CN106640171B - A kind of air door and its construction method with self-repair function - Google Patents

A kind of air door and its construction method with self-repair function Download PDF

Info

Publication number
CN106640171B
CN106640171B CN201710150825.5A CN201710150825A CN106640171B CN 106640171 B CN106640171 B CN 106640171B CN 201710150825 A CN201710150825 A CN 201710150825A CN 106640171 B CN106640171 B CN 106640171B
Authority
CN
China
Prior art keywords
pipe
self
construction method
mortar
repair function
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710150825.5A
Other languages
Chinese (zh)
Other versions
CN106640171A (en
Inventor
胡相明
吴明跃
程卫民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201710150825.5A priority Critical patent/CN106640171B/en
Publication of CN106640171A publication Critical patent/CN106640171A/en
Application granted granted Critical
Publication of CN106640171B publication Critical patent/CN106640171B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/10Air doors
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Abstract

The invention belongs to the technical fields of coal mine underground air door, are specifically related to a kind of Air Throttle in Mine Pit and its construction method with self-repair function.Air door provided by the invention is to pour closed filler for installing constructing in walling for doorframe, distribution is marked with the reparation pipe network of Bi-component adhesive inside filler, when there is crack in wall, pipe is repaired to rupture under stress, the adhesive of the inside is released, achievees the purpose that rapid healing wall body slit.The present invention has structure simple relative to traditional air door construction method, and anti-pressure ability is strong, can selfreparing, significant advantage with long service life.

Description

A kind of air door and its construction method with self-repair function
Technical field
The invention belongs to the technical fields of coal mine underground air door, are specifically related to a kind of method of Mine Ventilation with self-repair function Door and its construction method.
Background technique
Air door is the important ventilation equipment of underground coal mine, and distinguished and admirable or part is distinguished and admirable to be passed through not allowing for setting, but needs to go In the tunnel of people and vehicle excessively, the superiority and inferiority of quality and performance plays the stabilization of mine ventilation system and the safety of mistake vehicle, pedestrian Important role, and the stability of air door wall is installed, it is most important for air door normal use.With pit mining range Constantly expand, tunnel is pressed periodically to show obviously, and air door wall is often impacted due to adopting, wall damage, air door occurs Door frame distortions, phenomena such as fractureing, cause inside to be leaked out seriously, make to the safety of mine ventilation system, stability and reliability At very big influence, very big threat is caused to the safety in production of mine.
Traditional underground coal mine is often usually made of brick, sand, cement with air door wall, is pressed in biggish tunnel in mine, due to Wall body brick sand elasticity is very small, and decortication, scaling-off, phenomena such as cracking, crush, deforming easily occur for wall, and influencing air door normally makes With.Wall is once crack, it is necessary to which the crack for repeatedly pouring and generating to wall is handled, not only time-consuming in this way but also take material.
Therefore, a kind of not only to save the people of later period maintenance to the Air Throttle in Mine Pit that wall body slit is repaired Power material resources, and can guarantee air door long-term safety service to the full extent.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of Air Throttle in Mine Pit with self-repair function.It is provided by the invention Air door is to pour closed filler for installing constructing in walling for doorframe, and distribution is marked with double groups inside filler The reparation pipe network for dividing adhesive is repaired pipe and is ruptured under stress, the adhesive of the inside is discharged when crack occurs in wall Out, achieve the purpose that rapid healing wall body slit.This to achieve the above object, the present invention adopts the following technical scheme:
A kind of Air Throttle in Mine Pit with self-repair function, it is described including air door, doorframe and construct for installing doorframe Construct includes ground, wall and vault, and closed filler is filled with inside the wall of the construct, closed is filled described The reparation pipe equipped with adhesive is distributed with inside filling chock material, the reparation pipe is brittleness pipe.
Preferably, the doorframe is made of exterior door frame and interior doorframe, two layers of doorframe interval 60-80mm, in interior exterior door frame Centre is filled with padded coaming;Preferably, the padded coaming is foam, rubber etc..
Preferably, the wall top construction side of the construct offers pouring hole;Preferably, it is filled out inside the wall The closed filler filled is one of cement mortar, foamed concrete, high-grade concrete or polymeric foamed material.
Preferably, described repair the pipeline configuration that pipe is dual-pipe parallel, the reparation pipe is double-hole tube.
Preferably, described repair the chemical adhesive for being perfused with bi-component in pipe respectively;Preferably, the bi-component glue The epoxy resin injecting paste material and its curing agent of polyurethane injecting paste material and its catalyst, flame retardant type that agent is flame retardant type are sticked, or One or more of person's others chemical slip casting material and its catalyst;Preferably, the material for repairing pipe is glass, or Ceramics or high molecular material, wall thickness 1mm-4mm;Preferably, the reparation pipe can be laid with linear type, can also be with continuous U It lays.
Preferably, the main feed pipe for mortar being connected to the reparation pipe is also distributed with inside the closed filler.
Preferably, the main feed pipe for mortar is the pipeline configuration of dual-pipe parallel, it is marked with catalyst respectively in two pipelines And injecting paste material;Preferably, the main feed pipe for mortar is steel pipe or plastic tube;Preferably, on each pipeline of the main feed pipe for mortar Portion offers stock inlet and stomata.
Preferably, the main feed pipe for mortar is communicated with transportation system by stock inlet.
Preferably, the transportation system includes grouting pump and conveyance conduit;Preferably, the grouting pump is screw note Stock pump;Preferably, the conveyance conduit is mining high-voltage sebific duct, and two conveyance conduits convey catalyst and injecting paste material respectively; Preferably, the pipe diameter is 10mm-30mm, and pressure resistance is greater than 8MPa.
The second object of the present invention is to provide the construction method of above-mentioned air door.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of construction method of the Air Throttle in Mine Pit with self-repair function, comprising the following steps:
(1) inside and outside doorframe is installed in the position for opening up air door, and fills the materials such as foam, rubber between two doorframes, it is interior The distance between exterior door frame is 100-150mm;
(2) in roadway surrounding rock peripheral wall slotting, groove depth is not less than 200mm, builds after slotting according to the outer dimension of exterior door frame Ground and vault;
(3) two main feed pipe for mortar of inverted U are being installed apart from the position of country rock peripheral wall and vault 100-200mm, it is outer in distance The position of doorframe 100-200mm is installed respectively and the exterior door frame height main feed pipe for mortar of consistent four linear types, defeated in the master of inverted U Slurry tube top portion opens up a stomata, and stock inlet is opened up at left and right sides of stomata, opens up stomata on the main feed pipe for mortar top of linear type, Stomata lower part opens up stock inlet, and stock inlet is 50-100mm at a distance from stomata;
(4) the main feed pipe for mortar of inverted U is connected to the main feed pipe for mortar of linear type with reparation pipe, the position more than exterior door frame is used It repairs pipe to be connected to the main feed pipe for mortar of the inverted U of the left and right sides, the distance between adjacent reparation pipe is 100-400mm;
(5) masonry panel, and pouring hole is opened up in wall top construction side, the distance between wall and main feed pipe for mortar are 100mm-200mm;
(6) toward closed filler is poured inside wall, pouring hole is closed after pouring;
(7) conveyance conduit of the transportation system of adhesive is connected with stock inlet, is conveyed into main feed pipe for mortar and reparation pipe Bi-component adhesive closes stock inlet and stomata after slip casting;
(8) air door is installed on interior doorframe.
Beneficial effects of the present invention
(1) the walling laid inside of constructing for installing doorframe of the invention has brittle reparation to manage, and is repairing in pipe Portion is marked with fire-retardant bi-component adhesive.When constructing the filler inside walling and crack occur, Guan Ying masterpiece is repaired With lower rupture, the bi-component adhesive of internal ignition resistant type is released, rapidly heal filler formed crack, have and When, efficiently, quickly, selfreparing the characteristics of.
(2) inside and outside two doorframes are arranged not only can be with effective protection air door, and foam, rubber are filled among two doorframes Deng the material with buffer function, anti-pressure ability can be further improved, extend air door service life, with high economic effect Benefit.
(3) consolidant periodically can be injected into reparation pipe by grouting pump, guarantees that consolidant is abundant in reparation pipe, in turn Timely and effectively cure crack.
(4) using the polyurethane injecting paste material (and its catalyst) of flame retardant type, flame retardant type epoxy resin injecting paste material (and Its curing agent), or other chemical slip casting materials (and its catalyst), as adhesive, curative effect is more preferably.
Detailed description of the invention
Fig. 1 is air door main view;
Fig. 2 is bi-component adhesive transportation system structure chart;
Fig. 3, Fig. 4 are that the adhesive of the embodiment of the present invention cures distress in concrete figure.
In figure: 1: vault 2: stock inlet 3: stomata 4: main feed pipe for mortar 5: repair pipe 6: exterior door frame 7: interior doorframe 8: Padded coaming 9: air door 10: pouring hole 11: grouting pump 12: conveyance conduit 13: high-grade concrete 14: wall.
Specific embodiment
In the following with reference to the drawings and specific embodiments to of the invention a kind of with the air door of self-repair function and its side of constructing Method is described further.
Embodiment 1
It can be seen that a kind of Air Throttle in Mine Pit with self-repair function, including air door 9, doorframe and use by Fig. 1 and Fig. 2 In the construct of installation doorframe, the construct includes ground, wall 14 and vault 1, is filled out inside the wall 14 of the construct Filled with closed filler, the reparation pipe 5 equipped with adhesive, the reparation pipe 5 are distributed with inside the closed filler For brittleness pipe.
Preferably, the doorframe is made of exterior door frame 6 and interior doorframe 7, two layers of doorframe interval 80mm, in interior exterior door frame Between be filled with padded coaming 8, the padded coaming selects rubber.
Preferably, 14 top of the wall construction side of the construct offers pouring hole 10;It is filled out inside the wall 14 The closed filler filled is high-grade concrete.
Preferably, described repair the pipeline configuration that pipe 5 is dual-pipe parallel, the reparation pipe 5 is double-hole tube, the reparation The chemical adhesive of bi-component is perfused in pipe 5 respectively, the bi-component adhesive is the epoxy resin injecting paste material of flame retardant type And its curing agent;The material for repairing pipe 5 is ceramics, wall thickness 1mm;The reparation pipe 5 can be laid with linear type, can also be with Continuous U is laid.
Preferably, the main feed pipe for mortar 4 being connected to the reparation pipe is also distributed with inside the closed filler, it is described Main feed pipe for mortar 4 is the pipeline configuration of dual-pipe parallel, is marked with catalyst and injecting paste material respectively in two pipelines;The defeated slurry of master Pipe 4 is steel pipe;Each conduit upper of the main feed pipe for mortar 4 offers stock inlet 2 and stomata 3.
Preferably, the main feed pipe for mortar 4 is communicated with transportation system by stock inlet 2, the transportation system includes slip casting Pump 11 and conveyance conduit 12;The grouting pump 11 is screw grouting pump;The conveyance conduit 12 be mining high-voltage sebific duct, two Conveyance conduit 12 conveys catalyst and injecting paste material respectively;12 diameter of conveyance conduit is 10mm-30mm, and pressure resistance is greater than 8MPa。
Embodiment 2
A kind of construction method of the Air Throttle in Mine Pit with self-repair function, comprising the following steps:
(1) inside and outside doorframe is installed in the position for opening up air door, and fills the materials such as foam, rubber between two doorframes, it is interior The distance between exterior door frame is 100mm;
(2) in roadway surrounding rock peripheral wall slotting, groove depth is not less than 200mm, builds after slotting according to the outer dimension of exterior door frame Ground and vault;
(3) two main feed pipe for mortar 4 of inverted U are being installed apart from the position of country rock peripheral wall and vault 100mm, apart from exterior door frame The position of 100mm is installed respectively and the consistent main feed pipe for mortar 4 of four linear types of exterior door frame height, on the main feed pipe for mortar top of inverted U Portion opens up a stomata 3, and stock inlet 2 is opened up at left and right sides of stomata 3, stomata 3 is opened up on the main feed pipe for mortar top of linear type, in gas 3 lower part of hole opens up stock inlet 2, and stock inlet 2 is 100mm at a distance from stomata 3;
(4) the main feed pipe for mortar of inverted U is connected to the main feed pipe for mortar of linear type with repairing pipe 5, at the position of 6 or more exterior door frame, The main feed pipe for mortar of the inverted U of the left and right sides is connected to pipe 5 is repaired, the distance between adjacent reparation pipe 5 is 100mm;
(5) masonry panel 14, and pouring hole 10 is opened up in 14 top of wall construction side, between wall 14 and main feed pipe for mortar 4 Distance be 200mm;
(6) toward closed filler is poured inside wall 14, pouring hole 10 is closed after pouring;
(7) conveyance conduit 12 of the transportation system of adhesive is connected with stock inlet 2, to main feed pipe for mortar 4 and is repaired in pipe 5 Bi-component adhesive is conveyed, closes stock inlet 2 and stomata 3 after slip casting;
(8) air door 9 is installed on interior doorframe 7.
Embodiment 3
It can be seen that a kind of Air Throttle in Mine Pit with self-repair function, including air door 9, doorframe and use by Fig. 1 and Fig. 2 In the construct of installation doorframe, the construct includes ground, wall 14 and vault 1, is filled out inside the wall 14 of the construct Filled with closed filler, the reparation pipe 5 equipped with adhesive, the reparation pipe 5 are distributed with inside the closed filler For brittleness pipe.
Preferably, the doorframe is made of exterior door frame 6 and interior doorframe 7, two layers of doorframe interval 60mm, in interior exterior door frame Between be filled with padded coaming 8, the padded coaming selects foam.
Preferably, 14 top of the wall construction side of the construct offers pouring hole 10;It is filled out inside the wall 14 The closed filler filled is foamed concrete.
Preferably, described repair the pipeline configuration that pipe 5 is dual-pipe parallel, the reparation pipe 5 is double-hole tube, the reparation The chemical adhesive of bi-component is perfused in pipe 5 respectively, the bi-component adhesive is the epoxy resin injecting paste material of flame retardant type And its curing agent;The material for repairing pipe 5 is ceramics, wall thickness 4mm;The reparation pipe 5 can be laid with linear type, can also be with Continuous U is laid.
Preferably, the main feed pipe for mortar 4 being connected to the reparation pipe is also distributed with inside the closed filler, it is described Main feed pipe for mortar 4 is the pipeline configuration of dual-pipe parallel, is marked with catalyst and injecting paste material respectively in two pipelines;The defeated slurry of master Pipe 4 is steel pipe;Each conduit upper of the main feed pipe for mortar 4 offers stock inlet 2 and stomata 3.
Preferably, the main feed pipe for mortar 4 is communicated with transportation system by stock inlet 2, the transportation system includes slip casting Pump 11 and conveyance conduit 12;The grouting pump 11 is screw grouting pump;The conveyance conduit 12 be mining high-voltage sebific duct, two Conveyance conduit 12 conveys catalyst and injecting paste material respectively;12 diameter of conveyance conduit is 10mm-30mm, and pressure resistance is greater than 8MPa。
Embodiment 4
A kind of construction method of the Air Throttle in Mine Pit with self-repair function, comprising the following steps:
(1) inside and outside doorframe is installed in the position for opening up air door, and fills the materials such as foam, rubber between two doorframes, it is interior The distance between exterior door frame is 150mm;
(2) in roadway surrounding rock peripheral wall slotting, groove depth is not less than 200mm, builds after slotting according to the outer dimension of exterior door frame Ground and vault;
(3) two main feed pipe for mortar 4 of inverted U are being installed apart from the position of country rock peripheral wall and vault 200mm, apart from exterior door frame The position of 100mm is installed respectively and the consistent main feed pipe for mortar 4 of four linear types of exterior door frame height, on the main feed pipe for mortar top of inverted U Portion opens up a stomata 3, and stock inlet 2 is opened up at left and right sides of stomata 3, stomata 3 is opened up on the main feed pipe for mortar top of linear type, in gas 3 lower part of hole opens up stock inlet 2, and stock inlet 2 is 50mm at a distance from stomata 3;
(4) the main feed pipe for mortar of inverted U is connected to the main feed pipe for mortar of linear type with repairing pipe 5, at the position of 6 or more exterior door frame, The main feed pipe for mortar of the inverted U of the left and right sides is connected to pipe 5 is repaired, the distance between adjacent reparation pipe 5 is 400mm;
(5) masonry panel 14, and pouring hole 10 is opened up in 14 top of wall construction side, between wall 14 and main feed pipe for mortar 4 Distance be 100mm;
(6) toward closed filler is poured inside wall 14, pouring hole 10 is closed after pouring;
(7) conveyance conduit 12 of the transportation system of adhesive is connected with stock inlet 2, to main feed pipe for mortar 4 and is repaired in pipe 5 Bi-component adhesive is conveyed, closes stock inlet 2 and stomata 3 after slip casting;
(8) air door 9 is installed on interior doorframe 7.
Embodiment 5
The reparation pipe that the present embodiment uses is the poly- ammonia of flame retardant type for several linear type glass tubes, bi-component adhesive used Material between ester injecting paste material and its catalyst, two doorframes with buffer function is polymeric foamed material.
It can be seen that selfreparing air door by Fig. 1 and Fig. 2 to include: vault 1, stock inlet 2, stomata 3, main feed pipe for mortar 4, repair Multiple pipe 5, exterior door frame 6, interior doorframe 7, padded coaming 8, air door 9, pouring hole 10, grouting pump 11 and conveyance conduit 12.Opening up wind Inside and outside doorframe is installed in the position of door, and foam 8 is filled between two doorframes, and the distance between inside and outside doorframe is 120mm, in tunnel Country rock peripheral wall slotting, and groove depth is not less than 200mm, builds ground and vault according to the outer dimension of exterior door frame 6 after slotting, away from Two main feed pipe for mortar 4 of inverted U are installed from the position of country rock peripheral wall and vault 150mm, in the position apart from 6 150mm of exterior door frame point A gas An Zhuan not be opened up at the top of the main feed pipe for mortar of inverted U with the 6 consistent main feed pipe for mortar 4 of four linear types of height of exterior door frame Hole 3 opens up stock inlet 2 at left and right sides of stomata 3, opens up stomata 3 on the main feed pipe for mortar top of linear type, opens up in 3 lower part of stomata Stock inlet 2, stock inlet 2 are 80mm at a distance from stomata 3, and the main feed pipe for mortar of inverted U and the main feed pipe for mortar of linear type are connected with pipe 5 is repaired It is logical, at the position of 6 or more exterior door frame, the main feed pipe for mortar 4 of the inverted U of the left and right sides is connected to pipe 5 is repaired, adjacent reparation pipe 5 it Between distance be 300mm, with masonry bond wall, the distance between wall and main feed pipe for mortar are 150mm, and are applied on wall top Work side opens up pouring hole 10, from pouring hole 10 toward wall inside pour high-grade concrete 13, by pouring hole 10 after pouring Closing, the conveyance conduit 12 of the transportation system of adhesive is connected with stock inlet 2, to main feed pipe for mortar 4 and repairs conveying pair in pipe 5 Component adhesive closes stock inlet 2 and stomata 3 after slip casting, and air door 9 is installed on interior doorframe 7.When constructing in walling When crack occurs in the concrete in portion, repair pipe 5 and ruptured under stress, by the polyurethane injecting paste material of internal flame retardant type and Its catalyst releases, and under the effect of the catalyst, polyurethane repairs rapidly the crack on concrete, can achieve and controls in time More the purpose in crack.Stock inlet 2 and stomata 3 are periodically opened, supplements bi-component adhesive in main feed pipe for mortar 4 and reparation pipe 5.
Fig. 3, Fig. 4 are that the adhesive of the embodiment of the present invention cures distress in concrete figure.After crack occurs in concrete, repair Pipe 5 ruptures under stress, and consolidant is released, and consolidant is flowed out along crack, by crack self-healing.It can be with from figure Find out, consolidant is closely glued together by crack, and relatively uniform in crack punishment cloth, and filling degree of fractures is higher.It can To see, consolidant can be uniformly discharged into crack after repairing pipe 5 and rupturing, and it is cementing with concrete, realize the healing of fracture.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (20)

1. a kind of construction method of the Air Throttle in Mine Pit with self-repair function, comprising the following steps:
(1) inside and outside doorframe is installed in the position for opening up air door, and fills foam, rubber material, inside and outside doorframe between two doorframes The distance between be 100-150mm;
(2) in roadway surrounding rock peripheral wall slotting, groove depth is not less than 200mm, builds ground according to the outer dimension of exterior door frame after slotting And vault;
(3) two main feed pipe for mortar of inverted U are being installed apart from the position of country rock peripheral wall and vault 100-200mm, apart from exterior door frame The position of 100-200mm is installed respectively and the exterior door frame height main feed pipe for mortar of consistent four linear types, in the main feed pipe for mortar of inverted U Top opens up a stomata, and stock inlet is opened up at left and right sides of stomata, stomata is opened up on the main feed pipe for mortar top of linear type, in stomata Lower part opens up stock inlet, and stock inlet is 50-100mm at a distance from stomata;
(4) the main feed pipe for mortar of inverted U is connected to the main feed pipe for mortar of linear type with reparation pipe, the position other than exterior door frame, with reparation The main feed pipe for mortar of the inverted U of the left and right sides is connected to by pipe, and the distance between adjacent reparation pipe is 100-400mm;
(5) masonry panel, and pouring hole is opened up in wall top construction side, the distance between wall and main feed pipe for mortar are 100mm- 200mm;
(6) toward closed filler is poured inside wall, pouring hole is closed after pouring;
(7) conveyance conduit of the transportation system of adhesive is connected with stock inlet, to main feed pipe for mortar and repairs the double groups of conveying in pipe Divide adhesive, closes stock inlet and stomata after slip casting;
(8) air door is installed on interior doorframe.
2. the construction method of the Air Throttle in Mine Pit with self-repair function as described in claim 1, it is characterised in that: the mine Air door includes air door, doorframe and the construct for installing doorframe, and the construct includes ground, wall and vault, the structure It is filled with closed filler inside the wall of building body, the reparation equipped with adhesive is distributed with inside the closed filler Pipe, the reparation pipe is brittleness pipe.
3. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: the doorframe It is made of exterior door frame and interior doorframe, two layers of doorframe interval 60-80mm is filled with padded coaming among interior exterior door frame.
4. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 3, it is characterised in that: the buffering Material is foam or rubber.
5. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: described to construct The wall top construction side of body offers pouring hole.
6. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: the wall The closed filler of inside filling is in cement mortar, foamed concrete, high-grade concrete or polymeric foamed material It is a kind of.
7. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: the reparation Pipe is the pipeline configuration of dual-pipe parallel, and the reparation pipe is double-hole tube.
8. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 7, it is characterised in that: the reparation The chemical adhesive of bi-component is perfused in pipe respectively.
9. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 8, it is characterised in that: described double groups Dividing adhesive is the polyurethane injecting paste material and its catalyst, the epoxy resin injecting paste material of flame retardant type and its solidification of flame retardant type Agent.
10. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: described to repair The material of multiple pipe is glass, or ceramics or high molecular material, wall thickness 1mm-6mm.
11. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 2, it is characterised in that: described to repair Multiple pipe linear type is laid or continuous U is laid.
12. the construction method of the Air Throttle in Mine Pit with self-repair function as described in claim 2-11 is any, it is characterised in that: The main feed pipe for mortar being connected to the reparation pipe is also distributed with inside the closed filler.
13. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 12, it is characterised in that: the master Feed pipe for mortar is the pipeline configuration of dual-pipe parallel, is marked with catalyst and injecting paste material respectively in two pipelines.
14. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 12, it is characterised in that: the master Feed pipe for mortar is steel pipe or plastic tube.
15. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 13, it is characterised in that: the master Each conduit upper of feed pipe for mortar offers stock inlet and stomata.
16. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 12, it is characterised in that: the master Feed pipe for mortar is communicated with transportation system by stock inlet.
17. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 16, it is characterised in that: described defeated Sending system includes grouting pump and conveyance conduit.
18. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 17, it is characterised in that: the note Stock pump is screw grouting pump.
19. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 17, it is characterised in that: described defeated Sending pipeline is mining high-voltage sebific duct, and two conveyance conduits convey catalyst and injecting paste material respectively.
20. the construction method of the Air Throttle in Mine Pit with self-repair function as claimed in claim 17, it is characterised in that: described defeated Sending pipe diameter is 10mm-30mm, and pressure resistance is greater than 8MPa.
CN201710150825.5A 2017-03-14 2017-03-14 A kind of air door and its construction method with self-repair function Active CN106640171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710150825.5A CN106640171B (en) 2017-03-14 2017-03-14 A kind of air door and its construction method with self-repair function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710150825.5A CN106640171B (en) 2017-03-14 2017-03-14 A kind of air door and its construction method with self-repair function

Publications (2)

Publication Number Publication Date
CN106640171A CN106640171A (en) 2017-05-10
CN106640171B true CN106640171B (en) 2019-07-19

Family

ID=58848078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710150825.5A Active CN106640171B (en) 2017-03-14 2017-03-14 A kind of air door and its construction method with self-repair function

Country Status (1)

Country Link
CN (1) CN106640171B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925010B (en) * 2019-11-19 2021-06-01 煤炭科学技术研究院有限公司 Anti-deformation system for air door and air window of underground coal mine and installation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808641A (en) * 2012-07-14 2012-12-05 山东新阳能源有限公司 Compression resistant air door in underground mine
CN103224345A (en) * 2013-04-17 2013-07-31 重庆交通大学 Self-healing concrete structural body

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2924817C2 (en) * 1979-06-20 1986-11-13 Ruhrkohle Ag, 4300 Essen Resilient weather door frame
CN201560787U (en) * 2009-12-04 2010-08-25 沂源县鲁村煤矿有限公司 Coal mine underground pressure-resistant air door
CN202300460U (en) * 2011-10-28 2012-07-04 山西晋城无烟煤矿业集团有限责任公司 Quickly-mounted pressure-resistant air door
CN105545343A (en) * 2016-01-11 2016-05-04 枣庄万硕矿用设备制造有限公司 Crush-resistant and anti-deformation underground roadway air door
CN206681773U (en) * 2017-03-14 2017-11-28 山东科技大学 A kind of air door with self-repair function

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102808641A (en) * 2012-07-14 2012-12-05 山东新阳能源有限公司 Compression resistant air door in underground mine
CN103224345A (en) * 2013-04-17 2013-07-31 重庆交通大学 Self-healing concrete structural body

Also Published As

Publication number Publication date
CN106640171A (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN110017167B (en) Coal mine explosion-proof sealing wall and construction method thereof
CN102409768B (en) Vacuum heat insulation plate installation system and installation method
WO2019056794A1 (en) Method for constructing cavity behind tunnel lining, and composite lining structure formed after construction
CN106566501B (en) Flexible plugging agent and preparation method and application thereof
CN101634231A (en) Method for reinforcing and sealing coal mine and preventing gas
CN206681773U (en) A kind of air door with self-repair function
US8485873B2 (en) Steel anchored reinforced mine seal
CN106640171B (en) A kind of air door and its construction method with self-repair function
CN109779670A (en) A kind of closed composite construction of the quick fire-and explosion-proof pressure-bearing in underground and implementation method
CN108868819B (en) A kind of BFRP-ECC concrete shield duct piece and shield tunnel
CN110656936A (en) Mine roof directional roof cutting pressure relief method based on static expanding agent
CN202023532U (en) Hole packer for reinforcing for grouting in coal mine
KANG et al. Research progress on support technology and methods for soft rock with large deformation hazards in China
CN113356927B (en) Underground fireproof explosion-proof airtight isolation system and construction method thereof
CN207143756U (en) One kind building self-repairing system
CN106703885B (en) A kind of underground coal mine fire dam and its construction method with self-repair function
CN206233896U (en) For the anti-pumping blocking of gas pumping and the outer plugging device of drainage holes
CN206681795U (en) A kind of underground coal mine fire dam with self-repair function
CN106702915A (en) Building self-repair system and constructing method and application thereof
CN112983479B (en) Roadway surrounding rock sealing protection method
CN112663646A (en) Stable in-situ reinforcing method for grouting control
CN113416051A (en) Rapid sealing material and preparation method thereof
CN212053618U (en) Stretch-proofing exhaust passage structure
CN107034916A (en) Glass fibre composite reinforced plastics prefabricated assembly structural
CN207033496U (en) A kind of Coal Mine Fire door wall construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant