Truss closed construction system and construction method thereof Download PDFInfo
- Publication number
- CN106638688A CN106638688A CN201611009488.XA CN201611009488A CN106638688A CN 106638688 A CN106638688 A CN 106638688A CN 201611009488 A CN201611009488 A CN 201611009488A CN 106638688 A CN106638688 A CN 106638688A
- Authority
- CN
- China
- Prior art keywords
- purlin
- protection canopy
- car
- construction
- vehicle type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
- E02D29/055—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
Abstract
The invention discloses a truss closed construction system and a construction method thereof. The system comprises a protective shed and a truss; a pair of truss beams for arranging the truss is arranged in the protective shed; rails are arranged on the truss beams; two ends of the truss can slide along the corresponding rails; the truss is provided with soil taking equipment and lifting equipment; driving lanes for passing through transportation vehicles are arranged in the protective shed, and are positioned on the outer side of a foundation pit; and access ports for passing through persons and the transportation vehicles are arranged on two sides of the protective shed. The protective shed is used for isolating from an opening surface of the foundation pit to effectively prevent influence on the environment by various pollution and influence on construction by the weather to realize all-closed construction. The soil taking equipment and the lifting equipment are arranged on the truss; and the soil taking equipment can excavate soil, and the lifting equipment can lift, so that additional excavators and cranes are not needed, the equipment cost needed by construction is reduced, and the construction flow is simplified.
Description
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of purlin vehicle type closure construction system and its construction method.
Background technology
Often adopt traditional open type along the form of construction work of the practice during underground engineering construction such as subway station at this stage, foundation ditch is straight
Connect exposure in atmosphere.During construction, the pollution such as noise, airborne dust, high light is directly traveled in surrounding environment by open, to environment
Impact larger.
Accordingly, it would be desirable to a kind of closure construction method, in the case where construction operation is not affected, by the open place's envelope of the scope of operation
Close, to reduce propagation of the construction pollution to surrounding enviroment, reduce impact of the weather to constructing, realize efficient, green, safety applying
Work industry.
The content of the invention
It is an object of the invention to provide a kind of purlin vehicle type closure construction system and its construction method, to reduce construction to ring
Pollution and impact that border is caused, realize efficient green construction operation.
To solve above-mentioned technical problem, the present invention provides following technical scheme:
A kind of purlin vehicle type closure construction system, including protection canopy and purlin car, are provided with a pair for arranging in the protection canopy
The purlin bicycle beam of the purlin car, the purlin bicycle beam is provided with track, and the two ends of the purlin car can slide along corresponding track, institute
State purlin car and be provided with the equipment of fetching earth and hanging device, the runway passed through for haulage vehicle is additionally provided with the protection canopy,
The runway is located at the outside of foundation ditch, and the both sides of the protection canopy are provided with the discrepancy passed through that comes in and goes out for personnel and haulage vehicle
Mouthful.
Preferably, in above-mentioned purlin vehicle type closure construction system, the protection canopy width is more than the open face width of foundation ditch,
The protection canopy length is more than foundation ditch length, and the width and length dimension of the protection canopy need to meet vehicle pass-through requirement.
Preferably, in above-mentioned purlin vehicle type closure construction system, the height of the protection canopy is according to construction Clearance requirement
Arrange.
Preferably, in above-mentioned purlin vehicle type closure construction system, protection canopy periphery is wrapped up using protective materials.
Preferably, in above-mentioned purlin vehicle type closure construction system, the purlin car is provided with one and fetches earth equipment for setting
And the installing rack of hanging device, the installing rack can be along the axial movement of the purlin car.
Preferably, it is described to fetch earth equipment for grab bucket or hydraulic arm, the peace in above-mentioned purlin vehicle type closure construction system
Shelve by fetching earth equipment in the position of short transverse described in steel wire rope or retractor device regulation.
Preferably, in above-mentioned purlin vehicle type closure construction system, the hanging device is suspension hook, and the installing rack passes through
Steel wire rope or retractor device adjust hanging device in the position of short transverse.
The invention also discloses a kind of construction method of vehicle type closure construction system in purlin as above, including following step
Suddenly:
Step one, carries out preparing before field construction, lifts protection canopy, and protective materials, the protection are installed outside protection canopy
Canopy width is more than the open face width of foundation ditch, and the protection canopy length is more than foundation ditch length, and the width and length of the protection canopy
Size need to meet vehicle pass-through requirement, and protection canopy height is arranged according to construction Clearance requirement, and arranges gateway;
Step 2, arranges a pair parallel purlin bicycle beams in protection canopy, track is arranged in the bicycle beam of purlin, by the two ends of purlin car
It is arranged on corresponding track so that purlin car can be moved along track above foundation ditch;
Step 3, using the equipment of fetching earth digging is carried out, and using hanging device lifting operation is carried out;
Step 4, after the completion of structure construction, removes protection canopy and purlin car.
Preferably, in step 3, when digging is carried out, first the equipment of fetching earth is drop into shoveling face, is carried after shoveling
Rise and be moved to directly over runway, soil is unloaded to runway in muck haulage car, transported outward roach by muck haulage car.
Preferably, in step 3, when lifting operation is carried out, hanging device is drop on stockyard or carriage of vehicle first
Side, need to lift after material slings, and purlin car moves to precalculated position, slowly puts to the place for needing lifting.
Preferably, the construction method is used for the underground engineering construction of subway station.
From techniques disclosed above scheme, compared with prior art, beneficial effects of the present invention are as follows:
First, the present invention is provided purlin vehicle type closure construction system and its construction method, isolate foundation ditch open by protection canopy
Face, is prevented effectively from impact of impact and weather of all kinds of pollutions to environment to constructing, and realizes whole enclosed construction.
2nd, the present invention is provided purlin vehicle type closure construction system and its construction method, are set by arranging to fetch earth on the car of purlin
Standby and hanging device, the equipment of fetching earth can carry out digging, and hanging device can carry out lifting operation, it is not necessary to extra digging machine and
Crane, not only reduces the equipment cost needed for construction, and simplifies construction process.
Description of the drawings
Fig. 1 is the floor map of the purlin vehicle type closure construction system of one embodiment of the invention.
Fig. 2 is the elevational schematic view of the purlin vehicle type closure construction system of one embodiment of the invention.
In figure:Fetch earth equipment, the 7- liftings of 1- protection canopies, 2- purlins car, 3- purlins bicycle beam, 4- haulage vehicles, 5- gateways, 6- sets
Standby, 8- installing racks, 9- foundation ditches.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to description below and right
Claim, advantages and features of the invention will become apparent from.Hereinafter accompanying drawing will be combined by cited embodiment, describe this in detail
Bright technology contents and feature.Need to illustrate in addition, accompanying drawing is compared in the form of simplifying very much and accurately using non-
Example, only to purpose that is convenient, lucidly aiding in illustrating the embodiment of the present invention.For sake of convenience, described below " on ",
The upper and lower direction of D score and accompanying drawing is consistent, but this can not become the restriction of technical solution of the present invention.
Fig. 1 to Fig. 2 is referred to, wherein, Fig. 1 illustrates for the plane of the purlin vehicle type closure construction system of one embodiment of the invention
Figure, Fig. 2 is the elevational schematic view of the purlin vehicle type closure construction system of one embodiment of the invention.Present embodiment discloses a kind of purlin car
Formula closure construction system, for the construction of subway station.The purlin vehicle type closure construction system, including protection canopy 1 and purlin car 2, institute
State and a pair purlin bicycle beams 3 for arranging the purlin car 2 be provided with protection canopy 1, the purlin bicycle beam 3 is provided with track (not shown),
The two ends of the purlin car 2 can slide along corresponding track, and the purlin car 2 is horizontally disposed with and mutual with the purlin bicycle beam 3
Vertically, the purlin car 2 is provided with to be additionally provided with the equipment of fetching earth 6 and hanging device 7, the protection canopy 1 and leads to for haulage vehicle 4
Capable runway, the runway is located at the outside of foundation ditch 9, and the both sides of the protection canopy 1 are provided with and go out for personnel and haulage vehicle 4
Enter current gateway 5.On the one hand, the open face of foundation ditch 9 is isolated by protection canopy 1, is prevented effectively from shadow of all kinds of pollutions to environment
The impact of sound and weather to constructing, realizes whole enclosed construction.On the other hand, equipment 6 and hung by arranging to fetch earth on the car of purlin
Installing standby 7, the equipment 6 that fetches earth can carry out digging, and hanging device 7 can carry out lifting operation, it is not necessary to extra digging machine and hang
Car, not only reduces the equipment cost needed for construction, and simplifies construction process.
Preferably, in above-mentioned purlin vehicle type closure construction system, the width of the protection canopy 1 is more than the open face width of foundation ditch 9
Degree, the length of the protection canopy 1 be more than the length of foundation ditch 9, and the width and length dimension of the protection canopy 1 need to meet vehicle pass-through and
Construction requirement.The height of the protection canopy 1 is arranged according to construction Clearance requirement.
Preferably, in above-mentioned purlin vehicle type closure construction system, the periphery of protection canopy 1 is wrapped up using protective materials, to have
Beneficial to the pollution such as dust, noise, high light is stopped, impact of the weather to constructing is reduced.
Preferably, in above-mentioned purlin vehicle type closure construction system, the purlin car is provided with one and fetches earth equipment for setting
And the installing rack 8 of hanging device, the installing rack 8 can be along the axial movement of the purlin car, so as to be existed by purlin car 2
Move in purlin bicycle beam 3, fetch earth equipment 6 and hanging device 7 of realization is moved forward and backward on foundation ditch 9, is driven by installing rack 8 and is fetched earth
Equipment 6 and hanging device 7 are moved left and right on foundation ditch 9, to desired location.
For the ease of carrying out digging under enclosed environment, in the purlin vehicle type closure construction system of the present embodiment, institute
The equipment of fetching earth 6 is stated from grab bucket or hydraulic arm, the installing rack 8 described in the regulation (not shown) of steel wire rope or retractor device by taking
Indigenous equipment 6 is in the position of short transverse.
It is described in the purlin vehicle type closure construction system of embodiment for the ease of carrying out lifting operation under enclosed environment
Hanging device 7 selects suspension hook, the installing rack 8 to adjust hanging device 7 in the position of short transverse by steel wire rope or retractor device
Put.
Please continue to refer to Fig. 1 and Fig. 2, the construction method of vehicle type closure construction system in purlin as above, including following step
Suddenly:
Step one, carries out preparing before field construction, lifts protection canopy 1, and protective materials is installed outside protection canopy 1, described anti-
Shield canopy 1 width is more than the open face width of foundation ditch 9, and the length of the protection canopy 1 is more than the length of foundation ditch 9, and the width of the protection canopy 1
Vehicle pass-through requirement need to be met with length dimension, the height of protection canopy 1 is arranged according to construction Clearance requirement, and arranges gateway 5.
Step 2, arranges a pair parallel purlin bicycle beams 3 in protection canopy 1, track is arranged in purlin bicycle beam 3, by purlin car 2
Two ends are arranged on corresponding track so that purlin car 2 can be mobile in the top of foundation ditch 9 along track.
Step 3, using the equipment of fetching earth 6 digging is carried out, and using hanging device 7 lifting operation is carried out.
Preferably, in step 3, when digging is carried out, the equipment 6 that will fetch earth first drop to shoveling face, carries after shoveling
Rise and be moved to directly over runway, soil is unloaded to runway in muck haulage car (a kind of in haulage vehicle 2), will be useless by muck haulage car
Soil outward transport.
Preferably, in step 3, when lifting operation is carried out, first hanging device 7 is drop into stockyard or carriage of vehicle
Top, need to lift after material slings, and purlin car 2 moves to precalculated position, slowly puts to the place for needing lifting.
Step 4, after the completion of structure construction, removes protection canopy 1 and purlin car 2.
Preferably, the construction method is used for the underground engineering construction of subway station.
In sum, the present invention is provided purlin vehicle type closure construction system and its construction method, by protection canopy 1 base is isolated
9 open faces are cheated, impact of impact and weather of all kinds of pollutions to environment to constructing is prevented effectively from, whole enclosed construction is realized.It is logical
Cross and fetch earth equipment 6 and hanging device 7 are set on the car of purlin, the equipment 6 that fetches earth can carry out digging, and hanging device 7 can be hung
Pretend industry, it is not necessary to extra digging machine and crane, not only reduce the equipment cost needed for construction, and simplify construction stream
Journey.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this
Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims
Scope.
Claims (10)
1. a kind of purlin vehicle type closure construction system, it is characterised in that including protection canopy and purlin car, in the protection canopy a pair are provided with
For arranging the purlin bicycle beam of the purlin car, the purlin bicycle beam is provided with track, and the two ends of the purlin car can be along corresponding rail
Road slides, and the purlin car is provided with the equipment of fetching earth and hanging device, is additionally provided with the protection canopy current for haulage vehicle
Runway, the runway is located at the outside of foundation ditch, and the both sides of the protection canopy are provided with and come in and go out logical for personnel and haulage vehicle
Capable gateway.
2. vehicle type closure construction system in purlin as claimed in claim 1, it is characterised in that the protection canopy width is opened more than foundation ditch
Spacious face width, the protection canopy length is more than foundation ditch length, and the width and length dimension of the protection canopy need to meet vehicle and lead to
Row is required.
3. vehicle type closure construction system in purlin as claimed in claim 1, it is characterised in that the height of the protection canopy is according to construction
Clearance requirement is arranged.
4. vehicle type closure construction system in purlin as claimed in claim 1, it is characterised in that protection canopy periphery uses protective materials bag
Wrap up in.
5. vehicle type closure construction system in purlin as claimed in claim 1, it is characterised in that the purlin car is provided with for arranging
Fetch earth the installing rack of equipment and hanging device, and the installing rack can be along the axial movement of the purlin car.
6. vehicle type closure construction system in purlin as claimed in claim 5, it is characterised in that described to fetch earth equipment for grab bucket or hydraulic pressure
Arm, the installing rack described in steel wire rope or retractor device regulation by fetching earth equipment in the position of short transverse.
7. vehicle type closure construction system in purlin as claimed in claim 5, it is characterised in that the hanging device is suspension hook, described
Installing rack adjusts hanging device in the position of short transverse by steel wire rope or retractor device.
8. a kind of construction method of the purlin vehicle type closure construction system as described in any one in claim 1-7, its feature exists
In comprising the steps:
Step one, carries out preparing before field construction, lifts protection canopy, and protective materials, the protection canopy width are installed outside protection canopy
Degree is more than the open face width of foundation ditch, and the protection canopy length is more than foundation ditch length, and the width and length dimension of the protection canopy
Vehicle pass-through requirement need to be met, protection canopy height is arranged according to construction Clearance requirement, and arranges gateway;
Step 2, arranges a pair parallel purlin bicycle beams in protection canopy, and in the bicycle beam of purlin track is arranged, and the two ends of purlin car are arranged
On corresponding track so that purlin car can be moved along track above foundation ditch;
Step 3, using the equipment of fetching earth digging is carried out, and using hanging device lifting operation is carried out;
Step 4, after the completion of structure construction, removes protection canopy and purlin car.
9. the construction method of vehicle type closure construction system in purlin as claimed in claim 8, it is characterised in that in step 3, entering
During row digging, first the equipment of fetching earth is drop into shoveling face, lifted after shoveling and be moved to directly over runway, soil is unloaded
To runway in muck haulage car, roach is transported outward by muck haulage car.
10. the construction method of vehicle type closure construction system in purlin as claimed in claim 8, it is characterised in that in step 3, entering
During row lifting operation, first hanging device is drop into stockyard or carriage of vehicle top, need to be lifted after material slings, purlin car is moved
To precalculated position, slowly put to the place for needing lifting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009488.XA CN106638688B (en) | 2016-11-16 | 2016-11-16 | Purlin vehicle type closure construction system and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611009488.XA CN106638688B (en) | 2016-11-16 | 2016-11-16 | Purlin vehicle type closure construction system and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106638688A true CN106638688A (en) | 2017-05-10 |
CN106638688B CN106638688B (en) | 2018-11-02 |
Family
ID=58807186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611009488.XA Active CN106638688B (en) | 2016-11-16 | 2016-11-16 | Purlin vehicle type closure construction system and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106638688B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532610A (en) * | 2018-05-31 | 2018-09-14 | 中国水利水电第十四工程局有限公司 | A kind of dust-proof shed offline for foundation pit inner stator |
CN109610406A (en) * | 2018-12-26 | 2019-04-12 | 福建建中建设科技股份有限公司 | A kind of inland river Processing tecchnics |
CN109853657A (en) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology |
CN113023562A (en) * | 2021-03-05 | 2021-06-25 | 上海建工二建集团有限公司 | Soil body taking and transporting device and method for existing building underground space development |
CN116220046A (en) * | 2023-05-08 | 2023-06-06 | 中铁建工集团第二建设有限公司 | Residue soil transportation and excavation equipment for excavation of building construction foundation pit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6314929A (en) * | 1986-07-07 | 1988-01-22 | Nippon Telegr & Teleph Corp <Ntt> | Opening and closing device for steel plate cover |
CN103397649A (en) * | 2013-08-16 | 2013-11-20 | 中铁大桥局股份有限公司 | Double-wall steel cofferdam construction multifunctional platform and construction method thereof |
CN204059377U (en) * | 2014-10-16 | 2014-12-31 | 葛洲坝集团第五工程有限公司 | Circular Double-Wall Steel Boxed Cofferdam makes the vertical moulding bed support system of movable-type |
CN206279555U (en) * | 2016-11-16 | 2017-06-27 | 上海建工二建集团有限公司 | Purlin vehicle type closure construction system |
-
2016
- 2016-11-16 CN CN201611009488.XA patent/CN106638688B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6314929A (en) * | 1986-07-07 | 1988-01-22 | Nippon Telegr & Teleph Corp <Ntt> | Opening and closing device for steel plate cover |
CN103397649A (en) * | 2013-08-16 | 2013-11-20 | 中铁大桥局股份有限公司 | Double-wall steel cofferdam construction multifunctional platform and construction method thereof |
CN204059377U (en) * | 2014-10-16 | 2014-12-31 | 葛洲坝集团第五工程有限公司 | Circular Double-Wall Steel Boxed Cofferdam makes the vertical moulding bed support system of movable-type |
CN206279555U (en) * | 2016-11-16 | 2017-06-27 | 上海建工二建集团有限公司 | Purlin vehicle type closure construction system |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108532610A (en) * | 2018-05-31 | 2018-09-14 | 中国水利水电第十四工程局有限公司 | A kind of dust-proof shed offline for foundation pit inner stator |
CN108532610B (en) * | 2018-05-31 | 2023-12-01 | 中国水利水电第十四工程局有限公司 | A dustproof canopy that is used for stator to roll off production line in foundation ditch |
CN109610406A (en) * | 2018-12-26 | 2019-04-12 | 福建建中建设科技股份有限公司 | A kind of inland river Processing tecchnics |
CN109853657A (en) * | 2019-03-15 | 2019-06-07 | 湖北工业大学 | A kind of artificial digging pile automatic clinker-removing device and application method based on BIM technology |
CN113023562A (en) * | 2021-03-05 | 2021-06-25 | 上海建工二建集团有限公司 | Soil body taking and transporting device and method for existing building underground space development |
CN116220046A (en) * | 2023-05-08 | 2023-06-06 | 中铁建工集团第二建设有限公司 | Residue soil transportation and excavation equipment for excavation of building construction foundation pit |
Also Published As
Publication number | Publication date |
---|---|
CN106638688B (en) | 2018-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638688A (en) | Truss closed construction system and construction method thereof | |
JP2006348691A (en) | System for working on exterior wall part of building | |
CN107083843A (en) | It is a kind of to be used for the mobile platform of high-rise building equipment and material fast transportation | |
CN206279555U (en) | Purlin vehicle type closure construction system | |
KR101160273B1 (en) | Straddle carrier for bridge construction | |
CN205973518U (en) | Track portal jib crane | |
CN104512312B (en) | Function pair vehicle | |
JP4187445B2 (en) | crane | |
JP3031535B2 (en) | Conveyed object transfer device for shield excavation | |
CN215208114U (en) | Device for hoisting materials for shield construction of underground excavation transverse passage of subway | |
CN214217959U (en) | Slope type track panel hoisting structure for subway station | |
CN104512313B (en) | Function pair vehicle | |
JP2014196598A (en) | Excavation sediment/material-mechanical equipment carrying-in-and-out system and excavation sediment/material-mechanical equipment carrying-in-and-out method | |
JP3884825B2 (en) | Carrying system for lining segments for tunnel construction | |
CN210915089U (en) | A hoist and mount conveyer for coal mine tunnel equipment | |
JPS6115099Y2 (en) | ||
JPH10167668A (en) | Vertical and horizontal transporting device and its operation | |
JP3077904B1 (en) | Bogie lifting device | |
JP3515847B2 (en) | Equipment loading method during nuclear power plant construction | |
JPS6138999Y2 (en) | ||
JPH10176420A (en) | Conveying method and device for material in underground work | |
JP3085445B2 (en) | Elevator cage moving device | |
JPH05133128A (en) | Method for installing plural layer type underground parking equipment and installation working vehicle used for the installation method | |
JPS6139000Y2 (en) | ||
JP2859811B2 (en) | Equipment transportation method and elevator with transportation basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |