CN106640137A - Supporting device and supporting method for shallow-buried excavation engineering construction - Google Patents

Supporting device and supporting method for shallow-buried excavation engineering construction Download PDF

Info

Publication number
CN106640137A
CN106640137A CN201611224770.XA CN201611224770A CN106640137A CN 106640137 A CN106640137 A CN 106640137A CN 201611224770 A CN201611224770 A CN 201611224770A CN 106640137 A CN106640137 A CN 106640137A
Authority
CN
China
Prior art keywords
culvert
inwall
fixed plate
grouting pipe
shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611224770.XA
Other languages
Chinese (zh)
Other versions
CN106640137B (en
Inventor
熊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611224770.XA priority Critical patent/CN106640137B/en
Publication of CN106640137A publication Critical patent/CN106640137A/en
Application granted granted Critical
Publication of CN106640137B publication Critical patent/CN106640137B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/006Lining anchored in the rock

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Sewage (AREA)
  • Revetment (AREA)

Abstract

The invention provides a shallow-buried excavation supporting device and supporting method. An advancing duct is arranged on a rock, an upper culvert of a culvert is excavated, a plurality of holes are drilled on the inner wall of the upper culvert, fixing plates are arranged on the inner wall of the upper culvert, fixing rods penetrate through the fixing plates and extend to the holes in the inner wall of the upper culvert, fixing teeth on the fixing rods clamp the holes in the inner wall of the upper culvert, cement paste is injected into the holes in the inner wall of the upper culvert via an injection pipe, the fixing plates are combined into a circular arch, the junctions of the fixing plates are welded, a lower culvert is excavated, a support frame is connected with the fixing plates, and then concrete paste is sprayed to form a concrete layer. The device and the method realize early supporting of any position, and can use large machinery for construction; and the device is simple in structure and convenient to assemble.

Description

Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support
Technical field
The present invention relates to underground, culvert, tunnel construction field, more particularly to shallow buried and underground excavated engineering project construction is filled with supporting Put and its method for protecting support.
Background technology
It is in Dryopteris sublaetaChing et Hsu to adopt CRD methods, two side-wall pilot tunnel, these methods to excavate thought based on piecemeal, open more Dig and repeatedly disturbance country rock is removed in gib, operation conversion is complicated, and operating space is little, is unfavorable for making for heavy mechanical equipment With construction speed is slow, long in time limit, and cost is high, excavates stability and security is also poor.
The present invention provides a kind of shallow buried and underground excavated engineering project construction work suspension device and its method for protecting support, and the present invention can be realized Preliminary bracing to the optional position of architectural engineering, and big machinery excavation construction can be used, present configuration is simple, assembling side Just.
The content of the invention
For achieving the above object, the present invention provides following technical scheme:
Dryopteris sublaetaChing et Hsu engineering suspension device, is arranged in rock mass, and some advanced conduits are arranged on rock mass, and rock excavation is contained Hole, the upper culvert of culvert point and lower culvert, if excavate on the inwall of upper culvert having dry hole, arrange some fixations on the inwall of upper culvert Plate, if arranging dry hole in each fixed plate, fix bar extends to the hole excavated on the inwall of culvert through the hole in fixed plate Interior, fix bar includes shell and Grouting Pipe, and the Grouting Pipe is disposed through inside the shell, and Grouting Pipe two ends are stretched out outside shell Portion, Grouting Pipe upper end is provided with the second limiting plate, and Grouting Pipe lower end is connected with drawing handle, and fixed block is divided into multi-level and circumference It is arranged on outer shell outer wall, is arranged in a linear on the fixed block vertical direction of different levels, connecting pin is passed through on each fixed block A fixing tooth is hinged, the fixing tooth that vertical direction is arranged in a linear is hinged by connecting rod, is provided with shell some thin Elongated hole, the fixing tooth of the bottom on shell is connected with support bar, and support bar is connected through the elongated hole on shell with portable plate, Portable plate is located in the space between Grouting Pipe and shell, and the support block that cone-shaped is provided with Grouting Pipe is relative with portable plate Should, each fixation plate weld is combined into birdcage and is affixed on the inwall of culvert, and lower culvert both sides inwall is correspondingly arranged 2 Support, bracing frame is connected with the fixed plate of upper culvert inwall bottom, and concrete layer covers the birdcage of fixed plate formation and props up Support.
Specifically, the drawing handle centre position is provided with centre bore, and the centre bore of drawing handle is interior with Grouting Pipe Hole communicates, and the inwall of the centre bore of drawing handle is provided with internal thread, the internal thread of the centre bore that plug passes through drawing handle with Drawing handle connects, and drawing handle is connected by 2 symmetrically arranged expansion links with the first limiting plate, and screw is arranged on expansion link Bar, the first limiting plate is located at the lower end of shell and is connected with fixed plate.
Specifically, the method for protecting support of the Dryopteris sublaetaChing et Hsu engineering suspension device, is included on rock mass and arranges advanced Conduit, and cement mortar is injected from advanced conduit to rock mass, the upper culvert of culvert is excavated, then excavate on upper culvert inwall some Hole, often excavate on upper culvert can be at excavation at one inwall on mounting plate, fixed plate is close to the inwall of culvert, In the hole that fix bar is opened through the inwall that fixed plate extends to upper culvert, pulling the drawing handle of fix bar makes Grouting Pipe in shell It is interior to move to workmen direction, so as to drive the support block of the cone-shaped being arranged in slip casting pipe outer wall to workmen direction Mobile, the support block of cone-shaped promotes portable plate to move to rock mass direction, so that the fixing tooth being connected with support bar is opened, when When fixing tooth is opened to a certain extent, fixing tooth is stuck in the hole opened on culvert inwall, tightens the lead screw on expansion link, is made The support block of cone-shaped can stably support portable plate, and by the hole opened in Grouting Pipe upwards culvert inwall cement mortar is injected, and make Fix bar is connected as a single entity with the inwall of upper culvert.
Including when upper culvert excavate reach fixed plate can be made to be combined into dome shape when, weld each fixed plate, make each Individual fixed plate is linked to be entirety, then excavates lower culvert, and bracing frame is connected with the fixed plate of bottom on upper culvert inwall, then Again pneumatically placed concrete slurry, makes concrete cover fixed plate and bracing frame, and forms concrete layer.
The present invention provides a kind of Dryopteris sublaetaChing et Hsu engineering suspension device and its method for protecting support, can realize to architectural engineering Optional position preliminary bracing, and can be constructed using big machinery, present configuration is simple, easy to assembly.
Description of the drawings
Fig. 1 is Dryopteris sublaetaChing et Hsu engineering suspension device of the present invention.
In Fig. 1:Contain under the advanced conduit of 1- rock mass, 2-, 3- fix bars, 4- fixed plates, 5- bracing frames, the upper culverts of 6-, 7- Hole, 8- concrete layers.
Fig. 2 is the fix bar of Dryopteris sublaetaChing et Hsu engineering suspension device of the present invention.
In Fig. 2:4- fixed plates, the limiting plates of 9- first, 10- expansion links, 11- lead screw, 12- plugs, 13- second are spacing Plate, 14- drawing handles, 30- fixing tooths, 31- connecting pins, 32- fixed blocks, 33- connecting rods, the support block of 34- cone-shapeds, 35- Grouting Pipe, 36- support bars, 37- shells, 38- elongated holes, 39- portable plates.
Fig. 3 is the A areas enlarged drawing of Fig. 2.
In Fig. 3:The support block of 34- cone-shapeds, 35- Grouting Pipes, 36- support bars, 37- shells, 38- elongated holes, 39- live Dynamic plate.
Specific embodiment
This device is elaborated simultaneously below in conjunction with the accompanying drawing of Dryopteris sublaetaChing et Hsu engineering suspension device of the present invention The method for protecting support of Dryopteris sublaetaChing et Hsu engineering suspension device is explained.
Dryopteris sublaetaChing et Hsu engineering suspension device, is arranged in rock mass 1, and some advanced conduits 2, rock are arranged on rock mass 1 Body 1 excavates culvert, the upper culvert 6 of culvert point and lower culvert 7, if excavate on the inwall of upper culvert 6 having dry hole, the inwall of upper culvert 6 Upper to arrange some fixed plates 4, if arranging dry hole in each fixed plate 4, fix bar 3 extends to culvert through the hole in fixed plate 4 In the hole excavated on the inwall in hole 6, fix bar 3 includes shell 37 and Grouting Pipe 35, and the Grouting Pipe 35 is disposed through shell In 37, and the two ends of Grouting Pipe 35 are stretched out outside shell 37, and the upper end of Grouting Pipe 35 is provided with the second limiting plate 13, the lower end of Grouting Pipe 35 Drawing handle 14 is connected with, 32 points of fixed block is arranged on the outer wall of shell 37 for multi-level and circumference, the fixed block of different levels It is arranged in a linear on 32 vertical directions, a fixing tooth 30, vertical direction is hinged by connecting pin 31 on each fixed block 32 The fixing tooth 30 being arranged in a linear is hinged by connecting rod 33, some elongated holes 38 is provided with shell 37, on shell 37 most The fixing tooth 30 of lower end is connected with support bar 36, and support bar 36 is connected through the elongated hole 38 on shell 37 with portable plate 39, living Dynamic plate 39 is located at the support block 34 and activity for being provided with cone-shaped in the space between Grouting Pipe 35 and shell 37 in Grouting Pipe 35 Plate 39 is corresponding, and each welding of fixed plate 4 is combined into birdcage and is affixed on the inwall of culvert 6, the both sides inwall pair of lower culvert 7 2 bracing frames 5 should be set, and bracing frame 5 is connected with the fixed plate 4 of the inwall bottom of upper culvert 6, concrete layer 8 covers the shape of fixed plate 4 Into birdcage and bracing frame 5.
Specifically, the centre position of the drawing handle 14 is provided with centre bore, the centre bore and Grouting Pipe of drawing handle 14 35 endoporus is communicated, and the inwall of the centre bore of drawing handle 14 is provided with internal thread, the center that plug 12 passes through drawing handle 14 The internal thread in hole is connected with drawing handle 14, and drawing handle 14 is connected by 2 symmetrically arranged expansion links 10 with the first limiting plate 9 Connect, lead screw 11 is set on expansion link 10, first limiting plate 9 is located at the lower end of shell 37 and is connected with fixed plate 4.
Specifically, the method for protecting support of the Dryopteris sublaetaChing et Hsu engineering suspension device, is included on rock mass 1 and arranges advanced Conduit 2, and cement mortar is injected from advanced conduit 2 to rock mass 1, the upper culvert 6 of culvert is excavated, then excavate on the inwall of upper culvert 6 If dry hole, often excavate on upper culvert 6 can be at excavation at one inwall on mounting plate 4, fixed plate 4 is close to culvert 6 inwall, in the hole that fix bar 3 is opened through the inwall that fixed plate 4 extends to culvert 6, pulls the drawing handle 14 of fix bar 3 Make Grouting Pipe 35 in shell 37 to the movement of workmen direction, so as to drive the cone-shaped being arranged on the outer wall of Grouting Pipe 35 Support block 34 to workmen direction is moved, and the support block 34 of cone-shaped promotes portable plate 39 to move to the direction of rock mass 1, so that The fixing tooth 30 being connected with support bar 36 is opened, and when fixing tooth 30 is opened to a certain extent, fixing tooth 30 is stuck in culvert 6 In the hole opened on wall, the lead screw 11 on expansion link 10 is tightened, the support block 34 for enabling cone-shaped stably supports portable plate 39, Cement mortar is injected by the hole opened in the Grouting Pipe 35 upwards inwall of culvert 6, makes fix bar 3 be connected as a single entity with the inwall of upper culvert 6.
Including when upper culvert 6 excavate reach fixed plate 4 can be made to be combined into dome shape when, weld each fixed plate 4, make Each fixed plate 4 is linked to be entirety, then excavates lower culvert 7, and bracing frame 5 is connected with the fixed plate 3 of bottom on the inwall of upper culvert 6 Connect, then again pneumatically placed concrete is starched, make concrete cover fixed plate 4 and bracing frame 5, and form concrete layer 8.Concrete layer 8 enters One step its support reinforcement device, the bearing capacity for making suspension device is further strengthened.

Claims (4)

1. Dryopteris sublaetaChing et Hsu engineering suspension device, is arranged at rock mass(1)It is interior, it is characterised in that:Rock mass(1)It is upper to arrange some Advanced conduit(2), rock mass(1)Excavate culvert, the upper culvert of culvert point(6)With lower culvert(7), upper culvert(6)Inwall on excavate If there is dry hole, upper culvert(6)Inwall on some fixed plates are set(4), each fixed plate(4)If upper setting dry hole, fix bar (3)Through fixed plate(4)On hole extend to culvert(6)Inwall on excavate hole in, fix bar(3)Including shell(37) With Grouting Pipe(35), the Grouting Pipe(35)It is disposed through shell(37)It is interior, and Grouting Pipe(35)Stretch out shell in two ends(37) Outside, Grouting Pipe(35)Upper end is provided with the second limiting plate(13), Grouting Pipe(35)Lower end is connected with drawing handle(14), it is fixed Block(32)It is divided at many levels and circumference is arranged at shell(37)On outer wall, the fixed block of different levels(32)In straight on vertical direction Line is arranged, each fixed block(32)It is upper to pass through connecting pin(31)It is hinged a fixing tooth(30), vertical direction is arranged in a linear Fixing tooth(30)By connecting rod(33)It is hinged, shell(37)On be provided with some elongated holes(38), shell(37)On most The fixing tooth of lower end(30)It is connected with support bar(36), support bar(36)Through shell(37)On elongated hole(38)With portable plate (39)Connection, portable plate(39)Positioned at Grouting Pipe(35)With shell(37)Between space in, Grouting Pipe(35)On be provided with cone The support block of shape(34)With portable plate(39)It is corresponding, each fixed plate(4)Welding is combined into birdcage and is affixed on culvert (6)Inwall on, lower culvert(7)Both sides inwall is correspondingly arranged 2 bracing frames(5), bracing frame(5)With upper culvert(6)Inwall bottom The fixed plate in portion(4)Connection, concrete layer(8)Cover fixed plate(4)The birdcage and bracing frame of formation(5).
2. suspension device as claimed in claim 1, it is characterised in that:The drawing handle(14)Centre position is provided with center Hole, drawing handle(14)Centre bore and Grouting Pipe(35)Endoporus communicate, drawing handle(14)Centre bore inwall arrange There are internal thread, plug(12)By drawing handle(14)The internal thread of centre bore be connected with drawing handle (14), drawing handle (14)By 2 symmetrically arranged expansion links(10)With the first limiting plate(9)Connection, expansion link(10)Upper setting lead screw (11), first limiting plate(9)Positioned at shell(37)Lower end and and fixed plate(4)Connection.
3. a kind of method for protecting support for claim 1-2 Dryopteris sublaetaChing et Hsu engineering suspension device, it is characterised in that:In rock Body(1)It is upper that advanced conduit is set(2), and from advanced conduit(2)To rock mass(1)Injection cement mortar, excavates the upper culvert of culvert (6), then in upper culvert(6)If dry hole is excavated on inwall, in upper culvert(6)On often excavate can be at excavation at one inwall on Mounting plate(4), fixed plate(4)It is close to culvert(6)Inwall, fix bar(3)Through fixed plate(4)Extend to culvert (6)The hole opened of inwall in, pull fix bar(3)Drawing handle(14)Make Grouting Pipe(35)In shell(37)It is interior to constructor The movement of member direction, so as to drive Grouting Pipe is arranged on(35)The support block of the cone-shaped on outer wall(34)Move to workmen direction It is dynamic, the support block of cone-shaped(34)Promote portable plate(39)To rock mass(1)Direction is moved, so that and support bar(36)Connection Fixing tooth(30)Open, work as fixing tooth(30)When opening to a certain extent, fixing tooth(30)It is stuck in culvert(6)Open on inwall In hole, expansion link is tightened(10)On lead screw(11), make the support block of cone-shaped(34)Portable plate can stably be supported(39), By Grouting Pipe(35)Culvert upwards(6)The hole injection cement mortar opened on inwall, makes fix bar(3)With upper culvert(6)Inwall It is connected as a single entity.
4. method for protecting support as claimed in claim 3, it is characterised in that:When upper culvert(6)Excavation reaches can make fixed plate(4)Group During synthesis dome shape, each fixed plate is welded(4), make each fixed plate(4)It is linked to be entirety, then excavates lower culvert(7), and By bracing frame(5)With upper culvert(6)The fixed plate of bottom on inwall(3)Connection, then again pneumatically placed concrete is starched, and covers concrete Fixed plate(4)With bracing frame(5), and form concrete layer(8).
CN201611224770.XA 2016-12-27 2016-12-27 Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support Expired - Fee Related CN106640137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611224770.XA CN106640137B (en) 2016-12-27 2016-12-27 Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611224770.XA CN106640137B (en) 2016-12-27 2016-12-27 Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support

Publications (2)

Publication Number Publication Date
CN106640137A true CN106640137A (en) 2017-05-10
CN106640137B CN106640137B (en) 2018-01-30

Family

ID=58831522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611224770.XA Expired - Fee Related CN106640137B (en) 2016-12-27 2016-12-27 Shallow buried and underground excavated engineering project construction suspension device and its method for protecting support

Country Status (1)

Country Link
CN (1) CN106640137B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143345A (en) * 2017-05-17 2017-09-08 熊伟 Shallow buried covered excavation drilling suspension device and its method for protecting support

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100558469B1 (en) * 2005-09-08 2006-03-10 (주)한석엔지니어링 The compressing permanent anchor
JP2009052269A (en) * 2007-08-27 2009-03-12 Ohbayashi Corp Arch concrete curing method and curing agent spraying apparatus
CN202139588U (en) * 2011-06-18 2012-02-08 山东大学 Novel self-broaching anchor rod
CN103277118A (en) * 2013-06-04 2013-09-04 中铁第一勘察设计院集团有限公司 Joint steel frame supporting system for excavating auxiliary tunnel on main-tunnel arch wall and construction method of joint steel frame supporting system
CN203756182U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Support structure applied to shallow road tunnel in weak rock area
CN203961998U (en) * 2014-07-07 2014-11-26 陕西路桥集团第一工程有限公司 A kind of shallow tunnel combined type preliminary bracing structure
CN205422779U (en) * 2016-03-24 2016-08-03 山东科技大学 Side direction supports and to let pressure formula slip casting stock

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100558469B1 (en) * 2005-09-08 2006-03-10 (주)한석엔지니어링 The compressing permanent anchor
JP2009052269A (en) * 2007-08-27 2009-03-12 Ohbayashi Corp Arch concrete curing method and curing agent spraying apparatus
CN202139588U (en) * 2011-06-18 2012-02-08 山东大学 Novel self-broaching anchor rod
CN103277118A (en) * 2013-06-04 2013-09-04 中铁第一勘察设计院集团有限公司 Joint steel frame supporting system for excavating auxiliary tunnel on main-tunnel arch wall and construction method of joint steel frame supporting system
CN203756182U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Support structure applied to shallow road tunnel in weak rock area
CN203961998U (en) * 2014-07-07 2014-11-26 陕西路桥集团第一工程有限公司 A kind of shallow tunnel combined type preliminary bracing structure
CN205422779U (en) * 2016-03-24 2016-08-03 山东科技大学 Side direction supports and to let pressure formula slip casting stock

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107143345A (en) * 2017-05-17 2017-09-08 熊伟 Shallow buried covered excavation drilling suspension device and its method for protecting support

Also Published As

Publication number Publication date
CN106640137B (en) 2018-01-30

Similar Documents

Publication Publication Date Title
CN103940968B (en) Test bed device for tunnel excavating and grouting model and application method of device
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN105673046B (en) Double-arched tunnel middle drift vault backfills construction method
CN104453930B (en) Tunnel initial lining construction device and method
CN105178979A (en) Supporting structure of tunnel in bias salt cavity environment and construction method of supporting structure
CN108678771A (en) Pass through fault belt Tunnel and median septum strengthening supporting system
CN106884665A (en) A kind of Double Multi-Arch start tunneling method based on arch set arch
CN108131145A (en) A kind of construction method of super-span tunnel excavation support
CN209604053U (en) Combined bolting and shotcrete operation rock bolting jumbo
CN218439391U (en) Roadway supporting structure
CN106703835A (en) Welding-free quick assembly supporting structure with grid steel frames for tunnel primary supporting construction
JP4317322B2 (en) Arch support structure
CN106761772A (en) Shallow buried and underground excavated engineering project construction fixing device and its fixing means
CN105952459B (en) A kind of tunnel pin-connected panel preliminary bracing method
CN106640137A (en) Supporting device and supporting method for shallow-buried excavation engineering construction
CN110206571A (en) A kind of rock bolting jumbo and its operation engineering method for Tunnel Rock Bolt construction
CN112253176B (en) Combined supporting structure system for realizing large-span and small-clear-distance tunnels and construction method thereof
CN108979663A (en) A kind of main structure of subway station construction method using interim middle spacer post support
CN203881737U (en) Rack device for tunnel excavating and grouting model test
CN208734343U (en) A kind of station tunnel excavation structure with interim middle spacer post support
CN202170477U (en) Device for constructing arch ribs of concrete-filled steel tube arch bridges
CN103410529A (en) Tunnel supporting arch foot reinforced structure for soft surrounding rocks and construction method
CN106640117A (en) Underground cavern top arc structure, underground cavern and construction method of underground cavern
CN107143345B (en) Shallow buried covered excavation drilling suspension device and its method for protecting support
CN110173229A (en) One kind being used for the anti-well off-angle drilling plugging device of oil-gas pipeline and method for blocking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20181227

CF01 Termination of patent right due to non-payment of annual fee