CN106592992A - Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building - Google Patents

Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building Download PDF

Info

Publication number
CN106592992A
CN106592992A CN201710087404.2A CN201710087404A CN106592992A CN 106592992 A CN106592992 A CN 106592992A CN 201710087404 A CN201710087404 A CN 201710087404A CN 106592992 A CN106592992 A CN 106592992A
Authority
CN
China
Prior art keywords
guard rail
well opening
elevator well
elevator shaft
flat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710087404.2A
Other languages
Chinese (zh)
Inventor
李蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201710087404.2A priority Critical patent/CN106592992A/en
Publication of CN106592992A publication Critical patent/CN106592992A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3204Safety or protective measures for persons during the construction of buildings against falling down
    • E04G21/3223Means supported by building floors or flat roofs, e.g. safety railings
    • E04G21/3228Folding railings for flat roof edge, e.g. to hide the railings from view when not in use

Abstract

The invention discloses a flat-opening temporary rotating guardrail at an elevator shaft entrance of a civil building. The flat-opening temporary rotating guardrail comprises two guardrails, wherein one end of the two guardrails is respectively arranged at each of the two sides of the elevator shaft entrance through a rotating support base and is in rotatable connection with the elevator shaft entrance; the other ends of the two guardrails are interlocked with each other through a locking device; a fixing hole is formed on the rotating support base; the rotating support base is fixed on the outer side of the elevator shaft entrance in the manner of penetrating a bolt into the fixing hole. The flat-opening temporary rotating guardrail disclosed by the invention is designed as being made of section steel; the dedicated rotating support base can be reused; the construction measurement cost is lowered; the width of the two guardrails can be uniformly confirmed according to the width of each elevator shaft entrance and the size of the guardrails at the elevator shaft entrance can be reduced; the guardrail can be horizontally and outward rotated and opened in the process of temporary construction in the elevator shaft, so that the constructors can conveniently enter into the elevator shaft; the flat-opening temporary rotating guardrail can meet the neat, beautiful and safe standard of the guardrail of comprehensive floor; the civilized construction image can be promoted; higher social benefit can be acquired; the popularization and application values are higher.

Description

The interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat
Technical field
The invention belongs to construction implement field, is a kind of in China Democratic National Construction Association's housing construction, to China Democratic National Construction Association house elevator hole Mouth protected can Fast Installation temporary protection railing, and in particular to the interim rotation that China Democratic National Construction Association's house elevator well opening is opened flat Guard rail.
Background technology
In China Democratic National Construction Association's housing project construction, when each floor adjacent reinforced concrete bodies framework has been constructed, its floor elevator Well opening is not gone along with sb. to guard him, and personnel, article easily occurs in floor elevator well opening and the accident such as falls, it is necessary to its floor elevator Jing Dong Mouth carries out provisional protection.
The content of the invention
It is an object of the invention to provide the interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat, mainly solves Existing floor elevator well opening is not gone along with sb. to guard him, and personnel, article easily occurs in floor elevator well opening and the problem of accident such as falls.This Invention is that one kind can quickly arrange installation, the reusable temporary protection railing module of energy.
To achieve these goals, the technical solution used in the present invention is as follows:
The interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat, including two fan guard rails, two fan guard rails One end of bar is installed on the both sides outside elevator well opening by rotating stand respectively, and is connected with the rotation of elevator well opening, another Mutually locked by locking device at end;The rotating stand is provided with fixing hole, will be rotated through by way of fixing hole on bolt Bearing is fixed on the outside of elevator well opening.
Specifically, two rotating stands are respectively provided on two sides with outside the elevator well opening, to guarantee that it is solid that guard rail is installed It is fixed.
Preferably, the height of the guard rail at least 1.2m.
In order to reach the dismountable purpose of guard rail, the guard rail is latch with the connected mode of rotating stand.
Specifically, the locking device is snap ring.
In addition, the locking device is alternatively smart lock, the smart lock is connected with controller.
Further, pressure inductor or/and infrared inductor are also equipped with the guard rail, the pressure inductor Or/and infrared inductor is connected with controller, controller is also associated with alarm.The alarm is loudspeaker.
In order to reach uniform specification, purpose attractive in appearance, neat, the guard rail is formed using section steel manufacture.
Compared with prior art, the invention has the advantages that:
(1) guard rail of the invention is designed and produced using shaped steel, and special rotating stand can be reused, and reduces construction Measure cost.
(2) guard rail of the invention can be unified to determine that two fan guard rail width according to each elevator width of cave entrance, Reduce elevator well opening guard rail specification.
(3) present invention when into temporary construction in elevator, can level, be turned out opening protection function railing, constructor Member is convenient in well.
(4) present invention reaches neat, attractive in appearance, the safe standard of comprehensive floor guardrail bar, improves civilized construction image, and Cost is gone along with sb. to guard him in reduction, produces larger social benefit, has higher application value.
Description of the drawings
Fig. 1 is the structural representation of the present invention-embodiment.
Wherein, the title corresponding to reference:
1- guard rails, 2- rotating stands, 3- elevator well openings, 4- locking devices, 5- floor plates.
Specific embodiment
With reference to embodiment and accompanying drawing, the invention will be further described, and embodiments of the present invention are included but is not limited to The following example.
Embodiment 1
As shown in figure 1, the interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat, including two fan guard rails 1, The guard rail is installed on 3 outer both sides of elevator well opening and is rotated with elevator well opening 3 by rotating stand 2 respectively and is connected, and is turned Dynamic bearing 2 is provided with fixing hole, is provided with installing hole in 3 both sides relevant position of elevator well opening, using the expansion bolt of Φ 6- Φ 8mm Rotating stand is fixed at elevator well opening 3.
In the present embodiment, elevator well opening 3 is respectively provided on two sides with two rotating stands, to guarantee that it is solid that guard rail is installed It is fixed.Installing hole adopts electric hammer drill Φ 8- Φ 10mm, depth 60-80mm.
In the present embodiment, the width of guard rail 1 is according to the determination of the width of elevator well opening, height at least 1.2m.
In the present embodiment, guard rail 1 and the connected mode of rotating stand 2 are latch and detachable.
In the present embodiment, two fan guard rails are also mutually locked by locking device 4.The locking device 4 of the present embodiment For snap ring, and snap ring is two.
In the present embodiment, guard rail 1 is formed using section steel manufacture.
The installation process of the present embodiment is:
1st, manufacture and design the reusable interim rotation guard rail of a set of energy.
2nd, the width according to each elevator well opening, it is determined that two unified fan guard rail width.
3rd, the position installed according to safety protection balustrade for elevator well mouth, surveys concrete wall at hole two, and position is drawn at upper and lower two Line.
4th, using electric hammer drill Φ 8- Φ 10mm depth 60-80mm rotating stand installing hole.
5th, using the expansion bolt of Φ 6- Φ 8mm, hole upper and lower part is surveyed two and fix rotating stand.
6th, guard rail is fanned by two, install on insertion rotating stand.
7th, guard rail is fanned by two, locked with Special Locking device in the middle part of elevator well opening.
8th, in elevator well opening interior construction, two fan guard rails can be horizontally rotated to outside well, is applied in elevator Work, after construction is finished, then by two fan guard rail lockings, the installation site of two fan guard rails makes which outwards can only horizontally rotate And can not rotate inwards, make the safety coefficient of the present invention higher, outside people is also avoided that in the state of locking device is not locked Member enters by mistake through.
9th, after interim rotation guard rail is using finishing, guard rail is first removed, then tears rotating stand open, in next engineering weight It is multiple to use.
When the 10th, reusing interim rotation guard rail, the paint red and white to damaging carries out touch-up paint.
Embodiment 2
The interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat, as different from Example 1, the present embodiment Locking device is smart lock, can control its dozen of opening/closings by controller.
Embodiment 3
The interim rotation guard rail that China Democratic National Construction Association's house elevator well opening is opened flat, as different from Example 2, the present embodiment is also Pressure inductor or/and infrared inductor are provided with, the pressure inductor or/and infrared inductor are arranged on guard rail, control Device processed is also associated with alarm, and the alarm is loudspeaker.
The present embodiment has increased warning function newly on the basis of embodiment 2, by pressure inductor or/and infrared induction Device judges whether that someone is close to elevator well opening, if when locking device is not turned off, sending alarm this guard rail It is not turned off, does not carefully enter.
According to above-described embodiment, the present invention just can be realized well.What deserves to be explained is, before said structure design Put, be to solve same technical problem, even if some made in the present invention are adopted without substantial change or polishing Technical scheme essence still as the present invention, therefore which should also be as within the scope of the present invention.

Claims (9)

1. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening is opened flat, it is characterised in that including two fan guard rails, two One end of fan guard rail is installed on the both sides outside elevator well opening by rotating stand respectively, and rotates company with elevator well opening Connect, the other end is mutually locked by locking device;The rotating stand is provided with fixing hole, on bolt through by way of fixing hole Rotating stand is fixed on the outside of elevator well opening.
2. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that Two rotating stands are respectively provided on two sides with outside the elevator well opening.
3. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that The height of the guard rail at least 1.2m.
4. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that The connected mode of the guard rail and rotating stand is latch and detachable.
5. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that The locking device is snap ring.
6. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that The locking device is smart lock, and the smart lock is connected with controller.
7. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 6 is opened flat, it is characterised in that Pressure inductor or/and infrared inductor are also equipped with the guard rail, the pressure inductor or/and infrared inductor with Controller connects, and controller is also associated with alarm.
8. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 7 is opened flat, it is characterised in that The alarm is loudspeaker.
9. the interim rotation guard rail that China Democratic National Construction Association house elevator well opening according to claim 1 is opened flat, it is characterised in that The guard rail is formed using section steel manufacture.
CN201710087404.2A 2017-02-17 2017-02-17 Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building Pending CN106592992A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710087404.2A CN106592992A (en) 2017-02-17 2017-02-17 Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710087404.2A CN106592992A (en) 2017-02-17 2017-02-17 Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building

Publications (1)

Publication Number Publication Date
CN106592992A true CN106592992A (en) 2017-04-26

Family

ID=58587678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710087404.2A Pending CN106592992A (en) 2017-02-17 2017-02-17 Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building

Country Status (1)

Country Link
CN (1) CN106592992A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706414A (en) * 2018-06-07 2018-10-26 孔德朝 The protective fence and its construction method that a kind of China Democratic National Construction Association house elevator shaft mouth is flipped up

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050247518A1 (en) * 2004-04-23 2005-11-10 Klein Richard J Variable rail safety system
CN202202575U (en) * 2011-09-02 2012-04-25 广西凯迪建材科技有限公司 Protective rail for hole construction
CN102535873A (en) * 2012-02-24 2012-07-04 中国十七冶集团有限公司 Method for protecting reserved hole of high-rise building
EP2572759A1 (en) * 2011-09-22 2013-03-27 Albret Pourteau Device for protection against drops
CN204804371U (en) * 2015-07-28 2015-11-25 南通市达欣工程股份有限公司 But regularization switching formula is faced limit entrance to a cave and is prevented guardrail bar
CN206539045U (en) * 2017-02-17 2017-10-03 中国五冶集团有限公司 The interim rotation guard rail of elevator well opening

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050247518A1 (en) * 2004-04-23 2005-11-10 Klein Richard J Variable rail safety system
CN202202575U (en) * 2011-09-02 2012-04-25 广西凯迪建材科技有限公司 Protective rail for hole construction
EP2572759A1 (en) * 2011-09-22 2013-03-27 Albret Pourteau Device for protection against drops
CN102535873A (en) * 2012-02-24 2012-07-04 中国十七冶集团有限公司 Method for protecting reserved hole of high-rise building
CN204804371U (en) * 2015-07-28 2015-11-25 南通市达欣工程股份有限公司 But regularization switching formula is faced limit entrance to a cave and is prevented guardrail bar
CN206539045U (en) * 2017-02-17 2017-10-03 中国五冶集团有限公司 The interim rotation guard rail of elevator well opening

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706414A (en) * 2018-06-07 2018-10-26 孔德朝 The protective fence and its construction method that a kind of China Democratic National Construction Association house elevator shaft mouth is flipped up
CN108706414B (en) * 2018-06-07 2021-06-15 孔德朝 Protective guard for upward turnover of elevator well mouth of civil building and construction method thereof

Similar Documents

Publication Publication Date Title
KR20130001547U (en) Locking apparatus of anchor bolt for preventing fall of gang form
CN204899185U (en) Adhere to formula lift high altitude construction device
CN106592992A (en) Flat-opening temporary rotating guardrail at elevator shaft entrance of civil building
CN206539045U (en) The interim rotation guard rail of elevator well opening
CN103362297A (en) Construction scheme of inserted lift scaffold
CN204804366U (en) Construction safety rail guard and stair railing
CN105822076A (en) Construction edge safety protection warning fence
CN105040965A (en) Attached type raising and falling overhead working device and construction method
CN205637641U (en) Limit safety protection warning rail is faced in construction
CN114105008B (en) Turnover type tower crane manned channel climbing along with climbing frame
CN207776405U (en) Prefabricated outer wall panel safety protection frame
CN204126290U (en) Elevator shaft horizontal protective device
CN205577379U (en) Low -cost external construction platform
CN205444955U (en) Protection device for be used for elevator well
CN211818181U (en) Simple and easy closing means of elevator well
CN208056519U (en) A kind of detachable edge protection column
CN202467232U (en) Lift well opening protective railing
CN206220525U (en) Overall assembled gate control system
CN206616795U (en) A kind of self-sealing guardrail
CN205369881U (en) Elevartor shaft steel pipe scaffold hoisting device
CN214989569U (en) Construction elevator system free of scaffold
CN212715862U (en) Plate turnover mechanism for scaffold
CN218522312U (en) Electric sliding type safety net device with adjustable size
CN216810840U (en) Telescopic folding guardrail for portal scaffold
CN217420622U (en) Folding hook-type design elevator entrance to a cave safety device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170426

RJ01 Rejection of invention patent application after publication