A kind of Industrial Boiler that raw material can be preheated
Technical field
The present invention relates to boiler technology field, specially a kind of Industrial Boiler that can be preheated to raw material.
Background technology
Boiler is a kind of energy conversion, has chemical energy in fuel, electric energy, boiler output to the energy of boiler input
Steam with certain heat energy, high-temperature water or organic heat carrier, the original meaning of pot refer to the water container heated on fire, and stove refers to burning
The place of fuel, boiler include that pot and stove two large divisions, the hot water produced in boiler or steam can be directly commercial production and people
The people's livelihood is lived and provides required heat energy, also can be converted to mechanical energy by Steam Power Equipment, or turn mechanical energy by electromotor again
It is changed to electric energy, there is provided the boiler of hot water is referred to as hot-water boiler, is mainly used in life, also has a small amount of application in commercial production, produce
The boiler of steam is referred to as steam boiler, is often simply called boiler, is used for thermal power station, ship, locomotive and industrial and mining establishment, and boiler is in pot
Carried out with stove two parts simultaneously, after water enters boiler, in boiler circuit, the heat transfer for absorbing is fed water by boiler heating surface,
Water is heated into the hot water of uniform temperature and pressure or is generated steam, be brought out application, combustion apparatus part, fuel combustion are continuous
Heat is released, the high-temperature flue gas for producing that burn transfer heat to boiler heating surface, and self-temperature is gradually by the propagation of heat
Reduce, finally discharged by chimney.
But Industrial Boiler in the market, is difficult to preheat the raw material of industry during use, so as to not
Be easy to the heating to raw material, be also not easy to the processing to raw material, the person of being not convenient to use using while also reduce the work of boiler
Make efficiency.
The content of the invention
(One)The technical problem of solution
For the deficiencies in the prior art, the invention provides a kind of Industrial Boiler that can be preheated to raw material, solves industry
Boiler is difficult to the problem preheated to raw material.
(Two)Technical scheme
To realize object above, the present invention is achieved by the following technical programs:A kind of industry that raw material can be preheated
Boiler, including base, the both sides at the top of the base are symmetrically installed with supporting leg, are installed with the top of the supporting leg
Boiler body, the bottom of the boiler body and be located at two supporting legs between be installed with controller, the boiler pump housing
Left side be sequentially communicated manometer tube and discharge nozzle from top to bottom, be communicated with feed pipe at the top of the boiler body.
Motor housing, the bottom fixed installation of the boiler body inner chamber are installed with the top of the boiler body inner chamber
There is heat block, at the top of the motor box cavity, be installed with motor, the output shaft of the motor is installed with bull stick, institute
The one end of bull stick away from motor output shaft is stated through the bottom of motor housing and the outside of motor housing, on the bull stick and position is extended to
Intert in the inside of motor housing and be provided with first gear, on the right side of the first gear, be engaged with second gear, second tooth
Intert on wheel and be provided with the body of rod, the top and bottom of the body of rod are rotatably connected to the first sleeve, and two the first sleeve phases
From one end be fixedly connected with the top and bottom of motor box cavity respectively, the 3rd tooth is engaged with the right side of the second gear
Wheel, interts on the 3rd gear and is provided with montant, be rotatably connected to second sleeve at the top of the montant, the montant away from
One end of second sleeve is run through the bottom of motor housing and extends to the outside of motor housing, the fixed peace in both sides of the bull stick bottom
Equipped with the first stirring sheet, the both sides of the montant bottom are installed with the second stirring sheet, the controller respectively with motor and
Heat block is electrically connected with.
Preferably, the both sides of the base bottom are installed with fixed plate, intert and be provided with spiral shell in the fixed plate
Bolt.
Preferably, the discharge nozzle on be communicated with electromagnetic valve, the controller is electrically connected with electromagnetic valve, the pressure
Pressure gauge is communicated with pipe.
Preferably, the surface of the bull stick and sleeve pipe is arranged with positioned at the inside of motor housing, bottom and the electricity of described sleeve pipe
The bottom of cabinet inner chamber is fixedly connected.
Preferably, the both sides of the montant and plate is installed between the 3rd gear and the bottom of motor box cavity
Body, the bottom of the plate body are installed with gag lever post, and the bottom of the gag lever post is contacted with the bottom of motor box cavity.
(Three)Beneficial effect
The invention provides a kind of Industrial Boiler that can be preheated to raw material.Possesses following beneficial effect:
(1), the Industrial Boiler that raw material can be preheated, by the improvement to motor housing, heat block, motor, bull stick,
In the presence of one gear, second gear, the body of rod, the 3rd gear, montant, the first stirring sheet and the second stirring sheet, reach to original
The effect that material is stirred, while being also uniformly heated raw material, improves the preheating of raw material, also improves the use of filtration
Efficiency, so as to be also convenient for the use of user.
(2), the Industrial Boiler that raw material can be preheated, by the setting to fixed plate, bolt and supporting leg, reach
The effect of installation is fixed to boiler, so as to facilitate the installation to boiler, the use of user is also allowed for, so as to improve
The work efficiency of boiler.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural representation of boiler body of the present invention;
Fig. 3 is the structural representation of motor housing of the present invention.
In figure:1 base, 2 supporting legs, 3 boiler bodies, 4 controllers, 5 manometer tube, 6 discharge nozzles, 7 feed pipes, 8 motor housings,
9 heat blocks, 10 motors, 11 bull sticks, 12 first gears, 13 second gears, 14 bodies of rod, 15 first sleeves, 16 the 3rd gears, 17 are erected
Bar, 18 second sleeves, 19 first stirring sheets, 20 second stirring sheets, 21 fixed plates, 22 bolts, 23 electromagnetic valves, 24 pressure gauges, 25
Sleeve pipe, 26 plate bodys, 27 gag lever posts.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than the embodiment of whole.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Fig. 1-3 are referred to, the present invention provides a kind of technical scheme:A kind of Industrial Boiler that raw material can be preheated, bag
Base 1 is included, the both sides of 1 bottom of base are installed with fixed plate 21, intert in fixed plate 21 and be provided with bolt 22, fixed plate
21 and the setting of bolt 22, the effect that convenience is fixed installation to boiler is reached, so as to facilitate the use of user, bottom
The both sides at the top of seat 1 are symmetrically installed with supporting leg 2, and the top of supporting leg 2 is installed with boiler body 3, boiler body 3
Bottom and it is located between two supporting legs 2 and is installed with controller 4, model AEC4900 of controller 4, the boiler pump housing 3
Left side has been sequentially communicated manometer tube 5 and discharge nozzle 6 from top to bottom, and electromagnetic valve 23, controller 4 and electricity are communicated with discharge nozzle 6
Magnet valve 23 is electrically connected with, and pressure gauge 24 is communicated with manometer tube 5, and the top of boiler body 3 is communicated with feed pipe 7.
Motor housing 8 is installed with the top of 3 inner chamber of boiler body, the bottom of 8 inner chamber of boiler body is installed with and adds
Hot block 9, the setting of heat block 9 have reached the effect heated to raw material, so as to facilitate the use of boiler, motor housing 8
It is installed with motor 10 at the top of inner chamber, the output shaft of motor 10 is installed with bull stick 11, the surface of bull stick 11 and is located at
The inside of motor housing 8 is arranged with sleeve pipe 25, the bottom of sleeve pipe 25 is fixedly connected with the bottom of 8 inner chamber of motor housing, and sleeve pipe 25 sets
Put, having reached carries out spacing effect to bull stick 11, so as to facilitate the normal rotation of bull stick 11, bull stick 11 is defeated away from motor 10
One end of shaft is run through the bottom of motor housing 8 and extends to the outside of motor housing 8, on bull stick 11 and positioned at the inside of motor housing 8
Interspersed to be provided with first gear 12, the right side of first gear 12 is engaged with second gear 13, interts and be provided with second gear 13
The body of rod 14, the top and bottom of the body of rod 14 are rotatably connected to the first sleeve 15, and two the first sleeves 15 from one end point
It is not fixedly connected with the top and bottom of 8 inner chamber of motor housing, the right side of second gear 13 is engaged with the 3rd gear 16, the 3rd gear
It is interspersed on 16 to be provided with montant 17, the both sides of montant 17 and the fixation between the bottom of 8 inner chamber of the 3rd gear 16 and motor housing
Plate body 26 is installed, the bottom of plate body 26 is installed with gag lever post 27, the bottom of gag lever post 27 and the bottom of 8 inner chamber of motor housing
Contact, the setting of plate body 26 and gag lever post 27, having reached carries out spacing effect to montant 17, so as to facilitate turning for montant 17
Dynamic, the top of montant 17 is rotatably connected to second sleeve 18, montant 17 away from second sleeve 18 one end through the bottom of motor housing 8
Portion simultaneously extends to the outside of motor housing 8, and the both sides of 11 bottom of bull stick are installed with the first stirring sheet 19,17 bottom of montant
Both sides are installed with the second stirring sheet 20, and controller 4 is electrically connected with motor 10 and heat block 9 respectively.
When the Industrial Boiler that can be preheated to raw material is used, operational control device 4,9 work of controlled motor 10 and heat block
Make, 10 motors drive the first stirring sheet 19 and first gear 12 on bull stick 11 to be rotated, so as to drive second gear 13 right
3rd gear 16 of side is rotated, and is rotated with the second stirring sheet 20 that this drives 17 bottom of montant, so as to boiler sheet
Raw material inside body 3 is stirred, and heating plate 9 works and raw material is heated, so that the heating surface area of raw material is more uniform,
After the completion of use, operational control device 4, controlled motor 10 and heat block 9 quit work.
In sum, the Industrial Boiler that this can be preheated to raw material, by the improvement to motor housing 8, heat block 9,
Motor 10, bull stick 11, first gear 12, second gear 13, the body of rod 14, the 3rd gear 16, montant 17, the first stirring sheet 19 and
In the presence of two stirring sheets 20, the effect being stirred to raw material is reached, while being also uniformly heated raw material, improve
The preheating of raw material, also improves the service efficiency of filtration, so as to be also convenient for the use of user.
Also, by the setting to fixed plate 21, bolt 22 and supporting leg 2, reach and installation has been fixed to boiler
Effect, so as to facilitate the installation to boiler, also allows for the use of user, so as to improve the work efficiency of boiler.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation are made a distinction with another entity or operation, and are not necessarily required or implied these entities or deposit between operating
In any this actual relation or order.And, term " including ", "comprising" or its any other variant are intended to
Nonexcludability is included, so that a series of process, method, article or equipment including key elements not only will including those
Element, but also including other key elements being not expressly set out, or also include for this process, method, article or equipment
Intrinsic key element.In the absence of more restrictions.By sentence " include one ... the key element for limiting, it is not excluded that
Also there is other identical element in the process including the key element, method, article or equipment ".
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding can carry out various changes, modification, replacement to these embodiments without departing from the principles and spirit of the present invention
And modification, the scope of the present invention be defined by the appended.