CN106640190B - Mine goaf treatment method for surface construction photovoltaic power station - Google Patents

Mine goaf treatment method for surface construction photovoltaic power station Download PDF

Info

Publication number
CN106640190B
CN106640190B CN201611194709.5A CN201611194709A CN106640190B CN 106640190 B CN106640190 B CN 106640190B CN 201611194709 A CN201611194709 A CN 201611194709A CN 106640190 B CN106640190 B CN 106640190B
Authority
CN
China
Prior art keywords
photovoltaic power
goaf
power station
coal seam
mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611194709.5A
Other languages
Chinese (zh)
Other versions
CN106640190A (en
Inventor
张俊英
陈清通
陈凯
孙庆先
贾新果
刘义新
李宏杰
李文
李�杰
谷小敏
王翔宇
魏晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Research Institute CCRI
Original Assignee
China Coal Research Institute CCRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Research Institute CCRI filed Critical China Coal Research Institute CCRI
Priority to CN201611194709.5A priority Critical patent/CN106640190B/en
Publication of CN106640190A publication Critical patent/CN106640190A/en
Application granted granted Critical
Publication of CN106640190B publication Critical patent/CN106640190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Photovoltaic Devices (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The mine goaf treatment method for constructing the photovoltaic power station on the earth surface comprises the following steps: (a) determining the mine ground surface protection range according to the peripheral size of a planned photovoltaic power station construction; (b) determining subsidence data in a mine ground surface protection range, wherein the subsidence data comprises a maximum subsidence w, a maximum horizontal displacement epsilon and a maximum inclination i; (c) obtaining coal seam geological data and mining data in a protection range through drilling exploration, wherein the coal seam geological data and the mining data comprise the number n of coal seams, the thickness, the burial depth and the mining condition of each coal seam; (d) and determining whether the mined coal seam mined-out area is necessary to be treated or not according to the judgment criteria aiming at different types of the photovoltaic power stations to be built, determining that the mined coal seam mined-out area needs to be treated when one of the three judgment indexes is met, and determining that the maximum surface subsidence deformation value in the protection range is met when the three index values of the subsidence w, the horizontal deformation epsilon and the inclination i are met. The method is suitable for the mine goaf treatment of the photovoltaic power station constructed on the ground surface, and is low in cost, efficient and rapid.

Description

Mine goaf treatment method for surface construction photovoltaic power station
Technical Field
The invention relates to a mine goaf treatment method, in particular to a mine goaf treatment method for constructing a photovoltaic power station on the earth surface.
Background
A goaf can be formed below the underground of the coal mine after the coal seam is mined. Because of the existence of the goaf, the ground surface generates certain cracks, movement and deformation, and various structures, facilities and the like newly built in the influence range of the goaf generate certain influence, even damage, and can not be normally used, so that the goaf is often treated when the structures are built on the ground surface of the mine goaf. At present, important constructions such as expressways, high-rise residential buildings and the like are constructed on the ground surface above mine goafs, and the goafs are generally treated by performing all grouting filling treatment on all the goafs affected below a construction area, but the treatment method greatly increases the construction cost.
The photovoltaic power generation project mainly comprises a collection station, an inverter, a box transformer, a high-voltage transmission line tower, widely distributed photovoltaic modules, photovoltaic supports and other structures or facilities. For photovoltaic modules and photovoltaic supports which are widely distributed, because the photovoltaic modules and the photovoltaic supports are insensitive to ground surface settlement deformation of a coal mining subsidence area, a goaf below the photovoltaic modules and the photovoltaic supports does not need to be treated generally. The scattered single building structures such as the collection station, the inverter and box transformer, the high-voltage transmission line tower and the like are sensitive to ground surface subsidence deformation of the coal mining subsidence area, but are much lower in requirements compared with high-rise residential buildings and office buildings. At present, no goaf treatment method suitable for surface construction of a photovoltaic power station exists in the prior art.
Disclosure of Invention
The invention provides a mine goaf treatment method for a surface construction photovoltaic power station.
The technical scheme adopted by the invention is as follows:
the mine goaf treatment method for constructing the photovoltaic power station on the earth surface comprises the following steps:
(a) determining the mine ground surface protection range according to the peripheral size of a planned photovoltaic power station construction;
(b) determining subsidence data in the mine ground surface protection range, wherein the subsidence data comprises a maximum subsidence amount w, a maximum horizontal displacement amount epsilon and a maximum inclination amount i;
(c) obtaining coal seam geological data and mining data in a protection range through drilling exploration, wherein the coal seam geological data and the mining data comprise the number n of coal seams, the thickness, the burial depth and the mining condition of each coal seam;
(d) aiming at different types of the photovoltaic power stations to be built, determining whether the mined coal seam mined-out area needs to be treated or not according to the judgment criteria of the following table, determining that the mined coal seam mined-out area needs to be treated when one of the three judgment indexes is met, and determining that the maximum surface subsidence deformation value in the protection range is met when the three index values of subsidence w, horizontal deformation epsilon and inclination i are met;
Figure DEST_PATH_IMAGE002
(e) calculating to obtain a comprehensive treatment angle alpha according to the following formula, wherein beta is a comprehensive movement angle and is 70-75 degrees;
α=(90+ β)/2
(f) determining the control range of the mined coal seam goaf according to the mine ground surface protection range boundary and alpha;
(g) judging whether the goaf needs to be managed or not respectively aiming at different mining coal beds, and respectively determining a management range under the condition that the goaf needs to be managed;
(h) and performing grouting operation according to the control range of the goaf determined by each mined coal seam.
In the step (a) of the mine goaf treatment method for constructing the photovoltaic power station on the earth's surface, when the constructed photovoltaic power station is a gathering station, the peripheral dimension is determined according to the outer boundary of the surrounding construction enclosure, and when the constructed photovoltaic power station is of other types, the peripheral dimension is determined according to the basic outer boundary.
In the step (c) of the mine goaf treatment method for constructing the photovoltaic power station on the earth surface, when drilling exploration drill holes are arranged and the photovoltaic power station construction is proposed as a collecting station, 5 holes are arranged in the exploration drill holes, 1 hole is respectively arranged at the center of a protection range and 5-10 m inside 4 corner points, and when the photovoltaic power station construction is proposed as an inverter and box transformer or a high-voltage transmission line tower, 1 hole is arranged in the protection range center in the exploration drill holes.
In the method for treating the mine goaf of the photovoltaic power station built on the earth surface, the number n of the mined coal beds is determined to be 5 through drilling exploration.
In the step (h) of the method for treating the mine goaf of the photovoltaic power station built on the earth surface, the grouting operation comprises the following steps:
(a1) opening a hole and fixing the pipe by using an orifice pipe;
(b1) drilling to a bottom plate of a first layer of goaf, arranging a slurry injection pipe, preparing slurry, and then injecting slurry into the first layer of goaf;
(c1) and drilling to a bottom plate of the second layer of goaf, and grouting to the second layer of goaf.
In the method for treating the mine goaf of the photovoltaic power station constructed on the earth surface, the slurry is proportioned by using water: cement: 1: 0.3: 0.6-1.2, and when the drill drop height in the goaf is more than 0.3m, firstly injecting aggregate.
In the step (h) of the mine goaf treatment method for constructing the photovoltaic power station on the earth surface, the method further comprises a step (d 1), after the goaf grouting operation is completed for 2 months, the number of the inspection holes is 5% -10% of the number of the construction holes, the inspection holes are arranged in the middle of the two grouting holes, cores are taken from the grouting zone, the filling conditions of cavities, gaps and cracks in the goaf are found out, an indoor unidirectional compressive strength test is carried out on the test piece, and when the filling rate of the cavities is not less than 85% and the strength of the filled concretion body is not less than 0.5 MPa, the evaluation considers that the treatment meets the requirements.
Compared with the prior art, the technical scheme of the invention has the following advantages:
(1) according to the mine goaf treatment method for the surface construction of the photovoltaic power station, the basic outer boundary of the single building structure of the photovoltaic power station is used as the mine surface protection range, and the size of a maintenance belt considered according to the building protection grade is completely avoided in the protection range, so that the treatment cost can be effectively reduced, and the treatment efficiency can be improved.
(2) According to the mine goaf treatment method for constructing the photovoltaic power station on the ground surface, provided by the invention, the judgment criterion is determined aiming at different types of building structures of the photovoltaic power station, including single building structures or facilities such as a collecting station, an inverter, a box transformer, a high-voltage transmission line tower and the like, so that the method is more targeted in determining the necessity of treating the goaf, the treatment cost is controlled to a greater extent, and the treatment efficiency is improved.
(3) According to the mine goaf treatment method for the surface construction of the photovoltaic power station, the mining depth mining thickness ratio, the minimum mining depth, the maximum surface subsidence value, the maximum surface horizontal deformation value and the maximum inclined deformation value are used as judgment indexes for judging whether the goaf below the single building structure of the photovoltaic power station needs to be treated, and the comprehensiveness of influence factors and the weight influence are considered, so that the evaluation accuracy can be guaranteed, the difference of evaluation objects can be considered, and the evaluation reliability is effectively guaranteed.
(4) The mine goaf treatment method for the surface construction of the photovoltaic power station provided by the invention respectively confirms treatment necessity aiming at different goafs, avoids treating all layers of goafs under a building, and determines the goaf treatment range by depending on a comprehensive treatment angle, so that the method is more economical and faster on the premise of ensuring the purpose of protecting the building of the photovoltaic power station.
(5) According to the mine goaf treatment method for the surface construction of the photovoltaic power station, the situation of the goaf below the planned photovoltaic power station is obtained through drilling exploration, whether treatment is needed or not is determined according to the exploration result, the treatment range is determined, the number of holes with 5% -10% of grouting holes is arranged after the treatment is completed, effect detection is carried out, and the effect of goaf treatment is comprehensively evaluated, so that the method has higher accuracy, can better ensure the engineering quality, and can ensure that the goaf treatment achieves an ideal effect.
Drawings
In order that the present disclosure may be more readily and clearly understood, reference is now made to the following detailed description of the embodiments of the present disclosure taken in conjunction with the accompanying drawings, in which
FIG. 1 is a schematic diagram of a proposed photovoltaic power station and a goaf structure in the mine goaf management method for constructing the photovoltaic power station on the earth surface.
Labeled as: 1-planning a photovoltaic power station, 2-mine ground surface, 3-first layer mining coal seam, 4-second layer mining coal seam, 5-third layer mining coal seam, 6-fourth layer mining coal seam and 7-fifth layer mining coal seam.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
Fig. 1 shows a preferred embodiment of the mine goaf treatment method of the surface construction photovoltaic power station of the present invention.
The mine goaf treatment method for the photovoltaic power station constructed on the earth surface comprises the following steps:
(a) determining the protection range of the mine ground surface 2 according to the peripheral size of a planned photovoltaic power station construction 1;
(b) determining subsidence data within the mine ground surface 2 protection range, wherein the subsidence data comprises a maximum subsidence amount w, a maximum horizontal displacement amount epsilon and a maximum inclination amount i;
(c) obtaining coal seam geological data and mining data in a protection range through drilling exploration, wherein the coal seam geological data and the mining data comprise the number n of coal seams, the thickness, the burial depth and the mining condition of each coal seam;
(d) aiming at different types of the photovoltaic power stations to be built, determining whether the mined coal seam mined-out area needs to be treated or not according to the judgment criteria of the following table, determining that the mined coal seam mined-out area needs to be treated when one of the three judgment indexes is met, and determining that the maximum surface subsidence deformation value in the protection range is met when the three index values of subsidence w, horizontal deformation epsilon and inclination i are met;
Figure 642346DEST_PATH_IMAGE002
(e) calculating to obtain a comprehensive treatment angle alpha according to the following formula, wherein beta is a comprehensive movement angle and is 70-75 degrees;
α=(90+ β)/2
(f) determining the control range of the mined coal seam goaf according to the protection range boundary and alpha of the mine ground surface (2);
(g) judging whether the goaf needs to be managed or not respectively aiming at different mining coal beds, and respectively determining a management range under the condition that the goaf needs to be managed;
(h) and performing grouting operation according to the control range of the goaf determined by each mined coal seam.
In the step (a), when the proposed photovoltaic power station building 1 is a gathering station, the peripheral dimension is determined according to the outer boundary of a surrounding construction enclosure, and when the proposed photovoltaic power station building 1 is of other types, the peripheral dimension is determined according to the basic outer boundary.
In this embodiment, the photovoltaic power plant structure 1 is a collection station, the surrounding construction fence has a size of 58.6m × 47m, and the built-in (structure) structure has: the transformer comprises a main transformer, a main transformer lead framework, an SVG transformer, a grounding transformer, an arc suppression coil, an outdoor support, an accident oil pool, a 35m lightning rod, a firewall, a cable trench, an enclosure wall, a 35kV primary equipment cabin, a secondary equipment cabin, an SVG cabin, a living facility box room, a duty box room and the like. And taking the outer boundary of the enclosing wall built around the gathering station as the mine ground surface protection range, wherein the determined ground surface protection range is 58.6m multiplied by 47 m.
In the step (c), when drilling exploration drill holes are arranged and the proposed photovoltaic power station building 1 is a gathering station, 5 holes are arranged in the exploration drill holes, 1 hole is respectively arranged at the center of a protection range and 5-10 m positions inside 4 corner points, and when the proposed photovoltaic power station building 1 is an inverter and box transformer or a high-voltage transmission line tower, 1 hole is arranged in the exploration drill holes at the center of the protection range.
In the embodiment, the proposed photovoltaic power station construction 1 is a gathering station, 5 holes are arranged in exploration drilling holes, and 1 hole is arranged in the center of a protection range and 5-10 m inside 4 corner points.
In this embodiment, the number n of the coal seams to be mined is 5 through drilling exploration.
The average mining depth of the first layer of mining coal seam 3 is 54.12m, the coal seam is close to a horizontal coal seam, the coal seam thickness is 1.00-3.00 m, the average coal seam thickness is 2.12m, the drilling drop amount is 0.40-1.44 m, and the average coal seam is 1.09 m; the average mining depth of the second layer of mined coal seam 4 is 83.58m, the coal seam is close to a horizontal coal seam, the coal seam thickness is 2.1-3.5 m, the average coal seam thickness is 2.55m, the drilling dropping amount is 1.00-2.00 m, and the average coal seam is 1.68 m; the average mining depth of the third layer of mining coal seam 5 is 134.11m, the coal seam is nearly horizontal, the average thickness of the coal seam is 2.24m, and solid coal is not provided with a goaf; the mining depth of the fourth layer of mining coal seam 6 is 230m, and the average thickness of the coal seam is 1.40 m; the average mining depth of the fifth-layer mined coal seam 7 is 283m, the average mining thickness is 4.0m, and the fifth-layer mined coal seam is solid coal.
In this example, the maximum subsidence within the protective range of the mine floor 2 is 947mm, the maximum horizontal deflection is 4.8mm/m, and the maximum inclination is 8.1 mm/m.
Because the depths of the goafs of the first layer of mined coal seam 3 and the second layer of mined coal seam 4 are both less than 120m, and the mining depth-mining thickness ratio is less than 50, the goaf of the first layer of mined coal seam 3 and the goaf of the second layer of mined coal seam 4 below the ground surface of the planned gathering station are determined to need to be managed. And the mined-out area of the fourth layer of coal seam 6 does not need to be treated.
In the present embodiment, the surface integrated travel angle β within the protection range is 74 °, and the integrated treatment angle α calculated therefrom is 82 °. The surface protection range of the proposed collection station is 58.6m multiplied by 47m, so that the control range of the mined-out area of the first layer of mined coal seam 3 is 8m outside the building, and the control range of the mined-out area of the second layer of mined coal seam 4 is 12m outside the building.
In step (h) of this embodiment, the grouting operation further includes the following steps:
(a1) opening a hole and fixing the pipe by using an orifice pipe;
(b1) drilling to a bottom plate of a first layer of goaf 3, arranging a slurry injection pipe, preparing slurry, and then injecting slurry into the first layer of goaf 3;
(c1) and drilling to the bottom plate of the second layer of gob 4, and grouting to the second layer of gob 4.
In this example, the slurry ratio was water: cement: 1: 0.3: 0.6-1.2, and when the drill drop height in the goaf is more than 0.3m, firstly injecting aggregate.
In the embodiment, the method further comprises a step (d 1), after the goaf grouting operation is completed for 2 months, the goaf treatment effect is detected and evaluated by arranging the inspection holes, the number of the inspection holes is 5% -10% of the number of the construction holes, the inspection holes are arranged in the middle of the two grouting holes, cores are taken from the grouting zone, the filling conditions of cavities, gaps and cracks in the goaf are found out, an indoor unidirectional compressive strength test is carried out on the test piece, and when the filling rate of the cavities is not lower than 85% and the strength of the filled concretion body is not lower than 0.5 MPa, the evaluation considers that the treatment meets the requirements.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications therefrom are intended to be within the scope of the invention.

Claims (7)

1. The mine goaf treatment method for the surface construction of the photovoltaic power station is characterized by comprising the following steps: the method comprises the following steps:
(a) determining the protection range of the mine ground surface (2) according to the peripheral size of a planned photovoltaic power station building (1);
(b) determining subsidence data within the protection range of the mine earth surface (2), wherein the subsidence data comprises a maximum subsidence amount w, a maximum horizontal displacement amount epsilon and a maximum inclination amount i;
(c) obtaining coal seam geological data and mining data in a protection range through drilling exploration, wherein the coal seam geological data and the mining data comprise the number n of coal seams, the thickness, the burial depth and the mining condition of each coal seam;
(d) aiming at different types of the photovoltaic power stations to be built, determining whether the mined coal seam mined-out area needs to be treated or not according to the judgment criteria of the following table, determining that the mined coal seam mined-out area needs to be treated when one of the three judgment indexes is met, and determining that the maximum surface subsidence deformation value in the protection range is met when the three index values of subsidence w, horizontal deformation epsilon and inclination i are met;
Figure DEST_PATH_IMAGE001
(e) calculating to obtain a comprehensive treatment angle alpha according to the following formula, wherein beta is a comprehensive movement angle and is 70-75 degrees;
Figure DEST_PATH_IMAGE003
(f) determining the control range of the mined coal seam goaf according to the protection range boundary and alpha of the mine ground surface (2);
(g) judging whether the goaf needs to be managed or not respectively aiming at different mining coal beds, and respectively determining a management range under the condition that the goaf needs to be managed;
(h) and performing grouting operation according to the control range of the goaf determined by each mined coal seam.
2. The mine goaf treatment method for the surface construction of the photovoltaic power station as claimed in claim 1, wherein: in the step (a), when the proposed photovoltaic power station building (1) is a gathering station, the peripheral dimension is determined according to the outer boundary of a surrounding construction enclosure, and when the proposed photovoltaic power station building (1) is of other types, the peripheral dimension is determined according to the basic outer boundary.
3. The mine goaf treatment method for the surface construction of the photovoltaic power station as claimed in claim 1, wherein: in the step (c), when drilling exploration drill holes are arranged and the proposed photovoltaic power station building (1) is a gathering station, 5 holes are arranged in the exploration drill holes, 1 hole is respectively arranged at the center of a protection range and 5-10 m positions inside 4 angular points, and when the proposed photovoltaic power station building (1) is an inverter and box transformer or a high-voltage transmission line tower, 1 hole is arranged in the center of the protection range.
4. The mine goaf treatment method for the surface construction of photovoltaic power plants according to any one of claims 1 to 3, characterized in that: and (5) confirming the number n of the mined coal beds through drilling exploration.
5. The mine goaf treatment method for the surface construction of the photovoltaic power station as claimed in claim 4, wherein: in step (h), the grouting operation further comprises the following steps:
opening a hole and fixing the pipe by using an orifice pipe;
drilling to a bottom plate of a first layer of goaf (3), arranging a slurry injection pipe, preparing slurry, and then injecting slurry into the first layer of goaf (3);
and drilling to a bottom plate of the second layer of gob (4) and grouting to the second layer of gob (4).
6. The mine goaf treatment method for the surface construction of the photovoltaic power station as claimed in claim 5, wherein: the slurry proportion adopts water: cement: 1: 0.3: 0.6-1.2, and when the drill drop height in the goaf is more than 0.3m, firstly injecting aggregate.
7. The mine goaf treatment method for the surface construction of the photovoltaic power station as claimed in claim 5, wherein: and (d 1) after the goaf grouting operation is finished for 2 months, arranging inspection holes to detect and evaluate the goaf treatment effect, wherein the number of the inspection holes is 5% -10% of the number of the construction holes, the inspection holes are arranged in the middle of the two grouting holes, coring the grouting zone, finding out the goaf cavity, gap and crack filling conditions, carrying out an indoor unidirectional compressive strength test on the test piece, and evaluating that the treatment requirement is met when the cavity filling rate is not less than 85% and the filling concretion strength is not less than 0.5 MPa.
CN201611194709.5A 2016-12-22 2016-12-22 Mine goaf treatment method for surface construction photovoltaic power station Active CN106640190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611194709.5A CN106640190B (en) 2016-12-22 2016-12-22 Mine goaf treatment method for surface construction photovoltaic power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611194709.5A CN106640190B (en) 2016-12-22 2016-12-22 Mine goaf treatment method for surface construction photovoltaic power station

Publications (2)

Publication Number Publication Date
CN106640190A CN106640190A (en) 2017-05-10
CN106640190B true CN106640190B (en) 2020-01-03

Family

ID=58834591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611194709.5A Active CN106640190B (en) 2016-12-22 2016-12-22 Mine goaf treatment method for surface construction photovoltaic power station

Country Status (1)

Country Link
CN (1) CN106640190B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110307034B (en) * 2019-04-04 2020-05-22 中国矿业大学(北京) Strip type grouting filling method for goaf
CN112923129B (en) * 2021-01-21 2022-10-14 四川石油天然气建设工程有限责任公司 Butt-joint type dragging pipe construction process and system for oil and gas pipelines

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591988A (en) * 2009-06-30 2009-12-02 中国电力工程顾问集团公司 The base stabilization appraisal procedure in mining influence district and upright tower method
CN102330423A (en) * 2011-07-20 2012-01-25 山西潞安矿业(集团)有限责任公司 Method for evaluating stability of newly built railway foundation on goaf
CN103244177A (en) * 2013-05-16 2013-08-14 长沙矿山研究院有限责任公司 Goaf treatment method based on filling raises with surface barren rock
CN104408277A (en) * 2014-09-28 2015-03-11 沈阳大学 Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot
CN104863591A (en) * 2015-06-16 2015-08-26 东北大学 Method for controlling caving and earth surface filling treatment in goaf
CN105808818A (en) * 2016-01-28 2016-07-27 中煤科工集团唐山研究院有限公司 Method for evaluating foundation stability of coal mining subsidence area
CN106097123A (en) * 2016-06-17 2016-11-09 煤炭科学技术研究院有限公司 A kind of earth's surface, the sinking land in coalmining areas is built photovoltaic generation and is collected station suitability assessment method
CN106251053A (en) * 2016-07-27 2016-12-21 煤炭科学技术研究院有限公司 The suitability assessment method of high voltage power transmission transmission tower is built on earth's surface, a kind of sinking land in coalmining areas

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101591988A (en) * 2009-06-30 2009-12-02 中国电力工程顾问集团公司 The base stabilization appraisal procedure in mining influence district and upright tower method
CN102330423A (en) * 2011-07-20 2012-01-25 山西潞安矿业(集团)有限责任公司 Method for evaluating stability of newly built railway foundation on goaf
CN103244177A (en) * 2013-05-16 2013-08-14 长沙矿山研究院有限责任公司 Goaf treatment method based on filling raises with surface barren rock
CN104408277A (en) * 2014-09-28 2015-03-11 沈阳大学 Method for predicting, preventing and controlling earth surface residual movement and deformation caused by newly-built building in mine lot
CN104863591A (en) * 2015-06-16 2015-08-26 东北大学 Method for controlling caving and earth surface filling treatment in goaf
CN105808818A (en) * 2016-01-28 2016-07-27 中煤科工集团唐山研究院有限公司 Method for evaluating foundation stability of coal mining subsidence area
CN106097123A (en) * 2016-06-17 2016-11-09 煤炭科学技术研究院有限公司 A kind of earth's surface, the sinking land in coalmining areas is built photovoltaic generation and is collected station suitability assessment method
CN106251053A (en) * 2016-07-27 2016-12-21 煤炭科学技术研究院有限公司 The suitability assessment method of high voltage power transmission transmission tower is built on earth's surface, a kind of sinking land in coalmining areas

Also Published As

Publication number Publication date
CN106640190A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN107067333B (en) Method for monitoring stability of high-altitude and steep slope at high cold altitude
CN104102525B (en) A kind of risk stratification control method for passing through city track traffic engineering
CN106288995B (en) A kind of hole-by-hole initiation explosion treatment Abandoned golfs method
CN106640190B (en) Mine goaf treatment method for surface construction photovoltaic power station
CN111075478A (en) Pre-grouting reinforcement process for ground construction of broken belt of excavation working face structure
CN107489168A (en) A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system
CN106544998A (en) For the method for real-time of underground deep layer earth horizontal displacement
CN104064236B (en) Terrace flatly-buried type underground nuclear power station
CN104051037A (en) Terrace embedded type underground nuclear power station
CN105865281A (en) Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN106097123A (en) A kind of earth's surface, the sinking land in coalmining areas is built photovoltaic generation and is collected station suitability assessment method
CN203572970U (en) Overburden failure range detection system under impact of mining
Li Mine earthquake prevention and control technology induced by old coalmine goafs based on surface isolation grouting
CN115164699A (en) Low-damage road slope settlement monitoring system and monitoring method thereof
CN210923831U (en) Lightning protection, ground connection, shielding integration electric wave environmental monitoring tower
Li et al. Ground control issues on photovoltaic power generation facilities construction in coal sinkhole region
Huang et al. Study on deformation monitoring of subway station deep foundation construction
CN113464148A (en) Construction method of large structure with Xigeda stratum section shallow-buried underground ground surface
CN113818887A (en) Construction process of super-large section tunnel under complex geological conditions
CN113123720A (en) Construction process for treating grouting holes and simultaneously using grouting holes as gas extraction holes in water damage area of coal seam floor
CN117868225B (en) Deep and large foundation pit monitoring device and monitoring method
Pinglu et al. Feasibility analysis on using shaft in the region with large deformation
Li et al. Rockburst inducement mechanism and its prediction based on microseismic monitoring
CN112901272A (en) Geophysical prospecting and drilling cooperative advanced water detection and drainage construction method
CN110376648A (en) A kind of ultra-deep shaft spiral progressive rock burst microseism synergic monitoring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant