical network can be completely eliminated; Before AC power flow is checked, it is considered to the response condition of electromotor and interruptible load is associated during frequency modulation frequency modulation, to electromotor and Do not cut off the active of interruptible load to be adjusted, the trend that can simulate system after spatial load forecasting is distributed and guarantees in system Power-balance;The corresponding interruptible load controlling party of multiple gear linear weighted function factors can simultaneously be calculated by parallel computation Case, improves the calculating speed of overload aid decision.
Comprise the following steps that:
Step 1, the collection of user side installation data and interruptible load control device in interruptible load, in control centre Stand and obtain the controllable capacity data of interruptible load and to set up interruptible load corresponding with the medium duty value of EMS Relation.
, if control centre station detects has overload prevention device under current state, that is, there is alternating current circuit, transformator in step 2 Overload or transmission cross-section get over the situation of stability limitation, then into step 3;Otherwise, method ends.
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing Itself association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends.
Determine that overload prevention device associates the process of the adjustable space of electromotor and is:
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
3-2) filter out electromotor of the power transfer distribution factor absolute value more than setting threshold value, using the electromotor as Overload prevention device associates electromotor;
3-3) meet overload prevention device association electromotor of the power transfer distribution factor less than 0 exerts oneself adjustment direction to increase Power, calculates and increases the adjustable space that overload prevention device of exerting oneself associates electromotor;
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase and exert oneself Overload prevention device association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be by increasing Load equipment associates generator output to reduce the overload degree of overload prevention device.
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, and power transfer distribution factor is big Decision space is added in the interruptible load of setting threshold value.
Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load Duty value distribution factor is shifted to the power of overload prevention device, the power is shifted distribution factor as interruptible load to mistake The power transfer distribution factor of load equipment.
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount target according to power Function f1Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2's Contribution degree index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index.
Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be:
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the control of interruptible load Performance indications processed;
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device Qj Load factor, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, by the controlling of interruptible load Energy index is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree Index;
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index, γmax=max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is entered Row normalized, calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index, PiFor interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution Degree index, the excursion of κ is [0,1].
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor; Wherein, the corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1.
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, calculate respectively each gear linear weighted function because Son corresponding overload aid decision measure;Overload aid decision measure include needing the interruptible load of excision and with can interrupt The total flux matched generated power Adjusted Option of load excision.
The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ:
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjCan for what is cut off Interruptible load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power, For alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformation Device,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section, For power allowances of the transmission cross-section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower turn Move distribution factor;
7-3) maximum of all overload prevention devices correspondence interruptible load resection is examined as interruptible load resection Consider frequency modulation frequency modulation during frequency modulation frequency modulation association electromotor and interruptible load response condition, to electromotor and do not cut off can in The active of disconnected load is adjusted, and control measure are checked by AC power flow;
It is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jSet for overload Standby association electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ fAGC, then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and Terminate adjustment process;Otherwise, simulate frequency modulation frequency modulation course of action frequency modulation frequency modulation is associated electromotor and not cutting off can interrupt it is negative Lotus is adjusted, and step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For Frequency modulation frequency modulation associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation association electromotor g ' it is maximum active with It is current active;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total tune of load in system Frequency coefficient, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change Active power coefficient;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, really The corresponding overload prevention device Q of absolute value of the minima that fixed all power are more limited the quantityd
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CACheck for AC power flow secondary The maximum of number all overload prevention devices correspondence interruptible load resection when being A;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7- 1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7- 1。
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there is phase The difference of adjacent gear interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10.
Step 9, cuts off total amount difference true more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load Fixed newly-increased gear, return to step 7.
Total amount difference is cut off according to interruptible load newly-increased more than the linear weighted function factor region of search determination of computational accuracy ξ The process of gear be:
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1
The gear number for 9-2) newly increasingEt、Et+1Be divided into gear for t and t+1 can in Disconnected load cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference, Variation delta E that interruptible load cuts off total amount is calculated successively for other effective gear nn=E0-EnCut with interruptible load Except variation delta W of sumn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision Sum, by the overload aid decision measure that management and running personnel selection is final.
Said method calculates respectively interruptible load to reducing interruptible load excision total amount, interruptible load excision sum The contribution degree index of two object functions, using the linear weighted function factor comprehensive tribute of the interruptible load to two object functions is calculated Degree of offering index;The linear weighted function factor is divided into into different gears, the corresponding overload of each gear linear weighted function factor is calculated respectively auxiliary Policy making steps are helped, by the measure that management and running personnel selection is final;Spatial load forecasting side in the case where the given linear weighted function factor is calculated During case, distribution factor estimation interruptible load excision total amount is shifted according to the power of interruptible load, it is considered to frequency modulation frequency modulation process The response condition of middle frequency modulation frequency modulation association electromotor and interruptible load, to electromotor and do not cut off interruptible load it is active enter Row adjustment, gets over limitation and is modified using AC power flow check to the power of overload prevention device, and Approach by inchmeal meets computational accuracy simultaneously The aid decision measure of apparatus overload in electrical network can be completely eliminated;Using the inventive method, can be according to interruptible load pair The contribution degree index of object function carries out multiple-objection optimization, provides the efficient solution set for meeting computational accuracy, realizes that reduction can be interrupted Load cuts off the coordination optimization of total amount and total two object functions of interruptible load excision.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, on the premise of without departing from the technology of the present invention principle, some improvement and deformation can also be made, these improve and deform Also should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of multiple target based on interruptible load transships aid decision-making method, it is characterised in that:Comprise the following steps,
Step 1, obtains the controllable capacity data of interruptible load and sets up interruptible load and energy management at control centre station The corresponding relation of the medium duty value of system;
Step 2, if control centre station detects there is overload prevention device under current state, into step 3;Otherwise, we are terminated Method;
Step 3, detects that overload prevention device associates the adjustable space of electromotor, if all of overload prevention device cannot be by increasing itself Association electromotor it is active reducing overload degree, then into step 4;Otherwise, method ends;
Step 4, calculates interruptible load and shifts distribution factor to the power of overload prevention device, power transfer distribution factor is more than and is set The interruptible load of set threshold value adds decision space;
Step 5, shifts distribution factor and calculates interruptible load to reducing interruptible load excision total amount object function f according to power1 Contribution degree index, total object function f is cut off to interruptible load according to controllable calculation of capacity interruptible load2Contribution degree Index, interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
Step 6, C gear is equally divided into according to the check figure of parallel computing platform by the excursion of the linear weighted function factor;Wherein, The corresponding linear weighted function factors of gear m are κm=m/ (C-1), m=0 ..., C-1;
Step 7, is ranked up according to comprehensive contribution degree index to interruptible load, and each gear linear weighted function factor pair is calculated respectively The overload aid decision measure answered;The measure of overload aid decision includes needing the interruptible load and and interruptible load of excision The total flux matched generated power Adjusted Option of excision;
Step 8, calculates interruptible load excision total amount E of each gearmSum W is cut off with interruptible loadmIf there are adjacent shelves The difference of position interruptible load excision total amount is more than computational accuracy ξ, then execution step 9;Otherwise, execution step 10;
Step 9, cuts off total amount difference and determines newly more than the linear weighted function factor region of search of computational accuracy ξ according to interruptible load The gear of increasing, return to step 7;
Step 10, with interruptible load excision total amount E that gear is 00Sum W is cut off with interruptible load0As reference, for Other effective gear n calculate successively variation delta E that interruptible load cuts off total amountn=E0-EnIt is total with interruptible load excision Several variation deltas Wn=W0-Wn, EnAnd WnThe interruptible load excision total amount of respectively gear n and interruptible load excision are total Number, by the overload aid decision measure that management and running personnel selection is final.
2. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists In:Determine that overload prevention device associates the process of the adjustable space of electromotor and is,
3-1) electromotor being calculated respectively, distribution factor is shifted to the power of overload prevention device;
Electromotor of the power transfer distribution factor absolute value more than setting threshold value 3-2) is filtered out, using the electromotor as overload Equipment associates electromotor;
The adjustment direction of exerting oneself for 3-3) meeting overload prevention device association electromotor of the power transfer distribution factor less than 0 is exerted oneself for increasing, Calculate and increase the adjustable space that overload prevention device of exerting oneself associates electromotor;
ΔP g , j = P g m a x - P g 0
Wherein, Δ Pg,jTo increase the adjustable space that overload prevention device of exerting oneself associates electromotor g,WithRespectively increase overload of exerting oneself Equipment association electromotor g's is maximum active and current active;
If 3-4) all adjustable spaces for increasing overload prevention device association electromotor of exerting oneself are 0, cannot be set by increasing overload It is standby to associate generator output to reduce the overload degree of overload prevention device.
3. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists In:Calculate interruptible load is to the power transfer distribution factor process of overload prevention device:Calculate corresponding with interruptible load etc. Duty value shifts distribution factor to the power of overload prevention device, the power is shifted into distribution factor overload is set as interruptible load Standby power transfer distribution factor.
4. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists In:Interruptible load is calculated to object function f1And f2The process of comprehensive contribution degree index be,
5-1) distribution factor is shifted to the power of all overload prevention devices according to interruptible load, calculate the controlling of interruptible load Can index;
γ i = Σ j = 1 N γ i , j λ j
Wherein, γiFor interruptible load LiControl performance standard, N for overload prevention device sum, λjFor overload prevention device QjLoad Rate, γi,jFor interruptible load LiTo overload prevention device QjPower transfer distribution factor;
5-2) choose in interruptible load and be worth on the basis of the maximum of Control performance standard, the control performance of interruptible load is referred to Mark is normalized, and calculates interruptible load to reducing interruptible load excision total amount object function f1Contribution degree refer to Mark;
S i E = γ i / γ m a x
Wherein,For interruptible load LiTo reducing interruptible load excision total amount object function f1Contribution degree index, γmax =max (γi) for the maximum of Control performance standard in interruptible load;
5-3) choose in interruptible load and be worth on the basis of the maximum of controllable capacity, the controllable capacity of interruptible load is returned One change is processed, and calculates interruptible load to reducing the total object function f of interruptible load excision2Contribution degree index;
S i W = P i / P m a x
Wherein,For interruptible load LiTo reducing the total object function f of interruptible load excision2Contribution degree index, PiFor Interruptible load LiControllable capacity, Pmax=max (Pi) it is interruptible load LiIn controllable capacity the maximum;
5-4) interruptible load is calculated to object function f using the linear weighted function factor1And f2Comprehensive contribution degree index;
S i C ( κ ) = κS i E + ( 1 - κ ) S i W
Wherein,For the linear weighted function factor be κ when, interruptible load LiTo object function f1And f2Comprehensive contribution degree refer to Mark.
5. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists In:The process of corresponding overload aid decision measure is when the calculating linear weighted function factor is κ,
7-1) AC power flow check number of times A is initialized as into 0, it is ε to arrange AC power flow and check step-length2
7-2) determine that overload prevention device overload is completely eliminated corresponding interruptible load resection successively, meet:
E j ( &kappa; ) = &Sigma; i = 1 M j P i &Sigma; i = 1 M j &gamma; i , j P i > &Delta;P j &Sigma; i = 1 M j - 1 &gamma; i , j P i < &Delta;P j &gamma; i , j &GreaterEqual; &gamma; i + 1 , j
Wherein, Ej(κ) it is overload prevention device QjOverload is completely eliminated corresponding interruptible load resection, MjFor interrupting for excision Load number,For overload prevention device QjPower more limit the quantity, PjFor overload prevention device QjActive power, for Alternating current circuit,It is according to overload prevention device QjThe power limit that rated current and current voltage are converted into, for transformator,It is according to overload prevention device QjThe power limit that rated capacity and current voltage are converted into;For transmission cross-section,For defeated Power allowances of the electric section under the current method of operation, γi+1,jFor interruptible load Li+1To overload prevention device QjPower transfer point The cloth factor;
7-3) using the maximum of all overload prevention devices correspondence interruptible load resection as interruptible load resection, it is considered to two The response condition of frequency modulation frequency modulation association electromotor and interruptible load, can interrupt negative to electromotor and not cutting off in secondary frequency-modulating process The active of lotus is adjusted, and control measure are checked by AC power flow;
7-4) AC power flow check number of times A is updated to into A+1, the power that all overload prevention devices are calculated respectively is more limited the quantity, and determines institute There is the corresponding overload prevention device Q of absolute value of the minima of the out-of-limit amount of powerd
Process according to the following steps:
(1) ifThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A is checked for AC power flowdPower more limit the quantity, CAIt is A to check number of times for AC power flow The maximum of Shi Suoyou overload prevention devices correspondence interruptible load resection;
(2) if A>1、AndThen by CAAs final interruptible load control program;
Overload prevention device Q when number of times is A-1 is checked for AC power flowdPower more limit the quantity;
(3) if A>1、AndThen by CA-1As final interruptible load control program;
CA-1For the maximum that AC power flow checks all overload prevention device correspondence interruptible load resection when number of times is A-1;
(4) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7-1;
(5) ifThen by overload prevention device QdPower get over limitation and be updated to Δ Pd=Δ Pd2, return to step 7-1.
6. a kind of multiple target based on interruptible load according to claim 5 transships aid decision-making method, and its feature exists In:In step 7-3, it is to electromotor and the active process that is adjusted for not cutting off interruptible load,
7-3-1) Control performance standard of the computation overload equipment association electromotor to all overload prevention devices;
&tau; g = &Sigma; j = 1 N &tau; g , j &lambda; j
Wherein, τgControl performance standards of the electromotor g to all overload prevention devices, τ are associated for overload prevention deviceg,jFor overload prevention device association Electromotor g is to overload prevention device QjPower transfer distribution factor;
7-3-2) according to system frequency and the frequency departure of rated frequency computing system;
Δ f=f-f0
Wherein, Δ f is system frequency f and rated frequency f0The frequency departure of computing system;
7-3-3) compare the corresponding frequency departure threshold value Δ f in AGC operating dead zonesAGCWith the size of Δ f, if Δ f >=-Δ fAGC, Then select overload prevention device association electromotor drop to exert oneself by Control performance standard is descending, adjust total amount and CAUnanimously, and terminate Adjustment process;Otherwise, the course of action for simulating frequency modulation frequency modulation associates electromotor to frequency modulation frequency modulation and does not cut off interruptible load Row adjustment, step is as follows:
(1) the active variable quantity that frequency modulation frequency modulation associates electromotor is participated at the end of calculating controlling cycle T;
&Delta;P g &prime; = m i n ( V g &prime; T , P g &prime; max - P g &prime; 0 )
Wherein, Δ Pg′The active variable quantity that frequency modulation frequency modulation associates electromotor g ', V are participated at the end of for controlling cycle Tg′For secondary tune Frequency associates the climbing rate of electromotor g ',WithRespectively frequency modulation frequency modulation associates the maximum active of electromotor g ' and currently has Work(;
(2) calculate controlling cycle T at the end of system frequency variable quantity;
&Delta;f T = ( C A + &Sigma; g &prime; = 1 N G &Delta;P g &prime; ) / K s
Wherein, Δ fTThe variable quantity of system frequency, K at the end of for controlling cycle TsNot cut off total frequency modulation system of load in system Number, NGTo participate in frequency modulation frequency modulation association electromotor quantity;
(3) duty value B after frequency change is calculatedkActive variable quantity;
&Delta;P B k = K B k &Delta;f T
Wherein,For duty value B after frequency changekActive variable quantity,For duty value BkFrequency change it is active Coefficient.
7. a kind of multiple target based on interruptible load according to claim 1 transships aid decision-making method, and its feature exists In:Total amount difference is cut off according to interruptible load and determines newly-increased shelves more than the linear weighted function factor region of search of computational accuracy ξ Position process be,
It is t and t+1 9-1) to define adjacent gear positions, then the corresponding linear weighted function factor is respectively κtAnd κt+1
The gear number for 9-2) newly increasingEt、Et+1It is that interrupting for t and t+1 is negative to be divided into gear Lotus cuts off total amount;
9-3) by the region of search [κt, κt+1] press MtRespectively obtain the linear weighted function factor of newly-increased gear.
CN201710041188.8A 2017-01-20 2017-01-20 A kind of multiple target overload aid decision-making method based on interruptible load Active CN106655202B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710041188.8A CN106655202B (en) 2017-01-20 2017-01-20 A kind of multiple target overload aid decision-making method based on interruptible load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710041188.8A CN106655202B (en) 2017-01-20 2017-01-20 A kind of multiple target overload aid decision-making method based on interruptible load

Publications (2)

Publication Number Publication Date
CN106655202A true CN106655202A (en) 2017-05-10
CN106655202B CN106655202B (en) 2017-12-15

Family

ID=58841418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710041188.8A Active CN106655202B (en) 2017-01-20 2017-01-20 A kind of multiple target overload aid decision-making method based on interruptible load

Country Status (1)

Country Link
CN (1) CN106655202B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107423879A (en) * 2017-06-07 2017-12-01 国网辽宁省电力有限公司 A kind of method that controllable burden participates in Automatic Generation Control
CN108039709A (en) * 2017-10-23 2018-05-15 国网能源研究院有限公司 A kind of management method based on the electric power interruptible load that can interrupt Potential Evaluation
CN109599875A (en) * 2018-11-29 2019-04-09 国电南瑞科技股份有限公司 A kind of grid equipment overload quick cutting method of load based on supply path
CN109672225A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 The Automatic Control Strategy of 220kV transformer overload is eliminated in a kind of adjustment
CN110401208A (en) * 2019-07-26 2019-11-01 云南电网有限责任公司 A kind of intelligent setting method of ac and dc systems high-frequency cutting machine
CN111525586A (en) * 2020-05-28 2020-08-11 国网江苏省电力有限公司 Power grid load control method, device, equipment and medium
CN113671313A (en) * 2021-08-12 2021-11-19 国网安徽省电力有限公司 Anti-misoperation method, device and system for remote coordination of low-frequency low-voltage device receiving

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102957147A (en) * 2012-11-30 2013-03-06 辽宁省电力有限公司电力科学研究院 Multi-load characteristic-matched under-frequency load shedding optimal control system and multi-load characteristic-matched under-frequency load shedding optimal control method
CN105281320A (en) * 2015-09-16 2016-01-27 河海大学 Economical efficiency and load shedding rate fairness coordination emergency load control optimization method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102957147A (en) * 2012-11-30 2013-03-06 辽宁省电力有限公司电力科学研究院 Multi-load characteristic-matched under-frequency load shedding optimal control system and multi-load characteristic-matched under-frequency load shedding optimal control method
CN105281320A (en) * 2015-09-16 2016-01-27 河海大学 Economical efficiency and load shedding rate fairness coordination emergency load control optimization method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周晓宁等: "《计及负荷转供措施的电网设备过载辅助决策》", 《电力系统保护与控制》 *
鲍颜红灯: "《电力系统在线安全稳定综合辅助决策》", 《电力系统自动化》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107423879A (en) * 2017-06-07 2017-12-01 国网辽宁省电力有限公司 A kind of method that controllable burden participates in Automatic Generation Control
CN107423879B (en) * 2017-06-07 2018-08-24 国网辽宁省电力有限公司 A kind of method that controllable burden participates in Automatic Generation Control
CN108039709A (en) * 2017-10-23 2018-05-15 国网能源研究院有限公司 A kind of management method based on the electric power interruptible load that can interrupt Potential Evaluation
CN108039709B (en) * 2017-10-23 2020-10-02 国网能源研究院有限公司 Management method of electric interruptible load based on interruptible potential evaluation
CN109599875A (en) * 2018-11-29 2019-04-09 国电南瑞科技股份有限公司 A kind of grid equipment overload quick cutting method of load based on supply path
CN109599875B (en) * 2018-11-29 2022-04-19 国电南瑞科技股份有限公司 Power supply path-based power grid equipment overload load rapid removal method
CN109672225A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 The Automatic Control Strategy of 220kV transformer overload is eliminated in a kind of adjustment
CN110401208A (en) * 2019-07-26 2019-11-01 云南电网有限责任公司 A kind of intelligent setting method of ac and dc systems high-frequency cutting machine
CN110401208B (en) * 2019-07-26 2023-05-26 云南电网有限责任公司 Intelligent setting method for high-frequency cutting machine of AC/DC system
CN111525586A (en) * 2020-05-28 2020-08-11 国网江苏省电力有限公司 Power grid load control method, device, equipment and medium
CN113671313A (en) * 2021-08-12 2021-11-19 国网安徽省电力有限公司 Anti-misoperation method, device and system for remote coordination of low-frequency low-voltage device receiving

Also Published As

Publication number Publication date
CN106655202B (en) 2017-12-15

Similar Documents

Publication Publication Date Title
CN106655202B (en) A kind of multiple target overload aid decision-making method based on interruptible load
CN103384068B (en) Transient Security for Power Systems stablizes emergency control strategy of on-line optimized calculation method
CN102522747B (en) Calculation method of power supply capability of power distribution system
CN103887810B (en) Straight-flow system based on short-circuit ratio dynamic tracking continues phase conversion failure judgment method
CN107086578A (en) A kind of region voltage layered distribution type cooperative control system of photovoltaic power distribution network
CN107294131A (en) A kind of new energy power station voltage control system and method based on inverter generator operation as synchronous condenser
CN107134785B (en) Power transmission network voltage coordination optimization control method considering network structure optimization
CN110896231B (en) Distributed photovoltaic capacity receiving calculation method and system for power distribution network in poverty alleviation area
CN103514364A (en) Overloading assistant decision-making computing method of power grid equipment considering load transfer actions
CN105046575A (en) Evaluation method for determining power network equipment utilization rate evaluation indexes
CN103904673B (en) Method for optimizing PI parameter of high-voltage direct-current transmission constant-current controller
CN107425527A (en) A kind of THE UPFC static security prevention and control method
CN105406485B (en) Based on the transformer station&#39;s dynamic reactive power optimization method and system for improving bat algorithm
CN107025524A (en) Consider the apparatus overload aid decision-making method of load power supply reliability requirement
CN107579530A (en) The low frequency deloading method and low-frequency load reduction control system of a kind of power network
CN103904678A (en) Method for controlling high-voltage direct-current transmission subsection rate-variable low-voltage current-limiting unit
CN104993466A (en) Cascading fault fast dynamic simulation method applicable to alternating current-direct current power grid
CN104485661A (en) Tidal current automatic regulating method based on node type conversion
CN106712042A (en) Power grid energy conservation and loss reduction control method considering reactive response capability of charging pile
CN106570791A (en) Dynamic adjustment method for structure of regional power grid in allusion to main transformer overload
CN105117983B (en) Consider load and the UPFC installation site optimization methods of new energy randomness
CN104485662A (en) Method of calculating maximum power supply capability of power distribution network during parallel operation of substation
CN107067126A (en) It is a kind of based on power flow transfer than thermally-stabilised key transmission channel recognition method
CN107046289B (en) Power grid steady-state frequency estimation method considering security control strategy and primary frequency modulation characteristic
CN103904645B (en) Phase shifting transformer site selecting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant