Stagewise topping machanism
Technical field
The present invention relates to oil and gas well drilling, CBM Drilling, geological prospecting, mine boring tool field, especially a kind of stagewise topping machanism.
Background technology
The reduction of drilling speed has become the technical bottleneck of restriction China deep-seated oil gas reservoir Efficient Development, and existing conventional rock-breaking and well-drilling technology can not meet the technological requirement for putting forward effect.PDC drill bit has the advantages that to be widely applied better than other drill bits, but big size hole drilling speed is slow, high abrasive stratum bit wear is serious, large scale or expensive, the low broken rock energy deficiency of bit central linear velocity of high-performance drill bit etc., it is also subject matter that PDC drill bit faces, New well drilling technology such as laser drill, drilling by use of heat, particle punching drilling etc. also do not reach the technical requirements of scene application.
The content of the invention
The purpose of invention needs precisely in order to solving prior art, proposes a kind of simple structure, high, the easy to operate stagewise topping machanism of dependable performance, control accuracy.
The technical solution adopted for the present invention to solve the technical problems is:
Stagewise topping machanism, including shell body 1 and positive displacement motor 2, shaft coupling 3, the power transmission shaft 4 being placed in shell body 1;The top of power transmission shaft 4 sets by-pass prot 5, bottom sets one-level joint 13, expanding stabilizer 10 is extended with the bottom of shell body 1, stabilizer 10 opens up axially upward the uniform driven gear chamber of several circumferences from bottom, arrange and the homoaxial driven gear 8 of power transmission shaft 4 in each driven gear chamber, the lower end of driven gear 8 sets secondary joint 9;Driving gear 7 is fixed with outside power transmission shaft 4;The driven gear 8 uniform with periphery of driving gear 7 constitutes ratcheting rotatable engagement.
Such scheme also includes:The bottom of power transmission shaft 4 sets horizontal nozzle 12, and horizontal nozzle 12 is located at the lower section of secondary joint 9;The outer surface of stabilizer 10 is intervally distributed with convex wing, and the outer surface of stabilizer 10 inlays anti-roll flute.
Such scheme is further included:Primary seal device 6 is installed between power transmission shaft 4 and the inwall of shell body 1, two stage sealing device 11 is installed between driven gear 8 and stabilizer 10, driven gear within the chamber is full of lubricating oil.
The advantage of stagewise topping machanism of the present invention is:Combine multigroup small bits, and drive each drilling bit high-speed rotary broken rock, the purpose that big size hole is drilled to using small bits is reached, bottom rock can be to greatest extent cut again, the technical advantage of PDC drill bit is given full play to, so as to obtain higher efficiency of breaking rock and rate of penetration, additionally it is possible to control hole quality, while also overcoming the deficiency of low efficiency of breaking rock difference of conventional large scale drill bit linear velocity high quick abrasion life-span.Stagewise topping machanism compared with conventional rock crushing tool, under conditions of same consumption energy and drilling period, can cut more rocks, i.e. rate of penetration faster, efficiency of breaking rock it is higher;And small bits large-size drill bit is cheap, and big size hole can be got out again, its economic benefit is very notable.Field practice is proved, average to improve drilling efficiency 56.7% using stagewise topping machanism drilling well, saves drilling period 5-8 days, and drilling quality meets design standard, realizes low energy consumption, efficient drilling well purpose.
Meanwhile, stagewise topping machanism also have structure design simple, dependable performance, it is easy to operate the features such as.
Description of the drawings
Fig. 1 is according to stagewise topping machanism structural representation proposed by the invention.
Fig. 2 is according to stagewise topping machanism Section A-A schematic diagram proposed by the invention.
In figure:1- shell bodies, 2- positive displacement motors, 3- shaft couplings, 4- power transmission shafts, 5- by-pass prots, 6- primary seal devices, 7- driving gears, 8- driven gears, 9- secondary joints, 10- stabilizers, 11- two stage sealing devices, the horizontal nozzles of 12-, 13- one-level joints.
Specific embodiment
Below in conjunction with the accompanying drawings describing the present invention in detail.
Such as Fig. 1, stagewise topping machanism is mainly made up of shell body 1, positive displacement motor 2, shaft coupling 3, power transmission shaft 4, driving gear 7, driven gear 8, one-level joint 13, secondary joint 9, stabilizer 10.Shaft coupling 3 is installed between positive displacement motor and power transmission shaft, the top of power transmission shaft 4 processes by-pass prot 5, the bottom cross machine nozzle 12 of power transmission shaft 4, the bottom of power transmission shaft 4 connection one-level joint 13, primary seal device 6 is installed, driving gear 7 is arranged on power transmission shaft 4 between power transmission shaft 4 and the inwall of shell body 1;Expanding stabilizer 10 is extended with the bottom of shell body 1, stabilizer 10 opens up axially upward the uniform driven gear chamber of several circumferences from bottom, arrange and the homoaxial driven gear 8 of power transmission shaft 4 in each driven gear chamber, the lower end of driven gear 8 sets secondary joint 9, and two stage sealing device 11 is installed between driven gear 8 and stabilizer 10.
As Fig. 2, the outer surface of stabilizer 10 are intervally distributed with convex wing, the outer surface of stabilizer 10 inlays anti-roll flute.
When the device of the present invention is applied to well drilling and rock crushing,One-level drill bit is connected with one-level joint,Two grades of drill bits are connected with secondary joint,Its quantity can be according to specific requirement design processing 2 or more than 2,Then ground rotating disk and hydraulic pump are started,After drilling fluid enters stagewise topping machanism,Drilling fluid drives positive displacement motor to start to rotate,Drive axis are driven by shaft coupling,And then drive one-level drill bit to rotate broken rock,Drilling fluid is after positive displacement motor,Jing by-pass prots are entered inside power transmission shaft,Then shaft bottom is reached through one-level drill bit,As power transmission shaft is continuously rotated,Moment of torsion is transferred to driven gear by driving gear,Drive driven gear rotation,Because two grades of drill bits are connected with driven gear,Therefore two grades of drill bits start to rotate broken rock,Horizontal nozzle of the part drilling fluid on power transmission shaft is projected,Clear rock and cooling are carried out to two grades of drill bits,The stabilizer of shell body bottom can either guarantee stability of the stagewise topping machanism in all drill bit rock break-off process are driven,Borehole size can be kept again to meet the requirements,The borehole wall can also be repaired.