CN106570340A - 河道横剖面地下水径流量估算方法 - Google Patents

河道横剖面地下水径流量估算方法 Download PDF

Info

Publication number
CN106570340A
CN106570340A CN201610999264.1A CN201610999264A CN106570340A CN 106570340 A CN106570340 A CN 106570340A CN 201610999264 A CN201610999264 A CN 201610999264A CN 106570340 A CN106570340 A CN 106570340A
Authority
CN
China
Prior art keywords
section
river
river course
runoff
groundwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610999264.1A
Other languages
English (en)
Inventor
郑克勋
郭维祥
余波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Hydropower Consulting Group Guiyang Survey And Design Institute Of Geotechnical Engineering Co ltd
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
China Hydropower Consulting Group Guiyang Survey And Design Institute Of Geotechnical Engineering Co ltd
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Hydropower Consulting Group Guiyang Survey And Design Institute Of Geotechnical Engineering Co ltd, PowerChina Guiyang Engineering Corp Ltd filed Critical China Hydropower Consulting Group Guiyang Survey And Design Institute Of Geotechnical Engineering Co ltd
Priority to CN201610999264.1A priority Critical patent/CN106570340A/zh
Publication of CN106570340A publication Critical patent/CN106570340A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种河道横剖面地下水径流量估算方法,它是根据河流一定长度区间内总流量基本不变,河道内地表水径流与地下水径流相互转化的特点,通过实测不同代表性断面地表水径流量,来估算河道剖面地下水径流量。采用本发明的流程和计算方法,可以简便而有效地计算河道横剖面地下水径流量,不需要对河道内覆盖层进行大量复杂的地质勘察,并解决山区峡谷地区广泛存在的孤块石架空的紊流状态下的地下水径流量计算问题,也可以用于排泄型河流渗漏量的估算。可以为因大坝建设产生的减脱水河段的地下水补给需水量提供较为准确的参数,避免常规方法计算的生态流量的缺项,保护生态环境。

Description

河道横剖面地下水径流量估算方法
技术领域
本发明属于水文地质和环境工程技术领域,发明涉及河道剖面地下水径流量,特别是深厚覆盖层河段中地下水径流量的计算问题。
背景技术
在对河流进行开发建设的过程中,修筑大坝截断河流,可能造成大坝下游河道减脱水,特别是许多中小流域,通过引水式电站形式梯级开发,导致河流发生部分河段断流,水生态系统受到严重破坏。近年来,环境问题受到重视,水利水电工程减脱水河段的生态流量下放成为一个必须的内容,这就涉及到流量的计算和确定,目前有较多的计算方法,这些方法中均要求河道内产生一定的河道径流量,河道内要产生地表径流,必须首先将河道地下孔隙内充满,地下水位抬升至河道表面,否则将漏失,即首先应确定河道地下水径流量。
在一种河道生态流量地下水补给需水计算方法专利中,建立了一套相应的计算方法。其中对河道剖面地下水径流量的计算是根据剖面覆盖层面积、水力梯度和渗透系数,按照达西定律,采用下式计算:
QA=K1Adi
该方法需要查明河道覆盖层的水文地质特征,现场勘察工作量较大,取得相关参数的成本较高,且地下水流态必须满足层流的条件,对山区峡谷地区广泛存在的孤块石架空的紊流状态下的地下水径流计算不适用。
发明内容
根据河流一定长度区间内总流量基本不变,河道内地表水径流与地下水径流相互转化的特点,建立一种通过实测不同代表性断面地表水径流量,来估算河道剖面地下水径流量的方法。以避免对河道内覆盖层进行大量复杂的地质勘察,并解决山区峡谷地区广泛存在的孤块石架空的紊流状态下的地下水径流计算问题。
河道中的地表水径流与地下水径流是可以相互转化的。不发生渗漏的基岩河段,河道总径流量基本上为地表水径流,地下水径流量几乎可以忽略不计;而深厚覆盖层的河段地表水部分转化为地下水,地表水径流量会减小。在枯水期,地下水径流量比例增大,深厚覆盖层河段的地下径流比例更大。山区河流河道内覆盖层主要为砂卵砾石,甚至孤块石,渗透系数大;如果覆盖层内存在架空现象,地下径流量会急剧增加,甚至占河道径流量的绝大部分。对于排泄型河流,河道总流量将发生漏失,排泄型河段以下的总流量会减小。
因此,本发明根据河流一定长度区间内总流量基本不变,河道内地表水径流与地下水径流相互转化的特点,通过实测不同代表性断面地表水径流量,来估算河道剖面地下水径流量。
其中,对枯期覆盖层河段存在断流时段的河流,其河道横剖面地下水径流量按如下步骤估算:
步骤1:通过地质调查确定需要研究的河流深厚覆盖层河段A;
步骤2:在选取河段A上游最近位置寻找基岩河段B;
步骤3:观察河段A的流量变化,确定河段A地表水径流刚好消失的时段,测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn。其中最大值为QB,QB代表了此时刻河道总径流量,也为河道横剖面地下水径流量Q:
Q=QB
其中,对枯期不断流的河流,其河道横剖面地下水径流量按如下步骤估算:
步骤1:通过地质调查确定需要研究的河流深厚覆盖层河段A;
步骤2:在选取河段A上游最近位置寻找基岩河段B;
步骤3:在枯水期测量河段A各横剖面的地表水径流量,分别为QA1、QA2、…、QAn,其中最小值为QA
步骤4:同时测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn,其中最大值为QB,QB代表了河道总径流量;
步骤5:根据下式计算得到河道横剖面地下水径流量Q:
Q=QB-QA
本发明的有益效果如下:采用本发明的流程和计算方法,可以简便而有效地计算河道横剖面地下水径流量,不需要对河道内覆盖层进行大量复杂的地质勘察,并解决山区峡谷地区广泛存在的孤块石架空的紊流状态下的地下水径流量计算问题,也可以用于排泄型河流渗漏量的估算。可以为因大坝建设产生的减脱水河段的地下水补给需水量提供较为准确的参数,避免常规方法计算的生态流量的缺项,保护生态环境。
附图说明
图1是河道纵剖面示意图;
图2是图1中的河流横剖面A示意图;
图3是图1中的河流横剖面B示意图。
附图标记说明:1-库水位,2-大坝,3-基岩,4-河水位,5-覆盖层。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明。
实施例1:
首先看图1,图1展示了本实施例的河道纵剖面示意图。图中可以看到,在河道上游设有一个大坝2,大坝2壅高了水位,因此库水位1高于河水位4。大坝2建在基岩3上。沿河道上游向下游,根据地质不同,划分为河段B和河段A,河段B位于基岩上,即基岩河段B,而河段A上有深厚覆盖层5,则称为河流深厚覆盖层河段A。
河段B和河段A所在的河流横剖面分别选择两个代表断面,即代表断面B和代表断面A,两个代表断面的横剖面示意图如图2和图3所示。
一、对枯期覆盖层河段断流的河流
1.通过地质调查确定需要研究的河流深厚覆盖层河段A;
2.在选取河段A上游最近位置寻找基岩河段B,如果河段A上游较近区间不存在基岩河段,可以以覆盖层规模、渗透性和河流比降都较小的河段代替,河段B与河段A之间需避免有地表支流或者大规模泉水等汇入;
3.观察河段A的流量变化,在河段A地表水径流刚好消失的时段,测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn。其中最大值为QB,QB代表了此时刻河道总径流量,也为河道横剖面地下水径流量Q:
Q=QB
二、对枯期不断流的河流
1.通过地质调查确定需要研究的河流深厚覆盖层河段A;
2.在选取河段A上游最近位置寻找基岩河段B,如果河段A上游较近区间不存在基岩河段,可以以覆盖层规模、渗透性和河流比降都较小的河段代替,河段B与河段A之间需避免有地表支流或者大规模泉水等汇入;
3.在枯水期测量河段A各横剖面的地表水径流量,分别为QA1、QA2、…、QAn。其中最小值为QA
4.同时测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn。其中最大值为QB,QB代表了河道总径流量。
5.根据下式计算得到河道横剖面地下水径流量Q:
Q=QB-QA
当然,以上只是本发明的具体应用范例,本发明还有其他的实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明所要求的保护范围之内。

Claims (3)

1.一种河道横剖面地下水径流量估算方法,其特征在于:根据河流一定长度区间内总流量基本不变,河道内地表水径流与地下水径流相互转化的特点,通过实测不同代表性断面地表水径流量,来估算河道剖面地下水径流量。
2.根据权利要求1所述河道横剖面地下水径流量估算方法,其特征在于:对枯期覆盖层河段存在断流时段的河流,其河道横剖面地下水径流量按如下步骤估算:
步骤1:通过地质调查确定需要研究的河流深厚覆盖层河段A;
步骤2:在选取河段A上游最近位置寻找基岩河段B;
步骤3:观察河段A的流量变化,确定河段A地表水径流刚好消失的时段,测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn。其中最大值为QB,QB代表了此时刻河道总径流量,也为河道横剖面地下水径流量Q:
Q=QB
3.根据权利要求1所述河道横剖面地下水径流量估算方法,其特征在于:对枯期不断流的河流,其河道横剖面地下水径流量按如下步骤估算:
步骤1:通过地质调查确定需要研究的河流深厚覆盖层河段A;
步骤2:在选取河段A上游最近位置寻找基岩河段B;
步骤3:在枯水期测量河段A各横剖面的地表水径流量,分别为QA1、QA2、…、QAn,其中最小值为QA
步骤4:同时测量河段B各横剖面的地表水径流量,分别为QB1、QB2、…、QBn,其中最大值为QB,QB代表了河道总径流量;
步骤5:根据下式计算得到河道横剖面地下水径流量Q:
Q=QB-QA
CN201610999264.1A 2016-11-14 2016-11-14 河道横剖面地下水径流量估算方法 Pending CN106570340A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610999264.1A CN106570340A (zh) 2016-11-14 2016-11-14 河道横剖面地下水径流量估算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610999264.1A CN106570340A (zh) 2016-11-14 2016-11-14 河道横剖面地下水径流量估算方法

Publications (1)

Publication Number Publication Date
CN106570340A true CN106570340A (zh) 2017-04-19

Family

ID=58541866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610999264.1A Pending CN106570340A (zh) 2016-11-14 2016-11-14 河道横剖面地下水径流量估算方法

Country Status (1)

Country Link
CN (1) CN106570340A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104679985A (zh) * 2015-01-21 2015-06-03 河海大学 一种dhsvm模型的改进方法
CN104732073A (zh) * 2015-03-04 2015-06-24 河海大学 地表水-地下水耦合模拟的计算方法
CN105022922A (zh) * 2015-07-16 2015-11-04 中国水利水电科学研究院 基于水循环全过程非饱和带土壤水分消耗特性的评价方法
CN105550501A (zh) * 2015-12-09 2016-05-04 中国水利水电科学研究院 一种流域/区域干旱演变驱动机制的识别方法
CN105608307A (zh) * 2015-12-09 2016-05-25 中国水利水电科学研究院 一种水资源干旱评价系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104679985A (zh) * 2015-01-21 2015-06-03 河海大学 一种dhsvm模型的改进方法
CN104732073A (zh) * 2015-03-04 2015-06-24 河海大学 地表水-地下水耦合模拟的计算方法
CN105022922A (zh) * 2015-07-16 2015-11-04 中国水利水电科学研究院 基于水循环全过程非饱和带土壤水分消耗特性的评价方法
CN105550501A (zh) * 2015-12-09 2016-05-04 中国水利水电科学研究院 一种流域/区域干旱演变驱动机制的识别方法
CN105608307A (zh) * 2015-12-09 2016-05-25 中国水利水电科学研究院 一种水资源干旱评价系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨智: ""鄂尔多斯高原海流兔河地下水和地表水交互作用关系研究"", 《中国博士学位论文全文数据库 基础科学辑》 *
高树东: ""潍坊市地下水资源评价"", 《中国优秀博硕士学位论文全文数据库 (硕士) 基础科学辑》 *

Similar Documents

Publication Publication Date Title
Fu et al. Role of epikarst in near‐surface hydrological processes in a soil mantled subtropical dolomite karst slope: Implications of field rainfall simulation experiments
Chen et al. Hydrologic analyses of acidic and alkaline lakes
Alderwish Induced recharge at new dam sites-Sana’a Basin, Yemen
CN108316924B (zh) 一种保水采煤矿井/矿区等级划分方法
Fu et al. Assessment of submarine groundwater discharge in the intertidal zone of Laizhou Bay, China, using electrical resistivity tomography
CN106202911B (zh) 一种河道生态流量地下水补给需水计算方法
CN105243177A (zh) 海岸带地下淡水向海洋的排泄量计算方法
Zhu et al. Estimation of groundwater residence time and recession rate in watershed of the Loess Plateau
Ibn Ali et al. A method to estimate aquifer artificial recharge from a hill dam in Tunisia
CN106570340A (zh) 河道横剖面地下水径流量估算方法
CN109632254B (zh) 一种坝库水利工程影响下的河流泥沙输移比确定方法
Liu et al. Effects of rainfall intensity on the sediment concentration in the Loess Plateau, China
Li et al. Effective water quantity of multi-source water recharging aquifers in Yufuhe River based on groundwater and surface water semi-coupled modelling
CN104899454A (zh) 一种适用于土岩组合地层的地铁隧道裂隙水渗水量预测方法
Ahn et al. A study on the effectiveness of radar rainfall by comparing with flood inundation record map using KIMSTORM (Grid-based KIneMatic Wave STOrm Runoff Model)
Patowary et al. A modified hydrodynamic model for routing unsteady flow in a river having piedmont zone
Hou et al. Factors driving riverbed scouring and sedimentation in the Bayangaole to Toudaoguai reaches of the Upper Yellow River
Wen et al. Preliminary study on runoff analysis of karst landforms in Yunnan Province
CN113375751B (zh) 一种深厚覆盖层河床大坝渗漏量检测方法
Sleep et al. Effects of initial conditions on the results of transient seepage analyses
Choi et al. Sensitivity Analysis of Artificial Recharge in Consideration of Hydrogeologic Characteristics of Facility Agricultural Complex in Korea: Hydraulic Conductivity and Separation Distance from Injection Well to Pumping Well
CN106801400A (zh) 一种山丘区季节性河流长度的定量估算方法
Jaworska-Szulc et al. Monitoring Salt Water Intrusion During Construction of a Road Tunnel under the Martwa Wisła River in Gdańsk
Hong et al. Agricultural radial collector wells in South Korea and sustainability
Cao et al. Hydrogeological settings for underground dam construction–Four case studies from southwest karst area of China

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170419