CN106593494A - Grouting water plugging method for tunnel - Google Patents

Grouting water plugging method for tunnel Download PDF

Info

Publication number
CN106593494A
CN106593494A CN201710011634.0A CN201710011634A CN106593494A CN 106593494 A CN106593494 A CN 106593494A CN 201710011634 A CN201710011634 A CN 201710011634A CN 106593494 A CN106593494 A CN 106593494A
Authority
CN
China
Prior art keywords
tunnel
grouting
waterproof
secondary lining
injected hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710011634.0A
Other languages
Chinese (zh)
Inventor
余杨
宋延涛
耿利军
吴鸿胜
马辉杰
张红莉
陈子寅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
Fifth Engineering Co Ltd of China Railway 15th Bureau Group Co Ltd
Original Assignee
5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION filed Critical 5TH CONSTRUCTION Co Ltd OF CHINA 15TH CORPERATION
Priority to CN201710011634.0A priority Critical patent/CN106593494A/en
Publication of CN106593494A publication Critical patent/CN106593494A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a grouting water plugging method for a tunnel. The grouting water plugging method comprises the following steps that S1, a water leakage point in the tunnel is determined; S2, a grouting hole is punched in the water leakage point and penetrates through a waterproof layer to a preliminary-stage support from a secondary lining in the tunnel; S3 a grouting pipe is inserted and fixed into the grouting hole formed in the S2; and S4, grouting is conducted, and water leakage point plugging is completed. According to the grouting water plugging method for the tunnel, the punching depth of the grouting hole is changed, and thus the grouting water plugging method is suitable for grouting water plugging construction of the tunnel adopting reverse-sticky waterproof coiled materials as the waterproof layer.

Description

The grouting water blocking method in tunnel
Technical field
The present invention relates to the waterproofing and leakage-stopping construction field in tunnel, more particularly to using anti-viscous waterproof roll as waterproof layer The grouting water blocking method in tunnel.
Background technology
The architectural environment in tunnel often have it is moist, the features such as drip, and the substantial amounts of earth's surface knot due to penetration tunnel Structure, destroys the leak path of original underground water, thus work progress and it is actually used in, tunnel inner wall usually can ooze Leakage phenomenon.
In order to solve the Seepage of tunnel inner wall, at present during constructing tunnel, mainly supporting in the early stage with it is secondary The waterproof layer formed by splash guard or waterproof roll is laid between lining cutting, so as to intercept the water penetrated into from preliminary bracing, it is prevented Tunnel internal is entered through secondary lining.But, tunnel can be difficult to avoid that in work progress or in use for some time Appearance infiltration, its be mainly manifested on secondary lining seep water, now, the way of traditional waterproofing and leakage-stopping is:In secondary lining Drill on block to before waterproof layer, and to slip casting in the hole being drilled, leakage point is blocked, then aid in being imitated with the waterproof of waterproof layer Really, water seepage of tunnel is eliminated.
But traditional waterproof layer exist one it is generally acknowledged the drawbacks of, i.e., splash guard or traditional waterproof material with it is secondary Not closely connected between lining cutting, there is surface infiltration in the concrete of a position, does not necessarily mean that the waterproof roll of this position Rupture, it is also possible to which water flow to this position generation seepage after the waterproof roll rupture of other positions, therefore, traditional waterproof layer Seepage point is difficult to determine when there is waterproofing and leakage-stopping.Based on this reason, the waterproof layer in tunnel is now more using anti-viscous waterproof Coiled material, this waterproof roll is made up of the key assistant such as pitch, polyester carcass and tackifier, active hydrophilic material, when anti-viscous anti- When water coiled material is laid to secondary lining outer surface, active hydrophilic particle therein produces solidifying after contacting with the water in secondary lining Glue, produces between the two stronger adhesion, also, the prolongation over time of this adhesion and increase, it can be from basic Upper to solve the problems, such as that waterproof layer is not closely connected with secondary lining, after tunnel seeps water, seepage point is extremely convenient to be assured that.
But, this anti-viscous waterproof roll is done in the tunnel of waterproof layer, difficult when doing waterproofing and leakage-stopping after secondary lining infiltration To determine the depth of injected hole, injection slurry is squeezed between two linings and waterproof based on traditional mode, injection slurry is due to waterproof layer Method is bonded without and the top surface of secondary lining between in injected hole, it is difficult to implement waterproofing and leakage-stopping operation.
The content of the invention
It is an object of the invention to provide a kind of grouting water blocking method in tunnel, it passes through the punching depth for changing injected hole Degree, the mode for making grouting for water blocking is applied to tunnel water proofing blocking construction of the anti-viscous waterproof material as waterproof layer.
The present invention above-mentioned purpose technical scheme is that:A kind of grouting water blocking method in tunnel, Comprise the steps:
S1 determines the leakage point in tunnel;
S2 beats injected hole at leakage point, and secondary lining of the injected hole from tunnel penetrates waterproof layer into preliminary bracing;
S3 is inserted and fixed Grouting Pipe in the injected hole formed to S2;
S4 slip castings, complete leakage point closure.
By adopting above-mentioned technical proposal, after waterproof layer is using anti-viscous waterproof material, towards secondary on anti-viscous waterproof material After active hydrophilic particle in the one side of lining cutting is squeezed, there is creep reaction to secondary lining direction, produce gel, this makes Obtain bonding between waterproof layer and secondary lining and form one, secondary lining inside is it was observed that leakage point, you can immediately determine that waterproof The position of layer leak, now, drills through waterproof layer to preliminary bracing inner surface position, and into injected hole during slip casting, injection slurry is entered Leakage point is blocked in narrow and small gap between preliminary bracing and waterproof layer, injection slurry solidification.After conventional waterproof coiled material leak, even if Leakage point is determined, is also the close gap for injection slurry being squeezed between waterproof layer and secondary lining, after injection slurry solidification, waterproof Coiled material can aid in the injection slurry for solidifying to carry out waterproof;And for anti-viscous waterproof roll, it forms one with secondary lining, drilling Less than waterproof layer, the close blind hole of injected hole, injection slurry is difficult to inject, and after waterproof layer is beaten, injection slurry can be entered, with Realize waterproofing and leakage-stopping.
It is preferred that it is as follows to increase pore widening step after step 2:The aperture of the injected hole beaten in step S2 is increased, is allowed to certainly Secondary lining starts to preliminary bracing direction decreasing pore size.
The tube head for installing Grouting Pipe is needed, it is carried out after expanding treatment by adopting above-mentioned technical proposal, injected hole, can To increase the caliber of Grouting Pipe insertion position, to conveniently insert and fixed Grouting Pipe.
It is preferred that the depth that the injected hole stretches into preliminary bracing is less than 60 ㎜.
Spray to be formed for cement mortar near the side of waterproof layer, structure by adopting above-mentioned technical proposal, preliminary bracing, note It is too deep that slurry hole is beaten, and can affect the structural strength of preliminary bracing;And beat it is too shallow, be difficult to ensure that again and penetrate waterproof layer, set Within being set to 60 ㎜, can simultaneously ensure to penetrate waterproof layer, and weaken the intensity of preliminary bracing not too much.
In sum, the invention has the advantages that:After waterproof layer is using anti-viscous waterproof material, waterproof material is instead glued On be squeezed towards the active hydrophilic particle in the one side of secondary lining after, to secondary lining direction occur creep reaction, produce Raw gel, this causes bonding between waterproof layer and secondary lining to form one, and leakage point is observed in secondary lining inside, you can vertical Determine the position of waterproof layer leak, now, drill through waterproof layer to preliminary bracing inner surface position, into injected hole during slip casting, Injection slurry enters the narrow and small gap between preliminary bracing and waterproof layer, and leakage point is blocked in injection slurry solidification.Conventional waterproof coiled material It is also the close gap for injection slurry being squeezed between waterproof layer and secondary lining even if determining leakage point after leak, injection slurry After solidification, waterproof roll can aid in the injection slurry for solidifying to carry out waterproof;And for anti-viscous waterproof roll, it and secondary lining shape Integral, less than waterproof layer, the close blind hole of injected hole, injection slurry is difficult to inject for drilling, after waterproof layer is beaten, injection slurry Can enter, to realize waterproofing and leakage-stopping.
Description of the drawings
Fig. 1 is the topology view of tunnel inner waterproofing structure;
Fig. 2 is the A portions zoomed-in view of Fig. 1;
In figure, 1, preliminary bracing;2nd, secondary lining;3rd, waterproof roll is instead glued;4th, leakage point;5th, injected hole;6th, Grouting Pipe.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment 1
A kind of waterproof construction in tunnel, as shown in figure 1, anti-including preliminary bracing 1, secondary lining 2 and positioned between the two Viscous waterproof roll 3, anti-viscous waterproof roll 3 is arranged between the inwall of the preliminary bracing 1 in tunnel and the outer wall of secondary lining 2, instead It is seamlessly connected between viscous waterproof roll 3 and secondary lining 2.
Anti- viscous waterproof roll 3 is self-adhesion glued membrane, and self-adhesion glued membrane is anti-viscous anti-with special density polyethylene film with high as waterproof layer There is frosted particle on the surface of water coiled material 3, and its frosted particle is by the key such as pitch, polyester carcass and tackifier, active hydrophilic material Auxiliary agent is constituted, and can be reacted with liquid concrete slurry, and the anti-viscous waterproof roll 3 after reacting closely connects with concrete Connect, the anti-waterproof roll 3 that glues closely is connected with the concrete on secondary lining 2.
It should be pointed out that the material of the anti-viscous waterproof roll 3 employed in the present embodiment is not limited to self-adhesion glued membrane, The essence of anti-viscous waterproof roll 3 is that the material of anti-viscous waterproof roll 3 reacts with liquid concrete slurry, rolls up anti-waterproof of gluing Material 3 is combined closely with concrete, between the two seamless generation.Therefore, anti-viscous waterproof roll 3 can using other can with it is mixed The material that solidifying soil reacts.
A kind of waterproof construction in tunnel, its work progress is as follows:
According to construction requirement tunneling, the tunnel to having excavated arranges preliminary bracing 1, and preliminary bracing 1 can increase tunnel knot Structure degree of safety and facilitate subsequent construction in tunnel, preliminary bracing 1 is that rigidity is less, while as the structure of permanent bearing structure Layer is general in the form of gunite concrete.To the tunnel inner wall gunite concrete for having excavated, the concrete thickness of injection according to The tunnel intensity of required excavation determines.
After the concrete final set of preliminary bracing 1, fixed anti-viscous waterproof roll 3, makes anti-on the concrete of supporting in the early stage 1 Inwall of the one side with frosted particle back on preliminary bracing 1 on viscous waterproof roll 3.
Glue after waterproof roll 3 is fixed on preliminary bracing 1 after counter, secondary lining 2 is arranged to tunnel.Secondary lining 2 is built for mould Armored concrete, first by required bar splicing in the inwall of anti-viscous waterproof roll 3, to reinforcing bar gunite concrete, according to construction The supporting intensity of requirement, determines the thickness of armored concrete in secondary lining 2.The concrete slurry of injection and anti-viscous waterproof roll 3 surface frosted particle reacts, and so as to be brought into close contact, secondary lining 2 forms the form of impermeable structure.
Now, the waterproof construction shaping in tunnel.
Embodiment 2
A kind of grouting water blocking method in tunnel, it is as follows with reference to Fig. 1 and Fig. 2:
When anti-viscous waterproof layer coiled material 3 occurs breakage, when water leakage situation occurs in tunnel inner wall, the inwall correspondence of secondary lining 2 can go out Existing leakage point 4.Due to anti-viscous seamless connection between waterproof roll 3 and secondary lining 2, the leakage point 4 on the inwall of secondary lining 2 is Corresponding to the breakage of anti-viscous waterproof roll 3.
Injected hole 5 is opened up at the leakage point 4 of the inwall of secondary lining 2, injected hole 5 continues to tunnel through after secondary lining In road deeply, through after anti-viscous waterproof roll 3, until arriving at preliminary bracing 1, injected hole 5 is continued deeper into, but supporting in the early stage 1 depth is less than 60 mm.The aperture of injected hole 5 gradually increases from preliminary bracing 1 to secondary lining 2, facilitates follow-up slip casting.
Grouting Pipe 6 is inserted in injected hole 5, Grouting Pipe 6 is arrived at preliminary bracing 1.Simultaneously between injected hole 5 and Grouting Pipe 6 Certain space is left, slip casting operation is conveniently carried out.
Concrete is passed through to Grouting Pipe 6, concrete is slowly injected at preliminary bracing 1, until concrete is all by injected hole 5 Fill up, now, concrete repairs the breakage of anti-viscous waterproof roll 3, and leakage point 4 is plugged.
Next other leakage points 4 are blocked by above-mentioned steps, is realized instead to glue waterproof roll as the tunnel of waterproof layer Road water blockoff.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make as needed the modification without creative contribution after this specification is read to the present embodiment, but as long as at this All protected by Patent Law in the right of invention.

Claims (3)

1. a kind of grouting water blocking method in tunnel, is characterized in that:Comprise the steps:
S1 determines the leakage point in tunnel;
S2 beats injected hole at leakage point, and secondary lining of the injected hole from tunnel penetrates waterproof layer into preliminary bracing;
S3 is inserted and fixed Grouting Pipe in the injected hole formed to S2;
S4 slip castings, complete leakage point closure.
2. the grouting water blocking method in tunnel according to claim 1, is characterized in that:Increase pore widening step after step 2 as follows: The aperture of the injected hole beaten in step S2 is increased, is allowed to from secondary lining start to preliminary bracing direction decreasing pore size.
3. the grouting water blocking method in tunnel according to claim 1 and 2, is characterized in that:The injected hole stretches into the initial stage The depth of shield is less than 60 ㎜.
CN201710011634.0A 2017-01-07 2017-01-07 Grouting water plugging method for tunnel Pending CN106593494A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710011634.0A CN106593494A (en) 2017-01-07 2017-01-07 Grouting water plugging method for tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710011634.0A CN106593494A (en) 2017-01-07 2017-01-07 Grouting water plugging method for tunnel

Publications (1)

Publication Number Publication Date
CN106593494A true CN106593494A (en) 2017-04-26

Family

ID=58583116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710011634.0A Pending CN106593494A (en) 2017-01-07 2017-01-07 Grouting water plugging method for tunnel

Country Status (1)

Country Link
CN (1) CN106593494A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387123A (en) * 2017-08-22 2017-11-24 中铁十局集团城市轨道工程有限公司 The construction method of pressure grouting leak stopping is carried out for shield duct piece piece Seepage
CN109723466A (en) * 2018-12-10 2019-05-07 中交一公局桥隧工程有限公司 Tunnel primary support seepage grouting treatment construction method
CN110206563A (en) * 2019-06-25 2019-09-06 深圳市综合交通设计研究院有限公司 A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN110725706A (en) * 2019-12-18 2020-01-24 中铁九局集团第四工程有限公司 Tunnel water burst water stop method
CN111140264A (en) * 2020-04-02 2020-05-12 中铁工程设计咨询集团有限公司 Method for treating water leakage of cracks of tunnel concrete lining structure
CN111933007A (en) * 2020-07-22 2020-11-13 北京交通大学 Tunnel water leakage administers model test device
CN113833500A (en) * 2021-09-01 2021-12-24 中国华冶科工集团有限公司 Method for repairing waterproof impermeable layer of mountain cave depot

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (en) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk Grout and grouting method
JPH0893395A (en) * 1994-09-22 1996-04-09 Kajima Corp Cut-off method of check boring in shielding work
CN2613530Y (en) * 2003-05-15 2004-04-28 韩君国 Intermediate set grout injection waterstop
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06248895A (en) * 1993-02-26 1994-09-06 Itsuki Kogyo Kk Grout and grouting method
JPH0893395A (en) * 1994-09-22 1996-04-09 Kajima Corp Cut-off method of check boring in shielding work
CN2613530Y (en) * 2003-05-15 2004-04-28 韩君国 Intermediate set grout injection waterstop
CN1546842A (en) * 2003-12-11 2004-11-17 广州市泰利斯固结补强工程有限公司 Construction method of leakage waterstop for shield tunnel concrete structure segments

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹凡: "隧道工程渗漏水分析及防治处理", 《科技创新与应用》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387123A (en) * 2017-08-22 2017-11-24 中铁十局集团城市轨道工程有限公司 The construction method of pressure grouting leak stopping is carried out for shield duct piece piece Seepage
CN107387123B (en) * 2017-08-22 2019-02-19 中铁十一局集团城市轨道工程有限公司 The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN109723466A (en) * 2018-12-10 2019-05-07 中交一公局桥隧工程有限公司 Tunnel primary support seepage grouting treatment construction method
CN110206563A (en) * 2019-06-25 2019-09-06 深圳市综合交通设计研究院有限公司 A kind of full packet waterproof composite lining structure resistant to pressure and its construction method
CN110725706A (en) * 2019-12-18 2020-01-24 中铁九局集团第四工程有限公司 Tunnel water burst water stop method
CN111140264A (en) * 2020-04-02 2020-05-12 中铁工程设计咨询集团有限公司 Method for treating water leakage of cracks of tunnel concrete lining structure
CN111933007A (en) * 2020-07-22 2020-11-13 北京交通大学 Tunnel water leakage administers model test device
CN113833500A (en) * 2021-09-01 2021-12-24 中国华冶科工集团有限公司 Method for repairing waterproof impermeable layer of mountain cave depot

Similar Documents

Publication Publication Date Title
CN106593494A (en) Grouting water plugging method for tunnel
CN112343626B (en) Shield tunnel construction and reinforcement method for penetrating existing tunnel under upper soft and lower hard stratum
US8272811B2 (en) Process for grouting a curtain with polymer
CN204703160U (en) Two anchoring section prestressed anchor Cable Structure
CN107605498A (en) Rich water sand-pebble layer shield tunnel termination horizontal grouting ruggedized construction construction method
CN107762533A (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN105421497B (en) The waterproof construction method of sole plate and ground wall connecting node in combined fender construction system
CN109629845A (en) Concrete structure seam areas leakage treatment device and its construction method
CN108797641A (en) A kind of structure and its construction method of Underground Subway Station construction period full station sealing
CN106088095A (en) Process the injecting grout through steel perforated pipe method of works uneven settlement of foundation
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
US11585467B2 (en) Trenchless methods for forming curved hole channel with steel sleeve and pipeline lifting
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN109667586A (en) A kind of double-layer wall of well grouting system and grouting method
CN209603062U (en) Change the concentrative seepage plugging structure that dynamic water is hydrostatic in gallery
CN210127858U (en) A lining cutting back of body uide tube slip casting water shutoff device for muddy stratum
CN105350557B (en) One kind is suitable for deeper soft clay area water-stop curtain method
CN107476255A (en) A kind of hydraulic engineering waterproof construction method
CN208533543U (en) Improve the structure and foundation pit SMW supporting construction of foundation pit side-wall waterproof performance
KR19990007552A (en) Waterproofing grouting method on the back surface of leakage of concrete structure
CN207633354U (en) Novel foundation pit water leakage plugging structure
CN207829918U (en) A kind of tunnel cross-section construction that waterproof membrane is set in lining cutting with ground interlayer
CN208486269U (en) A kind of steel cylinder or steel sheet pile with seal groove and occlusion structure
CN208917843U (en) The diaphragm wall foundation pit that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426