CN106560817B - A kind of copper-molybdenum Ore loss and dilution rates control method - Google Patents

A kind of copper-molybdenum Ore loss and dilution rates control method Download PDF

Info

Publication number
CN106560817B
CN106560817B CN201610723517.2A CN201610723517A CN106560817B CN 106560817 B CN106560817 B CN 106560817B CN 201610723517 A CN201610723517 A CN 201610723517A CN 106560817 B CN106560817 B CN 106560817B
Authority
CN
China
Prior art keywords
ore
rock
boundary line
grade
quick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610723517.2A
Other languages
Chinese (zh)
Other versions
CN106560817A (en
Inventor
张海涛
王晓东
林书本
杨志刚
刘伟
周泓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA GOLD INNER MONGOLIA MINING Co Ltd
Original Assignee
CHINA GOLD INNER MONGOLIA MINING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA GOLD INNER MONGOLIA MINING Co Ltd filed Critical CHINA GOLD INNER MONGOLIA MINING Co Ltd
Priority to CN201610723517.2A priority Critical patent/CN106560817B/en
Publication of CN106560817A publication Critical patent/CN106560817A/en
Application granted granted Critical
Publication of CN106560817B publication Critical patent/CN106560817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Mining

Abstract

The invention discloses a kind of copper-molybdenum Ore loss and dilution rates control methods, including reinforcing production geology guidance, improve the accuracy of geologic information, ore body, rock mass, construction three-dimensional stereo model are established using software, establishes Ore-block Grade model and Grade Control system, optimization ore-rock point wears a point quick-fried design, tracing management is carried out to site operation, it is loosely regular to study quick-fried heap, designs boundary line of ore bed and rock unwrapping wire, realizes that ceaseless intelligent monitoring site is constructed for 24 hours using production control platform.The present invention uses various ways, is effectively controlled the loss and dilution rate of ore, improves ore Beneficiation Feed Grade indirectly, save beneficiation cost, improve resource utilization, the annual cost for giving 10,000,000 or more company's cost efficiency.

Description

A kind of copper-molybdenum Ore loss and dilution rates control method
Technical field
The present invention relates to ore extraction field, specifically a kind of copper-molybdenum Ore loss and dilution rates control method.
Background technique
The mining area Wu Nuge Tu Shan is constructively in the joining place of outer Baikalides Yu Daxing'an Mountainrange fold system, in area Exposure bottom is mainly carbonate, granite porphyry and copper-molybdenum ore body, and general inclination northwest, inclination angle is from east to west by 85 ° of gradual changes At 75 °, equal introversion at the turn end of two, north and south, 60 ° of inclination angle, ore body from middle part bad break, is divided into north and south two by later period faulting A mine section, for relative level mistake away from 600-700m, normal throw is little.Therefore it causes and considerably increases cost in ore dressing, and And this feature causes the utilization rate of mine not high, serious waste resource.
Summary of the invention
The purpose of the present invention is to provide a kind of copper-molybdenum Ore loss and dilution rates control methods, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme:
A kind of copper-molybdenum Ore loss and dilution rates control method, includes the following steps:
(1) reinforce production geology guidance, improve the accuracy of geologic information
1. working out quality of blasting pile figure: on working bench, inside ore body and ore-rock boundary position, take blasthole rock powder sample into Row chemical examination modifies ore body, establishment quality of blasting pile instruction figure, heap redeterimination Cai Bao circle quick-fried to ore using rock powder analysis data Line;
2. improving productive prospecting degree: timely feedbacking drilling data in production process, enclosed again using new data at any time Determine ore body, control Ore body morphology, occurrence and ore quality distribution improve the reserves degree of reliability, obtain needed for production accurately Matter data;
3. carrying out face geological record work: being edited and recorded by field geology, control crushed zone and andesitic porphyrite, fall thick and fast carefully The occurrence status of vein horsestone is surveyed by ground based on submitting geologic information, and geological sampling, production mine locating, geological record number are utilized According to, further modification and supplement are carried out to ore body in time, the end of ore body, boudary portion are accurately controlled, amendment mine The boundary line of body is allowed to closer than practical, provides geologic basis for Ore quality control, control loss and dilution;
(2) ore body, rock mass, construction three-dimensional stereo model are established using software, it is intuitive reflect ore body physical model, ore-rock and Architectonic space occurrence status expresses to complete and accurate various geological phenomenons, the geology of sectility all directions as needed Sectional view accurately reflects the grade of arbitrary point in ore body, Ore-block Grade model, Grade Control system is updated while data update System, adjusted design parameter and standard, guarantee the timeliness and accuracy of Mining scheme and monolithic design at any time, for loss and dilution Management provides precise number information;
(3) Ore-block Grade model is established, human intervention is reduced, realizes that analysis data does not land, passes through reflecting automatically for software Function is penetrated, by laboratory automatic collection analysis data union, and the rock powder being synchronized in digital mining softwares platform database Grade information is automatically mapped in drilling mark circle;Based on rock powder sampled data, Ore-block Grade model is created, distance is utilized Orebody Grade carries out more accurate valuation within the scope of the area power inverse ratio Fa Duibao, according to different grade information to each cell block Different attributes is assigned, so as to the quick-fried reasonable boundary line of ore bed and rock of heap redeterimination of ore;
(4) Grade Control system is established, on the basis of Ore-block Grade model, geological record data are added, with reference to upper layer Boundary line of ore bed and rock, grade, the information such as geological record, create Grade Control system, using Inverse Distance Weighted Method monthly to status with The ore body of lower two steps carries out valuation and update, and carries out second termination to ore body, reinforces to ore body end and boudary portion Control, correct the boundary line of ore body, be allowed to closer than practical, control loss and dilution rate provides geologic basis.
As a further solution of the present invention: further including that optimization ore-rock point wears a point quick-fried design, site operation is tracked Management, specific as follows:
(1) in the monolithic design for doing nugget, according to the instant status of stope that measurement provides, the orebody shape of geology offer Orebody shape includes trend, tendency, inclination angle, is designed according to the boundary line of ore bed and rock that Ore-block Grade model is drawn a circle to approve, and a point quick-fried item is met The ore-rock of part is taken and point wears a point quick-fried mining method, fifty-fifty according to loss and dilution rate according to the boundary line of ore bed and rock that geology provides Principle carry out nugget monolithic design;
(2) complicated for occurrence, folder rock is not up to eliminating thickness, is difficult to realize point wear a point quick-fried nugget, and ore-rock is taken to mix Quick-fried mining method is exploited, and after explosion, the ore body boundary line drawn a circle to approve using geology is designed different shovels and installs standby shovel dress Line.
As a further solution of the present invention: further including that study quick-fried heap loosely regular, design boundary line of ore bed and rock unwrapping wire, specifically Are as follows:
(1) by a large amount of measurement data, the rule for showing that quick-fried heap is spread is researched and analysed;
(2) survey crew's field calibration shovel dress boundary line;
(3) accurate control shovel dress process and shovel dress angle.
As further scheme of the invention: further including realizing that ceaseless intelligentization is supervised for 24 hours using production control platform Control site operation.
Compared with prior art, the beneficial effects of the present invention are: the present invention uses various ways, it is effectively controlled ore Loss and dilution rate, improve ore Beneficiation Feed Grade indirectly, save beneficiation cost, improve resource utilization, it is annual to public affairs Take charge of the cost of 10,000,000 or more cost efficiency.
Detailed description of the invention
Schematic diagram of the Fig. 1 for boundary line of ore bed and rock in Boston ivy down-the-hole drill punched areas in big gun area backlash direction.
Schematic diagram of the Fig. 2 for boundary line of ore bed and rock in Boston ivy down-the-hole drill punched areas in big gun area side blow direction.
Schematic diagram of the Fig. 3 for boundary line of ore bed and rock in rotary drill punched areas in big gun area backlash direction.
Schematic diagram of the Fig. 4 for boundary line of ore bed and rock in rotary drill punched areas in big gun area side blow direction.
Wiring schematic diagram is shoveled in design when Fig. 5 and Fig. 6 is power shovel.
Wiring schematic diagram is shoveled in design when Fig. 7 and Fig. 8 is hydraulic crawler excavator.
Fig. 9 is to reject folder rock to shovel wiring schematic diagram.
Figure 10 is the B-B sectional view in Fig. 9.
Figure 11 is entity sectional view after explosion.
Figure 12 is empty body sectional view after explosion.
Figure 13 is live quick-fried heap defence line schematic diagram.
In figure: breasting the tape after 1-;2- boundary line of ore bed and rock;3- pitch-row;4- side blow;5- side blow line;6- backlash;7- array pitch;8- design Shovel wiring;9- is for the low copper of mine;The special low copper mine heap of 10-;11- rhyolite-porphyry;12- shovels wiring;Quick-fried heap shovel wiring measurement after 13- explosion Setting-out position.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Copper-molybdenum Ore loss and dilution rates control method, including reinforce geology technical management, utilize advanced three-dimensional software Improve geological resource management;Optimization ore-rock point wears a point quick-fried design, carries out tracing management to site operation;Quick-fried heap is studied loosely to advise Rule designs boundary line of ore bed and rock unwrapping wire new method;Realize that ceaseless intelligent monitoring site is constructed for 24 hours using production control platform.
One, reinforce geology technical management, reduce Ore loss and dilution rates
(1) accuracy for improving geologic information reinforces production geology guidance
1, work out quality of blasting pile figure: on working bench, inside ore body and ore-rock boundary position, take blasthole rock powder sample into Row chemical examination modifies ore body, establishment quality of blasting pile instruction figure, heap redeterimination Cai Bao circle quick-fried to ore using rock powder analysis data Line.
2, productive prospecting degree is improved;Drilling data is timely feedbacked in production process, is enclosed again using new data at any time Determine ore body, control Ore body morphology, occurrence and ore quality distribution improve the reserves degree of reliability, obtain needed for production accurately Matter data.
3, carry out face geological record work: being edited and recorded by field geology, control crushed zone and andesitic porphyrite, fall thick and fast carefully The occurrence status of vein horsestone is surveyed by ground based on submitting geologic information, and geological sampling, production mine locating, geological record etc. are utilized Data carry out further modification and supplement to ore body in time, are applied in production mine work in every.Reinforce end emphatically The boundary line of ore body is corrected in the control in portion, boudary portion, is allowed to closer than practical, is lost for Ore quality control, control and poor Change and geologic basis is provided.
(2) softwares such as surpac dimine are introduced and establish ore body, rock mass, construction three-dimensional stereo model, it is intuitive to reflect Ore body physical model, ore-rock and architectonic space occurrence status, express to complete and accurate various geological phenomenons, as needed The log sheet of sectility all directions makes up deficiency and error with conventional method in terms of delineation ore body and construction, accurately The grade for reflecting arbitrary point in ore body, becomes apparent from geological condition clear, closer to really, updates nugget at any time with data update Grade Model, Grade Control system, adjusted design parameter and standard at any time, guarantee Mining scheme and monolithic design timeliness and Accuracy provides precise number information for loss and dilution management.
(3) Ore-block Grade model is established, human intervention is reduced, realizes that analysis data does not land, certainly by dimine software Dynamic mapping function after the automatic collection analysis data union of laboratory and will be synchronized in digital mining softwares platform database Rock powder grade information is automatically mapped in drilling mark circle.Based on rock powder sampled data, Ore-block Grade model, unit are created Block size is set as 2m × 2m × 15m.Orebody Grade within the scope of quick-fried area is more accurately estimated using Inverse Distance Weighted Method Value, assigns different attributes to each cell block according to different grade information, so as to reasonable to the quick-fried heap redeterimination of ore Boundary line of ore bed and rock reduces the loss and dilution rate of ore.
(4) Grade Control system is established, on the basis of Ore-block Grade model, geological record data are added, with reference to upper layer Boundary line of ore bed and rock, grade, the information such as geological record create Grade Control system, and cell block is dimensioned to 4m × 6m × 15m.Benefit Valuation and update monthly are carried out to the ore body of status following two step with Inverse Distance Weighted Method, and secondary circle is carried out to ore body It is fixed, reinforce the control to ore body end and boudary portion, correct the boundary line of ore body, is allowed to closer than practical, is ore quality Management, control loss and dilution rate provide geologic basis.
Two, optimization ore-rock point wears a point quick-fried design, carries out tracing management to site operation
(1) in the monolithic design for doing nugget, according to the instant status of stope that survey speciality provides, geology is provided Orebody shape (including trend, tendency, inclination angle) and according to Ore-block Grade model draw a circle to approve boundary line of ore bed and rock be designed.Ore-rock is full Foot point quick-fried condition, it firmly takes and point wears a point quick-fried mining method.According to the boundary line of ore bed and rock that geology provides, in strict accordance with damage It loses the fifty-fifty principle of the rate of dilution and carries out nugget monolithic design.
1, Boston ivy down-the-hole drill punched areas, Hole pattern parameters are 6m × 4.5m, big gun area backlash 4.5m, big gun area side blow 4m. When being designed, according to the fifty-fifty principle of loss and dilution rate, if boundary line of ore bed and rock divides boundary line of ore bed and rock in big gun area backlash direction 2.25m is not deviated respectively to two sides, and 2.25m is last round position on the inside of boundary line of ore bed and rock, position of breasting the tape after being at the 2.25m of outside It sets.As shown in Figure 1.
If boundary line of ore bed and rock respectively deviates 2m, boundary line of ore bed and rock inside in big gun area side blow direction, by boundary line of ore bed and rock to two sides respectively 2m is the position in last column hole, and 2m is side blow line position on the outside of boundary line of ore bed and rock.As shown in Figure 2.
2, YZ-35 rotary drill punched areas, Hole pattern parameters are 8m × 7m, big gun area backlash 6.5m, big gun area side blow 5m.Into When row design, according to the fifty-fifty principle of loss and dilution rate, if boundary line of ore bed and rock in big gun area backlash direction, by boundary line of ore bed and rock respectively to Two sides respectively deviate 3.25m, and 3.25m is last round position on the inside of boundary line of ore bed and rock, are backlash position at the 3.25m of outside.Such as Shown in Fig. 3.
If boundary line of ore bed and rock respectively deviates 2.5m in big gun area side blow direction, by boundary line of ore bed and rock to two sides respectively, in boundary line of ore bed and rock Side 2.5m is the position in last column hole, and 2.25m is side blow position on the outside of boundary line of ore bed and rock.As shown in Figure 4.
(2) more complex for occurrence, folder rock be not up to eliminating thickness, relatively difficult to achieve point wear a point quick-fried nugget, take ore-rock Mix quick-fried mining method.After explosion, the ore body boundary line drawn a circle to approve using geology is designed different shovels and installs standby shovel wiring:
1, WK-10B, EX2500 power shovel: analyzing according to produced on-site actual measurement data, and it is 58 ° that electric shovel, which fills angle, quick-fried According to the principle design shovel wiring that shovel dress sequence, loss and dilution rate are fifty-fifty after broken, as shown in Figure 5 and Figure 6.
10 → 9 be to shovel dress sequence in figure, and design shovel wiring deviates 4.75m to 9 for boundary line of ore bed and rock.
2, the hydraulic crawler excavators such as Volvo 700, Hitachi 870, little Song 360: analyzing according to produced on-site actual measurement data, It is 60 ° that hydraulic excavating mechanical shovel, which fills angle,.According to the principle design shovel wiring that shovel dress sequence, loss and dilution rate are fifty-fifty after explosion, such as Shown in Fig. 7 and Fig. 8.
10 → 9 be to shovel dress sequence in figure, and design shovel wiring deviates 4.3m to 9 for boundary line of ore bed and rock.
3, it is not up to the folder rock (andesitic porphyrite, rhyolite-porphyry) of eliminating thickness, when carrying out monolithic design, though it not can be carried out It point wears point quick-fried.But the folder rock occurrence of offer can be edited and recorded after explosion according to geology, produced on-site actual conditions are rejected Rock shovel wiring design is pressed from both sides, the principle of rejecting is only to reject folder rock, does not lose ore amount.As shown in 7 figures.
(3) except the waste adhered in design is the largest the principle of waste, design pass is maintained strict control over, nugget monomer is continued to optimize Design is outer, and supervision and management in 24 hours is carried out for unit in charge of construction's site operation situation.Standby shovel dress instruction, perforation are installed to shovel Whether accurate, the quick-fried heap shovel dress of operation cloth hole hole location executes in strict accordance with design carries out current check, accomplishes that design guidance is constructed, Construction guarantees to achieve the purpose that control reduces loss late, the rate of dilution in strict accordance with design control loss and dilution rate.
Three, it is loosely regular to study quick-fried heap, designs boundary line of ore bed and rock unwrapping wire new method
(1) by a large amount of measurement data, the universal law for showing that quick-fried heap is spread is researched and analysed
1, quick-fried heap coefficient of volumetric expansion average value 1.5, ramp portion about 1.58, the flat heap part about 1.42 of 13m high or more.
2, quick-fried heap more than a scope of freedom and 4 rounds, the following partial volume of quick-fried heap slope surface 13m high account for the one of entire quick-fried heap Half.
3, in the preshoot of explosion and dropping process, there are certain mixing phenomenas, but not bery serious, are that setting-out has on quick-fried heap There is the basis of feasibility.
(2) measuring technique personnel on site demarcates shovel dress boundary line principle
1, whether the shovel dress boundary line for checking mining operators' design first meets loss and dilution rate Controlling principle.
2, shovel dress boundary line setting-out position should be mining design evolution be quick-fried heap on empty body position, the shovel of field calibration It is consistent with design idea to the maximum extent to fill boundary line, not because of shovel dress loss and dilution rate increasing caused by unwrapping wire position.
3, survey crew should install standby, blasting technology according to shovel and explosion spreads the statistical that rule carries out actual parameter Analysis targetedly carries out fining and calculates and analyze, reduces loss and dilution rate to the maximum extent.
4, shovel dress boundary line setting-out classification on quick-fried heap
Shovel in monolithic design of digging up mine fills boundary line, and setting-out should shovel dress boundary line when on the quick-fried heap of empty body according to physically ore-rock With the relationship of blasting direction and former top of the slope wire spacing, point five kinds of situation processing are shown in Table 1.
It extrapolates about in shovel dress boundary line
Because mining operators are in physically design shovel dress boundary line, field lofting carries out on quick-fried heap void body, on quick-fried heap void body Shovel dress angle is less than shovel physically and fills angle, thus the shovel dress boundary line on quick-fried heap should extrapolate or it is interior push away, inside push away extrapolation width setting-out circle Muckpile's hight and its coefficient of volumetric expansion where being considered as boundary's flag when flag, presumption width are shown in Table 2.
The 2 flag setting-out position Chan Zhuan circle of table is compared with initial calculation result additional extrapolation width again
(3) management of shovel dress process and shovel dress angle
1, number is set about boundary's flag
For completely penetrating through boundary line, backlash position one in principle, flat heap high point one, 13m eminence 1,10m eminence It is 1,5m eminence one, total at least to install 5 boundary's flags.Other situations are optionally arranged.
2, the acceptance gauging in shovel dress boundary line
It is exercised supervision management using production control platform to shovel dress operating area daily, is attached to Chan Zhuan circle when discovering device shovels After line, inspected for acceptance by technical staff to construction quality.Determine it is qualified after measure examination shovel dress status bench crest and Bench toe, shovel dress use sized devices integration of operation in the process, shovel dress angle are continuously improved, to be effectively reduced the damage of ore Lose the rate of dilution.
3, the management at shovel dress angle
Reinforce unit in charge of construction and shovel packing quality management, field surveillance simultaneously checks and accepts ore-rock boundary shovel dress face status, and has adopted The mode of one piece of one piece of calculating, by field control and management, quick-fried heap shovel dress angle is increased to 58.5 ° from 56.5 °, effective to drop Low Ore loss and dilution rates.
Four, realize that 24 hours ceaseless intelligent monitoring sites are constructed using production control platform
(1) production control platform provides quick-fried heap using Grade Control model as its back-end data for three-dimensional card adjusting system The data informations such as mine amount, grade, amount of metal, the Decentralization means of original two-dimentional card adjusting system, which are changed into, which will adopt stripping the moon, applies It work plan, perforation process plan, ore matching plan and adopts the quick-fried heapinfo of stripping and simulates the monitoring in three-dimensional truck dispatching system in real time Management means.
(2) for the management of the loss and dilution rate in ore-rock boundary shovel dress, green is, for mine, yellow is stripping rock.When shovel fills When having a common boundary to ore-rock, live video monitoring is recalled in time, it can be seen that the mark of ore-rock boundary.Unit in charge of construction is notified to stop making Industry, measuring technique personnel carry out live actual measurement and calculate loss and dilution rate rate, then carry out construction operation again.
(3) by the function of the high accuracy positioning using power shovel, if working as power shovel during filling mine in the position of stripping rock It sets and carries out shovel dress, blue is mine, and cyan is rock, and production control three-dimensional platform will automatic alarm.
Wu Nuge spits mountain copper-molybdenum and passes through many measures taken, and is effectively controlled the loss and dilution rate of ore, indirectly Improve ore Beneficiation Feed Grade, save beneficiation cost, improve resource utilization, every year to company's cost efficiency 10,000,000 with On.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (4)

1. a kind of copper-molybdenum Ore loss and dilution rates control method, which comprises the steps of:
(1) reinforce production geology guidance, improve the accuracy of geologic information
1. working out quality of blasting pile figure: on working bench, blasthole rock powder sample is taken inside ore body and ore-rock boundary position It tests, modifies ore body using rock powder analysis data, establishment quality of blasting pile instruction figure adopts stripping boundary line to the quick-fried heap redeterimination of ore;
2. improving productive prospecting degree: timely feedbacking drilling data in production process, utilize new data redeterimination mine at any time Body, control Ore body morphology, occurrence and ore quality distribution, the raising reserves degree of reliability, accurately geology provides needed for acquirement production Material;
3. carrying out face geological record work: being edited and recorded by field geology, control crushed zone and andesitic porphyrite, flesite arteries and veins The occurrence status of horsestone is surveyed by ground based on submitting geologic information, using geological sampling, production mine locating, geological record data, and When further modification and supplement are carried out to ore body, the end of ore body, boudary portion are accurately controlled, the side of ore body is corrected Boundary line is allowed to closer than practical, provides geologic basis for Ore quality control, control loss and dilution;
(2) ore body, rock mass, construction three-dimensional stereo model are established using software, it is intuitive to reflect ore body physical model, ore-rock and geology The space occurrence status of construction expresses to complete and accurate various geological phenomenons, the geologic section of sectility all directions as needed Figure accurately reflects the grade of arbitrary point in ore body, Ore-block Grade model, Grade Control system is updated while data update, with When adjusted design parameter and standard, guarantee the timeliness and accuracy of Mining scheme and monolithic design, for loss and dilution management Precise number information is provided;
(3) Ore-block Grade model is established, human intervention is reduced, realizes that analysis data does not land, passes through the automatic mapping function of software Can, by laboratory automatic collection analysis data union, and the rock powder grade being synchronized in digital mining softwares platform database Information is automatically mapped in drilling mark circle;Based on rock powder sampled data, Ore-block Grade model is created, using apart from power Orebody Grade carries out more accurate valuation within the scope of the area inverse ratio Fa Duibao, is assigned according to different grade information to each cell block Different attribute, so as to the quick-fried reasonable boundary line of ore bed and rock of heap redeterimination of ore;
(4) Grade Control system is established, on the basis of Ore-block Grade model, geological record data are added, with reference to upper layer ore-rock Boundary line, grade, geological record information create Grade Control system, using Inverse Distance Weighted Method monthly to status following two The ore body of step carries out valuation and update, and carries out second termination to ore body, reinforces the control to ore body end and boudary portion, The boundary line for correcting ore body is allowed to closer than practical, and control loss and dilution rate provides geologic basis.
2. copper-molybdenum Ore loss and dilution rates control method according to claim 1, which is characterized in that further include optimization mine Rock point wears a point quick-fried design, carries out tracing management to site operation, specific as follows:
(1) in the monolithic design for doing nugget, according to the instant status of stope that measurement provides, the orebody shape ore body of geology offer Occurrence includes trend, tendency, inclination angle, is designed according to the boundary line of ore bed and rock that Ore-block Grade model is drawn a circle to approve, and point quick-fried condition is met Ore-rock is taken and point wears a point quick-fried mining method, according to the boundary line of ore bed and rock that geology provides, according to the fifty-fifty original of loss and dilution rate Then carry out nugget monolithic design;
(2) complicated for occurrence, folder rock is not up to eliminating thickness, is difficult to realize point wear a point quick-fried nugget, takes ore-rock to mix quick-fried Mining method is exploited, and after explosion, the ore body boundary line drawn a circle to approve using geology is designed different shovels and installs standby shovel wiring.
3. copper-molybdenum Ore loss and dilution rates control method according to claim 1, which is characterized in that further include that research is quick-fried Heap is loosely regular, designs boundary line of ore bed and rock unwrapping wire, specifically:
(1) by a large amount of measurement data, the rule for showing that quick-fried heap is spread is researched and analysed;
(2) survey crew's field calibration shovel dress boundary line;
(3) accurate control shovel dress process and shovel dress angle.
4. copper-molybdenum Ore loss and dilution rates control method according to claim 1, which is characterized in that further include utilizing life It produces control platform and realizes that ceaseless intelligent monitoring site is constructed for 24 hours.
CN201610723517.2A 2016-08-26 2016-08-26 A kind of copper-molybdenum Ore loss and dilution rates control method Active CN106560817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610723517.2A CN106560817B (en) 2016-08-26 2016-08-26 A kind of copper-molybdenum Ore loss and dilution rates control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610723517.2A CN106560817B (en) 2016-08-26 2016-08-26 A kind of copper-molybdenum Ore loss and dilution rates control method

Publications (2)

Publication Number Publication Date
CN106560817A CN106560817A (en) 2017-04-12
CN106560817B true CN106560817B (en) 2019-07-26

Family

ID=58485651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610723517.2A Active CN106560817B (en) 2016-08-26 2016-08-26 A kind of copper-molybdenum Ore loss and dilution rates control method

Country Status (1)

Country Link
CN (1) CN106560817B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254802A (en) * 2018-01-11 2018-07-06 武志明 A kind of technique for delineating on metalliferous deposit boundary influenced by secondary fragmentation construction
CN108425675B (en) * 2018-04-11 2019-12-03 云南华联锌铟股份有限公司 A kind of surface mine orebody shape is accurately positioned and the method for back production
CN111126692A (en) * 2019-12-21 2020-05-08 河北钢铁集团矿业有限公司 Method for predicting dilution rate of loss rate of surface mine
CN113833468A (en) * 2021-05-28 2021-12-24 北京工业大学 Metal strip mine blasting pile grade distribution measuring and calculating system and accurate shoveling and loading method
CN114140968B (en) * 2021-12-07 2023-06-06 四川智能建造科技股份有限公司 Blasting product consumption early warning system and method
CN116537789B (en) * 2023-05-31 2024-01-26 中国水利水电第三工程局有限公司 Ore layered mining depletion loss control method under complex geological conditions

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2780169A1 (en) * 2012-06-08 2013-12-08 The Governors Of The University Of Alberta Hyperspectral imaging for ore froth processing
CN103742144A (en) * 2013-09-30 2014-04-23 贵州开磷(集团)有限责任公司 Ore loss and dilution control method and application thereof
CN104929687A (en) * 2015-07-02 2015-09-23 中国黄金集团内蒙古矿业有限公司 Mine digitlization production management and control system and method
CN104951589A (en) * 2015-04-02 2015-09-30 中南大学 Surface blasting ore body boundary loss and dilution control system and operation method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2780169A1 (en) * 2012-06-08 2013-12-08 The Governors Of The University Of Alberta Hyperspectral imaging for ore froth processing
CN103742144A (en) * 2013-09-30 2014-04-23 贵州开磷(集团)有限责任公司 Ore loss and dilution control method and application thereof
CN104951589A (en) * 2015-04-02 2015-09-30 中南大学 Surface blasting ore body boundary loss and dilution control system and operation method
CN104929687A (en) * 2015-07-02 2015-09-23 中国黄金集团内蒙古矿业有限公司 Mine digitlization production management and control system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《Dimine软件在乌山铜钼矿三维矿体模型中的更新及应用》;冯瑞等;《黄金》;20150331;第48-52页
《乌努格吐山铜钼矿建设工程的测量保障》;李晓露,林书本;《科技创新导报》;20101231;第119,112页
《采矿中的测量技术与损失贫化》;林书本等;《科技创新导报》;20131231;第56页

Also Published As

Publication number Publication date
CN106560817A (en) 2017-04-12

Similar Documents

Publication Publication Date Title
CN106560817B (en) A kind of copper-molybdenum Ore loss and dilution rates control method
WO2019042483A2 (en) Tbm boring rock state real-time sensing system and method
CN107503797B (en) Mine Methane tendency early warning system based on 3D emulation platform
CN108305184A (en) A kind of number mining softwares platform
CN106968673B (en) Metal Open mountain goaf harnessing method
CN108827233B (en) Prediction method for ground settlement of two-layer goaf
CN113362469B (en) Shield tunnel construction early warning method integrating city building information and stratum structure
CN109446659A (en) A kind of method that integrated forecasting heading emits heights of roofs and hidden danger classification
CN110119994A (en) A kind of GIS supports the quick-fried heap displacement extraction of lower metallic ore and prediction technique
CN110410027A (en) It is a kind of to carry out the continuous evaluation method of rock-mass quality and system using drilling core
CN104809266A (en) Spline based accurate predicating method for face coal seam occurrence condition
CN110334432A (en) A kind of mining overburden gas accumulation area space discrimination method and system
Dominy et al. Grade and geological continuity in high-nugget effect gold–quartz reefs: implications for resource estimation and reporting
CN112329252A (en) 3Dmine modeling ore body boundary accurate control method and application
CN115690354A (en) Shallow tunnel construction dynamic control method based on three-dimensional live-action numerical analysis
CN103699712A (en) Method for making mining extraction plan based on explosion unit bodies
CN114202143A (en) Goaf safety evaluation method and device and storage medium
CN113338935A (en) Method for delineating ore body
CN112489162A (en) Large-range micro-unit coal seam geological prediction and profile drawing method
CN105046409B (en) Comprehensive evaluation of coal seam group ascending mining feasibility and establishment method of technical support system
Baylis et al. Mobile drone LiDAR structural data collection and analysis
CN115185015A (en) Deep lithium beryllium ore exploration method
CN112627811A (en) Method for exploring geological structure by utilizing extraction drill hole
CN104462649A (en) Automatic updating method of ore body block model reserves
Medinac Advances in pit wall mapping and slope assessment using unmanned aerial vehicle technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant