Test pit for single-packet tests and stacking tests of explosives Download PDF

Info

Publication number
CN106596635A
CN106596635A CN201611148273.6A CN201611148273A CN106596635A CN 106596635 A CN106596635 A CN 106596635A CN 201611148273 A CN201611148273 A CN 201611148273A CN 106596635 A CN106596635 A CN 106596635A
Authority
CN
China
Prior art keywords
test
hole
stacking
pit
tests
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611148273.6A
Other languages
Chinese (zh)
Inventor
严春
肖焕新
商杰
彭晓凤
陈斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hazardous Material Detection Technology Center Of Guangxi Entry-Exit Inspection And Quarantine
Original Assignee
Hazardous Material Detection Technology Center Of Guangxi Entry-Exit Inspection And Quarantine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hazardous Material Detection Technology Center Of Guangxi Entry-Exit Inspection And Quarantine filed Critical Hazardous Material Detection Technology Center Of Guangxi Entry-Exit Inspection And Quarantine
Priority to CN201611148273.6A priority Critical patent/CN106596635A/en
Publication of CN106596635A publication Critical patent/CN106596635A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N25/00Investigating or analyzing materials by the use of thermal means
    • G01N25/50Investigating or analyzing materials by the use of thermal means by investigating flash-point; by investigating explosibility
    • G01N25/54Investigating or analyzing materials by the use of thermal means by investigating flash-point; by investigating explosibility by determining explosibility

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a test pit for single-packet tests and stacking tests of explosives. The test pit comprises a cylindrical pit body formed by pouring of reinforced concrete, a verification plate through hole for placement of a verification plate is formed in the bottom of the pit body, and pressure relief holes are distributed in the wall of the cylindrical pit body evenly. The test pit provides a powerful guarantee for carrying out the single-packet tests and the stacking tests of explosives, specified by the United Nations, on superficial underground in a sand sealing manner, and has the advantages of low production cost, high firmness and reusability.

Description

A kind of test pit tested for the single parcel post test of explosive and stacking
Technical field
The present invention relates to a kind of experimental rig, specifically a kind of examination tested for the single parcel post test of explosive and stacking Test hole.
Background technology
The United Nations with regard to Dangerous Goods Transport recommendation test and manual of standards in Section 16.4 of Part I and 16.5 Section has respectively provided the side of single parcel post test [6 (a) of test] and the stacking test [6 (b) of test] classified to explosive Method.Single parcel post is tested for determining explosive with the presence or absence of overall blast, and whether stacking is tested for determining blast from one Parcel post travels to another parcel post or travels to another article from one without packing article.The requirement ratio of two test methods It is relatively similar, require and close parcel post, specific way is that parcel post is placed on one block of checking steel plate of ground, best Enclosure method is to fill soil or sand with the shapes and sizes container similar with parcel post, and the four of parcel post is closely placed on as far as possible In week, the minimum thickness of encapsulation in each direction is made, for less than 0.15m3Parcel post be 0.5m, for more than 0.15m3Parcel post For 1.0m.Other enclosure methods are surrounding and the tops that parcel post is placed on using the chest or sack of filling soil or sand, or Using loose sand.
Cause the material or article in parcel post and do following observation:Fuel factor, to burst out effect, detonation, detonation or parcel post complete The sign of portion's content blast.One section of safe waiting time of test mechanism regulation should be observed after initiation, and test should carry out three It is secondary, unless occurred conclusive result (such as whole content blasts) when earlier.If the test number (TN) of suggestion is obtained The result that can clearly can't make an explanation, then test number (TN) should be increased.
Single parcel post tests the method for [6 (a) of test] assessment result --- represents if there is the sign of overall blast Product is contemplated that and puts 1.1 under, and this sign includes:A there is a hole in () testing ground;B the witness plate below () parcel post is damaged It is bad;C () measures shock wave;(d) closed material division and four dissipates.As fruit product is put into 1.1, then need not be in addition Do experiment again;The test of type 6 (b) should otherwise be carried out.
The method of stacking test [test 6 (b)] assessment result is --- more than one parcel post or without the built-in of packing article Thing actually instantaneously explodes, then product should put 1.1 under.The sign that this thing happens includes:The one of (a) testing ground appearance Individual hole is much greater than single parcel post or without what is occurred in packing article test;Witness plate damaged condition ratio below (b) parcel post Single parcel post is much greater without the damage caused in packing article test;C () measures shock wave and substantially exceeds in single bag Part or without measuring in packing article test;(d) closed material division and four dissipates terribly.Otherwise, class is then carried out The test of type 6 (c).
In the underground superficial test closed using loose sand, a heatable adobe sleeping platform is typically dug, checking iron plate and sample are put into In hole, filled with loose sand.But after off-test, heatable adobe sleeping platform due to explode impact, situations such as easily there is fragmentation and disintegrate, it is impossible to Tested next time in original soil hole, heatable adobe sleeping platform is excavated again can expend very big human cost and time cost.
The content of the invention
The technical problem to be solved is to provide a kind of for the test of explosive single parcel post and stacking test Test pit, to meet the United Nations with regard to Dangerous Goods Transport recommendation test and manual of standards in explosive is carried out it is single Parcel post is tested and the operation of stacking test is required, it is ensured that the reusability of test pit, improves single parcel post test and stacking The efficiency of test.
The present invention solves above-mentioned technical problem with following technical scheme:
A kind of test pit tested for the single parcel post test of explosive and stacking of the present invention, it is included by armored concrete The tubular hole body for pouring, hole body bottom has witness plate to bore a hole and can place witness plate, is evenly equipped with the crater wall of tubular hole body Relief hole.
The relief hole runs through the inside and outside wall of hole body, and circularizes distribution.
The relief hole is in frustum type, and the big one end in aperture is located at the internal wall in hole, and the little one end in aperture is located at the external wall in hole.
Tubular hole body is rounded or square.
The present invention compared with prior art, has the advantages that:
Meet the United Nations with regard to Dangerous Goods Transport recommendation test and manual of standards in explosive is carried out it is single While the operation that parcel post is tested and stacking is tested is required, reinforced concrete structure is integrally adopted, it is durable.Hole body is using circle Tubular is square, and the impact stress that blast is produced can be effectively dispersed in total, it is to avoid stress is piled up and damages hole Body.The frustum type relief hole taken can ensure the integrality that hole body is kept while maximum pressure release, prevented also from outside mud Sand pours in down a chimney internal to hole.Open bottom end is embedded in ground, and while ensureing that witness plate completely attaches to ground fixed hole is also played The effect of body.Test pit of the present invention can be realized reusing, and facilitate excavation and the landfill of second trial, be greatly saved test Human cost and time cost.
Description of the drawings
Fig. 1 is the structural representation of test pit of the present invention.
Fig. 2 is test pit of the present invention schematic diagram when in use.
Specific embodiment
Technical solution of the present invention is further described below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, according to the sample size and sample volume in a period, rational design experiment hole Size, it is ensured that sample is all around more than the numerical value of test determination when bottom is cheated with the closed thickness in top.According to design Size digs out a circular pit-hole for being large enough to hold test pit on ground 6, and bottom soil compaction is simultaneously trimmed to level.By setting Reinforcing bar and casting concrete shaping are assigned in meter requirement, build up tubular hole body 1, and the bottom of tubular hole body 1 is provided with witness plate perforation 3 (cheating body bottom end opening), for placing witness plate 4, in the crater wall of tubular hole body 1 relief hole 2 is evenly equipped with;Relief hole 2 is through hole The inside and outside wall of body, and circularize distribution;Relief hole 2 is in frustum type, and the big one end in aperture is located at the internal wall in hole, the little one end in aperture Positioned at the external wall in hole.
After circular pit body 1 is built up, cover in full hole body bottom end opening and extremely cheat body bottom concordantly and tamp.Along test pit Cylindrical wall around cover in full and tamp, by test pit be completely enclosed within ground spill below 6, only it is near coal-mine.
Below test pit of the present invention is applied to into the single parcel post test of 10 cun of display shells, concrete operations are described as follows:
1. the checking steel plate 4 of one piece of 2m × 2m is layered on into test pit bottom, display shell sample 5 is put in into checking steel plate 4 (display shell sample volume is 0.18m for center3).Display shell has been plugged into ignition.
2. gradually loose sand is filled up into whole hole body and be more than 1m up to the upper thickness away from display shell sample.
3. display shell is lighted in Jing electronic ignitions, and records phenomenon.
4. test all digs out loose sand in test pit after finishing, the situation that observation hole bottom and witness plate are damaged, and prepares Tested next time.
5. 10 cun of display shells are observed:The loose sand four of closing dissipates the severity splashed;Bottom steel plate is without substantially deformation; There is not a hole in the bottom of test pit.According in recommendation test and manual of standards of the United Nations with regard to Dangerous Goods Transport The decision method that Section 16.4 of Part I, 10 cun of display shells can be classified as explosive 1.1 for overall blast.
As needed, tubular hole of the present invention body 1 may be designed in square structure.

Claims (4)

1. it is a kind of to test the test pit tested with stacking for the single parcel post of explosive, it is characterised in that it includes being mixed by reinforcing bar The tubular hole body that solidifying soil is poured, hole body bottom has witness plate to bore a hole and can place witness plate, in the crater wall of tubular hole body It is furnished with relief hole.
2. the test pit of the single parcel post test of explosive and stacking test is used for according to claim 1, it is characterised in that institute Inside and outside wall of the relief hole through hole body is stated, and circularizes distribution.
3. according to claim 1 or claim 2 to test the test pit tested with stacking for the single parcel post of explosive, its feature exists In the relief hole is in frustum type, and the big side in aperture is located at the internal wall in hole, and the little one end in aperture is located at the external wall in hole.
4. according to claim 1 or claim 2 to test the test pit tested with stacking for the single parcel post of explosive, its feature exists In tubular hole body is rounded or square.
CN201611148273.6A 2016-12-13 2016-12-13 Test pit for single-packet tests and stacking tests of explosives Pending CN106596635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611148273.6A CN106596635A (en) 2016-12-13 2016-12-13 Test pit for single-packet tests and stacking tests of explosives

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611148273.6A CN106596635A (en) 2016-12-13 2016-12-13 Test pit for single-packet tests and stacking tests of explosives

Publications (1)

Publication Number Publication Date
CN106596635A true CN106596635A (en) 2017-04-26

Family

ID=58802057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611148273.6A Pending CN106596635A (en) 2016-12-13 2016-12-13 Test pit for single-packet tests and stacking tests of explosives

Country Status (1)

Country Link
CN (1) CN106596635A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108801117A (en) * 2018-07-31 2018-11-13 广西出入境检验检疫局危险品检测技术中心 A kind of scale of depth for explosive single parcel post experiment and stacking experiment
CN109060881A (en) * 2018-07-31 2018-12-21 广西出入境检验检疫局危险品检测技术中心 A kind of test pit for explosive single parcel post test and stacking test
CN113189141A (en) * 2021-04-21 2021-07-30 哈尔滨工业大学 Shrinkage ratio experimental device for explosion damage of complex reinforced concrete structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494991A (en) * 2011-10-19 2012-06-13 中国石油化工股份有限公司 Device for measuring explosion characteristic of fallen liquid, using method and application
CN204758586U (en) * 2015-06-11 2015-11-11 中国人民解放军总参谋部工程兵科研三所 Indoor explosion test device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102494991A (en) * 2011-10-19 2012-06-13 中国石油化工股份有限公司 Device for measuring explosion characteristic of fallen liquid, using method and application
CN204758586U (en) * 2015-06-11 2015-11-11 中国人民解放军总参谋部工程兵科研三所 Indoor explosion test device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中华人民共和国国家监督检验检疫总局: "危险货物运输-爆炸品的认可和分项试验方法", 《GB/T 14372-2013》 *
叶英: "《兵器工业科学技术辞典 引信》", 31 December 1991 *
李香灿: "废钢铁爆破坑安全性的研究", 《工业安全与防尘》 *
杨永昌: "爆炸硐室的技术设计", 《工业建筑》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108801117A (en) * 2018-07-31 2018-11-13 广西出入境检验检疫局危险品检测技术中心 A kind of scale of depth for explosive single parcel post experiment and stacking experiment
CN109060881A (en) * 2018-07-31 2018-12-21 广西出入境检验检疫局危险品检测技术中心 A kind of test pit for explosive single parcel post test and stacking test
CN109060881B (en) * 2018-07-31 2021-11-05 南宁海关技术中心 Test pit for explosive single package test and stacking test
CN108801117B (en) * 2018-07-31 2024-02-23 南宁海关技术中心 Depth scale for single explosive package test and stacking test
CN113189141A (en) * 2021-04-21 2021-07-30 哈尔滨工业大学 Shrinkage ratio experimental device for explosion damage of complex reinforced concrete structure

Similar Documents

Publication Publication Date Title
CN1934407B (en) Blasting method
CN106596635A (en) Test pit for single-packet tests and stacking tests of explosives
CN104931334B (en) A kind of based on blast self-destruction plus discharge mechanism
CN106382864A (en) Shaped charge structure for active energy-containing composite shaped charge liner
De et al. Physical modeling of explosive effects on tunnels
Wu et al. Experimental and numerical simulation study on polyurea-coated fuel tank subjected to combined action of blast shock waves and fragments
CN106197178A (en) A kind of novel deep hole water pressure blasting demolition set and blasting method
WO2006121377A1 (en) A device for storage, transport or disposal of objets
CN108981514A (en) A kind of Close in blasting bag pressing covers net blasting method
CN109163978B (en) Full-scale test method for pressure-bearing capacity and ductile-brittle transition behavior of low-temperature gas transmission steel pipe
CN102323297B (en) Method and device for measuring post-combustion effect of non-ideal explosive by underwater explosion method
CN104318847A (en) Simulated training device for ammunition explosion
CN110008603A (en) It explodes in a kind of tunnel portal structure the calculation method of tunnel internal impact wave superpressure reduction coefficient
CN101532806A (en) Method for testing waterproof compressive property of explosive apparatus under high pressure and device thereof
CN104132590B (en) Safe initiation tool
CN110020483B (en) Method for calculating equivalent coefficient of overpressure medicine quantity of shock wave in structure leaked into tunnel by explosion
CN108360499A (en) A kind of closely knit processing method of runway basis large area explosion
CN106596634A (en) Test method for single pack test and stacking test of explosive
CN105064971B (en) A kind of high pressure nitrogen blast cracking anti-reflection experimental device and method
CN106338443B (en) Performance testing device and method for blasting equipment in simulated underwater environment
CN106198918B (en) For realizing the impact test device that drops hammer of second load
CN104534948A (en) Rapid construction device suitable for high temperature fire district
CN104762918B (en) Chock blasting model test hydraulic pressure test method
Kristoffersen et al. Blast loading of concrete pipes using spherical centrically placed C-4 charges
CN201289352Y (en) Loading device for secondary punching field of strip mine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426