CN106655156A - Automatic load control terminal switching device of dual-power-supply user - Google Patents

Automatic load control terminal switching device of dual-power-supply user Download PDF

Info

Publication number
CN106655156A
CN106655156A CN201610904302.0A CN201610904302A CN106655156A CN 106655156 A CN106655156 A CN 106655156A CN 201610904302 A CN201610904302 A CN 201610904302A CN 106655156 A CN106655156 A CN 106655156A
Authority
CN
China
Prior art keywords
power supply
auxiliary
main
binding post
relay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610904302.0A
Other languages
Chinese (zh)
Inventor
万召杰
宋春辉
廖烽然
于林卉
王炫丹
于洨
王俊涛
于秀梅
曹勇
宋书强
马传波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yantai Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610904302.0A priority Critical patent/CN106655156A/en
Publication of CN106655156A publication Critical patent/CN106655156A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J3/005

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The invention discloses an automatic load control terminal switching device of a dual-power-supply user. A main power supply terminal arranged at a main body (10) is connected with a main contact of a relay by a voltage transformer PT and a main supply circuit switch S1 and an auxiliary power supply terminal is connected with an auxiliary contact of the relay by the voltage transformer PT and an auxiliary circuit switch S2; the relay is connected with a voltage output port connected with a load control terminal; and a tripping coil TQ is connected with the auxiliary circuit switch S2 and the relay. An electric energy meter A communication module a is connected with the auxiliary circuit switch S2 and the relay; an electric energy meter B communication module b is connected with the main supply circuit switch S1 and the relay. The automatic load control terminal switching device has advantages of simple structure, low cost, low power consumption, convenience in installation, greatly reduced maintenance staff workload, saved enterprise costs and reduced field work security risk.

Description

A kind of dual power supply customer charge control terminal automatic switching control equipment
Technical field:
The present invention relates to a kind of dual power supply customer charge control terminal automatic switching control equipment, belongs to electric energy acquisition O&M technology neck Domain.
Background technology:
" all standing, full collection, control in full " is the construction object of State Grid Corporation of China's power information acquisition system, spatial load forecasting end Hold for carrying out power information Real-time Collection and monitoring to user, load control terminal is divided to two kinds of phase three-wire three and three-phase and four-line, Phase three-wire three acquisition terminal being adopted as dual power supply user, its operating voltage is 3*100V, with what is required power supply reliability more Improve, customer quantity may proceed to increase.The power supply mode is to the puzzlement that power information acquisition system is brought:Load control terminal Only it is connected on the PT of user's main power supply, once being switched to stand-by power supply terminal will result in terminal power failure, causes user's electric energy Table cannot be gathered, and while causing index to decline, also have impact on the development of other business such as remote bill control, load management, scene O&M maintenance also increases the O&M cost and field work safe risk of enterprise.
The most volume of existing customer charge control terminal automatic switching control equipment is big, install loaded down with trivial details, high cost, is not appropriate for Application is installed on a large scale, therefore urgently studies a kind of load control terminal automatic switching control equipment that can meet work in every requirement.
The content of the invention:
It is an object of the invention to overcome above-mentioned existing not enough and provide a kind of simple structure, with low cost, low in energy consumption, installation It is convenient, maintainer's workload is greatly decreased, entreprise cost is saved, reduce the dual power supply customer charge of field work safe risk Control terminal automatic switching control equipment.
The purpose of the present invention can be reached by following measure:A kind of dual power supply customer charge control terminal automatically switches Device, it includes body, it is characterised in that body is provided with main power supply binding post A1, main power supply binding post A2, master Power supply source binding post A3, auxiliary power supply source binding post B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3, electricity Energy Table A communication module connection terminal a1, a0, electric energy meter B communication module connection terminal b1, b0, it is defeated that the front end of body 10 is provided with U phases Go out terminal, V phase output terminals, W phase output terminals, main confession contactor S1, auxiliary confession contactor S2, main power supply terminals Sub- A1 is connected with main power supply voltage secondary side a, and main power supply binding post A2 is connected with main power supply voltage secondary side b Connect, main power supply binding post A3 is connected with main power supply voltage secondary side c;Auxiliary power supply source binding post B1 and auxiliary power supply source Voltage secondary side a is connected, and auxiliary power supply source binding post B2 is connected with auxiliary power supply source voltage secondary side b, auxiliary power supply source wiring Terminal B3 is connected with auxiliary power supply source voltage secondary side c;U phase output terminals are connected with load control terminal input power u, V phases Lead-out terminal is connected with load control terminal input power v, and W phase output terminals are connected with load control terminal input power w;Electricity Can Table A communication module connection terminal a1, a0 connection electric energy Table A communication module a, electric energy meter B communication module connection terminal b1, b0 Connection electric energy meter B communication module b;This is provided with vivo power-switching circuit, and power-switching circuit includes voltage transformer pt, relay Device, main power supply binding post A1, main power supply binding post A2, main power supply binding post A3 are connected by voltage transformer pt Meet main confession contactor S1, three lead-out terminals of main confession contactor S1 connect respectively the main contacts 1 of relay, main contacts 2, Main contacts 3, auxiliary power supply source binding post B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3 are by another electricity Pressure transformer PT connects auxiliary confession contactor S2, and three lead-out terminals of auxiliary confession contactor S2 connect respectively the auxiliary of relay and touch Point 4, auxiliary contact 5, auxiliary contact 6, the main contacts 1 of relay, auxiliary contact 4 and main contacts 2, auxiliary contact 5 and main contacts 3, auxiliary contact 6 Respectively voltage output 7, voltage output 8, voltage output 9 are connected by selecting switch, the connection of voltage output 7 U phases are defeated Go out terminal, the connection V phase output terminals of voltage output 8, voltage output 9 is connected with W phase output terminals;Breaking coil TQ is positive and negative Pole is connected on the loop between auxiliary confession contactor S2 and auxiliary contact 5, the auxiliary contact 6 of relay;Electric energy Table A communication module connects Connecting terminal a1, a0 are connected on the loop between auxiliary confession contactor S2 and auxiliary contact 4, the auxiliary contact 5 of relay;Electric energy meter B Communication module connection terminal b1, b0 are connected to the loop between main confession contactor S1 and main contacts 1, the main contacts 2 of relay On.
The present invention can produce compared with the prior art following good effect:
The present invention can timely and effectively solve dual power supply user's negative control terminal power supply switching problem, it is to avoid non-faulting reason is made Into terminal stop transport.It has:
1. simple structure, with low cost, and device main components are relay, by relay breaking coil monitor in real time two The voltage signal of road power supply, and send control signal in real time according to actual conditions, realizes the automatic of main power supply and auxiliary power supply source Switching.
2. maintainer's workload is greatly decreased, entreprise cost is saved, field work safe risk is reduced.Because user falls Lock is operated, and acquisition terminal has a power failure cannot cannot realize data acquisition with master station communication, terminal, have influence on miscellaneous service application.Adopt Collecting system main website shows acquisition abnormity, and maintainer must ascertain the reason to scene.After the present invention, after user's grid switching operation Terminal supplying power switches therewith, still normal work, and maintainer need not be to on-site maintenance.
3. automatic switching control equipment main devices be relay, small power consumption(<1W), low cost, convenient and flexible installation can be with It is installed in wall, metering cabinet, disclosure satisfy that the requirement of work on the spot, without the need for transforming switchgear house, investment reduction is easy to Widespread adoption.
Description of the drawings:
Fig. 1 is the external structure schematic diagram of the present invention;
Fig. 2 is principle of the invention wiring diagram.
Specific embodiment:
Embodiments of the present invention are elaborated below in conjunction with the accompanying drawings:
Embodiment:A kind of dual power supply customer charge control terminal automatic switching control equipment(Referring to Fig. 1, Fig. 2), it includes body 10, Body 10 is provided with main power supply binding post A1, main power supply binding post A2, main power supply binding post A3, auxiliary power supply source Binding post B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3, electric energy Table A communication module connection terminal a1, A0, electric energy meter B communication module connection terminal b1, b0, it is defeated that the front end of body 10 is provided with U phase output terminals, V phase output terminals, W phases Go out terminal, main confession contactor S1, auxiliary confession contactor S2, main power supply binding post A1 and main power supply voltage secondary side a It is connected, main power supply binding post A2 is connected with main power supply voltage secondary side b, main power supply binding post A3 and main confession Supply voltage secondary side c is connected.Auxiliary power supply source binding post B1 is connected with auxiliary power supply source voltage secondary side a, auxiliary power supply source Binding post B2 is connected with auxiliary power supply source voltage secondary side b, auxiliary power supply source binding post B3 and auxiliary power supply source voltage secondary side c It is connected.U phase output terminals are connected with load control terminal input power u, and V phase output terminals are electric with load control terminal input Source v connects, and W phase output terminals are connected with load control terminal input power w.Electric energy Table A communication module connection terminal a1, a0 connect Meet electric energy Table A communication module a, electric energy meter B communication module connection terminals b1, b0 connection electric energy meter B communication module b.
Power-switching circuit is provided with body 10(Referring to Fig. 2), power-switching circuit include voltage transformer pt, relay Device, main power supply binding post A1, main power supply binding post A2, main power supply binding post A3 are connected by voltage transformer pt Meet main confession contactor S1(DZ47-D6A), three lead-out terminals of main confession contactor S1 connect respectively the main contacts of relay 1st, main contacts 2, main contacts 3, auxiliary power supply source binding post B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3 lead to Cross another voltage transformer pt and connect auxiliary confession contactor S2(DZ47-D6A), three lead-out terminals of auxiliary confession contactor S2 Connect auxiliary contact 4, auxiliary contact 5, the auxiliary contact 6 of relay respectively, the main contacts 1 of relay, auxiliary contact 4 and main contacts 2, auxiliary touch Point 5 and main contacts 3, auxiliary contact 6 connect voltage output 7, voltage output 8, voltage output 9 by selecting switch respectively, Voltage output 7 connects U phase output terminals, the connection V phase output terminals of voltage output 8, voltage output 9 and W phase output terminals Son connection.Breaking coil TQ both positive and negative polarities are connected to returning between auxiliary confession contactor S2 and auxiliary contact 5, the auxiliary contact 6 of relay Lu Shang.Electric energy Table A communication module connection terminal a1, a0 are connected to auxiliary contact 4, the auxiliary contact of auxiliary confession contactor S2 and relay On loop between 5.Electric energy meter B communication module connection terminal b1, b0 are connected to main confession contactor S1 and the master of relay touches On loop between point 1, main contacts 2.
Main power supply Jing after PT conversions, is accessed by main power supply binding post A1, A2, A3 by main confession contactor S1, Auxiliary power supply source Jing after PT conversions, is accessed by auxiliary power supply source binding post B1, B2, B3 by auxiliary confession contactor S2, electricity after conversion Press as 3*100V, power-switching circuit is mainly by relay breaking coil TQ, the main contacts 1 of relay, main contacts 2, main contacts 3, the auxiliary contact 4 of relay, auxiliary contact 5, auxiliary contact 6 constitute, automatic switching control equipment by voltage output 7,8,9 by U, V, W phase output terminals access load control terminal.When user is powered by main power supply, breaking coil TQ is monitored less than voltage, after Appliance contact is failure to actuate, and terminal is powered by the main contacts 1 of relay, main contacts 2, main contacts 3;When user's power supply is by main power supply When switching to auxiliary power supply source and powering, breaking coil TQ is monitored to voltage, relay contact action, terminal by relay main contacts 1st, main contacts 2, main contacts 3 are changed to the auxiliary contact 4 of relay, auxiliary contact 5, auxiliary contact 6 and powered, it is possible to achieve terminal online with And the collection to 2 electric energy meters.
Although above with reference to the accompanying drawings table is described in detail to embodiments of the invention, this specific embodiment party is not limited only to Formula, various equivalents, deformation process that those skilled in the art is carried out according to this concrete technical scheme, also in the protection of the present invention Within the scope of.

Claims (1)

1. a kind of dual power supply customer charge control terminal automatic switching control equipment, it includes body(10), it is characterised in that body (10)It is provided with main power supply binding post A1, main power supply binding post A2, main power supply binding post A3, auxiliary power supply source to connect Line terminals B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3, electric energy Table A communication module connection terminal a1, a0, Electric energy meter B communication module connection terminal b1, b0, the front end of body 10 is provided with U phase output terminals, V phase output terminals, W phase output terminals Sub, main confession contactor S1, auxiliary confession contactor S2, main power supply binding post A1 is connected with main power supply voltage secondary side a Connect, main power supply binding post A2 is connected with main power supply voltage secondary side b, main power supply binding post A3 and main power supply Voltage secondary side c is connected;Auxiliary power supply source binding post B1 is connected with auxiliary power supply source voltage secondary side a, auxiliary power supply source wiring Terminal B2 is connected with auxiliary power supply source voltage secondary side b, and auxiliary power supply source binding post B3 is connected with auxiliary power supply source voltage secondary side c Connect;U phase output terminals are connected with load control terminal input power u, V phase output terminals and load control terminal input power v Connection, W phase output terminals are connected with load control terminal input power w;Electric energy Table A communication module connection terminal a1, a0 connect Electric energy Table A communication module a, electric energy meter B communication module connection terminals b1, b0 connection electric energy meter B communication module b;Body(10) Power-switching circuit is inside provided with, power-switching circuit includes voltage transformer pt, relay, main power supply binding post A1, master Power supply source binding post A2, main power supply binding post A3 connect main confession contactor S1, main power supply by voltage transformer pt Three lead-out terminals of way switch S1 connect respectively main contacts 1, main contacts 2, the main contacts 3 of relay, auxiliary power supply source terminals Sub- B1, auxiliary power supply source binding post B2, auxiliary power supply source binding post B3 connect auxiliary confession circuit by another voltage transformer pt Switch S2, three lead-out terminals of auxiliary confession contactor S2 connect respectively auxiliary contact 4, auxiliary contact 5, the auxiliary contact 6 of relay, after The main contacts 1 of electrical equipment, auxiliary contact 4 and main contacts 2, auxiliary contact 5 and main contacts 3, auxiliary contact 6 are respectively by selecting switch connection electricity Pressure delivery outlet 7, voltage output 8, voltage output 9, the connection U phase output terminals of voltage output 7, the connection V of voltage output 8 Phase output terminals, voltage output 9 is connected with W phase output terminals;Breaking coil TQ both positive and negative polarities are connected to auxiliary confession contactor S2 On the loop between auxiliary contact 5, auxiliary contact 6 with relay;Electric energy Table A communication module connection terminal a1, a0 are connected to auxiliary confession On loop between auxiliary contact 4, the auxiliary contact 5 of contactor S2 and relay;Electric energy meter B communication module connection terminal b1, b0 It is connected on the loop between main confession contactor S1 and main contacts 1, the main contacts 2 of relay.
CN201610904302.0A 2016-10-18 2016-10-18 Automatic load control terminal switching device of dual-power-supply user Pending CN106655156A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610904302.0A CN106655156A (en) 2016-10-18 2016-10-18 Automatic load control terminal switching device of dual-power-supply user

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610904302.0A CN106655156A (en) 2016-10-18 2016-10-18 Automatic load control terminal switching device of dual-power-supply user

Publications (1)

Publication Number Publication Date
CN106655156A true CN106655156A (en) 2017-05-10

Family

ID=58855505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610904302.0A Pending CN106655156A (en) 2016-10-18 2016-10-18 Automatic load control terminal switching device of dual-power-supply user

Country Status (1)

Country Link
CN (1) CN106655156A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112798840A (en) * 2021-02-05 2021-05-14 国网河南省电力公司濮阳供电公司 Power supply monitoring system suitable for rural motor-pumped well communication small electric quantity transformer area and working method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201134A (en) * 1997-01-10 1998-07-31 Toko Electric Co Ltd Power-supply changeover circuit
CN102025191A (en) * 2010-11-29 2011-04-20 江苏省电力公司兴化市供电公司 Automatic switching device for double power supplies of power load management terminal
CN104242469A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Comprehensive railway power monitoring device
CN204858728U (en) * 2015-08-10 2015-12-09 常熟开关制造有限公司(原常熟开关厂) Two power supply automatic switching devices, dual power supply system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10201134A (en) * 1997-01-10 1998-07-31 Toko Electric Co Ltd Power-supply changeover circuit
CN102025191A (en) * 2010-11-29 2011-04-20 江苏省电力公司兴化市供电公司 Automatic switching device for double power supplies of power load management terminal
CN104242469A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Comprehensive railway power monitoring device
CN204858728U (en) * 2015-08-10 2015-12-09 常熟开关制造有限公司(原常熟开关厂) Two power supply automatic switching devices, dual power supply system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112798840A (en) * 2021-02-05 2021-05-14 国网河南省电力公司濮阳供电公司 Power supply monitoring system suitable for rural motor-pumped well communication small electric quantity transformer area and working method

Similar Documents

Publication Publication Date Title
WO2018064861A1 (en) Dual-connector electric car direct current charging pile
CN101651364B (en) Remote automation control high-voltage measurement comprehensive distribution equipment
CN202948879U (en) Intelligent integrated controller for permanent magnet vacuum circuit breaker (VCB)
CN102545388B (en) A kind of Intelligent controller of permanent magnet mechanism breaker
CN203352295U (en) Intelligent terminal of rural network direct distribution station
CN103021729A (en) Intelligent integrated controller for permanent magnet vacuum circuit breaker
CN102646546B (en) Intelligent self-energy-obtaining vacuum breaker
CN102522827B (en) Intelligent integrated electricity-distributing method and device as well as intelligent integrated electricity-distributing terminal
CN103545926A (en) Distributed power supply grid connection interface device
CN105576834A (en) Intelligent low-voltage power distribution system
CN102751663A (en) Pole-mounted intelligent combination type transformer and running mode thereof
CN202906572U (en) Intelligent controller of permanent magnet mechanism breaker
CN202695269U (en) Intelligent self-energy-fetching vacuum circuit breaker
CN106655156A (en) Automatic load control terminal switching device of dual-power-supply user
CN201191712Y (en) Low voltage AC cabinet for touching integrated intelligent transforming plant
CN202363969U (en) Novel complete equipment for automatically switching backup power supply
CN208806479U (en) A kind of power distribution network ring network cabinet of automatic improving
CN207650261U (en) A kind of new distribution network data acquisition terminal
CN203165086U (en) High-voltage intelligent prepayment control system
CN202712720U (en) Pole-mounted intelligent combination type transformer
CN203537070U (en) Distributed power supply grid connection interface device
CN202856451U (en) Miniature intelligent direct current power supply
CN104362519A (en) Medium-voltage power distribution system
CN204903609U (en) Terminal box is united to electric energy meter with voltage switches function
CN219498959U (en) High-load control transformation device for high-load meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510

WD01 Invention patent application deemed withdrawn after publication