CN106593058A - Locating device for rubber shock insulation support and manufacturing and installing method for locating device - Google Patents

Locating device for rubber shock insulation support and manufacturing and installing method for locating device Download PDF

Info

Publication number
CN106593058A
CN106593058A CN201611178273.0A CN201611178273A CN106593058A CN 106593058 A CN106593058 A CN 106593058A CN 201611178273 A CN201611178273 A CN 201611178273A CN 106593058 A CN106593058 A CN 106593058A
Authority
CN
China
Prior art keywords
pier base
mounting structure
isolation support
earthquake isolation
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611178273.0A
Other languages
Chinese (zh)
Other versions
CN106593058B (en
Inventor
陈亮
吴新玉
宁东
秦丽敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201611178273.0A priority Critical patent/CN106593058B/en
Publication of CN106593058A publication Critical patent/CN106593058A/en
Application granted granted Critical
Publication of CN106593058B publication Critical patent/CN106593058B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Vibration Prevention Devices (AREA)

Abstract

The invention discloses a locating device for a rubber shock insulation support. The locating device comprises an installing structure used for installing the rubber shock insulation support, and a locating framework. The installing structure is anchored in a pier base, and an installing end is formed on the top face of the pier base. The locating framework is fixedly connected with the installing structure and is used for fixing the installing structure in the pier base. The invention further discloses a manufacturing method and an installing method for the locating device for the rubber shock insulation support. Through the locating device, the locating precision of the rubber shock insulation support is high, and cycle reuse can be achieved. The installing method for the rubber shock insulation support is coherent and high in installing precision, and subsequent construction is ensured.

Description

The positioner and its making and installation method of rubber earthquake isolation support
Technical field
The present invention relates to the positioner in construction, the positioner of espespecially a kind of rubber earthquake isolation support and its making With installation method.
Background technology
With the continuous development and the increase of security precautions of China's building trade, people to building it is shockproof, The effect of shock insulation is more valued, so in facilities such as building, bridges, it is overall to lift building to add all kinds of rubber supports Anti-seismic performance, improve its service life.Shock insulation rubber bearing must possess enough vertical rigidities to bear vertical load, and And the pressure of superstructure can be reliably delivered to infrastructure;Additionally, rubber earthquake isolation support also has good elasticity, and With larger detrusion meeting the horizontal displacement of superstructure.Embody very in the earthquake disaster China of China in recent years Big superior function.But when making rubber earthquake isolation support at the construction field (site), because the reinforcing bar of undersetting is very fine and close, cause list Individual bolt cannot be placed vertically, positioning failure;And if high-strength bolt in advance, intermediate concrete can be caused normally to pour Build, affect efficiency of construction.
The content of the invention
It is an object of the invention to overcome the defect of prior art, there is provided one kind can pinpoint rubber vibration isolation positioning dress Put and its make and installation method, solve location difficulty when rubber earthquake isolation support is installed, while improving efficiency of construction, it is ensured that apply Work is smoothed out.
To achieve these goals, the invention provides a kind of positioner of rubber earthquake isolation support, including:
Mounting structure for installing the rubber earthquake isolation support, the mounting structure is anchored in the pier base and in described The top surface of pier base is formed with installation end;And
Be fixedly connected with the mounting structure, for locating framework that the mounting structure is fixed in the pier base.
Beneficial effects of the present invention are:Simple structure, is positioned using template to sleeve pipe, improves the rubber vibration isolation The precision of the positioner of seat, and the rubber earthquake isolation support of unified specification only uses same set of template, reaches cycling and reutilization Purpose;And the positioner of the rubber earthquake isolation support does not affect pouring for concrete, improves efficiency of construction.
Further improvement of the present invention is that the mounting structure includes setting female multiple sleeve pipes, described sleeve pipe Top protrude out the top surface of the pier base to form the installation end.
Further improvement of the present invention is that the locating framework includes many elongate rod arranged in a crossed manner, described elongated Bar is welded in the side of described sleeve pipe to connect multiple sleeve pipes.Including multiple locating rods arranged in a crossed manner, the locating rod with it is right The described sleeve pipe answered is fixedly connected.
Further improvement of the present invention is that the locating framework is installed with a setpoint distance with the top of described sleeve pipe.
The invention also discloses a kind of manufacture method of the positioner of rubber earthquake isolation support, the manufacture method include with Lower step:
S11:Offer adapts to the template of the rubber earthquake isolation support, makes in the template and the rubber vibration isolation Identical attachment structure on seat;
S12:The mounting structure that is adapted with the attachment structure of offer, and by the mounting structure and the template Attachment structure connection fastening, to make the mounting structure be installed in the template;
S13:Locating framework is provided, the locating framework is fixedly connected with the mounting structure to make the locating framework The mounting structure is carried out spacing;
S14:Release the connection of the mounting structure and the attachment structure and remove the template, it is described fixed to be formed Position device.
Further improvement of the present invention is, the attachment structure is the through hole being opened in the template, the installation Structure be adapted with the through hole set female sleeve pipe;By the attachment structure in the mounting structure and the template Connection fastening, including:
By described sleeve pipe to together in the through hole in the template, and it is fastenedly connected in the template by high-strength bolt.
Further improvement of the present invention is that the locating framework includes multiple locating rods arranged in a crossed manner;Will be described fixed Position bar transverse and longitudinal connects to form latticed support body, and diagonal brace connects a support on the grid formed in the latticed support body Bar;The latticed support body is connected with described sleeve pipe.
Present invention also offers a kind of installation method of the positioner of use rubber earthquake isolation support, the installation method bag Include following steps:
S21:In the reinforcing bar of colligation pier base, the positioner is positioned over into the top surface of pier base reinforcing bar, it is described fixed to make The locating framework of position device is held on the pier base reinforcing bar, the bottom of the mounting structure be inserted in the pier base reinforcing bar and The installation end protrudes out the top surface of the pier base reinforcing bar;
S22:The lay-down position of the locating framework is adjusted to make the top surface holding level of the mounting structure, and will be described Locating framework is fixedly connected with the pier base reinforcing bar;
S23:Install pier base template and casting concrete is to form pier base, formed pier base is controlled during casting concrete Absolute altitude, to make the installation end be exposed to the top surface of the pier base;
S24:The rubber earthquake isolation support is fixedly connected with the installation end of the pier base top surface.
Further improvement of the present invention is that the mounting structure includes setting female multiple sleeve pipes, the installation Method also includes:Before casting concrete, adhesive tape is filled in described sleeve pipe.
Further improvement of the present invention is the rubber earthquake isolation support to be fixed with the installation end of the pier base top surface and is connected Connect, including:
Through hole is offered on the rubber earthquake isolation support, the rubber earthquake isolation support is positioned over into the top surface of the pier base, And make the through hole align with the installation end setting;
The through hole is worn by a high-strength bolt and the installation end is screwed together in make the rubber earthquake isolation support and institute State pier base to be fastenedly connected.
Description of the drawings
Fig. 1 is the top view of the positioner preferred embodiment one of rubber earthquake isolation support;
Fig. 2 is the graphics of the positioner preferred embodiment one of rubber earthquake isolation support;
Fig. 3 is the template schematic diagram of the positioner preferred embodiment one of rubber earthquake isolation support;
Fig. 4 is the connection diagram of sleeve pipe and high-strength bolt;
Fig. 5 is the schematic diagram that framework of steel reinforcement is welded between sleeve pipe;
Fig. 6 is the template schematic diagram of the positioner preferred embodiment two of rubber earthquake isolation support;
Fig. 7 is the top view of the positioner preferred embodiment two of rubber earthquake isolation support.
Specific embodiment
Below in conjunction with the accompanying drawings, the present invention is described in further detail.In recent years, earthquake disaster happens occasionally, people couple The shock resistance of building requires also more and more higher, particularly skyscraper, and rubber earthquake isolation support is often installed on ground to bear Vertical load and horizontal displacement.And the installation accuracy of rubber earthquake isolation support also contributes to the anti-seismic performance built, traditional positioning Method is positioned using bolt, but because the reinforcing bar of undersetting is very fine and close, causes single bolt to erect It is straight to place, positioning failure;And if high-strength bolt in advance, intermediate concrete can be caused normally to pour, affect efficiency of construction. The present invention is connected sleeve pipe using locating rod by template, then consolidates rubber earthquake isolation support with sleeve pipe by high-strength bolt Fixed connection.Below, the structures and methods of the present invention are illustrated with reference to accompanying drawing.
Refering to Fig. 1,2, the invention provides a kind of positioner of rubber earthquake isolation support, is building for rubber earthquake isolation support The positioning on pier base is built, the positioner of the rubber earthquake isolation support includes:Mounting structure 3 and locating framework 4.Wherein, install Structure is, for installing rubber earthquake isolation support, mounting structure 3 to be anchored in pier base, and forms one on top surface on pier base The individual installation end for installing rubber earthquake isolation support;Locating framework is fixedly connected with mounting structure, limits its relative displacement, and then will peace Assembling structure is fixed in pier base.The level of locating framework 4 is placed on the reinforcing bar in pier base, and carries out pre-determined bit, then to pier Seat carries out concreting, and finally rubber earthquake isolation support is connected with the installation end of mounting structure 3, and so as to reach rubber is installed The purpose of glue shock isolating pedestal.
Used as presently preferred embodiments of the present invention, mounting structure 3 sets female sleeve pipe for multiple, on pier base Afterwards, the top of sleeve pipe must protrude out in the top surface of pier base, form the installation end for installing rubber earthquake isolation support.And locating framework 4 are formed by many locating rods are arranged in a crossed manner, and locating rod is fitted on the side of corresponding sleeve pipe to connect each sleeve pipe. And there is a certain distance with the top of sleeve pipe in locating framework.By sleeve pipe 3 according to lower of rubber earthquake isolation support to be installed The corresponding position horizontal positioned of installing hole on seat, and upper surface keeps concordant, then with locating rod by the sleeve pipe company of laminating two-by-two Connect, be then welded and fixed contact point so that the relative position of sleeve pipe is fixed, in order to improve positioning precision, increase structure Intensity, between distance sleeve pipe relatively far away from a diagonal brace support bar is welded, and ultimately forms the positioning dress of rubber earthquake isolation support Put.
Present invention also offers a kind of manufacture method of the positioner of rubber earthquake isolation support, the positioning of rubber earthquake isolation support The manufacture method of device is comprised the following steps:
With reference to Fig. 3,4,5, first one template 1 being adapted with need rubber earthquake isolation support to be mounted of offer, and Produce in template 1 and rubber earthquake isolation support identical attachment structure, the suitable wooden boards of one piece of area of selection are bored above Go out, aperture identical with the position of mounting hole of rubber earthquake isolation support lower steel plate equal four (preferred embodiments one) or eight logical Hole (preferred embodiment two).Then providing a mounting structure 3 being adapted with attachment structure, i.e. mounting structure 3 can be with rubber Glue shock isolating pedestal is connected, and mounting structure is connected into fastening with the attachment structure in template 1 so that mounting structure 3 is installed solid It is scheduled in template 1, to obtain the relative position of mounting structure 3;Then, then a locating framework is provided, locating framework is fixed On mounting structure 3 so that locating framework can limit the relative position of mounting structure 3;Finally release mounting structure 3 and be connected The annexation of structure simultaneously removes template, is formed determining for the rubber earthquake isolation support that locating framework is fixedly connected with mounting structure Position device.
Used as presently preferred embodiments of the present invention, attachment structure is the through hole being opened in template 1, under rubber earthquake isolation support The aperture of the installing hole on bearing, position consistency, and mounting structure 3 is that female set can be adapted and set with through hole Pipe.
As presently preferred embodiments of the present invention one, according to the layout of the installing hole of the undersetting of rubber earthquake isolation support, select Four sleeve pipes being adapted to installing hole aperture, form a square shape, by the through hole in sleeve pipe alignment template 1, Ran Houyong High-strength bolt 2 is screwed togather with sleeve pipe so that sleeve pipe is close to the bottom surface of template 1.
As presently preferred embodiments of the present invention two, as shown in Figure 6,7, according to the installing hole of the undersetting of rubber earthquake isolation support Layout, select eight sleeve pipes be adapted to installing hole aperture, layout be an octagon shape, by sleeve pipe alignment template 1 On through hole, then screwed togather with high-strength bolt 2 and sleeve pipe so that sleeve pipe is close to the bottom surface of template 1.
Used as presently preferred embodiments of the present invention, locating framework is formed by multiple locating rods are arranged in a crossed manner, and each is positioned Bar transverse and longitudinal connects into latticed support body.Locating rod level connection joint is close to into the side of sleeve pipe two-by-two, then will with the mode of welding Locating rod and telescopic joint fixation, one latticed support body of formation, the relative motion of limiting boot, and in order to increase whole rubber The structural strength and positioning precision of the positioner of shock isolating pedestal, the grid formed in the latticed support body of locating framework On, and be fixedly connected a support bar to increase the knot of the positioner of the rubber earthquake isolation support between the larger sleeve of two spacing Structure intensity.
Used as presently preferred embodiments of the present invention one, the mounting structure 3 with four sleeve pipes is square, locating rod be 5 Root, wherein four locating rods are close to the inner side welding of sleeve pipe, forms a square net between four sleeve pipes, then selects Two sleeve pipes on a pair of diagonal, weld between them a support bar to increase their structural stability.
Used as presently preferred embodiments of the present invention one, the mounting structure with eight sleeve pipes is an octagon, at interval of Two sleeve pipes are set in a line, and the locating rod for connecting the mounting structure is 9, select four longer locating rods to be close to sleeve pipe Inner side welding, the both sides of two sleeve pipe of the short locating rod connection of reselection four on the same side, by the two sleeve pipes Enclose and be located at wherein, then select two opposite side with sleeve pipe, the middle spot welding one between two on the two sides sleeve pipe Root support bar is increasing their structural stability.
Present invention also offers a kind of installation method of the positioner using above-mentioned rubber earthquake isolation support, for installing rubber Glue shock isolating pedestal, the installation method is comprised the following steps:
First, in the reinforcing bar of colligation pier base, positioner is positioned on the top surface of pier base reinforcing bar so that positioner Locating framework 4 be shelved on pier base reinforcing bar, and the reinforcing bar tied up is adjusted, so that the bottom of mounting structure 3 is inserted It is located in pier base reinforcing bar and the installation end for installing rubber earthquake isolation support protrudes out the top surface of pier base reinforcing bar so as to can be with rubber Glue shock isolating pedestal is connected;After positioner is placed on pier base reinforcing bar, the lay-down position for adjusting locating framework 4 causes to install The top surface of structure 3 keeps level, and locating framework 4 and pier base reinforcing bar are carried out into pre-determined bit using spot welding fixes;Then, in colligation Reinforcing bar outside install the template of pier base, the casting concrete toward in template forms pier base, attentively after concrete setting molding It is the absolute altitude that formed pier base is controlled when casting concrete so that the installation end of mounting structure 3 exposes in pier base Top surface on, treat to be connected with rubber earthquake isolation support;Finally, by the installing hole on the undersetting of rubber earthquake isolation support with pier base top The installation end pairing in face, and both are fixedly connected by high-strength bolt.
Used as presently preferred embodiments of the present invention, mounting structure 3 is to set female multiple sleeve pipes, so rubber vibration isolation The positioner of seat is placed in the top surface of the assembling reinforcement of pier base, and in pier base during casting concrete, in order to prevent concrete Pollution inside pipe casing even blocks sleeve pipe, causes subsequent installation failure or effect on driving birds is not good, so before casting concrete, in set Adhesive tape is filled in the inside of pipe, after xoncrete structure solidification, takes out adhesive tape, treats to be connected with rubber earthquake isolation support.
Used as presently preferred embodiments of the present invention, it is by rubber that rubber earthquake isolation support is fixedly connected with the installation end of pier base top surface The installing hole of glue shock isolating pedestal undersetting is fixedly connected with the installation end of the positioner for exposing pier base top surface, by the rubber every Shake bearing is positioned on the top surface of pier base, the installation end of the through hole on rubber earthquake isolation support and the positioner for exposing pier base top surface Alignment, then wears through hole and is screwed together in installation end to make rubber earthquake isolation support be fastenedly connected with pier base by a high-strength bolt. In construction, for the rubber earthquake isolation support of same diameter only uses same set of template, degree of accuracy is high.And every group of bolt Using one group of skeleton, relative position degree of accuracy 100%.It is multiple again with template 1 after the positioner positioning of rubber earthquake isolation support Close, it is qualified to guarantee bolt positioning 100%.
The present invention utilizes the positioner of template construct rubber earthquake isolation support so that the fixed precision of rubber earthquake isolation support is carried Height, and the positioner of the rubber earthquake isolation support can repeatedly for the rubber earthquake isolation support of same specification, and the present invention is also situated between Continued the installation method of rubber earthquake isolation support, and work progress is simple, links up.And the installation qualification rate of rubber earthquake isolation support is high, Ensure that being smoothed out for subsequent construction work.
The present invention is described in detail above in association with drawings and Examples, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some of embodiment details should not constitute limitation of the invention, The present invention is by the scope defined using appended claims as protection scope of the present invention.

Claims (10)

1. a kind of positioner of rubber earthquake isolation support, for rubber earthquake isolation support to be installed on into pier base, it is characterised in that institute Stating positioner includes:
Mounting structure for installing the rubber earthquake isolation support, the mounting structure is anchored in the pier base and in the pier base Top surface be formed with installation end;And
Be fixedly connected with the mounting structure, for locating framework that the mounting structure is fixed in the pier base.
2. positioner as claimed in claim 1, it is characterised in that the mounting structure includes setting female multiple sets Pipe, the top of described sleeve pipe protrudes out the top surface of the pier base to form the installation end.
3. positioner as claimed in claim 2, it is characterised in that the locating framework includes multiple positioning arranged in a crossed manner Bar, the locating rod is fixedly connected with corresponding described sleeve pipe.
4. positioner as claimed in claim 2, it is characterised in that the locating framework is installed with the top of described sleeve pipe One setpoint distance.
5. a kind of manufacture method of the positioner of rubber earthquake isolation support, it is characterised in that the manufacture method includes following step Suddenly:
S11:Offer adapts to the template of the rubber earthquake isolation support, make in the template with the rubber earthquake isolation support Identical attachment structure;
S12:The mounting structure that is adapted with the attachment structure of offer, and by the connection in the mounting structure and the template Structure connection fastening, to make the mounting structure be installed in the template;
S13:Locating framework is provided, the locating framework is fixedly connected with the mounting structure to make the locating framework to institute State mounting structure carry out it is spacing;
S14:Release the connection of the mounting structure and the attachment structure and remove the template, be formed the rubber every The positioner of shake bearing.
6. manufacture method as claimed in claim 5, it is characterised in that the attachment structure be opened in it is logical in the template Hole, the mounting structure be adapted with the through hole set female sleeve pipe;By the mounting structure and the template On attachment structure connection fastening, including:
By described sleeve pipe to together in the through hole in the template, and it is fastenedly connected in the template by high-strength bolt.
7. manufacture method as claimed in claim 6, it is characterised in that
The locating framework includes multiple locating rods arranged in a crossed manner;
The locating rod transverse and longitudinal is connected to form latticed support body, and diagonal brace on the grid formed in the latticed support body Connect a support bar;
The latticed support body is connected with described sleeve pipe.
8. a kind of installation method of the positioner using rubber earthquake isolation support as claimed in claim 1, it is characterised in that institute State installation method to comprise the following steps:
S21:In the reinforcing bar of colligation pier base, the positioner is positioned over into the top surface of pier base reinforcing bar, to make the positioning dress The locating framework put is held on the pier base reinforcing bar, and the bottom of the mounting structure is inserted in the pier base reinforcing bar and described Installation end protrudes out the top surface of the pier base reinforcing bar;
S22:Adjust the lay-down position of the locating framework to make the top surface holding level of the mounting structure, and by the positioning Skeleton is fixedly connected with the pier base reinforcing bar;
S23:Install pier base template and casting concrete is to form pier base, the mark of formed pier base is controlled during casting concrete Height, to make the installation end be exposed to the top surface of the pier base;
S24:The rubber earthquake isolation support is fixedly connected with the installation end of the pier base top surface.
9. installation method as claimed in claim 8, it is characterised in that the mounting structure includes setting female multiple sets Pipe, the installation method also includes:Before casting concrete, adhesive tape is filled in described sleeve pipe.
10. installation method as claimed in claim 9, it is characterised in that by the rubber earthquake isolation support and the pier base top surface Installation end be fixedly connected, including:
Through hole is offered on the rubber earthquake isolation support, the rubber earthquake isolation support is positioned over into the top surface of the pier base, and made The through hole aligns setting with the installation end;
The through hole is worn by a high-strength bolt and the installation end is screwed together in make the rubber earthquake isolation support with the pier Seat is fastenedly connected.
CN201611178273.0A 2016-12-19 2016-12-19 The positioning device of rubber earthquake isolation support and its production and installation method Active CN106593058B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611178273.0A CN106593058B (en) 2016-12-19 2016-12-19 The positioning device of rubber earthquake isolation support and its production and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611178273.0A CN106593058B (en) 2016-12-19 2016-12-19 The positioning device of rubber earthquake isolation support and its production and installation method

Publications (2)

Publication Number Publication Date
CN106593058A true CN106593058A (en) 2017-04-26
CN106593058B CN106593058B (en) 2019-11-19

Family

ID=58599514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611178273.0A Active CN106593058B (en) 2016-12-19 2016-12-19 The positioning device of rubber earthquake isolation support and its production and installation method

Country Status (1)

Country Link
CN (1) CN106593058B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329715A (en) * 2000-05-24 2001-11-30 Taisei Corp Method of constructing base-isolated structure
JP2002357016A (en) * 2001-05-30 2002-12-13 Satoshi Hachiman Earthquake control device for house
CN102433935A (en) * 2011-12-21 2012-05-02 宿迁华夏建设(集团)工程有限公司 Mounting and positioning rack for shock isolation supporting seat
CN102767238A (en) * 2012-07-27 2012-11-07 中铁十六局集团有限公司 Construction method of shock-isolation rubber support
CN105256894A (en) * 2015-10-23 2016-01-20 中国十七冶集团有限公司 Construction method for precisely mounting embedded bolt sleeves of seismic isolation and reduction support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329715A (en) * 2000-05-24 2001-11-30 Taisei Corp Method of constructing base-isolated structure
JP2002357016A (en) * 2001-05-30 2002-12-13 Satoshi Hachiman Earthquake control device for house
CN102433935A (en) * 2011-12-21 2012-05-02 宿迁华夏建设(集团)工程有限公司 Mounting and positioning rack for shock isolation supporting seat
CN102767238A (en) * 2012-07-27 2012-11-07 中铁十六局集团有限公司 Construction method of shock-isolation rubber support
CN105256894A (en) * 2015-10-23 2016-01-20 中国十七冶集团有限公司 Construction method for precisely mounting embedded bolt sleeves of seismic isolation and reduction support

Also Published As

Publication number Publication date
CN106593058B (en) 2019-11-19

Similar Documents

Publication Publication Date Title
CN109853779B (en) Full-swing structure system containing swing column and swing wall and construction method thereof
CN103243654B (en) Mounting method for steel anchor beam of cable-stayed bridge and assembly jig and cable bent tower mounting platform used in method
CN103104092B (en) Support composite structure of beam and slab
CN105220874A (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN209538693U (en) A kind of template single side bracing
CN106836490A (en) A kind of prestressing force assembled high-performance concrete-filled steel square tubular column concrete girder connection and its construction method
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN203669112U (en) Added-storey steel frame column base joint on top of multilayer concrete frame structure
CN105019354B (en) Mounting method for modular anti-drop-beam expansion joint device
CN208251764U (en) Modular assembly formula mixing control house structural system
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN117536354A (en) Shock insulation support and installation and construction method thereof
CN105002930A (en) Beam column joint structure constructed through steel annular plate and method of beam column joint structure
CN202644567U (en) Concrete foundation for fixing mechanical equipment
KR101247396B1 (en) Structure Of Diagrid Casting Connection And Method For It
CN106593058B (en) The positioning device of rubber earthquake isolation support and its production and installation method
CN106677557B (en) A kind of support protection structure and construction technology rising top replacement large-scale air spring
CN107558607B (en) Tower crane system arranged on existing concrete structure and construction method thereof
CN207659982U (en) A kind of roofing tower crane based process structure
CN105672524B (en) Construction method without primary stress adjustable type damper embedded part
CN210827533U (en) Device for embedding foundation bolt group
CN207538199U (en) A kind of support construction of Applying Steel Structures To A Villa
CN205776736U (en) A kind of connecting structure of prefabricated frame support structure bean column node
CN206554273U (en) A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN111236464A (en) Shock insulation construction process based on LRBLNR type support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant