A kind of base
Technical field
The present invention relates to the base of wall-hanging air conditioner.
Background technology
Air-conditioning is used for air in regulation room, allows room air to keep being most appropriate to the state of people.Such as, in summer Indoor Temperature
When degree is higher, by blowing Cryogenic air, interior is freezed, and warm braw is blowed to interior in winter, heated.Wall built-up
Formula air-conditioning, is widely used in each family, market and office space.And often there is condensed water leakage and asks in existing base plate of air conditioner
Topic, therefore, the Drainage Design of base is badly in need of optimization.
The content of the invention
The technical problem to be solved is to provide a kind of compact conformation, wall built-up that is reasonable in design and being easy to draining
The base of formula indoor apparatus of air conditioner, is easily installed and dismantles.
The present invention solve the technical scheme that adopted of above-mentioned technical problem for:A kind of base, including backboard, the top of backboard
For plate part, bottom is the arch section for extending downwardly forward, it is characterised in that:Set above the bottom of the arch section
There is the joint face separately with the bottom of the arch section, the connection faces forward and extends downwardly, the bottom of the arch section
To rear side extend be provided with bottom, one end of the base is provided with electric-controlled parts installation portion, on the base the plate part with
Arch section boundary position, the one end being located from electric-controlled parts installation portion are provided with the width extension along base towards the other end
Gutter, the bottom faces of the gutter are a stair-stepping face, from electric-controlled parts installation portion side towards opposite side gradually
Downward ladder.
For the ease of dismounting, the bottom includes the leading flank extended back under facing forward laterally and the bottom from the leading flank
The folding surface that end level extends back, on the upper surface of the joint face, be provided with width along base it is spaced to
The Elastic buckle of upper protrusion, the Elastic buckle is connected with center, the upper left position of the plate part of the base, be provided with
The buckle that the left socle of evaporimeter is connected.So can also ensure that overall intensity but also screw element can be cut, save
Save air-conditioning holistic cost.
For base deformation caused by preventing electric-controlled parts overweight, one end of the base is provided with electric-controlled parts installation portion,
The electric-controlled parts installation portion includes base plate, and the base plate is to set on ondulated shape from top to bottom, and the base plate
Having extend up and down and the reinforcement vertical with base plate, and the reinforcement is interval with multiple along the width of base plate.
For the ease of connecting motor pressing cover, the inner side of the electric-controlled parts installation portion of one end of the base is provided with and motor
The connection member of gland connection, the connection member includes the fluting extended laterally positioned at front side, and on rear side of the fluting
The baffle plate for extending up and down, the buckle insertion of motor pressing cover is located at after the fluting and is fastened in fluting.
For the ease of draining, end difference position rounding off.
For the ease of by base condensed water discharge and while the other end that can support evaporimeter, the base sets
The bottom for having the rhone for extending downwardly, the rhone is provided with osculum, is provided with along the width side of base in the gutter
To extending and gutter is divided into multiple dividing plates being spaced apart of former and later two water channels, the gap between the dividing plate
Connect former and later two water channels.
For more preferable draining, the second osculum, the base are additionally provided with the bottom surface of the step at the highest level of the tank
The back side is provided with the rear water receiving tank for catching the condensed water discharged from second osculum, and rear water receiving tank is communicated with rhone, after
Condensed water in water receiving tank is excluded outside air-conditioning by osculum.
For the ease of connecting foam, the back side of the arch section of the base is provided with and the mating shapes of arch section
Foam, the back side and the foam of the arch section are connected with each other by buckle structure, and the buckle structure includes above
First buckle and underlying second buckle, first buckle and the second buckle are spaced apart along the width of base
Have multiple, the upper end of the foam is connected together with the first buckle, the lower end of the foam is connected together with the second buckle.
Preferably, first buckle includes being connected bayonet, the Yi Ji for stretching out with the base upper end
The first shrapnel part that the bayonet bends away from one end of the base, the upper end of the foam is clamped on described
Between bayonet, the first shrapnel part and base;Second buckle is on the upper surface of the folding surface, including one end
It is connected with folding surface and extends towards leading flank and has spaced second shrapnel part and leading flank between, the bottom insertion of foam
Between second shrapnel part and leading flank.
Preferably, air-out is formed with interval between the joint face of the base and the bottom of arch section and leading flank
Mouthful, air guide structure is installed on the air outlet, it is active blade that the air guide structure includes being arranged in the air outlet, many
Individual passive blade and connecting rod, driving means are arranged on the outside of the arch section, and the active blade passes through the curved portions
Divide and be connected with the driving means, connected by the connecting rod between the active blade and passive blade.
In order that motor is not take up the space in base, the arch section offers peace on one end of width
Dress hole, the installing hole is communicated to the leading flank and folding surface of lower section, and forms installation in the position of leading flank and folding surface
Seat, the mounting seat is used to install driving means.
For the ease of installing, the active blade includes active blade main body and active blade connecting portion, the active leaf
Piece connecting portion stretches out from the installing hole and is connected with the output shaft of the driving means, arranges on the active blade connecting portion
Have the first spacing ring and the second spacing ring, first spacing ring and the second spacing ring be stuck in the arch section it is interior,
Outer both sides.
Preferably, the passive blade includes passive blade main body, passive blade connecting portion and installing plate, described from movable vane
Piece main body is connected on the installing plate by the passive blade connecting portion, and the installing plate is solid with arch section inner side
It is fixed.
Preferably, be provided with thin-wall regions in the passive blade main body, the thickness of the thin-wall regions less than it is described from
The thickness of dynamic blade body remainder, the thickness of the thin-wall regions is 0.4mm~0.6mm, is opened up on the thin-wall regions
There are elongate holes.
For the ease of draining, each cascaded surface in the bottom faces of the gutter is plane or/and inclined-plane.
Preferably, the joint face, arch section and plate part connect into single piece.
Compared with prior art, it is it is an advantage of the current invention that the base not only compact conformation and reasonable in design, it is easy to connect
The miscellaneous parts such as center, evaporimeter, electric-controlled parts and foam are connect, is easy to the installation and removal of base, and the base to be additionally provided with
The waterproof constructions such as gutter, baffle plate, can discharge the condensed water produced inside air-conditioning, and intensity is high to be easy to use, particularly, bottom
Seat is arranged to stair-stepping face, with Quick drainage, and can prevent after installation heat exchanger, the generation of gutter inside hydrops;
The flow velocity of water when on the one hand increased draining, the depth of another aspect gutter is formed from high to low along the direction of current
Structure;Base is arranged to stair-stepping face, increased the flow process of the current of gutter, and does not affect the compactedness of base, favorably
Volatilization in condensed water in flowing;Structural strength can also finally be increased.
Description of the drawings
Fig. 1 is the front view of the base of the embodiment of the present invention.
Fig. 2 is the schematic perspective view of the base of the embodiment of the present invention.
Fig. 3 is the base of the embodiment of the present invention and the exploded view of center.
Fig. 4 is connected with each other the schematic diagram of rear coupling part for the base and center of the embodiment of the present invention.
Fig. 5 is the sectional view after the base and center of the embodiment of the present invention is connected with each other.
Fig. 6 is the partial enlarged drawing of part A in Fig. 5.
Fig. 7 is the sectional view after the base of the embodiment of the present invention is fixedly connected with the left socle of evaporimeter.
Fig. 8 is the sectional view after the base and motor pressing cover of the embodiment of the present invention is connected with each other.
Fig. 9 is the partial enlarged drawing of part B in Fig. 8.
Figure 10 is the sectional view of the line C-C along Fig. 1.
Figure 11 is the schematic rear view of the base of the embodiment of the present invention.
Figure 12 is the base of the embodiment of the present invention and the optical cable of foam.
Figure 13 is the sectional view after the base of the embodiment of the present invention is connected with foam.
Figure 14 is the schematic diagram after the base of the embodiment of the present invention is connected with air guide structure.
Figure 15 is the schematic diagram of the other direction after the base of the embodiment of the present invention is connected with air guide structure.
Figure 16 is the active blade schematic diagram of the air guide structure of the present invention.
Figure 17 is the passive blade schematic diagram of the air guide structure of the present invention.
Figure 18 is the passive blade and connecting rod schematic diagram of the air guide structure of the present invention.
Figure 19 is the E-E of the passive blade of Figure 17 to sectional view.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing embodiment.
As shown in figures 1-15, the base 100 of the embodiment of the present invention, is an overall part in rectangular-shape, its backboard
Top is fixedly connected for a plate part 1 with wallboard, and the bottom of its backboard is an arch section 2 for extending downwardly forward, should
The lower front of arch section 2, is provided with a joint face 3 with the bottom of arch section 2 separately, and the joint face 3 is similarly
Extend to front side downwards, by the sidepiece 5 positioned at the both sides of base 100 between the joint face 3 and plate part 1 and arch section 2
Interconnect.The bottom of the arch section 2 is provided with a bottom 4 for extending back.The top of the joint face 3 be additionally provided with
Joint face 3 is connected and is spaced the mounting surface 500 of extension.
On the upper surface of the joint face 3, multiple Elastic buckles 31 prominent forward and up, the edge of Elastic buckle 31 are provided with
The width of joint face 3 be interval with it is multiple, as shown in figures 2-6, the Elastic buckle 31 be towards front side project Y shape card
Button, the flexure strip 311 that the Elastic buckle 31 links together including inner side, the outside of the flexure strip 311 outwards separately extends, and
Position on the center 300 being connected with base 100 towards the Elastic buckle 31 is provided with rearwardly projecting elastic clamping block 301, should
Elastic clamping block 301 is snapped in backward between two flexure strips 311 so that elastic clamping block 301 is mutually permanently connected with Elastic buckle 31,
And then connection center 300 and base 100, it is preferable that the elastic clamping block 301 is the elastic clamping block that section is C-shaped.And center
The middle part on 300 with spaced each opening 302 of opening 302. in the width direction extends back C-shaped elasticity
Fixture block 301.
As shown in Fig. 1,2,3 and 7, the upper left corner of the base 100, the i.e. upper left position of plate part 1 are provided with a connection
Buckle 11, the connection buckle 11 includes that the front side for being located at base 100 is connected with the bottom of plate part 1, what top separately extended
Clamp 111, and the buckle 112 between the plate part 1 of clamp 111 and base 100, on the left socle 200 of evaporimeter
The snap-in structure 201 matched with the connection buckle 11 that extends back is provided with, the snap-in structure 201 is connected to buckle 112 with card
Between plate 111, and fixation is mutually clamped with buckle 112, the installation for being not only easy to evaporimeter is positioned, and decreases spiral shell
Nail.
As shown in Fig. 1,2 and 9, one end of the base 100 is provided with electric-controlled parts installation portion 6, and the electric-controlled parts installation portion 6 is wrapped
Base plate 61 is included, the base plate 61 is provided with screw 62 for fixedly mounting electric-controlled parts.
The base plate 61 is ondulated shape from top to bottom, and for round and smooth fluctuating.And on the base plate 61, it is provided with
It is vertically extending with base plate 61, and the reinforcement 62 of base plate 61 is extended through from top to bottom.The reinforcement 62 is along base plate 61
Width is interval with multiple.The reinforcing rib structure can strengthen the bulk strength of electric-controlled parts installation portion, prevent base because
Damage for electric-controlled parts component is overweight, and electric-controlled parts are firmly installed.
On the leading flank of the inner side of the electric-controlled parts installation portion 6, the plate part 1 and the junction section of arch section 2, it is provided with
The connection member being connected with motor pressing cover 400, the connection member includes a fluting 12 for extending laterally, and positioned at the fluting 12
The baffle plate 13 for extending up and down of rear side, as shown in figure 9, the buckle 401 on motor pressing cover 400 is inserted being fastened on after the fluting 12
In fluting 12, the lower section of baffle plate 13 is entrapped in, and baffle plate 13 is served and prevents the condensed water of the rear side of base 100 from entering the motor
In gland 400.
As shown in Fig. 1,10, one end that the base 100 is located from electric-controlled parts installation portion 6 towards the other end, in the flat board
On the leading flank of the position that part 1 has a common boundary with arch section 2, the gutter 7 extended along the width of base 100 is provided with, should
The bottom surface of gutter from the one end of electric-controlled parts installation portion 6 it is lateral another side extend obliquely downward, it is preferable that the gutter 7
Bottom faces be a stair-stepping face, from ladder of the side of electric-controlled parts installation portion 6 towards opposite side gradually downward, and ladder
Position rounding off.The bottom end of the i.e. gutter 7 of the other end of the base 100 is provided with the rhone 71 for extending downwardly, should
The bottom of rhone 71 is provided with osculum 72.And the centre of the gutter 7, along the width of the base 100 be provided with every
Plate 73, the dividing plate 73 is the polylith being spaced apart in the width direction, and gutter 7 is separated into former and later two water by dividing plate 73
Road, the gap 74 between multiple dividing plates 73 connects former and later two water channels.The dividing plate 73 plays a part of to strengthen intensity, Er Qieqi
To the effect for supporting the evaporimeter above it.And the two ends of the gutter 7 are provided with end baffle 75 upwards, prevent water from two
Flow out at end.Also be formed with the second osculum on the bottom surface of the step at the highest level of gutter 7, the bead formed on back of base 100 catch from
The rear water receiving tank of the condensed water that the second osculum is discharged.By V-shaped channel-shaped, rear water receiving tank is by being horizontally installed on bottom for the rear water receiving tank
Gusset on seat 100 is surrounded with base 100, and the rear water receiving tank is communicated with rhone 71, and the condensed water in rear water receiving tank is by row
Water hole 4 is excluded outside air-conditioning.
As shown in Figure 11,12, the back side of the base 100 is fixedly connected with foam 8, and the foam is located at the arc of base 100
The back side of part 2, and pass through buckle structure phase between the mating shapes of arch section 2, and foam 8 and base 100
Connect, the buckle structure includes the first buckle 14 above, and underlying second buckle 15, the first buckle 14
With spaced apart multiple on the width of base 100, the same length direction having in base 100 of the second buckle 15
It is upper spaced apart multiple.Preferably, the first buckle 14 and the second buckle 15 can misplace arrangement, so as to more on foam 8
Diverse location blocked, so as to preferably guarantee the docile of foam 8, and avoid both relative movements.
As shown in figure 12, the first buckle 14 includes the bayonet 141 for extending laterally being connected with base 100, and
From the first shrapnel part 142 that bayonet 141 bends away from one end of base 100, i.e. the first buckle 14 is formed substantially
For L-shaped.The upper end of foam 8 is snapped onto between base 100, the shrapnel part 142 of bayonet 141 and first, it is preferred that foam 8
Upper end there is thickening part 81 in end so that the end of foam 8 is more closely clamped on the He of the first buckle 14
Between base 100.
The arch section 2 of base 100 forms arc-shaped transition from upper end to lower end, the bottom of the arch section 2 be provided with one to
The bottom 4 for extending afterwards, the bottom 4 includes the leading flank 41 for installing air guide structure extended back under facing forward laterally, from
The folding surface 42 that the lower horizontal of leading flank 41 extends back.Second buckle 15 is wrapped on the upper surface of the folding surface 42
Include one end to be connected with folding surface 42 and extend towards leading flank 41, have spaced second shrapnel part between leading flank 41
151, the insertion of the bottom of foam 8 is located between second shrapnel part 151 and leading flank 41, so as to can by the lower end of foam 8 with it is front
Side 41 compresses.
During installation, first the upper end of foam 8 is snapped onto into the first buckle 14, then again the lower end of foam 8 snapped onto into
Two buckles 15, fix without gluing, reduce the installation procedure of foam 8.After being fixed, if discovery is out of alignment,
Adjusting only need to take out the end of foam 8 from buckle;Furthermore, the bond strength between foam 8 and base 100 is big, when
The surface of base 100 is not clean or air-conditioning is using after the long period, and foam 8 will not come off easily, it is ensured that play insulation effect.
As shown in Figure 14-19, fixed peace between the joint face 3 of the bottom and top of the leading flank 41 and arch section 2
Equipped with air guide structure, the air outlet of the air-conditioning is formed between the bottom and joint face 3 of the leading flank 41 and arch section 2.
And the lower section of the joint face 3 is connected with snail tongue 32, snail tongue 32 can be fixed under joint face 3 by buckle or other modes
Fang Shang, or snail tongue 32 can be integrally formed with joint face 3.
Referring to Figure 14~Figure 15, air guide structure includes driving means 91, active blade 92, multiple passive blades 93 and connecting rod
94.Driving means 91 can adopt motor.Active blade 92 includes active blade main body 921 and is arranged on active blade main body 921
The active blade connecting portion 922 of root.Active blade main body 921, passive blade 93 and connecting rod 94 are located in air outlet, and are driven
Device 91 is then located at outside air outlet, and the driving means 91 can be fixed on the folding surface 42 of bottom 4.
Installing hole 21 is offered on one end of arch section 2, the installing hole 21 is communicated to the leading flank 41 of lower section and bending
Face 42, and mounting seat 22 is formed in the position of leading flank 41 and folding surface 42, mounting seat 22 is used to install driving means 91, pacifies
The size and dimension of dress seat 22 is adapted to driving means 91, and is provided with towards one end of arch section 2 in driving means 91
Mounting lug 912, can pass through the part that screw etc. is located at around installing hole 21 through on mounting lug 912 and arch section 2, and
Driving means 91 and leading flank 41 are fixed.Thus, driving means 91 need not take the exceptional space in base 100, save
Space in base 100.
Active blade connecting portion 922 is reached outside air outlet from installing hole 21, and the output shaft of driving means 91 is inserted into master
In movable vane piece connecting portion 922, so as to active blade 92 can be driven to swing.First is respectively arranged with active blade connecting portion 922
The spacing ring 924 of spacing ring 923 and second, is stuck in the inside and outside both sides of arch section 2, so as to define the phase of active blade 92
For the position of arch section 2.Active blade main body 921 is overall relatively thin, is provided with reinforcement 925, so that actively
Blade body 921 had both been easy to drive swing by driving means 91, also ensured that certain intensity in order to wind-guiding.
Active blade 92 and multiple passive blades 93 along air outlet length direction arranged for interval, active blade 92 and from
Connected by connecting rod 94 between movable vane piece 93, when active blade 92 swings, can drivening rod 94 make straight reciprocating motion, so as to
Passive blade 93 is transferred force to, drives passive blade 93 to swing.Passive blade 93 includes passive blade main body 931 and from movable vane
Piece connecting portion 932, connecting rod 94 is connected on active blade 921 and passive blade main body 931.
Active blade main body 921 and passive blade main body 931 are all preferred, in leaf shape.Open in active blade main body 921
The first breach 926 extended internally from edge is provided with, two ends is provided with the first breach 926 and is connected to the both sides of the first breach 926
The first connecting shaft 927;Likewise, the second breach 933 extended internally from edge is offered in passive blade main body 931, the
The second connecting shaft 934 that two ends are connected to the both sides of the second breach 933 is provided with two breach 933.With active blade on connecting rod 94
The corresponding position of the second breach 933 on the first breach 926, passive blade main body 921 in main body 921 is each formed with connection card
Groove 941, connection draw-in groove 941 can be fastened in the first connecting shaft 927 and the second connecting shaft 934, so as to by active blade main body 921
Swing be delivered to passive blade main body 931, be allowed to swing and realize wind-guiding together with active blade main body 921.
In order to ensure flexibility when passive blade 93 swings, the middle setting of passive blade main body 931 has thin-wall regions
9311, the thickness of thin-wall regions 9311 is less than the thickness of the remainder of passive blade main body 931, the above-mentioned shape of the second breach 933
Into the part beyond thin-wall regions 9311 in passive blade main body 931.The thickness of thin-wall regions 9311 is preferably 0.4~
0.6mm, in the centre of thin-wall regions 9311 elongate holes 9312 are offered, and the bearing of trend of elongate holes 9312 is connected with second
The bearing of trend of axle 934 is roughly the same, can further ensure flexibility when swinging.
Above-mentioned each passive blade 93 is connected on installing plate 935, in the present embodiment by passive blade connecting portion 932
In, installing plate 935 has two, is one group per five passive blades 93, is connected on an installing plate 935.Installing plate 935 is consolidated
The top i.e. inner side of arch section 2 is scheduled on, thus active blade 92, passive blade 93 and base 100 form a closing structure,
Prevent air guide structure abjection from base 100.
Although the preferred embodiments of the present invention described in detail above, it is to be clearly understood that for this area
Technical staff for, the present invention can have various modifications and variations.It is all made within the spirit and principles in the present invention appoint
What modification, equivalent, improvement etc., should be included within the scope of the present invention.