CN106545170A - Rod member hoisting method - Google Patents

Rod member hoisting method Download PDF

Info

Publication number
CN106545170A
CN106545170A CN201510603321.5A CN201510603321A CN106545170A CN 106545170 A CN106545170 A CN 106545170A CN 201510603321 A CN201510603321 A CN 201510603321A CN 106545170 A CN106545170 A CN 106545170A
Authority
CN
China
Prior art keywords
auxiliary
lifting rope
suspension centre
main
rod member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510603321.5A
Other languages
Chinese (zh)
Other versions
CN106545170B (en
Inventor
魏明明
刘佳
贾雷刚
陈建兵
陈柳花
倪文全
徐桂平
蒋海里
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Group Road Engineering Co Ltd
Shanghai Road and Bridge Group Co Ltd
Original Assignee
Shanghai Urban Construction Group Road Engineering Co Ltd
Shanghai Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Group Road Engineering Co Ltd, Shanghai Road and Bridge Group Co Ltd filed Critical Shanghai Urban Construction Group Road Engineering Co Ltd
Priority to CN201510603321.5A priority Critical patent/CN106545170B/en
Publication of CN106545170A publication Critical patent/CN106545170A/en
Application granted granted Critical
Publication of CN106545170B publication Critical patent/CN106545170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of rod member hoisting method, which comprises the steps:S1:Main suspension centre is set in one end of rod member, the first auxiliary suspension centre, the second auxiliary suspension centre, the 3rd auxiliary suspension centre are respectively provided with the 1/4 of rod length, at 1/2, at 3/4;S2:A fixed pulley is installed on the second auxiliary suspension centre;S3:One end of main lifting rope is connected with boom hoisting, and the other end of main lifting rope is connected with main suspension centre;S4:One end of auxiliary lifting rope is connected with movable pulley device;S5:One end of connecting rope is connected with the first auxiliary suspension centre, and the other end of connecting rope is connected with the 3rd auxiliary suspension centre after sequentially passing through movable pulley device, fixed pulley;S6:Main lifting rope, auxiliary lifting rope motion certain altitude upwards;S7:Main lifting rope is continued up, and auxiliary lifting rope is moved downward;S8:After rod member is adjusted to required position, main lifting rope, auxiliary lifting rope stop motion.The present invention has the advantages that to prevent rod member from rupturing.

Description

Rod member hoisting method
Technical field
The present invention relates to a kind of rod member hoisting method.
Background technology
In engineering construction, the rod length lifted by crane is needed constantly to increase, such as steel reinforcement cage needs basis Design requirement connects into the whole section liftings of 24m, and such as 50m steel-pipe piles need joint length integrally to squeeze into soil Body.But, after rod length increases, when rod member is transformed to vertical state by horizontality, it is susceptible to As the weight of rod member itself causes unbalance stress between suspension centre and suspension centre, rod member therefrom between the safe thing that ruptures Therefore;Or component, in transition state, amplitude of fluctuation is excessive, and then cause the safety that crane gear topples Accident.
The content of the invention
The technical problem to be solved in the present invention is that rod member each several part unbalance stress during lifting easily breaks Split or problem that amplitude of fluctuation is excessive, there is provided a kind of rod member hoisting method.
The present invention is solving above-mentioned technical problem by following technical proposals:
A kind of rod member hoisting method, its feature are which comprises the steps:
S1:Main suspension centre is set in one end of rod member, is rod length in the distance with the main suspension centre The first auxiliary suspension centre, the second auxiliary suspension centre, the 3rd auxiliary hanging are respectively provided with 1/4, at 1/2, at 3/4 Point;
S2:A fixed pulley is installed on the second auxiliary suspension centre;
S3:One end of main lifting rope is connected with boom hoisting, and the other end of main lifting rope is connected with main suspension centre;
S4:One end of auxiliary lifting rope is connected with movable pulley device;
S5:One end of connecting rope is connected with the first auxiliary suspension centre, and the other end of connecting rope sequentially passes through dynamic cunning It is connected with the 3rd auxiliary suspension centre after wheel apparatus, fixed pulley;
S6:Main lifting rope, the synchronous motion certain altitude upwards of auxiliary lifting rope;
S7:Main lifting rope is continued up, and auxiliary lifting rope is moved downward;
S8:After rod member is adjusted to required position, main lifting rope, auxiliary lifting rope stop motion.It is logical Cross and main suspension centre, auxiliary suspension centre be set on rod member so that rod member during lifting, stress than more uniform, Avoid rod member that fracture or the excessive problem for causing crane gear to topple of the rod member amplitude of oscillation occur.
It is preferred that the main suspension centre includes symmetrically arranged a pair main suspension centre retainer rings.By arranging a pair Main suspension centre retainer ring so that one end stress of rod member is than more uniform, it is to avoid can be partial in rod member moving process Side.
It is preferred that the two ends of a connecting rod are connected with main suspension centre retainer ring described in two respectively, the main lifting rope The other end be connected with the connecting rod.
It is preferred that on the first auxiliary suspension centre, the second auxiliary suspension centre, the 3rd auxiliary suspension centre It is respectively provided with an auxiliary hanging point retainer ring.
It is preferred that the movable pulley device is rack block group.
It is preferred that the main lifting rope, the auxiliary lifting rope are steel wire rope.
It is preferred that after step s8, following steps are carried out:
S9:Main lifting rope, auxiliary lifting rope are synchronously moved downward.Enter rod member by the step suitable In position, the such as soil body.
The present invention positive effect be:By main suspension centre and auxiliary suspension centre are arranged on rod member, and Using devices such as pulleys so that rod member stress during lifting, than more uniform, will not occur asking for fracture Topic.
Description of the drawings
Fig. 1 is connection diagram between the part of the rod member hoisting method of the embodiment of the present invention 1.
Flow charts of the Fig. 2 for the rod member hoisting method of the embodiment of the present invention 1.
Rod member 1
Main suspension centre retainer ring 2
Auxiliary hanging point retainer ring 3,4,5
Main lifting rope 6
Connecting rope 7
Fixed pulley 8
Rack block group 9
Auxiliary lifting rope 10
Connecting rod 11
Specific embodiment
The present invention is further illustrated below by the mode of embodiment, but is not therefore limited the present invention to Among described scope of embodiments.
Embodiment 1
Understood incorporated by reference to body Fig. 1-2, a kind of rod member hoisting method, which comprises the steps:
S1:Main suspension centre is set in one end of rod member 1, the main suspension centre includes a pair symmetrically arranged main suspension centres Retainer ring 2, arranges auxiliary on the first auxiliary suspension centre at 1/4 that the distance with main suspension centre is rod length Suspension centre retainer ring 3 is helped, the distance with main suspension centre is that second at the 1/2 of rod length aids in setting on suspension centre Auxiliary hanging point retainer ring 4 is put, the distance with main suspension centre is the 3rd auxiliary suspension centre at the 3/4 of rod length Upper setting auxiliary hanging point retainer ring 5;
S2:A fixed pulley 8 is installed in auxiliary hanging point retainer ring 4;
S3:Connecting rod 11 is for realizing the connection between main lifting rope 6 and main suspension centre retainer ring 2, even Bar 11 is connected with the other end of main lifting rope 6, one end of main lifting rope 6 be used for lift connecting rod 11 Boom hoisting connects, and the two ends of connecting rod 11 are connected with two main suspension centre retainer rings 2 respectively;
S4:One end of auxiliary lifting rope 10 is connected with rack block group 9;
S5:One end of connecting rope 7 is connected with auxiliary hanging point retainer ring 3, then by the another of connecting rope 7 End aids in the auxiliary hanging point retainer ring on suspension centre with the 3rd after sequentially passing through rack block group 9, fixed pulley 8 5 connections;
S6:Main lifting rope 6,10 synchronous motion certain altitude upwards of auxiliary lifting rope;
S7:Main lifting rope 6 is continued up, and auxiliary lifting rope 10 is moved downward.In motor process, Connecting rope 7 adjusts the distance of connection auxiliary hanging point retainer ring 3,4,5 by rack block group 9, until Rod member 1 is adjusted to the position for needing completely by horizontality;
S8:After rod member 1 is adjusted to required position, main lifting rope 6, auxiliary lifting rope 10 stop Motion;
S9:Main lifting rope 6, auxiliary lifting rope 10 are synchronously moved downward, and make rod member 1 be put into suitable position Put, in the such as soil body.
Embodiment 2
The other parts of the present embodiment are same as Example 1, and which is characterized in that, main lifting rope 6, Auxiliary lifting rope 10 is steel wire rope.
Although the foregoing describing the specific embodiment of the present invention, those skilled in the art should manage Solution, these are merely illustrative of, and protection scope of the present invention is defined by the appended claims.This The technical staff in field, can be to these embodiment party on the premise of the principle and essence without departing substantially from the present invention Formula makes various changes or modifications, but these changes and modification each fall within protection scope of the present invention.

Claims (7)

1. a kind of rod member hoisting method, it is characterised in which comprises the steps:
S1:Main suspension centre is set in one end of rod member, is rod length in the distance with the main suspension centre The first auxiliary suspension centre, the second auxiliary suspension centre, the 3rd auxiliary hanging are respectively provided with 1/4, at 1/2, at 3/4 Point;
S2:A fixed pulley is installed on the second auxiliary suspension centre;
S3:One end of main lifting rope is connected with boom hoisting, and the other end of main lifting rope is connected with main suspension centre;
S4:One end of auxiliary lifting rope is connected with movable pulley device;
S5:One end of connecting rope is connected with the first auxiliary suspension centre, and the other end of connecting rope sequentially passes through dynamic cunning It is connected with the 3rd auxiliary suspension centre after wheel apparatus, fixed pulley;
S6:Main lifting rope, the synchronous motion certain altitude upwards of auxiliary lifting rope;
S7:Main lifting rope is continued up, and auxiliary lifting rope is moved downward;
S8:After rod member is adjusted to required position, main lifting rope, auxiliary lifting rope stop motion.
2. rod member hoisting method as claimed in claim 1, it is characterised in that the main suspension centre includes Symmetrically arranged a pair main suspension centre retainer rings.
3. rod member hoisting method as claimed in claim 2, it is characterised in that the two ends of a connecting rod point It is not connected with main suspension centre retainer ring described in two, the other end of the main lifting rope is connected with the connecting rod.
4. rod member hoisting method as claimed in claim 1, it is characterised in that first auxiliary hanging An auxiliary hanging point retainer ring is respectively provided with point, the second auxiliary suspension centre, the 3rd auxiliary suspension centre.
5. rod member hoisting method as claimed in claim 1, it is characterised in that the movable pulley device For rack block group.
6. rod member hoisting method as claimed in claim 1, it is characterised in that the main lifting rope, The auxiliary lifting rope is steel wire rope.
7. rod member hoisting method as claimed in claim 1, it is characterised in that after step s8, Carry out following steps:
S9:Main lifting rope, auxiliary lifting rope are synchronously moved downward.
CN201510603321.5A 2015-09-21 2015-09-21 Rod piece hoisting method Active CN106545170B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510603321.5A CN106545170B (en) 2015-09-21 2015-09-21 Rod piece hoisting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510603321.5A CN106545170B (en) 2015-09-21 2015-09-21 Rod piece hoisting method

Publications (2)

Publication Number Publication Date
CN106545170A true CN106545170A (en) 2017-03-29
CN106545170B CN106545170B (en) 2019-03-19

Family

ID=58365137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510603321.5A Active CN106545170B (en) 2015-09-21 2015-09-21 Rod piece hoisting method

Country Status (1)

Country Link
CN (1) CN106545170B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979164A (en) * 2017-05-31 2018-12-11 五冶集团上海有限公司 A kind of on-site concrete prefabricated post turnover hoisting method
CN113788394A (en) * 2021-08-20 2021-12-14 海洋石油工程股份有限公司 Inclined hoisting method for large-size shallow foundation anti-sinking plate

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1514066A (en) * 2003-05-13 2004-07-21 中铁工程机械研究设计院 Light rail communication PC rail beam conveying and mounting equipment and construction method
JP2012154407A (en) * 2011-01-26 2012-08-16 Chugoku Electric Power Co Inc:The Traction tool and traction apparatus
KR20130055064A (en) * 2011-11-18 2013-05-28 주식회사 이안 Roof cover installing structure of vinyl house
JP2013203530A (en) * 2012-03-29 2013-10-07 Kitagawa Iron Works Co Ltd Compound tackle mechanism of crane
CN203781631U (en) * 2014-04-08 2014-08-20 中石化南京工程有限公司 Sling system for integral slinging of thin-wall equipment
CN204624958U (en) * 2015-04-11 2015-09-09 江苏新扬子造船有限公司 The row of hanging

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1514066A (en) * 2003-05-13 2004-07-21 中铁工程机械研究设计院 Light rail communication PC rail beam conveying and mounting equipment and construction method
JP2012154407A (en) * 2011-01-26 2012-08-16 Chugoku Electric Power Co Inc:The Traction tool and traction apparatus
KR20130055064A (en) * 2011-11-18 2013-05-28 주식회사 이안 Roof cover installing structure of vinyl house
JP2013203530A (en) * 2012-03-29 2013-10-07 Kitagawa Iron Works Co Ltd Compound tackle mechanism of crane
CN203781631U (en) * 2014-04-08 2014-08-20 中石化南京工程有限公司 Sling system for integral slinging of thin-wall equipment
CN204624958U (en) * 2015-04-11 2015-09-09 江苏新扬子造船有限公司 The row of hanging

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979164A (en) * 2017-05-31 2018-12-11 五冶集团上海有限公司 A kind of on-site concrete prefabricated post turnover hoisting method
CN113788394A (en) * 2021-08-20 2021-12-14 海洋石油工程股份有限公司 Inclined hoisting method for large-size shallow foundation anti-sinking plate

Also Published As

Publication number Publication date
CN106545170B (en) 2019-03-19

Similar Documents

Publication Publication Date Title
CN204490312U (en) The upending frame that a kind of suspension switch cabinet moves
CN102190254B (en) Hoisting method for equipment installation in in-between hollow space of multilayer concrete platforms
CN103863938B (en) For carrying the safty hoisting device of wind tunnel experiment car
CN103883129B (en) A kind of steel structural roof beam installation method
CN107988943B (en) Highway height limiting portal frame and height limiting adjusting method thereof
CN108149723A (en) A kind of plumbing device and its correcting method for contrary sequence method low Low Level steel-pipe pile
CN105645248A (en) Reinforcement cage lifting device and method
CN109680568A (en) The linear adjustment equipment of track girder and method
CN104326356A (en) Construction platform hanger with clear stress and adjustable hanging point
CN103397629A (en) Construction method for lifting overlong reinforcement cage by one step
CN103663101A (en) Method for lifting voltage stabilizer of nuclear power station
CN103754800A (en) Crane type multi-directional horizontal-movement multifunctional hydraulic lifting construction method
CN106545170A (en) Rod member hoisting method
CN210825204U (en) High-precision four-hoisting-point synchronous lifting appliance
CN205530228U (en) A well type frame that is used for super large diameter pile steel reinforcement cage of overlength to construct
CN203781631U (en) Sling system for integral slinging of thin-wall equipment
CN102211734A (en) Progressive gravity center stimulation adjustment device
CN206488934U (en) Avoid the Suspension Attachment of Offshore Platform load test stabilization device by face external force
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN106829726A (en) A kind of new equipment safety hanging apparatus and application method without hoisting platform
CN104085832B (en) A kind of method for improving of flexible member lifting device
CN106226101A (en) A kind of folding bridge crane static load test counterweight water bag and suspension bracket
CN105775993A (en) Device for hoisting steel tubes
CN106861882A (en) The method that ball mill has bad luck lifting in building
CN204675597U (en) The lifting auxiliary device of continuous concrete wall steel reinforcement cage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant