CN106593486B CN201710035533.7A CN201710035533A CN106593486B CN 106593486 B CN106593486 B CN 106593486B CN 201710035533 A CN201710035533 A CN 201710035533A CN 106593486 B CN106593486 B CN 106593486B
Authority
CN
China
Prior art keywords
ledge
supporting rack
crossing point
roadway
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710035533.7A
Other languages
Chinese (zh)
Other versions
CN106593486A (en
Inventor
王军
王正泽
陈冰慧
何晓升
左建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201710035533.7A priority Critical patent/CN106593486B/en
Publication of CN106593486A publication Critical patent/CN106593486A/en
Application granted granted Critical
Publication of CN106593486B publication Critical patent/CN106593486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/22Clamps or other yieldable means for interconnecting adjacent arch members either rigidly, or allowing arch member parts to slide when subjected to excessive pressure

Abstract

The present invention relates to a kind of roadway crossing point concrete filled steel tube sectional shelf-units.It includes supporting rack, and ledge is equipped on supporting rack, and supporting rack is connected with ledge by docking facilities.Structure of the invention reasonable design, high capacity, construction is simple, later stage repair rate are low, cost-effective, can be applied to Deep Soft Rock Tunnel crossover point.

Description

A kind of roadway crossing point concrete filled steel tube sectional shelf-unit
Technical field
The present invention relates to a kind of roadway crossing point concrete filled steel tube sectional shelf-units.
Background technology
Tunnel is the artery of downhole production, according to the requirement of exploit study and in order to adapt to variation or the geological conditions of ore body Particular/special requirement, can arrange roadway crossing point, that section of tunnel of two tunnels intersection or tunnel turnoff is handed over tunnel Trouble point, compared with common tunnel, the excavation space of roadway crossing point is larger, and prop structure and construction technology design are more multiple It is miscellaneous.Roadway crossing point is the key position of roadway construction supporting, if design is unreasonable, production and safety belt can be given prodigious The disadvantage of the smaller crossover point supporting of unfavorable factor, especially intersecting angle is more serious, therefore the construction method of roadway crossing point And support pattern is especially important to keeping the safety in production.
Currently, the most important support technology of roadway crossing point is the supporting of U-shaped steel collapsible timbering, suspension roof support and block The various Combined Support Technologies such as arch, pneumatically placed concrete layer, slip casting, anchor cable, truss, metal mesh.In recent years, with coal mining depth It is continuously increased, engineering project disaster increases increasingly, and especially there are large deformation, rheology, ground temperature liters for the country rock at deep tunnel crossover point Phenomena such as high, the supporting of U-shaped steel collapsible timbering, suspension roof support and various Combined Support Technologies have been difficult to solve deep soft rock Roadway crossing point difficulty support issues cause grave danger to the safety and high efficiency of deep resource.
Concrete filled steel tube is a kind of composite structure that pouring concrete within steel pipe is formed, and this composite structure is integrated with The high pressure resistance of concrete can be with the good ductility of steel pipe.In the prior art, filling type steel pipe concrete bracket in underground is as one The novel support form of kind, has the advantages that high capacity, support cost are low, but it is limited only to Single drive support technology Research and application, and the application study of steel pipe concrete bracket still belongs to blank in Deep Soft Rock Tunnel crossover point, thus how This support form is preferably applied in roadway crossing point, and there is prodigious researching value.
Invention content
The present invention provides a kind of roadway crossing point concrete filled steel tube sectional shelf-units, it is reasonable in design, bearing capacity Height, construction is simple, later stage repair rate are low, cost-effective, can be applied to Deep Soft Rock Tunnel crossover point, solve the prior art The problem of.
Used technical solution is the present invention to solve above-mentioned technical problem:It includes supporting rack, is set on supporting rack There are ledge, supporting rack to be connected by docking facilities with ledge.
Support frame as described above is end to end closed type structure, and several ledges, ledge are equipped at intervals on supporting rack Both ends for C-shaped, ledge are welded with sealing plate, and one end of ledge is located on supporting rack upper outside face and by right Connection device is coupled, and the other end of ledge is located on supporting rack lower outside face and coupled by docking facilities.
The docking facilities include supporting rack baffle arrangement and ledge baffle arrangement, and supporting rack baffle arrangement includes welding Two first baffles on the supporting rack lateral surface of ledge end both sides are respectively equipped on two first baffles perpendicular with it Second baffle, second baffle are welded with first baffle, supporting rack;Ledge baffle arrangement includes being welded in ledge end both sides Two third baffles, two third baffles abut against with two second baffles, and fourth gear plate is welded on ledge tip inside face, Four baffles are abutted against with supporting rack.
First baffle, second baffle, third baffle and fourth gear plate are I-steel.
The fourth gear plate and the length between the ledge end of the fourth gear plate are at least 500mm.
Support frame as described above is the disjunct non-enclosed structure of head and the tail, and several ledges are equipped at intervals on supporting rack, are taken It is n shapes to connect frame, one end of ledge be located at it is on supporting rack upper outside face and coupled by docking facilities, ledge it is another One end is fixed on roadway floor, and the both ends of supporting rack and ledge are welded with sealing plate;Docking facilities are to be welded in branch Inserted joint casing and its grafting are stretched into one end of the inserted joint casing on support top, ledge.
The both sides of the inserted joint casing are equipped with flap plate, and flap plate is welded on inserted joint casing and supporting rack.
Grouting port, exhaust outlet are equipped on support frame as described above and ledge.
Supporting rack is formed by several supporting rack monomers being connected by flange and/or casing connection, and ledge is by several The ledge monomer being connected is formed by flange and/or casing connection.
Anchoring otic placode is equipped on support frame as described above and ledge.
The present invention using the above scheme, has the following advantages:
1, in use, concrete perfusion in supporting rack and ledge, forms concrete filled steel tube, it is integrated with concrete High pressure resistance can and steel pipe good ductility;Supporting rack forms integer support structure with ledge by docking facilities, effectively Improve the total bearing capacity of roadway junction;The configuration of the present invention is simple, easy for construction, economic and reliable solves deep soft rock The problem of roadway crossing point difficulty supporting, simplify the complexity of roadway crossing point support pattern.
2, a kind of structure of docking facilities includes supporting rack baffle arrangement and ledge baffle arrangement, due to tunnel when use To the pressure of ledge, ledge baffle arrangement is made tightly to be connected to one, supporting rack and ledge with supporting rack baffle arrangement Integer support structure is formed, this docking mode can realize the transmission of pressure and thrust between ledge and supporting rack, at docking Moment of flexure is not generated, easily realizes and firm, ensure that the total bearing capacity of roadway junction.
3, first baffle, second baffle, third baffle and fourth gear plate are I-steel, and I-steel bending resistance is strong, residual Residue stress is small, at low cost, weight is small.
4, fourth gear plate and the length between the ledge end of the fourth gear plate are at least 500mm, that is, install Ledge end reserves the lap of splice appropriate after the completion, is conducive to the overlap joint stability for improving supporting rack and ledge.
5, another structure of docking facilities is to be welded in the inserted joint casing on supporting rack top, and one end of ledge is stretched into slotting Female connector pipe and its grafting.Since tunnel is to the pressure of ledge when use, so that ledge is tightly connected to one with supporting rack, prop up Support and ledge form integer support structure, and this docking mode can realize pressure and thrust between ledge and supporting rack It transmits, the load that ledge transmits acts directly on supporting rack, and moment of flexure is not generated at docking, easily realizes and firm, ensure that The total bearing capacity of roadway junction.
6, it is equipped with grouting port, exhaust outlet in supporting rack and ledge, core coagulation can be perfused by grouting port in this way The coagulators such as soil, the gas that the coagulators such as core concrete generate are discharged from exhaust outlet.
7, supporting rack is formed by several supporting rack monomers being connected by flange and/or casing connection, if ledge by The dry ledge monomer being connected is formed by flange and/or casing connection.This structure is conducive to supporting rack and ledge Manufacture, transport and installation.
8, the both ends of supporting rack and ledge are welded with sealing plate, when preventing supporting rack with ledge concrete perfusion Running pulp.
9, it is equipped with anchoring otic placode in supporting rack and ledge, passes through anchoring otic placode to fixed branch by anchor pole or anchor cable Support and ledge, and it is located at supporting rack monomer, the ledge monomer at top after preventing supporting rack and ledge from being destroyed It falls off and causes safety accident.
Description of the drawings
Fig. 1 is the dimensional structure diagram of embodiment one.
Fig. 2 is the structural schematic diagram of the docking facilities of embodiment one.
Fig. 3 is the main structure diagram of embodiment one.
Fig. 4 be in Fig. 3 A-A to schematic cross-sectional view.
Fig. 5 is the right side structural representation of Fig. 4.
Fig. 6 is the left structural representation view of embodiment one.
Fig. 7 be in Fig. 6 B-B to schematic cross-sectional view.
Fig. 8 is the use state diagram one of embodiment one.
Fig. 9 is the use state diagram two of embodiment one.
Figure 10 is the structural schematic diagram of embodiment two.
Figure 11 is the structural schematic diagram of the docking facilities of embodiment two.
Figure 12 is the structural schematic diagram of two supporting rack of embodiment.
Figure 13 is the structural schematic diagram of two ledge of embodiment.
In figure, 1, supporting rack, 2, ledge, 3, docking facilities, 4, grouting port, 5, exhaust outlet, 6, sealing plate, 7, anchoring ear Plate, 8, auxiliary support frame, 101, supporting rack monomer, 102, flange, 103, casing, 201, ledge monomer, 202, flange, 203, Casing, 301, first baffle, 302, second baffle, 303, third baffle, 304, fourth gear plate, 3001, inserted joint casing, 3002, Flap plate.
Specific implementation mode
In order to clarify the technical characteristics of the invention, below by specific implementation mode, and its attached drawing is combined, to this hair It is bright to be described in detail.
Embodiment 1
As shown in Fig. 1~Fig. 9, the present invention includes supporting rack 1, and supporting rack 1 is end to end closed type structure, is being supported Several ledges 2 are equipped at intervals on frame 1, ledge 2 is C-shaped, and one end of ledge 2 is located on 1 upper outside face of supporting rack simultaneously It is coupled by docking facilities 3, the other end of ledge 2 be located on 1 lower outside face of supporting rack and by docking facilities 3 with It is connected.Docking facilities 3 include supporting rack baffle arrangement and ledge baffle arrangement, and supporting rack baffle arrangement includes being welded in take Two first baffles 301 on 1 lateral surface of supporting rack of 2 end both sides of frame are connect, the distance between two first baffles 301, which are slightly larger than, to be taken The diameter of frame 2 is connect, the second baffle 302 perpendicular with it, second baffle 302 and first are respectively equipped on two first baffles 301 Baffle 301, supporting rack 1 weld;Ledge baffle arrangement includes two third baffles 303 for being welded in 2 end both sides of ledge, and two Third baffle 303 is abutted against with two second baffles 302, and ledge is welded with fourth gear plate 304, fourth gear on 2 tip inside face Plate 304 is abutted against with supporting rack 1.First baffle 301, second baffle 302, third baffle 303 and fourth gear plate 304 are I-shaped Steel.Supporting rack 1 is formed by connecting by several supporting rack monomers 101 being connected by flange 102 and/or casing 103.Ledge 2 It is formed by connecting by flange 202 and/or casing 203 by several ledge monomers 201 being connected, the both ends of ledge 2 are equal It is welded with sealing plate 6.Grouting port 4, exhaust outlet 5 are equipped on supporting rack 1 and ledge 2.It is all provided in supporting rack 1 and ledge 2 There is anchoring otic placode 7.Fourth gear plate 304 and the length between 2 end of ledge of the fourth gear plate 304 are at least 500mm.Supporting rack 1 and ledge 2 are tube body.
Supporting rack 1 is end to end closed type structure, and the section configuration of supporting rack 1 is according to drift section size, country rock The requirements such as geological conditions can be round, ellipse, annular or similar round etc., can effectively prevent Floor Heave in Roadway.Supporting rack 1 4~6 supporting rack monomers 101 are generally divided into, are connected using casing 103 or flange 102 between supporting rack monomer 101.Because of support Frame 1 pushes up segmental arc from great, and supporting rack 1 pushes up segmental arc and helps section to be connect preferably with flange 102 with two, prevents the top of supporting rack 1 segmental arc from existing It is slid in installation process.
Supporting rack 1 is other than bearing pressure from surrounding rock, it is also necessary to the pressure of ledge 2 is born, so the shape of supporting rack 1 needs Selecting has compared with the circle of high bearing capacity, ellipse, annular or similar round, and larger in roadway crossing point cross dimensions Place also needs setting auxiliary support frame 8, auxiliary support frame 8 to be close to set up without spacing with supporting rack 1, as shown in Figure 8, Figure 9.
Ledge 2 is non-closed structure, is in " C " shape, and the two ends of ledge 2 pass through docking facilities 3 and 1 shape of supporting rack At enclosed construction.At roadway crossing point, the overlap joint position of " C " the shape open height of ledge 2 by ledge on supporting rack 1 Set determination.Ledge 2 is generally divided into 3~5 ledge monomers 201, and casing 203 or flange are used between ledge monomer 201 202 connections.W steel bands are used between ledge 2(It is not drawn into figure)Connection, to maintain roadway crossing point steel pipe concrete bracket Overall stability.Ledge 2 has angle with supporting rack 1, preferably, ledge 2 and 1 perpendicular setting of supporting rack.Support Frame 1 and ledge 2 are steel pipe.
In use, supporting rack 1 and concrete perfusion in ledge 2, form concrete filled steel tube, it is integrated with concrete High pressure resistance can and steel pipe good ductility;Supporting rack 1 forms integer support structure with ledge 2 by docking facilities 3, has Effect improves the total bearing capacity of roadway junction;The configuration of the present invention is simple, easy for construction, it is soft to solve deep for economic and reliable The problem of rock roadway crossing point difficulty supporting, simplify the complexity of roadway crossing point support pattern.
Docking facilities 3 include supporting rack baffle arrangement and ledge baffle arrangement, since tunnel is to ledge 2 when use Pressure makes ledge baffle arrangement tightly be connected to one with supporting rack baffle arrangement, and 2 groups of supporting rack 1 and ledge are integral Supporting construction, this docking mode can realize the transmission of pressure and thrust between ledge 2 and supporting rack 1, not generated at docking Moment of flexure is easily realized and firm, ensure that the total bearing capacity of roadway junction.
First baffle 301, second baffle 302, third baffle 303 and fourth gear plate 304 are I-steel, I-steel bending resistance Ability is strong, residual stress is small, at low cost, weight is small.
Grouting port 4, exhaust outlet 5 are equipped on supporting rack 1 and ledge 2, it is mixed core can be perfused by grouting port 4 in this way The coagulators such as solidifying soil, the gas that the coagulators such as core concrete generate are discharged from exhaust outlet 5.
Supporting rack 1 is formed by connecting by several supporting rack monomers 101 being connected by flange 102 and/or casing 103, is taken Frame 2 is connect to be formed by connecting by flange 202 and/or casing 203 by several ledge monomers 201 being connected.This structure is advantageous In the manufacture, transport and installation of supporting rack 1 and ledge 2.
Fourth gear plate 304 and the length between 2 end of ledge of the fourth gear plate 304 are at least 500mm, i.e., 2 end of ledge reserves the lap of splice appropriate after installation is complete, is conducive to improve supporting rack 1 and the overlap joint of ledge 2 is stablized Property.
The both ends of ledge 2 are welded with sealing plate 6, running pulp when preventing 2 concrete perfusion of ledge.
It is equipped with anchoring otic placode 7 on supporting rack 1 and ledge 2, passes through anchoring otic placode 7 to fixed by anchor pole or anchor cable Supporting rack 1 and ledge 2, and be located at the supporting rack monomer 101 at top after preventing supporting rack 1 and ledge 2 from being destroyed, take It connects frame monomer 201 and falls off and cause safety accident.
Embodiment 2
As shown in Figure 10~Figure 13, the present embodiment and embodiment 1 difference lies in:It includes supporting rack 1, and supporting rack 1 is Non-enclosed structure disjunct from beginning to end, is equipped at intervals with several ledges 2 on supporting rack 1, and ledge 2 is n shapes, ledge 2 One end be located on 1 upper outside face of supporting rack and coupled by docking facilities 3, the other end of ledge 2 is fixed on lane On road bottom plate.Docking facilities 3 are the inserted joint casing 3001 for being welded in 1 top of supporting rack, and inserted joint casing is stretched into one end of ledge 2 3001 with its grafting.The both sides of inserted joint casing 3001 be equipped with flap plate 3002, flap plate 3002 be welded in inserted joint casing 3001 with On supporting rack 1.Grouting port 4, exhaust outlet 5 are equipped on supporting rack 1 and ledge 2.Supporting rack 1 is by several supporting racks being connected Monomer 101 is formed by connecting by flange 102 and/or casing 103.Ledge 2 is passed through by several ledge monomers 201 being connected Flange 202 and/or casing 203 are formed by connecting.Supporting rack 1 is arc-shaped.Supporting rack 1 and the both ends of ledge 2 are welded with Sealing plate 6.Anchoring otic placode 7 is equipped on supporting rack 1 and ledge 2.Supporting rack 1 and ledge 2 are tube body.
Supporting rack 1 is other than bearing pressure from surrounding rock, it is also necessary to the pressure of ledge 2 is born, so the shape of supporting rack 1 needs Selecting has arc-shaped compared with high bearing capacity, and in roadway crossing point cross dimensions larger part, also needs setting Auxiliary support Frame 8, auxiliary support frame 8 are close to set up with supporting rack 1 without spacing.
W steel bands are used between ledge 2(It is not drawn into figure)Connection, to maintain roadway crossing point steel pipe concrete bracket Overall stability.Ledge 2 has angle with supporting rack 1, preferably, ledge 2 and 1 perpendicular setting of supporting rack.Support Frame 1 and ledge 2 are steel pipe.
In use, supporting rack 1 and concrete perfusion in ledge 2, form concrete filled steel tube, it is integrated with concrete High pressure resistance can and steel pipe good ductility;Supporting rack 1 forms integer support structure with ledge 2 by docking facilities 3, has Effect improves the total bearing capacity of roadway junction;The configuration of the present invention is simple, easy for construction, it is soft to solve deep for economic and reliable The problem of rock roadway crossing point difficulty supporting, simplify the complexity of roadway crossing point support pattern.
Docking facilities 3 are the inserted joint casing 3001 for being welded in 1 top of supporting rack, and inserted joint casing is stretched into one end of ledge 2 3001 with its grafting.Since tunnel is to the pressure of ledge 2 when use, ledge 2 is made tightly to be connected to one with supporting rack 1, Supporting rack 1 and ledge 2 form integer support structure, this docking mode can realize between ledge 2 and supporting rack 1 pressure and The transmission of thrust, the load that ledge 2 transmits act directly on supporting rack 1, and moment of flexure is not generated at docking, easily realize and firm It leans on, ensure that the total bearing capacity of roadway junction.
Above-mentioned specific implementation mode cannot function as limiting the scope of the invention, for the technology people of the art For member, any alternate modification or transformation made to embodiment of the present invention are all fallen in protection scope of the present invention.
Place is not described in detail by the present invention, is the known technology of those skilled in the art of the present technique.

Claims (3)

1. a kind of roadway crossing point concrete filled steel tube sectional shelf-unit, it is characterised in that:Including supporting rack, it is equipped on supporting rack Ledge, supporting rack are connected with ledge by docking facilities;Support frame as described above is the disjunct non-enclosed structure of head and the tail, Several ledges are equipped at intervals on supporting rack, ledge is n shapes, and one end of ledge is located on supporting rack upper outside face and leads to Cross that docking facilities are coupled, the other end of ledge is fixed on roadway floor, and the both ends of supporting rack and ledge are welded It is connected to sealing plate;Docking facilities are the inserted joint casing for being welded in supporting rack top, and inserted joint casing and its are stretched into one end of ledge Grafting;Grouting port, exhaust outlet are equipped on support frame as described above and ledge;Anchoring ear is equipped on support frame as described above and ledge Plate.
2. a kind of roadway crossing point concrete filled steel tube sectional shelf-unit according to claim 1, it is characterised in that:It is described to insert The both sides of female connector pipe are equipped with flap plate, and flap plate is welded on inserted joint casing and supporting rack.
3. a kind of roadway crossing point concrete filled steel tube sectional shelf-unit according to claim 1 or 2, it is characterised in that:Branch Support is formed by several supporting rack monomers being connected by flange and/or casing connection, ledge by it is several be connected take Frame monomer is connect to form by flange and/or casing connection.
CN201710035533.7A 2017-01-18 2017-01-18 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit Active CN106593486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710035533.7A CN106593486B (en) 2017-01-18 2017-01-18 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710035533.7A CN106593486B (en) 2017-01-18 2017-01-18 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit

Publications (2)

Publication Number Publication Date
CN106593486A CN106593486A (en) 2017-04-26
CN106593486B true CN106593486B (en) 2018-07-17

Family

ID=58584782

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710035533.7A Active CN106593486B (en) 2017-01-18 2017-01-18 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit

Country Status (1)

Country Link
CN (1) CN106593486B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107313790A (en) * 2017-08-30 2017-11-03 中国电建集团中南勘测设计研究院有限公司 A kind of symmetrical trouble hole supporting construction and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485797A (en) * 2013-09-06 2014-01-01 中国矿业大学(北京) Reinforcing structure of grouting port and air exhausting hole of steel-bar concrete rack
CN203515613U (en) * 2013-09-23 2014-04-02 济南深博矿山设备有限公司 Structure for connecting ejector rods between steel tube concrete supports
CN206429252U (en) * 2017-01-18 2017-08-22 山东建筑大学 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4296545B2 (en) * 2004-06-01 2009-07-15 清水建設株式会社 Center-pillar structure of eyeglass tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485797A (en) * 2013-09-06 2014-01-01 中国矿业大学(北京) Reinforcing structure of grouting port and air exhausting hole of steel-bar concrete rack
CN203515613U (en) * 2013-09-23 2014-04-02 济南深博矿山设备有限公司 Structure for connecting ejector rods between steel tube concrete supports
CN206429252U (en) * 2017-01-18 2017-08-22 山东建筑大学 A kind of roadway crossing point concrete filled steel tube sectional shelf-unit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
极软岩巷道交岔点钢管混凝土支架结构设计与应用;何晓升等;《煤炭学报》;20150930;第40卷(第9期);第2040-2048页 *

Also Published As

Publication number Publication date
CN106593486A (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN109209398B (en) Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation method
CN104847380B (en) A kind of structure and its construction method for reducing tunnel lining structure internal force
CN106351670A (en) Closed pre-support tunnel structure
CN209179761U (en) Pass through that high angle is inverse to rush rich water richness sand tomography supporting and protecting system of tunnel
CN204082170U (en) A kind of energy-absorbing being applicable to weak broken wall rock allows presses tunnel support system
CN109751063A (en) A kind of large section tunnel supporting construction and its construction method
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
CN108952804A (en) For blocking the tailing-filled barricade and construction method of dead zone mining tunnel to be filled
CN106968687A (en) The closed annulus yield supporting device of half-edge coal seam stope drift active workings and method for protecting support
CN210599028U (en) Primary support supporting structure of super-large-span underground engineering in hard rock area
CN106593486B (en) A kind of roadway crossing point concrete filled steel tube sectional shelf-unit
CN205858371U (en) A kind of colliery big cross section digging laneway combined support structure
CN215444085U (en) High-strength flexible stainless steel part
CN204716248U (en) Tunnel Heng Dong enters main hole and to caunch structure
CN206429252U (en) A kind of roadway crossing point concrete filled steel tube sectional shelf-unit
CN206816278U (en) The new recyclable supporting steel arch-shelf of horizontal ground settlement and tunnel
CN206486912U (en) Precast concrete settles adjusting apparatus
CN105927251B (en) Shallow buried type magnesium iron frame-reinforced concrete combination tunnel siding
CN217974413U (en) Deep and shallow foundation pit supporting construction structure
CN204677212U (en) A kind of structure reducing tunnel lining structure internal force
CN208619164U (en) For blocking the tailing-filled barricade of dead zone mining tunnel to be filled
CN104832188B (en) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof
CN113339014A (en) Steel rail pipe curtain method and structure for protecting side wall of backward tunnel with sandwiched rock in ultra-small clear distance tunnel
CN206144569U (en) Confined is advance in advance and is protected tunnel structure
CN210239717U (en) Strong anchor grouting supporting structure for controlling red shale tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant