CN106624476A - Assembly process of steel wire cross beam for alignment - Google Patents
Assembly process of steel wire cross beam for alignment Download PDFInfo
- Publication number
- CN106624476A CN106624476A CN201610880724.9A CN201610880724A CN106624476A CN 106624476 A CN106624476 A CN 106624476A CN 201610880724 A CN201610880724 A CN 201610880724A CN 106624476 A CN106624476 A CN 106624476A
- Authority
- CN
- China
- Prior art keywords
- steel wire
- center
- cross beam
- scale pan
- alignment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B5/00—Measuring arrangements characterised by the use of mechanical techniques
Abstract
The invention relates to an assembly process of a steel wire cross beam for alignment. The steel wire cross beam consisting of an upper cross beam, a lower cross beam, a steel wire and a scale pan forms a fixed tension straightening steel wire. The assembly process of the steel wire cross beam for alignment is successfully applied to one gas turbine generator project, guarantees accurate alignment center position of the top of the steel wire, guarantees accurate alignment center position of the bottom of the steel wire, and overcomes reduction of the steel wire tension caused by conversion from elastic deformation to plastic deformation of the steel wire in tensioning of two ends of the steel wire by bolts in the prior art; a traditional process enables the steel wire to generally locate in the alignment center position, so that the measurement precision problem caused by swing of the steel wire during measuring is overcome; and in long correction process after alignment and welding of a positioning rib (2) of the steel wire cross beam by several months, the steel wire (4) serves as reference measurement data to achieve excellent repeatability, measurement speed and precision.
Description
Technical field:
The present invention relates to a kind of assembly technology of centering with steel wire crossbeam.
Background technology:
During steam turbine generator positioning bar (2) centering, it is desirable to have the center of a vertical direction, as benchmark, can be center
Post or steel wire (4), this center first with support (1) centering, positioning bar (2) again with this center centering, it is fixed so just to can guarantee that
After position muscle (2) is assembled on support (1) or is welded on support (1), positioning bar (2) is coaxial with support (1) in one
On the face of cylinder, so as to ensure being smoothed out for stator lasmination work.
Steel wire (4) when steam turbine generator positioning bar (2) centering is used for as center, if with an entablature (5) and
One sill (6) fixes steel wire (4) two ends, and steel wire (4) tensioned state can become plasticity by elasticity when the operating time is very long,
So as to the linearity for being difficult to ensure that steel wire (4) does not change in operation;If steel wire (4) upper end is fixed on horizontal stroke
Beam (5) and lower end hanging weight, then measurement size when steel wire (4) can swing constantly and make service speed and certainty of measurement compared with
Difference.
The content of the invention:
It is an object of the invention to provide a kind of assembly technology of centering with steel wire crossbeam.Technical scheme is:
1) steel wire crossbeam is made up of entablature (5), sill (6), steel wire (4), scale pan (9);
2) there is a set of fixed steel wire device (7) at entablature (5) center, and fixed steel wire device (7) can realize that steel wire (4) exists
Move on horizontal plane, center bolt (10) and steel wire (4) upper end of fixed steel wire device (7) are directly connected to fix;
3) there is a set of anti-steel wire pendulous device (8) at sill (6) center, and anti-steel wire pendulous device (8) can realize steel wire
(4) move in the horizontal plane, steel wire (4) is connected through the center bolt (11) of anti-steel wire pendulous device (8) with scale pan (9)
Fixed, the weight transfer of scale pan (9) gives steel wire (4), the exceptionally straight steel wire (4) of one fixed tightening force of formation;
4) scale pan (9) by center post (13) cup dolly (12) and the annular sheet material counterweight of one group of two lobes
(14) constitute, scale pan (9), base (12), the post (13) of center are connected with steel wire (4) lower end, scale pan (9)
The quantity that counterweight (14) is stacked on base (12) determines the gross weight of scale pan (9), realizes the selection of steel wire (4) tightening force.
It is below the explanation of the technique to the present invention:
During steam turbine generator positioning bar (2) centering, it is desirable to which positioning bar (2) is uniform on a face of cylinder, a steel wire
(4) cental axial position on the face of cylinder is placed on as benchmark, again by each positioning bar (2) of this benchmark centering after benchmark determination;
Steel wire (4) two ends are fixed with entablature (5) and sill (6), and entablature (5) and sill (6) joint welding are in machine
On seat (1) end face, entablature (5) centre bit is equipped with fixed steel wire device (7), steel wire (4) upper end can be fixed and realized
All directions movement in the horizontal plane, sill (6) centre bit is equipped with anti-steel wire pendulous device (8), can be steel wire (4) lower end
Head position restriction does not swing and realizes all directions movement in the horizontal plane;
Steel wire (4) lower end is connected through the anti-steel wire pendulous device (8) of sill (6) center with scale pan (9)
Fixed, scale pan (9) makes steel wire (4) exceptionally straight with self gravitation taut wire (4), scale pan (9) by center post (13)
Cup dolly (12) and one group of two lobes annular sheet material counterweight (14) composition, stack counterweight on scale pan (9) base (12)
(14) quantity determines the gross weight of scale pan (9), realizes the selection of steel wire (4) tightening force;
When the steel wire crossbeam of this invention is used, the counterweight (14) in scale pan (9) is stacked suitable quantity, make steel wire
(4) exceptionally straight, by the upper horizontal numerical value of adjustment fixed steel wire device (7) and the anti-steel wire pendulous device (8) of sill (6), steel
Silk (4) is adjusted to concentric with support (1), makes steel wire (4) in upper head plate endoporus and the center of bottom plate endoporus, then with steel wire
(4) all positioning bars of centering (2) on the basis of, location of proofreading muscle (2) position on the basis of steel wire (4) again after welding positioning bar (2).
The technique effect of the present invention:
1) a kind of centering assembly technology of steel wire crossbeam, during certain gas turbine generator project has been successfully applied to;
2) steel wire (4) upper end is connected with the center bolt (10) of the fixed steel wire device (7) of entablature (5), leads to
Crossing adjustment makes center of the steel wire (4) in support (1) upper head plate endoporus, it is ensured that steel wire top centering center is accurate
Really;
3) steel wire (4) lower end passes through the center bolt (11) of the anti-steel wire pendulous device (8) of sill (6), by adjusting
Whole anti-steel wire pendulous device (8) makes center of the steel wire (4) in support (1) bottom plate endoporus, it is ensured that steel wire bottom is looked for
Center position is accurate;
4) steel wire (4) is exceptionally straight by scale pan (9) gravity tensioning, realizes in operating process all the time with a fixed tension
The exceptionally straight steel wire of power, when overcoming conventional steel wire two ends bolt tension, because steel wire elastic deformation is to the transformation of plastic deformation
The reduction of the Wire pulling power for causing, current process causes steel wire elongated in centering center;
5) center bolt (11) of anti-steel wire pendulous device (8), top center has hole, the latter half to have a skewed slot, hole and tiltedly
Groove causes steel wire to pass through by side hole wall and opposite side cell wall along broken line, so plays steel wire (4) position and does not uniquely swing
Effect, steel wire swings brought certainty of measurement problem when overcoming measurement;
6) the steel wire crossbeam of this invention, during positioning bar (2) centering of some months and welding post-equalization is up to, steel wire
(4) as reference measurement data redundancy very well, measuring speed and precision are fine.
Description of the drawings
The assembling schematic diagram of Fig. 1 steel wire crossbeams
Fig. 2 fixes steel wire device schematic diagram
The anti-steel wire pendulous device schematic diagrames of Fig. 3
The center bolt schematic diagram of Fig. 4 sills
Fig. 5 scale pan assembling schematic diagrams
Specific embodiment:
A kind of centering assembly technology of steel wire crossbeam.Its processing step is as follows:
1) support 1 is erected, and is put on the special square chest 3 of the centering station of positioning bar 2, and support 1 looks for horizontal and vertical;
2) entablature 5 and sill 6 are tentatively fixed and is welded to the end plate endoporus centering of support 1, crossbeam 5 and crossbeam 6
On the end plate of support 1;
3) steel wire 4 is chosen, intercepts appropriate length;
4) upper end of steel wire 4 is connected with the center bolt 10 in the fixed steel wire device 7 of entablature 5;
5) steel wire 4 is freely sagging, bottom termination is passed through the center bolt 11 of the anti-steel wire pendulous device 8 of sill 6, in
The hole of the top center of heart screw rod 11 and the skewed slot of the latter half make the broken line of steel wire 4 through not swinging;
6) lower end of steel wire 4 is connected with the post 13 of the center of scale pan 9;
7) choose appropriate number of counterweight 14 to be put on scale pan 9, make steel wire 4 exceptionally straight;
8) the anti-steel wire pendulous device 8 of the fixed steel wire device 7 of mobile adjustment entablature 5 and sill 6, makes at steel wire 4
In the upper head plate endoporus center of support 1 and the bottom plate endoporus center of support 1;
9) work of the centering of positioning bar 2 is carried out.
Concrete technology step:
Illustrate by taking certain gas turbine generator as an example below:
By accompanying drawing 1, support 1 is stood up on the square chest 3 of dress pressure station, the bottom end plate face of support 1 assembling sill 6, top surface
Entablature 5 is assembled in end plate face, and the fixed steel wire device 7 of the center of entablature 5 and the anti-steel wire of the center of sill 6 swing
There is steel wire 4 between device 8, the lower end of steel wire 4 is connected through sill 6 with scale pan 9;
By accompanying drawing 2, steel wire 4 is directly connected to fix with the center bolt 10 of the fixed steel wire device 7 of entablature 5, center spiral shell
The adjustment of bar 10 is in the upper head plate center of support 1;
By accompanying drawing 3, steel wire 4 is connected solid with scale pan 9 through the center bolt 11 of the anti-steel wire pendulous device 8 of sill 6
Fixed, the adjustment of center bolt 11 is in the bottom plate center of support 1;
By accompanying drawing 4, when steel wire 4 passes through the center bolt 11 of the anti-steel wire pendulous device 8 of sill 6, center bolt 11
The hole of top center and the skewed slot of the latter half cause the broken line of steel wire 4 to pass through, and steel wire 4 leans against hole wall and opposite side cell wall
On so that the position of steel wire 4 does not uniquely swing and can transmit the exceptionally straight steel wire 4 of gravity tensioning of scale pan 9;
By accompanying drawing 5, steel wire 4 connects through after the center bolt 11 of the anti-steel wire pendulous device 8 of sill 6 with scale pan 9
Connect, scale pan 9 is made up of base 12, post 13, counterweight 14, on the post 13 of the centre-lock of steel wire 4, by stacking counterweight 14
Quantity select taut wire 4 to tighten power;
Steel wire crossbeam is assembled by process above method, steel wire 4 does not swing in measurement process so that precision during measurement size
Fast at high speed, after scale pan 9 determines to the tightening force of steel wire 4, the tightening force of steel wire 4 is constant during the centering of whole positioning bar 2,
The center for ensureing steel wire 4 does not accurately change.
Claims (1)
1. a kind of centering assembly technology of steel wire crossbeam, is characterized in that:
1) steel wire crossbeam is made up of entablature (5), sill (6), steel wire (4), scale pan (9);
2) there is a set of fixed steel wire device (7) at entablature (5) center, and fixed steel wire device (7) can realize steel wire (4) in level
Move on face, center bolt (10) and steel wire (4) upper end of fixed steel wire device (7) are directly connected to fix;
3) there is a set of anti-steel wire pendulous device (8) at sill (6) center, and anti-steel wire pendulous device (8) can realize that steel wire (4) exists
Move on horizontal plane, steel wire (4) is connected through the center bolt (11) of anti-steel wire pendulous device (8) with scale pan (9),
The weight transfer of scale pan (9) gives steel wire (4), the exceptionally straight steel wire (4) of one fixed tightening force of formation;
4) scale pan (9) by center post (13) cup dolly (12) and annular sheet material counterweight (14) of one group of two lobes
Composition, scale pan (9), base (12), the post (13) of center are connected with steel wire (4) lower end, scale pan (9) base
(12) quantity that counterweight (14) is stacked on determines the gross weight of scale pan (9), realizes the selection of steel wire (4) tightening force.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610880724.9A CN106624476A (en) | 2016-10-09 | 2016-10-09 | Assembly process of steel wire cross beam for alignment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610880724.9A CN106624476A (en) | 2016-10-09 | 2016-10-09 | Assembly process of steel wire cross beam for alignment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106624476A true CN106624476A (en) | 2017-05-10 |
Family
ID=58854488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610880724.9A Pending CN106624476A (en) | 2016-10-09 | 2016-10-09 | Assembly process of steel wire cross beam for alignment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106624476A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5149922A (en) * | 1989-09-08 | 1992-09-22 | Mitsubishi Denki Kabushiki Kaisha | Elevator load detector device using movable detector plates |
CN203337148U (en) * | 2013-05-21 | 2013-12-11 | 中国十七冶集团有限公司 | Auxiliary device for verticality alignment |
CN104390542A (en) * | 2014-11-12 | 2015-03-04 | 郑州磨料磨具磨削研究所有限公司 | Limit gauge detecting device and limit gauge detecting method using same |
CN104690548A (en) * | 2015-04-08 | 2015-06-10 | 武汉科技大学 | Aligning device for drawn steel wire of turbine partition plate |
CN105910592A (en) * | 2016-07-07 | 2016-08-31 | 成都富通光通信技术有限公司 | Perpendicularity measuring device |
-
2016
- 2016-10-09 CN CN201610880724.9A patent/CN106624476A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5149922A (en) * | 1989-09-08 | 1992-09-22 | Mitsubishi Denki Kabushiki Kaisha | Elevator load detector device using movable detector plates |
CN203337148U (en) * | 2013-05-21 | 2013-12-11 | 中国十七冶集团有限公司 | Auxiliary device for verticality alignment |
CN104390542A (en) * | 2014-11-12 | 2015-03-04 | 郑州磨料磨具磨削研究所有限公司 | Limit gauge detecting device and limit gauge detecting method using same |
CN104690548A (en) * | 2015-04-08 | 2015-06-10 | 武汉科技大学 | Aligning device for drawn steel wire of turbine partition plate |
CN105910592A (en) * | 2016-07-07 | 2016-08-31 | 成都富通光通信技术有限公司 | Perpendicularity measuring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105817670B (en) | A kind of handware processing drilling equipment | |
CN202471021U (en) | Measurer for axiality of barrel | |
CN108747302B (en) | Novel button drill bit pressure equipment machine | |
CN205996577U (en) | A kind of drilling jig | |
CN106624476A (en) | Assembly process of steel wire cross beam for alignment | |
CN206488757U (en) | A kind of slab thickness detector auxiliary locator | |
CN211229587U (en) | Horizontal plane determining device convenient for steel structure construction | |
CN106705917A (en) | Inner and outer diameter measuring mechanism and measuring fixture | |
CN107634614A (en) | A kind of motor Fast Installation spotting device | |
CN204222234U (en) | For the electric-controlled type high-precision rotary swager of material forming | |
CN207076801U (en) | The cylindrical outer cover positioning apparatus for correcting of generator | |
CN201519778U (en) | Drilling device for pin shaft parts | |
CN202339183U (en) | Device used for adjusting roller bed mounting accuracy | |
CN108772651B (en) | Auxiliary tool for manufacturing large octagonal base | |
CN208628728U (en) | A kind of loading arm tailor-welding tool | |
CN103317352B (en) | One determines beam gantry pentahedron Z beam structure | |
CN209614534U (en) | A kind of welding fixture device for double mass flywheel balancing machine | |
CN102059548A (en) | Steel wire drawing and centering device for steam turbine assembly | |
CN206961527U (en) | The control rod guide tubes and bundles Friction Force test device of in-pile component | |
CN205593546U (en) | Test machine with shock -absorbing structure | |
CN103278273A (en) | Axle case residual stress detecting method and device | |
CN104476796B (en) | A kind of electric-controlled type standard specimen rotating material-pressing machine | |
CN204222256U (en) | Rotating material-pressing dynamo-electric dynamic formula guiding charger | |
CN218147833U (en) | A spacing adjusting device for prefabricated stand installation | |
CN208083891U (en) | Both ends open balance shaft milling flat fixing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170510 |