CN106545513B - A kind of change of current cooler control method - Google Patents

A kind of change of current cooler control method Download PDF

Info

Publication number
CN106545513B
CN106545513B CN201610963202.5A CN201610963202A CN106545513B CN 106545513 B CN106545513 B CN 106545513B CN 201610963202 A CN201610963202 A CN 201610963202A CN 106545513 B CN106545513 B CN 106545513B
Authority
CN
China
Prior art keywords
cooler
current
change
control method
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610963202.5A
Other languages
Chinese (zh)
Other versions
CN106545513A (en
Inventor
杨晓维
王典浪
陈静
曹鸿
李国艮
刘宁
李东
皮天满
谢正波
龚禹璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qujing Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Qujing Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qujing Bureau of Extra High Voltage Power Transmission Co filed Critical Qujing Bureau of Extra High Voltage Power Transmission Co
Priority to CN201610963202.5A priority Critical patent/CN106545513B/en
Publication of CN106545513A publication Critical patent/CN106545513A/en
Application granted granted Critical
Publication of CN106545513B publication Critical patent/CN106545513B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/008Stop safety or alarm devices, e.g. stop-and-go control; Disposition of check-valves

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Programmable Controllers (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

A kind of change of current cooler control method proposed by the present invention, change of current cooler are applied in one-tower double-circuit DC transmission system, and one-tower double-circuit DC transmission system includes PLC control modules, and this method includes:Judge that the change of current becomes default fault condition whether occur;If so, the control command for representing excision cooler is then sent to cooler;And then detect the control command whether cooler receives excision cooler;Differential unblock button is triggered according to first scheduled time if control command is received;Differential unblock button is triggered according to second scheduled time, cooler automatic start on the spot is controlled by PLC control modules.Then the present invention realizes different control logics, meets the requirement that the change of current in one-tower double-circuit DC transmission system becomes cooling performance by judging that the change of current becomes default fault condition whether occur.

Description

A kind of change of current cooler control method
Technical field
The present invention relates to electric power energy field, more particularly to a kind of change of current cooler control method.
Background technology
The country ± 500kV current conversion stations change of current cooler wind turbine uses PLC frequency control mostly at present, by by transformer The analog quantitys such as oil temperature, bypass temperature and load current are converted into digital quantity input PLC logical programs, this series analog amount is passed through 4-20mA current signals will be exported after the processing of logical program to frequency conversion fan, frequency conversion fan can control after receiving current signal Rotation speed of fan is maintained at zone of reasonableness class, can meet the requirement of transformer cooler cooling performance and appropriate energy saving.
Domestic change of current cooler air cooler control system logical program control is mainly controlled using PLC logical programs, but by There is special performance requirement in super-pressure, bulk power grid, long range systems exchange rheology cooling system, in addition domestic direct current now The cooling performance of transmission system mode diversification exchange rheology also not to the utmost, such as:In multi-terminal direct current transmission system, back-to-back Cooler performance is different from DC transmission system, one-tower double-circuit DC transmission system, flexible direct current power transmission system, but Often copied slavishly during redesign, used PLC program in conventional DC transmission engineering is read according to the copy for new In DC transmission system, this will cause the change of current to become cooling performance cannot meet the requirements to a certain extent.
The content of the invention
Embodiments of the present invention are intended at least solve one of technical problem existing in the prior art.It is for this reason, of the invention Embodiment need to provide a kind of change of current cooler control method.
A kind of change of current cooler control method proposed by the present invention, the change of current cooler are applied straight in common-tower double-return Flow in transmission system, the one-tower double-circuit DC transmission system includes PLC control modules, the new change of current cooler controlling party Method comprises the following steps:
Judge that the change of current becomes default fault condition whether occur;
If the determination result is YES, then the control command for representing excision cooler is sent to cooler;
Whether detection cooler receives the control command of excision cooler;
If cooler receives the control command of excision cooler, pressed according to the differential unlock of first scheduled time triggering Button;
Differential unblock button is triggered according to second scheduled time, controls cooler to open automatically on the spot by PLC control modules It is dynamic.
A kind of change of current cooler control method of embodiment of the present invention, by judging it is default whether change of current change occurs Fault condition, then realizes different control logics, and cooler control is cut off after specially breaking down, then passes through differential solution Lock realizes involution differential wave, the control program in PLC control modules is finally realized that automatic start cools down into ready state The result of device.
The advantages of additional aspect of the present invention, will be set forth in part in the description, and will partly become from the following description Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
The above-mentioned and/or additional aspect and advantage of embodiments of the present invention are from accompanying drawings below is combined to embodiment It will be apparent and be readily appreciated that in description, wherein:
Fig. 1 is a kind of flow diagram of change of current cooler control method of embodiment of the present invention;
Fig. 2 is a kind of PLC control schematic diagrams of change of current cooler control method of embodiment of the present invention;
Fig. 3 is that automatic mold on the spot is realized in a kind of PLC controls of change of current cooler control method of embodiment of the present invention Formula schematic diagram;
Fig. 4 is that automatic mold on the spot is realized in a kind of PLC controls of change of current cooler control method of embodiment of the present invention Start the schematic diagram of wind turbine after formula;
Fig. 5 be a kind of change of current cooler control method of embodiment of the present invention PLC control in wind turbine operate show It is intended to;
Fig. 6 is that wind turbine operates again during a kind of PLC of change of current cooler control method of embodiment of the present invention is controlled One width schematic diagram.
Embodiment
Embodiments of the present invention are described below in detail, the example of embodiment is shown in the drawings, wherein identical or class As label represent same or similar element from beginning to end or there is same or like element.Below with reference to attached The embodiment of figure description is exemplary, and can only be used to explain embodiments of the present invention, and it is not intended that to the present invention Embodiment limitation.
What one-tower double-circuit DC transmission system referred to be exactly twice DC line wiring on the same tower, change of current valve group built with location it is straight Flow power transmission engineering;Have the characteristics that many different from conventional single time DC engineering:Both ends current conversion station two returns direct current with location construction, nothing Work(compensation coordinates the unified configuration of control by twice direct currents, stand in change of current valve group be adjacently positioned, twice direct current leads share one and connect Earth polar, and twice DC power transmission line wiring on the same tower etc..
Separated under decoupled mode there may be receiving end and sending end individually with string with main grid structure, system will automatically exit from The functions such as damping control, more direct current coordinated control functions, subsynchronous oscillation damping.
Under both the above situation, have larger fluctuation to direct current station power use system, once DC DC station electro-mechanical wave compared with Big or loss, will cause the PLC logical programs by direct current control to turn cold there are larger unstability so as to influence the change of current But the control of device.
Patent of the present invention is mainly improved and innovated on original a whole set of logical program, for original change of current Deficiency in cooler control logic carries out regrouping PLC logical programs.
A kind of referring to Fig. 1, change of current cooler control method of embodiment of the present invention.In this embodiment, with Exemplified by one-tower double-circuit DC transmission system is as the execution object of step, hereinafter referred transmission system.
In the change of current cooler control method, change of current cooler is applied in one-tower double-circuit DC transmission system, together Tower double back DC transmission system includes PLC control modules, i.e., the PLC logical programs of direct current control are realized by the module, when So, transmission system also includes other modules, and details are not described herein.The change of current cooler control method comprises the following steps:
Step 1, judge that the change of current becomes default fault condition whether occur.Operation personnel can pass through the prison to transmission system Control, obtains the working status that the change of current becomes.When the change of current becomes the default fault condition of appearance, 2 are entered step.
Step 2, if the determination result is YES, then the control command for representing excision cooler is sent to cooler.When transmission of electricity is System judges that the change of current becomes the default fault condition of appearance, then is by sending form to cooler, control command of control command Represent excision cooler control command, it is ensured that trouble point will not rapid dispersion to elsewhere.
Step 3, whether detection cooler receives the control command of excision cooler.Transmission system further determines that cooling Whether device receives the control command of excision cooler, that is, determines whether the control command of excision cooler, subsequently into Step 4.
Step 4, if cooler receives the control command of excision cooler, differential solution is triggered according to first scheduled time Lock button.The operation personnel of transmission system can preset a time, such as 150ms is going out as first scheduled time After now cutting off the control command of cooler, transmission system can realize that involution is poor by the triggering 150ms of differential unblock button Signal is moved, the program in PLC control modules can enter ready state at this time.It is specific as shown in Figure 2.
Step 5, differential unblock button is triggered according to second scheduled time, cooler is controlled on the spot by PLC control modules Automatic start.The operation personnel of transmission system can reset a time in advance, such as 5s is pressed as second scheduled time Live in differential unblock button 5s, the function of automatic start on the spot is realized by PLC control modules control cooler.It is specific such as Fig. 3 and Shown in Fig. 4.
It is used for Novel DC with all reading according to the copy for the conventional used PLC program of direct current power transmission engineering in the prior art In transmission system, this will cause the change of current to become cooling performance cannot meet the requirements to a certain extent.The solution of the present invention passes through Judge that the change of current becomes default fault condition whether occur, then realize different control logics, cut off after specially breaking down Cooler controls, and then realizes involution differential wave by differential unlock, enters the control program in PLC control modules and prepares State finally realizes the result of automatic start cooler.
Wherein, in certain embodiments, default fault condition breaks down including inverter inside, i.e., transmission system connects Receive and represent that the change of current becomes internal the first instruction broken down.
Wherein, in certain embodiments, default fault condition includes relay protection switch drive experiments, i.e. transmission system Receive the second instruction for representing relay protection switch drive experiments.
Wherein, in certain embodiments, default fault condition includes change of current transformer differential protection misoperation, i.e. transmission system Receive the 3rd instruction for representing change of current transformer differential protection misoperation.
Embodiment 2:
In the logical program of the PLC control modules of transmission system, whole group cooler is stopped transport during failure in order to prevent, is cancelled Traditional working group, spare group, the setting of the function such as assisted group, by the way of four groups of coolers start at the same time, ran Cheng Zhong, simply wind turbine rotational frequency is in different size, and so dependence mutual between difference wind turbines will become less, be conducive to cold But the stability of device, but the requirement higher to PLC logical programs.On the basis of embodiment 1, the change of current proposed by the present invention turns cold But device control method, except the step 1 comprising embodiment 1 to step 5, change of current cooler control method is further comprising the steps of:
Whether the temperature contact for judging to detect is below default level-one temperature contact;
If the temperature detected, below default level-one temperature contact, control cooler makes wind turbine with first frequency Speed is run.
The temperature of detection includes oil surface temperature or winding temperature.Operation personnel can pre-set level-one in transmission system Temperature contact and wind turbine rotational frequency are 10%, can be the level-one temperature that oil surface temperature corresponds to an oil surface temperature specifically Contact is spent, winding temperature corresponds to the level-one temperature contact of winding temperature.
, can be by detecting pasta when four groups of coolers start at the same time by taking transmission system includes four groups of coolers as an example Temperature or winding temperature, and then the temperature contact that detects is judged whether below default level-one temperature contact, if detecting Temperature below default level-one temperature contact, then control cooler wind turbine is run with 10% speed of minimum speed. It is specific as shown in Figure 5.
It is preferred that on the basis of embodiment 2, change of current cooler control method is further comprising the steps of:
Whether the temperature for judging to detect reaches default two level temperature contact;
If the temperature detected reaches default two level temperature contact, control cooler makes wind turbine with the speed of second frequency Degree operation;
Wherein, level-one temperature contact is less than two level temperature contact.
The temperature of detection includes oil surface temperature or winding temperature.Operation personnel can pre-set two level in transmission system Temperature contact and wind turbine rotational frequency are 20%, can be the two level temperature that oil surface temperature corresponds to an oil surface temperature specifically Contact is spent, winding temperature corresponds to the two level temperature contact of winding temperature.For example, when oil surface temperature is higher than 45 DEG C or winding temperature is high In 60 DEG C, then cooler is controlled wind turbine is run with the speed of 20% frequency.
It is preferred that control cooler makes wind turbine with further comprising the steps of after the speed operation of second frequency:
Acquisition and the electric current of more current valve side and the electric current of net side, it is the first side to determine the big side of electric current;
Control cooler makes wind turbine be run according to first side Real-time frequency conversion.
For example, when oil surface temperature is higher than 45 DEG C or winding temperature is higher than 60 DEG C, then control cooler makes wind turbine with 20% The speed operation of frequency, rear fan run according to larger load Real-time frequency conversion in transmission system valve side or net side, judge a certain Can then be compared when whether side is larger load using electric current.It is specific as shown in Figure 5.
It is preferred that transmission system can continue to detect corresponding temperature, the change of current cooler control method further include with Lower step:
Whether the temperature for judging to detect reaches default three-level temperature contact;
If the temperature detected reaches default three-level temperature contact, control cooler makes wind turbine with the speed of the 3rd frequency Degree operation;
Wherein, two level temperature contact is less than three-level temperature contact.
The temperature of detection includes oil surface temperature or winding temperature.Operation personnel can pre-set two level in transmission system Temperature contact and wind turbine rotational frequency are 40%, can be the three-level temperature that oil surface temperature corresponds to an oil surface temperature specifically Contact is spent, winding temperature corresponds to the three-level temperature contact of winding temperature.For example, when oil surface temperature is higher than 60 DEG C or winding temperature is high In 70 DEG C, then cooler is controlled wind turbine is run with the speed of 40% frequency.
It is preferred that control cooler makes wind turbine with further comprising the steps of after the speed operation of second frequency:
Acquisition and the electric current of more current valve side and the electric current of net side, it is the second side to determine the big side of electric current;
Control cooler makes wind turbine be run according to second side Real-time frequency conversion.
For example, when oil surface temperature is higher than 60 DEG C or winding temperature is higher than 70 DEG C, then control cooler makes wind turbine with 40% The speed operation of frequency, rear fan run according to larger load Real-time frequency conversion in transmission system valve side or net side, judge a certain Can then be compared when whether side is larger load using electric current.It is specific as shown in Figure 6.
Wherein, which is applicable to the normal operation mode of one-tower double-circuit DC transmission system Or islet operation pattern.
In the description of embodiments of the present invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length Degree ", " width ", " thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom ", " interior ", The orientation or position relationship of the instruction such as " outer ", " clockwise ", " counterclockwise " are based on orientation shown in the drawings or position relationship, only It is to be described for the ease of description embodiments of the present invention with simplified, rather than indicates or imply that the device of meaning or element are necessary With specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to embodiments of the present invention. In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance or implicit Indicate the quantity of indicated technical characteristic.Thus, " first " is defined, the feature of " second " can be expressed or impliedly wrap Include one or more feature.In the description of embodiments of the present invention, " multiple " are meant that two or two More than, unless otherwise specifically defined.
, it is necessary to illustrate in the description of embodiments of the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can mechanically connect or be electrically connected or can mutually communicate;It can be directly connected, can also lead to Cross intermediary to be indirectly connected, can be the interaction relationship of connection inside two elements or two elements.For ability For the those of ordinary skill in domain, it can understand that above-mentioned term in embodiments of the present invention specific contains as the case may be Justice.
In embodiments of the present invention, unless otherwise clearly defined and limited, fisrt feature second feature it " on " or it " under " can directly be contacted including the first and second features, it is not directly to connect that can also include the first and second features Touch but pass through the other characterisation contact between them.Moreover, fisrt feature second feature " on ", " top " and " on Face " includes fisrt feature directly over second feature and oblique upper, or to be merely representative of fisrt feature level height special higher than second Sign.Fisrt feature second feature " under ", " lower section " and " below " include fisrt feature immediately below second feature and obliquely downward Side, or be merely representative of fisrt feature level height and be less than second feature.
Following disclosure provides many different embodiments or example is used for realizing embodiments of the present invention not Same structure.In order to simplify the disclosure of embodiments of the present invention, hereinafter the component and setting of specific examples are described.When So, they are merely examples, and is not intended to limit the present invention.In addition, embodiments of the present invention can be in different examples Repeat reference numerals and/or reference letter in son, this repetition are for purposes of simplicity and clarity, itself not indicate to be begged for By the relation between various embodiments and/or setting.In addition, the various specific techniques that embodiments of the present invention provide With the example of material, but application and/or other materials those of ordinary skill in the art may realize that other techniques makes With.
In the description of this specification, reference term " embodiment ", " some embodiments ", " schematically implementation The description of mode ", " example ", " specific example " or " some examples " etc. means the tool with reference to the embodiment or example description Body characteristics, structure, material or feature are contained at least one embodiment or example of the present invention.In the present specification, Schematic expression of the above terms is not necessarily referring to identical embodiment or example.Moreover, the specific features of description, knot Structure, material or feature can combine in an appropriate manner in any one or more embodiments or example.
Any process or method described otherwise above description in flow chart or herein is construed as, and represents to include Module, fragment or the portion of the code of the executable instruction of one or more the step of being used for realization specific logical function or process Point, and the scope of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable Sequence, including according to involved function by it is basic at the same time in the way of or in the opposite order, carry out perform function, this should be of the invention Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system including the system of processing module or other can be from instruction The system of execution system, device or equipment instruction fetch and execute instruction) use, or combine these instruction execution systems, device or Equipment and use.For the purpose of this specification, " computer-readable medium " can be it is any can include, store, communicating, propagating or Transmission program uses for instruction execution system, device or equipment or with reference to these instruction execution systems, device or equipment Device.The more specifically example (non-exhaustive list) of computer-readable medium includes following:With one or more wiring Electrical connection section (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only storage (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device, and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable Medium, because can be for example by carrying out optical scanner to paper or other media, then into edlin, interpretation or if necessary with it His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each several part of embodiments of the present invention can be with hardware, software, firmware or combinations thereof come real It is existing.In the above-described embodiment, multiple steps or method can use storage in memory and by suitable instruction execution system The software or firmware of execution is realized.If for example, being realized with hardware, with another embodiment, ability can be used Any one of following technology known to domain or their combination are realized:With for realizing logic function to data-signal The discrete logic of logic gates, has the application-specific integrated circuit of suitable combinational logic gate circuit, programmable gate array (PGA), field programmable gate array (FPGA) etc..
Those skilled in the art are appreciated that to realize all or part of step that above-described embodiment method carries Suddenly it is that relevant hardware can be instructed to complete by program, the program can be stored in a kind of computer-readable storage medium In matter, the program upon execution, including one or a combination set of the step of embodiment of the method.
In addition, each functional unit in various embodiments of the present invention can be integrated in a processing module, also may be used To be that unit is individually physically present, can also two or more units be integrated in a module.It is above-mentioned integrated Module can both be realized in the form of hardware, can also be realized in the form of software function module.The integrated module If realized in the form of software function module and as independent production marketing or in use, a calculating can also be stored in In machine read/write memory medium.
Storage medium mentioned above can be read-only storage, disk or CD etc..
Although the embodiment of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is impossible to limitation of the present invention is interpreted as, those of ordinary skill in the art within the scope of the invention can be to above-mentioned Embodiment is changed, changes, replacing and modification.

Claims (10)

1. a kind of change of current cooler control method, it is characterised in that the change of current cooler is applied in common-tower double-return direct current In transmission system, the one-tower double-circuit DC transmission system includes PLC control modules, the new change of current cooler control method Comprise the following steps:
Judge that the change of current becomes default fault condition whether occur;
If the determination result is YES, then the control command for representing excision cooler is sent to cooler;
Whether detection cooler receives the control command of excision cooler;
If cooler receives the control command of excision cooler, differential unblock button is triggered according to first scheduled time;
Differential unblock button is triggered according to second scheduled time, cooler automatic start on the spot is controlled by PLC control modules.
2. change of current cooler control method as claimed in claim 1, it is characterised in that the default fault condition includes Receive and represent that the change of current becomes internal the first instruction broken down.
3. change of current cooler control method as claimed in claim 1, it is characterised in that the default fault condition includes Receive the second instruction for representing relay protection switch drive experiments.
4. change of current cooler control method as claimed in claim 1, it is characterised in that the default fault condition includes Receive the 3rd instruction for representing change of current transformer differential protection misoperation.
5. the change of current cooler control method as described in any one in Claims 1-4, it is characterised in that described new Change of current cooler control method is further comprising the steps of:
Whether the temperature contact for judging to detect is below default level-one temperature contact;
If the temperature detected, below default level-one temperature contact, control cooler makes wind turbine with the speed of first frequency Operation.
6. change of current cooler control method as claimed in claim 5, it is characterised in that the new change of current cooler control Method processed is further comprising the steps of:
Whether the temperature for judging to detect reaches default two level temperature contact;
If the temperature detected reaches default two level temperature contact, control cooler makes wind turbine be transported with the speed of second frequency OK;
Wherein, level-one temperature contact is less than two level temperature contact.
7. change of current cooler control method as claimed in claim 6, it is characterised in that it is described control cooler make wind turbine with It is further comprising the steps of after the speed operation of second frequency:
Acquisition and the electric current of more current valve side and the electric current of net side, it is the first side to determine the big side of electric current;
Control cooler makes wind turbine be run according to first side Real-time frequency conversion.
8. change of current cooler control method as claimed in claims 6 or 7, it is characterised in that the new change of current becomes cooling Device control method is further comprising the steps of:
Whether the temperature for judging to detect reaches default three-level temperature contact;
If the temperature detected reaches default three-level temperature contact, control cooler makes wind turbine be transported with the speed of the 3rd frequency OK;
Wherein, two level temperature contact is less than three-level temperature contact.
9. change of current cooler control method as claimed in claim 8, it is characterised in that it is described control cooler make wind turbine with It is further comprising the steps of after the speed operation of second frequency:
Acquisition and the electric current of more current valve side and the electric current of net side, it is the second side to determine the big side of electric current;
Control cooler makes wind turbine be run according to second side Real-time frequency conversion.
10. change of current cooler control method as claimed in claim 9, it is characterised in that the new change of current cooler control Method processed is applicable to the normal operation mode or islet operation pattern of one-tower double-circuit DC transmission system.
CN201610963202.5A 2016-11-04 2016-11-04 A kind of change of current cooler control method Active CN106545513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610963202.5A CN106545513B (en) 2016-11-04 2016-11-04 A kind of change of current cooler control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610963202.5A CN106545513B (en) 2016-11-04 2016-11-04 A kind of change of current cooler control method

Publications (2)

Publication Number Publication Date
CN106545513A CN106545513A (en) 2017-03-29
CN106545513B true CN106545513B (en) 2018-05-11

Family

ID=58394202

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610963202.5A Active CN106545513B (en) 2016-11-04 2016-11-04 A kind of change of current cooler control method

Country Status (1)

Country Link
CN (1) CN106545513B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110957109A (en) * 2019-11-25 2020-04-03 国网四川省电力公司广安供电公司 Oil-immersed self-cooling transformer cooling system
CN117177546A (en) * 2023-11-02 2023-12-05 海门市飞鹭制冷设备有限公司 Intelligent control system of cooling fan

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5748209A (en) * 1980-09-05 1982-03-19 Hitachi Ltd Control method for operation of transformer
JP4438533B2 (en) * 2004-06-30 2010-03-24 株式会社ダイヘン Fan control method for cooling device for indoor installation transformer
KR20130049026A (en) * 2011-11-03 2013-05-13 주식회사 포스코 Apparatus for controling linkage of transformer load and method thereof
CN103324130B (en) * 2012-04-26 2016-01-20 山东电力集团公司青岛供电公司 A kind of transformer intelligent air-cooling energy-saving and frequency-variable method
CN205122373U (en) * 2015-09-17 2016-03-30 国网山东烟台市牟平区供电公司 Power transformer
CN205644199U (en) * 2015-11-25 2016-10-12 中国南方电网有限责任公司超高压输电公司曲靖局 Distributing type frequency conversion fan intelligent monitoring system

Also Published As

Publication number Publication date
CN106545513A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
Wang et al. Service restoration based on AMI and networked MGs under extreme weather events
CN106471704A (en) Uninterrupted power supply(ups)
Alam et al. Protection coordination for networked microgrids using single and dual setting overcurrent relays
CN102411117A (en) Method for positioning short-circuit fault of distribution network based on distributed intelligent multi-calibration
CN106545513B (en) A kind of change of current cooler control method
CN211183525U (en) AC/DC integrated UPS
CN105896490A (en) Fault processing method and device of power distribution network
CN102157213B (en) Method and system of digital overall running program for nuclear power unit
CN105870893A (en) Protection configuration method for micro-grid group
CN110445170A (en) A kind of active power and frequency control method and system of the soft direct join net of marine wind electric field
Patil et al. Voltage stability assessment of grid connected solar pv system
CN110445171A (en) A kind of active power and frequency control method and system based on the soft lineal system of marine wind electric field
Joshi et al. Application of IoT in Indian power system
Peng et al. Envisioning the Future Renewable and Resilient Energy Grids–A Power Grid Revolution Enabled by Renewables, Energy Storage, and Energy Electronics
Bakhshi et al. Passive anti-islanding scheme based on reactive power in the smart grids
KR102008150B1 (en) Decentralized power control apparatus
CN106523041B (en) A kind of steam turbine differential expansion Protection control system
Invernizzi et al. Challenges in microgrid control systems design. An application case
CN103696955B (en) A kind of circulating water pump exit butterfly valve control system and method
CN203655590U (en) System for controlling outlet butterfly valve of circulating water pump
Hajizadeh et al. Service restoration framework for distribution networks incorporating switching crew routing
Hemmati et al. Multifunctional scheme for frequency/voltage/stability control in HVDC line under concurrent cyber‐attacks and faults
Sanjeevikumar et al. Power Electronics in Smart Grid
Alavi‐Koosha et al. A multi‐area design of under frequency load shedding schemes considering energy storage system
Gu et al. Research on the load transfer strategy of smart distribution grid considering the important power customers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant