CN106624607A - Novel manufacturing technology of sheet metal parts - Google Patents

Novel manufacturing technology of sheet metal parts Download PDF

Info

Publication number
CN106624607A
CN106624607A CN201510728986.9A CN201510728986A CN106624607A CN 106624607 A CN106624607 A CN 106624607A CN 201510728986 A CN201510728986 A CN 201510728986A CN 106624607 A CN106624607 A CN 106624607A
Authority
CN
China
Prior art keywords
procedure
sheet metal
mould
manufacturing technology
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510728986.9A
Other languages
Chinese (zh)
Inventor
王欣欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510728986.9A priority Critical patent/CN106624607A/en
Publication of CN106624607A publication Critical patent/CN106624607A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention relates to a novel manufacturing technology of sheet metal parts. The technological process relates to the manufacturing procedures and process of sheet metal parts of left and right wind scoopers of automobiles. The novel manufacturing technology comprises the manufacturing procedures of procedure 1, blanking of a plate shearing machine; procedure 2, fixed length cutting and punching of a mold; procedure 3, mold forming; procedure 4, mold bending; procedure 5, separation punching of the mold; procedure 6, butt resistance welding; procedure 7, acid pickling and phosphorization; procedure 8, electrostatic spraying; and procedure 9, loading and storage. According to the novel manufacturing technology, the material and equipment utilization rate is increased, the working efficiency is greatly improved, the qualification rate of a product is greatly increased, parameters of the raw materials are designed, the equipment during the processing process is designed, the processing procedures and technology are designed, and a good effect is achieved.

Description

Novel sheet metal part manufacturing process
Technical field
The invention belongs to mechanical manufacturing field, and in particular to a kind of Novel sheet metal part manufacturing process.
Background technology
In vehicle right and left wind scooper sheet metal component manufacturing process, prior art processes flow process operation is unreasonable, utilization rate of equipment and installations is low, inefficiency, upper and lower procedure connection is not careful enough, there is many manual operations in erasing greasy dirt and clear welding slag etc. many places, productive temp is uncoordinated to realizing continuous productive process, the big Production requirement of modernization is had a strong impact on, product percent of pass is low, has a strong impact on product quality.
The content of the invention
Instant invention overcomes the deficiencies in the prior art, it is proposed that a kind of Novel sheet metal part manufacturing process, the flow process is designed the blank dimension of vehicle right and left wind scooper sheet metal component, and on the premise of quality is not affected stock utilization is improved;Correspondence calculating is carried out to mold work parameter and device parameter, it is ensured that reasonable employment, it is to avoid cause energy waste;The layout of working site is adjusted, as far as possible can continuous productive process improving efficiency;The problems such as to stamping procedure by technological demonstration, the merging of sequencing and operation for operation, is adjusted or improves;It is adjusted to welding technique process, to reach energy-saving purpose;Greasy dirt, the corrosion produced during to work pieces process is processed leftover pieces from basic solution, is reached and is made the best use of everything.
The technical scheme is that:A kind of Novel sheet metal part manufacturing process, the technological process is related to the manufacturing process of vehicle right and left wind scooper sheet metal component and flow process, including following manufacturing process:
Operation 1, plate shearing machine for blanking;
Operation 2, mould scale material cuts punching;
Operation 3, mould molding;
Operation 4, mould bending;
Operation 5, mould separates punching;
Operation 6, butt resistance welding;
Operation 7, pickling, phosphatization;
Operation 8, electrostatic spraying;
Operation 9, entrucking warehouse-in.
To operation 1, the tolerance constraints of blank size are:± 0.25mm, the dwell time scope of operation 3 is:7-9 hours.
The vehicle right and left wind scooper sheet metal component of operation 8 is provided with aperture and corresponding bolt, and the diameter of the aperture control bolt of vehicle right and left wind scooper sheet metal component is adjusted in the margin of tolerance;Make bolt and aperture constrained each other, monolateral gap is between 0.05mm-0.1mm.
Existing process flow process operation is excessive;Utilization rate of equipment and installations is low;Inefficiency;Up and down procedure connection is not careful enough; There is the operation erasing manual operation such as greasy dirt and clear welding slag, productive temp is uncoordinated to realizing continuous productive process.Leftover pieces are rationally utilized.Modifications and adaptations have been carried out to original technological process with deficiency for disadvantage mentioned above.Technological process after improvement improves material and facility utilization rate;Greatly improve operating efficiency and product percent of pass.Raw material parameter is designed, the equipment in process is designed, manufacturing procedure and technique are designed, reached good effect.
The present invention has the advantages that:
1) present invention greatly enhances material and facility utilization rate, utilization rate of raw materials brings up to 97%.
2)The present invention substantially increases operating efficiency, and whole work efficiency improves 85%.
3)The present invention substantially increases product percent of pass, and product percent of pass has reached 98.7%.
4)The present invention saves 63% in terms of manpower.
Specific embodiment
The present invention is designed for the processing technology of vehicle right and left wind scooper sheet metal component, and on the basis of original significant improvement, including following operation have been carried out:
Operation 1, plate shearing machine for blanking;
Operation 2, mould scale material cuts punching;
Operation 3, mould molding;
Operation 4, mould bending;
Operation 5, mould separates punching;
Operation 6, butt resistance welding;
Operation 7, pickling, phosphatization;
Operation 8, electrostatic spraying;
Operation 9, entrucking warehouse-in.
1)Adjustment and improvement aspect to material
(1):Tolerance constraints are added to the plate shearing machine for blanking size of operation 1.(±0.25mm), in the Measurement Allowance of product, Jing tests can reach requirement.
(2):Because of the raising of the plate shearing machine for blanking dimensional accuracy of operation 1., the processing of mould scale material can be changed to the mould blanking of operation 2.,(Note:Blanking is to remove material method to blank material periphery and internal feature;Scale material is to borrow blank material periphery, only removes material to internal feature, thus can improve stock utilization).Stock utilization brings up to 97% by original 51% after improvement.(3):After to the processing of the mould scale material of operation 2., the material of the waste material that inside occurs, material is thick, and peripheral dimensions etc. are counted;In correspondence waste material feature find that vehicle right and left support can be produced.Because vehicle right and left wind scooper and Auto Instrument desk or so support is same automobile model, so material, quantity is unanimously.The material of Auto Instrument desk or so support need not get the raw materials ready after improvement;Material-saving 100%.
2)Adjustment and improvement aspect to equipment
(1):The original production equipment of mould molding is YZ27-630 presses(Main motor current 44KW/h);Use YZ27-400 presses(Main motor current 22KW/h)Angle of arrival rebound phenomenon during experiment, later on earth the dwell time produced qualified products to adjusted equipment;Energy saving 80% after adjustment.
(2):Mould bending operation is original respectively in J31-315 closed single points(Main motor current 30KW/h)Production;Later the stamping press of two molds calculated respectively;Determine two original molds simultaneously in J36-630 closed double-points(Main motor current 55KW/h)Production.(note:J36-630 closed double-point work tops are big).Energy saving 83.3% after adjustment;Improve operating efficiency 88%.
3)Working site is adjusted and is improved
(1):Originally product turnover employment is pushed and pulled a cart between last process and next procedure, is occurred laborious. and it is time-consuming. product easily overstocks the phenomenons such as deformation;Through the fixation planning to measurement and material area between equipment;The removable product carriage in inclined-plane is built between devices in decision;Solve problem above.Whole work efficiency improves 78.5% after adjustment;Product sequence turnover qualification rate reaches 100%;Substantially continuous productive process is realized.
4:Operation is adjusted and is improved
(1):Be previously present erasing greasy dirt operation, belong to manual operation, and occur during plant equipment operation collaborative work work tempo it is uncoordinated the problems such as.By carrying out Analysis on Problems to wiping greasy dirt, it is found that greasy dirt prevents mould from occurring to product " scuffing " plus lubricating oil when being mould molding.Qualified products have been produced in the case of non lubricant oil using copper alloy CB-2H materials to the local for mould at scuffing occur by technological demonstration.Greasy dirt is wiped after adjustment can be without having reached the purpose of reduction operation, saving manpower 28%.
(2)In the past clear welding slag was also required to manual operation;Work is also comparatively laborious.Welding slag is positioned by original operation bolt position(Spot welding)Cause.Spot welding is dimensional accuracy between principal security bolt, because the diameter of bolt it is excessive with the bore clearance of product.Finally the diameter that the aperture of product compares bolt is adjusted in the margin of tolerance;Make bolt and aperture constrained each other(Monolateral gap ensures between 0.05mm---0.1mm).Jing tests size qualification(Product tolerance be ± 0.5mm, actual maximum deviation 0.25mm -0.3mm).Adjustment rear bolt position positioning(Spot welding)Can also omit with former clear welding slag;Reach reduction operation and saved the purpose of wlding solder flux, save manpower 35%.
After above-mentioned technological process, the present invention saves 63% in terms of manpower, and utilization rate of raw materials brings up to 97%, and whole work efficiency improves 85%, and product percent of pass has brought up to 98.7%, and energy saving increases benefit more than 2,600 ten thousand yuan in year more than 80 percent.

Claims (2)

1. a kind of Novel sheet metal part manufacturing process, the technological process is related to the manufacturing process of vehicle right and left wind scooper sheet metal component and flow process, it is characterised in that:Including following manufacturing process:
Operation 1, blanking;
Operation 2, mould scale material cuts punching;
Operation 3, mould molding;
Operation 4, mould bending;
Operation 5, mould separates punching;
Operation 6, butt resistance welding;
Operation 7, pickling, phosphatization;
Operation 8, electrostatic spraying;
Operation 9, entrucking warehouse-in.
2. Novel sheet metal part manufacturing process according to claim 1, it is characterised in that:To operation 1, the tolerance constraints of blank size are:± 0.25mm, the dwell time scope of operation 3 is:7-9 hours.
CN201510728986.9A 2015-11-01 2015-11-01 Novel manufacturing technology of sheet metal parts Pending CN106624607A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510728986.9A CN106624607A (en) 2015-11-01 2015-11-01 Novel manufacturing technology of sheet metal parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510728986.9A CN106624607A (en) 2015-11-01 2015-11-01 Novel manufacturing technology of sheet metal parts

Publications (1)

Publication Number Publication Date
CN106624607A true CN106624607A (en) 2017-05-10

Family

ID=58809296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510728986.9A Pending CN106624607A (en) 2015-11-01 2015-11-01 Novel manufacturing technology of sheet metal parts

Country Status (1)

Country Link
CN (1) CN106624607A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109514212A (en) * 2019-01-28 2019-03-26 金恒山电气无锡有限公司 A kind of flanging sheet metal component processing technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109514212A (en) * 2019-01-28 2019-03-26 金恒山电气无锡有限公司 A kind of flanging sheet metal component processing technology

Similar Documents

Publication Publication Date Title
CN102161149A (en) Technical process of manufacturing sheet metal components of automobile left and right wind guide covers
CN101691003B (en) Machining process of bent cross beams of heavy truck frames
CN101695727A (en) Stamping technology for integral door frame of heavy truck
CN109909375A (en) A kind of metal tile shaping mould group and its moulding process
CN108080901A (en) Electric motor end cap manufacturing method
CN105215240A (en) A kind of blank-making method of ultra-large type whole titanium alloy frame forging
CN104227330A (en) Manufacturing process flow of car left-right wind guide cover sheet metal component
CN106964722A (en) The Sheet Metal Forming Technology and equipment of a kind of outer plate of automotive engine cover
CN103182606B (en) A kind of production method not waiting material thick laser assembly solder steel plate
CN101712111A (en) Machining process of rear square axle housing of automobile
CN106624607A (en) Novel manufacturing technology of sheet metal parts
CN102989866A (en) Automobile engine hood outer plate manufacturing process
CN106862862A (en) Automobile metal plate work preparation method
CN200951448Y (en) Pattern die for puncture plate materials
CN106808156A (en) Vehicle right and left wind scooper sheet metal component manufacturing process flow
CN201625728U (en) Novel trimming combined cutter block
CN104439908A (en) Automobile left and right wind scooper sheet metal part manufacturing technological process
CN105328402A (en) Manufacturing process flow for sheet metal parts for left and right wind scoopers of car
CN202367068U (en) Flanging and punching device for mounting bracket on rear bumper of automobile
CN105328403A (en) Manufacturing process flow for outer board for engine cover of car
CN102114870A (en) Application of arc steel plates in production of internal and external plates of engine cover of motor vehicle
CN106808152A (en) Automobile engine hood exterior panel manufacturing process flow
CN110814160A (en) Cold stamping production process for upper plate of automobile triangular swing arm
CN206415501U (en) The drawing mechanism produced for fuel tank oil pump locking piece
CN104148892A (en) Process for machining boundary beam of vehicle carrying plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170510