CN106596898A - 一种测定根系土壤剖面优先流的方法 - Google Patents
一种测定根系土壤剖面优先流的方法 Download PDFInfo
- Publication number
- CN106596898A CN106596898A CN201710038412.8A CN201710038412A CN106596898A CN 106596898 A CN106596898 A CN 106596898A CN 201710038412 A CN201710038412 A CN 201710038412A CN 106596898 A CN106596898 A CN 106596898A
- Authority
- CN
- China
- Prior art keywords
- soil
- root
- profile
- rainfall
- root system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
- G01N33/24—Earth materials
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Food Science & Technology (AREA)
- Analytical Chemistry (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Medicinal Chemistry (AREA)
- Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明公开了一种测定根系土壤剖面优先流的方法,主要步骤为:首先挖取一块土坑,对形成的实验剖面进行加工,并划分根茎并记录,然后剪去根系露在土壤剖面外的部分;在实验剖面上插入若干块铁板,用支架对铁板外部进行固定,再对土壤剖面进行湿润预处理,并记录产生优先流的根在剖面中所处位置;在产生优先流的根的位置处插入若干连接有软管的金属管,软管另一端连接至容器,以收集实验过程中所导出的土壤水,最后控制降雨强度以及降雨时间,测定不同降雨强度或者降雨时间条件下,土壤剖面及经由根系所产生优先流的数量。本发明的优点在于采用挖取土壤剖面的方法来研究土壤优先流这一“黑箱”问题,更加直观,方便操作。
Description
技术领域
本发明涉及森林的水文观测领域,具体涉及一种测定根系土壤剖面优先流的方法。
背景技术
在森林水文观测中,土壤优先流是土壤中非常普遍的一种水分和溶质运移形式,其存在将导致溶质快速向下迁移。但由于土壤优先流是一个“黑箱”问题,依靠当前的技术手段很难探索土壤优先流的形成原因及产生规模,特别是对于森林土壤,复杂的根系对优先流的作用机制尚不明确。
发明内容
本发明所要解决的技术问题在于提供一种测定根系土壤剖面优先流的方法,该方法有效解决了当前的技术手段很难探索土壤优先流的形成原因及产生规模的问题。
本发明所要解决的技术问题采用以下技术方案来实现:
一种测定根系土壤剖面优先流的方法,包括以下步骤:
a、沿着坡向垂直方向,竖直向下挖取一块长度、宽度和深度均为100cm的土坑,对土坑上游侧壁所形成的100cm2的实验剖面进行加工,使土壤剖面竖直、光滑;如果在平地上,则直接挖取一处长度、宽度和深度均为100cm的土坑;
b、如果测定经由根系产生的优先流,则将根分为枯根和活根,或者划分根茎并记录,然后剪去根系露在土壤剖面外的部分;
c、在实验剖面上一定距离插入若干块铁板,在将铁板插入土壤剖面2cm后,用支架对铁板外部进行固定,同时控制铁板的水平角度,以利于导水;
d、通过人工降雨的方法实施较大强度的连续降雨,对土壤剖面进行湿润预处理,根据土壤质地确定湿润预处理时间,一般连续降雨时间为15min,降雨过程中,记录产生优先流的根,并记录其在剖面中所处位置;
e、湿润预处理结束后,在产生优先流的根的位置处插入若干连接有软管的金属管,金属管插入土壤层1cm,软管另一端连接至容器,以收集实验过程中所导出的土壤水,软管分别由支架固定,以避免在实验过程中出现从土壤中脱落;
f、待全部记录工作及金属管连接工作结束,并且湿润预处理间隔满1小时后,采用人工降雨的方法,控制降雨强度以及降雨时间,测定不同降雨强度或者降雨时间条件下,土壤剖面及经由根系所产生优先流的数量。
进一步改进在于,步骤c中,所述铁板为三块,且分别插在距离土壤层上表面10cm、20cm和30cm处。
进一步改进在于,所述铁板的厚度小于0.5mm。
进一步改进在于,步骤e中,所述在产生优先流的根的位置处插入金属管具体操作为使用一定内径的金属管在产生优先流的根的位置处顺着根的生长方向插入土壤层,从而与地面形成一定角度。
进一步改进在于,若测定2mm的细根,所用金属管的内径为5±1mm,若为较粗的根系,则随之增加内径,确保根系与金属管内壁的距离大于1mm。
本发明的有益效果是:
1)采用挖取土壤剖面的方法来研究土壤优先流这一“黑箱”问题,更加直观,方便操作;
2)该方法对于可以定量研究根系条件、土壤深度、降雨强度、降雨时间对于优先流形成的影响;
3)该方法特别适用于森林土壤中根系比较复杂的研究区域,并可根据不同根茎、根系生长力分别进行研究和比较;
4)该方法结合压力传感器和无纸记录仪,通过设定时间步长,可以定量描述优先流形成过程的变化规律。
附图说明
图1为挖取土坑的侧视图;
图2为沿坡面方向的实验剖面所示图;
图3为所测定实验剖面的结构示意图。
其中,1-铁板,2-人工降雨,3-软管,4-金属管,5-容器,6-挡板,7-渗透水。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本发明。
一种测定根系土壤剖面优先流的方法,包括以下步骤:
a、如图1和图2所示沿着坡向垂直方向,竖直向下挖取一块长度、宽度和深度均为100cm的土坑,对土坑上游侧壁所形成的100cm2的实验剖面进行加工,使土壤剖面竖直、光滑;如果在平地上,则直接挖取一处长度、宽度和深度均为100cm的土坑;
b、如果测定经由根系产生的优先流,则将根分为枯根和活根,或者划分根茎并记录,然后剪去根系露在土壤剖面外的部分;
c、如图3所示,在实验剖面上一定距离插入若干块铁板1,在将铁板1插入土壤剖面2cm后,用支架(图中未示出)对铁板1外部进行固定,同时控制铁板1的水平角度,以利于导水;
d、通过人工降雨2的方法实施较大强度的连续降雨,对土壤剖面进行湿润预处理,根据土壤质地确定湿润预处理时间,一般连续降雨时间为15min,降雨过程中,记录产生优先流的根,并记录其在剖面中所处位置;
e、湿润预处理结束后,在产生优先流的根的位置处插入若干连接有软管3的金属管4,金属管4插入土壤层1cm,软管3另一端连接至容器5,以收集实验过程中所导出的土壤水,软管3分别由支架(图中未示出)固定,以避免在实验过程中出现从土壤中脱落;
f、待全部记录工作及金属管连接工作结束,并且湿润预处理间隔满1小时后,采用人工降雨1的方法,控制降雨强度以及降雨时间,测定不同降雨强度或者降雨时间条件下,土壤剖面及经由根系所产生优先流的数量。
作为优选案例,步骤c中,所述铁板1为三块,且分别插在距离土壤层上表面10cm、20cm和30cm处。
作为优选案例,所述铁板1的厚度小于0.5mm。
作为优选案例,步骤e中,所述在产生优先流的根的位置处插入金属管4具体操作为使用一定内径的金属管4在产生优先流的根的位置处顺着根的生长方向插入土壤层,从而与地面形成一定角度。若测定2mm的细根,所用金属管4的内径为5±1mm,若较粗的根系,则随之增加内径,确保根系与金属管4内壁的距离大于1mm。
上述案例在实施过程中,均用到挡水板6来挡住降雨的直接浇灌,用渗透水7对土壤层进行浇灌,可避免所取土壤剖面受到雨水的损坏。然后根据记录的优先流数量、降雨强度等数据来分析土壤剖面及经由根系优先流的影响因素,如根系条件、土壤深度、降雨强度、降雨时间等。
特别的,该方法中用到的容器5可以选择连接压力传感器和无纸记录仪,以通过设定时间步长,可以定量描述优先流形成过程的变化规律。
以上显示和描述了本发明的基本原理、主要特征和优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (5)
1.一种测定根系土壤剖面优先流的方法,包括以下步骤:
a、沿着坡向垂直方向,竖直向下挖取一块长度、宽度和深度均为100cm的土坑,对土坑上游侧壁所形成的100cm2的实验剖面进行加工,使土壤剖面竖直、光滑;如果在平地上,则直接挖取一处长度、宽度和深度均为100cm的土坑;
b、如果测定经由根系产生的优先流,则将根分为枯根和活根,或者划分根茎并记录,然后剪去根系露在土壤剖面外的部分;
c、在实验剖面上一定距离插入若干块铁板,在将铁板插入土壤剖面2cm后,用支架对铁板外部进行固定,同时控制铁板的水平角度,以利于导水;
d、通过人工降雨的方法实施较大强度的连续降雨,对土壤剖面进行湿润预处理,根据土壤质地确定湿润预处理时间,一般连续降雨时间为15min,降雨过程中,记录产生优先流的根,并记录其在剖面中所处位置;
e、湿润预处理结束后,在产生优先流的根的位置处插入若干连接有软管的金属管,金属管插入土壤层1cm,软管另一端连接至容器,以收集实验过程中所导出的土壤水,软管分别由支架固定,以避免在实验过程中出现从土壤中脱落;
f、待全部记录工作及金属管连接工作结束,并且湿润预处理间隔满1小时后,采用人工降雨的方法,控制降雨强度以及降雨时间,测定不同降雨强度或者降雨时间条件下,土壤剖面及经由根系所产生优先流的数量。
2.根据权利要求1所述的一种测定根系土壤剖面优先流的方法,其特征在于:步骤c中,所述铁板为三块,且分别插在距离土壤层上表面10cm、20cm和30cm处。
3.根据权利要求2所述的一种测定根系土壤剖面优先流的方法,其特征在于:所述铁板的厚度小于0.5mm。
4.根据权利要求1所述的一种测定根系土壤剖面优先流的方法,其特征在于:步骤e中,所述在产生优先流的根的位置处插入金属管具体操作为使用一定内径的金属管在产生优先流的根的位置处顺着根的生长方向插入土壤层,从而与地面形成一定角度。
5.根据权利要求4所述的一种测定根系土壤剖面优先流的方法,其特征在于:若测定直径为2mm的细根,所用金属管的内径为5±1mm,若为较粗的根系,则随之增加内径,确保根系与金属管内壁的距离大于1mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710038412.8A CN106596898B (zh) | 2017-01-19 | 2017-01-19 | 一种测定根系土壤剖面优先流的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710038412.8A CN106596898B (zh) | 2017-01-19 | 2017-01-19 | 一种测定根系土壤剖面优先流的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106596898A true CN106596898A (zh) | 2017-04-26 |
CN106596898B CN106596898B (zh) | 2019-03-05 |
Family
ID=58585956
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710038412.8A Active CN106596898B (zh) | 2017-01-19 | 2017-01-19 | 一种测定根系土壤剖面优先流的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106596898B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109297879A (zh) * | 2018-08-15 | 2019-02-01 | 北京林业大学 | 土壤优先流区和基质流区的溶液扩散模拟装置与方法 |
CN109709015A (zh) * | 2018-12-25 | 2019-05-03 | 河海大学 | 一种可定量描述优先流现象的运动波下渗方法 |
CN110132964A (zh) * | 2019-05-06 | 2019-08-16 | 中国科学院寒区旱区环境与工程研究所 | 一种提取荒漠植被根系优先水流运动过程的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104345134A (zh) * | 2014-10-30 | 2015-02-11 | 中国科学院沈阳应用生态研究所 | 一种测量森林土壤壤中流的方法 |
CN204479580U (zh) * | 2015-02-03 | 2015-07-15 | 云南省交通规划设计研究院 | 一种模拟降水型式的大孔隙路面排水能力试验设备 |
CN204557907U (zh) * | 2015-04-30 | 2015-08-12 | 西安科技大学 | 一种降雨强度可调节的水土流失教学演示装置 |
CN104977049A (zh) * | 2014-04-03 | 2015-10-14 | 南京林业大学 | 一种可移动变坡径流组分测定装置及测定方法 |
CN105510552A (zh) * | 2015-11-26 | 2016-04-20 | 沈阳农业大学 | 一种获取土壤壤中流的模拟试验装置 |
-
2017
- 2017-01-19 CN CN201710038412.8A patent/CN106596898B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104977049A (zh) * | 2014-04-03 | 2015-10-14 | 南京林业大学 | 一种可移动变坡径流组分测定装置及测定方法 |
CN104345134A (zh) * | 2014-10-30 | 2015-02-11 | 中国科学院沈阳应用生态研究所 | 一种测量森林土壤壤中流的方法 |
CN204479580U (zh) * | 2015-02-03 | 2015-07-15 | 云南省交通规划设计研究院 | 一种模拟降水型式的大孔隙路面排水能力试验设备 |
CN204557907U (zh) * | 2015-04-30 | 2015-08-12 | 西安科技大学 | 一种降雨强度可调节的水土流失教学演示装置 |
CN105510552A (zh) * | 2015-11-26 | 2016-04-20 | 沈阳农业大学 | 一种获取土壤壤中流的模拟试验装置 |
Non-Patent Citations (2)
Title |
---|
张英虎等: "森林生态系统林木根系对优先流的影响", 《生态学报》 * |
董宾芳等: "土壤优势流的植物根系效应", 《安徽农业科学》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109297879A (zh) * | 2018-08-15 | 2019-02-01 | 北京林业大学 | 土壤优先流区和基质流区的溶液扩散模拟装置与方法 |
CN109297879B (zh) * | 2018-08-15 | 2020-10-02 | 北京林业大学 | 土壤优先流区和基质流区的溶液扩散模拟装置与方法 |
CN109709015A (zh) * | 2018-12-25 | 2019-05-03 | 河海大学 | 一种可定量描述优先流现象的运动波下渗方法 |
CN109709015B (zh) * | 2018-12-25 | 2021-03-02 | 河海大学 | 一种可定量描述优先流现象的运动波下渗方法 |
CN110132964A (zh) * | 2019-05-06 | 2019-08-16 | 中国科学院寒区旱区环境与工程研究所 | 一种提取荒漠植被根系优先水流运动过程的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106596898B (zh) | 2019-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dahan et al. | Dynamics of flood water infiltration and ground water recharge in hyperarid desert | |
CN106596898A (zh) | 一种测定根系土壤剖面优先流的方法 | |
Ganot et al. | Monitoring and modeling infiltration–recharge dynamics of managed aquifer recharge with desalinated seawater | |
CN105136638B (zh) | 尾矿坝渗流场相似模拟试验系统 | |
Krüger et al. | De-icing progression of ice-cored moraines in a humid, subpolar climate, Kötlujökull, Iceland | |
CN106593526B (zh) | 一种基于模糊判断的隧道地质岩溶风险评估方法 | |
CN106932555A (zh) | 离子型稀土原地浸矿单孔注液影响半径的计算方法 | |
CN105572024B (zh) | 喀斯特地区土壤环境下碳酸盐岩溶蚀速率实验装置 | |
Maksimov et al. | Simulation of channel development on the surface of agrolandscapes on slopes | |
CN105181935B (zh) | 一种土壤二氧化碳浓度的监测装置及监测方法 | |
CN108719011A (zh) | 一种山地集雨地下微孔陶瓷灌溉系统 | |
Rushton et al. | Significance of hydraulic head gradients within horizontal wells in unconfined aquifers of limited saturated thickness | |
Townsend et al. | Anatomy and evolution of a dynamic arroyo system, Kanab Creek, southern Utah, USA | |
CN104088663B (zh) | 一种喀斯特洞穴滴水流量监测方法及监测装置 | |
CN206207773U (zh) | 一种地下土壤储热系统 | |
Hokanson et al. | Hummock-scale controls on groundwater recharge rates and the potential for developing local groundwater flow systems in water-limited environments | |
Clayton et al. | Establishing a multi-scale stream gaging network in the Whitewater River basin, Kansas, USA | |
CN204101537U (zh) | 一种灌丛降水截留测量装置 | |
Cervi et al. | Hydrogeological characterization of peculiar Apenninic springs | |
CN106982626B (zh) | 一种矿区堆土场保水绿化装置及其水环境监测方法 | |
Grismer | Cracks in irrigated clay soil may allow some drainage | |
Shepley | Analysis of flows from a large Carboniferous Limestone drainage adit, Derbyshire, England | |
CN109255504A (zh) | 市政管道破洞诱发路基空洞形成范围的预测方法 | |
Gomo et al. | Investigation of groundwater recharge and stable isotopic characteristics of an alluvial channel | |
Feyen et al. | Runoff processes in catchments with a small scale topography |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Jinchi Inventor after: Guo Xiaoping Inventor after: Gao Chao Inventor before: Zhang Jinchi |
|
GR01 | Patent grant | ||
GR01 | Patent grant |