CN106544962A - The prestress reinforced construction method of xoncrete structure - Google Patents

The prestress reinforced construction method of xoncrete structure Download PDF

Info

Publication number
CN106544962A
CN106544962A CN201610963502.3A CN201610963502A CN106544962A CN 106544962 A CN106544962 A CN 106544962A CN 201610963502 A CN201610963502 A CN 201610963502A CN 106544962 A CN106544962 A CN 106544962A
Authority
CN
China
Prior art keywords
reinforced
pull bar
xoncrete structure
strut
reel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610963502.3A
Other languages
Chinese (zh)
Other versions
CN106544962B (en
Inventor
李方元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201610963502.3A priority Critical patent/CN106544962B/en
Publication of CN106544962A publication Critical patent/CN106544962A/en
Application granted granted Critical
Publication of CN106544962B publication Critical patent/CN106544962B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of prestress reinforced construction method of xoncrete structure, the adjustment of the pull bar length by being fixed on xoncrete structure to be reinforced, promote two oblique struts to stretch;Strut end winds the CFRP cloth of anchoring on reel and under strut promotion constantly rolls tightly and elongate;CFRP cloth 5 is adjusted to bonding with tack coat invest concrete structural surface to be reinforced by elevation and subsidence regulating device;When tack coat reaches design cohesive force, CFRP cloth is cut off;Remove pull bar, strut, reel and elevation and subsidence regulating device.The method be capable of achieving CFRP cloth material to structure along different directions and position prestress anchoraging.

Description

The prestress reinforced construction method of xoncrete structure
Technical field
The present invention relates to the prestress anchoraging and tension technology in a kind of prestress reinforced construction method of xoncrete structure, The specifically prestress strengthening method of xoncrete structure.
Background technology
With developing rapidly for China's traffic scale, in Bridges in Our Country, 70% or so concrete-bridge enters the excess of imports and bears Lotus service phase, many bridges enter the maintenance and reinforcement phase, and the bridge being on active service in a large number soon also occurs in that damage, causes China The appearance of the more reinforcing maintenance engineering of bridge, equally deposits in this phenomenon Tunnel Engineering in the wild even routine building engineering .
Two at present common to the reinforcement means of concrete-bridge or works class reinforcing modes, one be using dead burning plate, The passive force way of viscous carbon fiber board or fiber cloth is carried out;Two is to adopt prestressing force, and especially external prestressing technique is carried out Active force mode is reinforced.According to the loading characteristic and degree of injury of structure, and the performance after reinforcing is required, using pre- Stress is reinforced, and can recover or even can improve the bearing capacity of structure to a certain extent completely.And adopt dead burning plate and FRP plate or cloth Mode, due to being occur to destroy or the remedial measure that carries out after rigidity changes in structure, thus in performance or Carry force direction and cannot return to original design point.
The content of the invention
It is contemplated that overcoming the defect of prior art, there is provided a kind of prestress strengthening method of xoncrete structure, by Self friction power of the CFRP cloth in winding process overcomes shear action of the intermediate plate anchoring to fiber, and FRP cloth is realized anchoring;Again By the strut and Tiebar structure of integration, the parallel tensioning to cloth material is realized.Then it is pasted on and adds fixing structure surface, you can Realize applying prestressing force effect to structure.
In order to solve above-mentioned technical problem, what the present invention was realized in:
A kind of prestress reinforced construction method of xoncrete structure, it is characterised in that it comprises the steps:
Step one:Drill on xoncrete structure to be reinforced;
Step 2:Pull bar is penetrated in above-mentioned hole, the upper and lower ends of the pull bar are provided with screw thread, and the top of pull bar is stretched out will The xoncrete structure upper surface of reinforcing is in xoncrete structure to be reinforced and fixed, and the bottom of pull bar stretches out to be reinforced Xoncrete structure lower surface, respectively by one end of hinge two struts of oblique connection, two struts lead to for the bottom both sides of pull bar Cross down adjusting nut and be fixed on pull bar bottom;The xoncrete structure two ends bottom to be reinforced is respectively equipped with lift adjustment dress Put, elevation and subsidence regulating device is provided between the xoncrete structure to be reinforced on reel, reel and its top space, two struts The other end connect the center of two reels respectively;
Step 3:CFRP cloth is wound on reel;
Step 4:Adjusting yoke, promotes the oblique two piece strut being connected with pull bar to stretch, while driving two pole points Portion under strut promotion is constantly stretched and is rolled tightly with the CFRP cloth that roll type is anchored;
Step 5:Tack coat is smeared in xoncrete structure lower surface to be reinforced;
Step 6:Elevation and subsidence regulating device is adjusted, the CFRP cloth after stretching is heightened makes which with xoncrete structure to be reinforced The tack coat of lower surface is bonded together;
Step 7:After layer to be bonded reaches adhesion strength, CFRP cloth is cut off at reel and pull bar, strut, reel is removed And elevation and subsidence regulating device.
The prestress reinforced construction method of described xoncrete structure, it is characterised in that:Xoncrete structure to be reinforced cuts When face is low, the top of pull bar is stretched out xoncrete structure upper surface to be reinforced and is fixed by upper adjusting nut;To be reinforced is mixed When Xtah Crude Clay structure is hollow-core construction, the top of pull bar is fixed in xoncrete structure to be reinforced and by upper adjusting nut; When xoncrete structure section to be reinforced is thick, the top of pull bar is in xoncrete structure to be reinforced and by bar planting or anchoring Bolt is fixed.
The prestress reinforced construction method of described xoncrete structure, it is characterised in that:The support of pull bar bottom both sides Bar is arranged using asymmetric.
The invention has the beneficial effects as follows:The method be capable of achieving CFRP cloth material to structure along different directions and position prestressing force Anchoring.By the frictional force transmission pulling force of itself between CFRP fibers, fastening destruction weakness is overcome;Make full use of the soft of CFRP cloth Feature, realizes tensioning by the jacking of itself, so as to realize tensioning and sticking construction integrated construction, has both reduced construction work Sequence, while saving conventional anchoring system, realizes economy efficiently construction method.
This method is applied to bridge, structure, the entirety of tunnel structure or local prestressed reinforcement.Using the anchoring of this patent And method for stretching, with reference to corresponding jacking or tensioning process, the repairing and reinforcing to bridge and other xoncrete structures can be improved and imitated Rate.
Description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is that schematic diagram is reinforced in the anchoring jacking tensioning of CFRP cloth.
Fig. 2 is Fig. 1 penetration tensioning schematic diagrames.
Fig. 3 is Fig. 1 intracavity tensioning schematic diagrames.
Fig. 4 is Fig. 1 anchoring type tensioning schematic diagrames.
Reference:Reinforced structure 1, pull bar 2, strut 3, reel 4, CFRP cloth 5, elevation and subsidence regulating device 6, tack coat 7, Hinge 8, upper adjusting nut 9, lower adjusting nut 10, anchor bolt 11.Specific embodiment
As shown in Figure 1:
A kind of prestress reinforced construction method of xoncrete structure, it comprises the steps:
Step one:Drill on reinforced structure 1;
Step 2:Pull bar 2 is penetrated in above-mentioned hole, the upper and lower ends of the pull bar are provided with screw thread, and the top of pull bar is stretched out Xoncrete structure upper surface to be reinforced is in xoncrete structure to be reinforced and fixed, and the bottom of pull bar is stretched out and will be reinforced Xoncrete structure lower surface, the bottom both sides of pull bar are respectively by one end of two struts 3 of oblique connection of hinge 8, two supports Bar is fixed on pull bar bottom by lower adjusting nut 10;The xoncrete structure two ends bottom to be reinforced is respectively equipped with rising-falling tone Regulating device 6, elevation and subsidence regulating device is provided between the xoncrete structure to be reinforced on reel 4, reel and its top space, and two The other end of root strut connects the center of two reels respectively;
Step 3:CFRP cloth 5 is wound on reel;
Step 4:Adjusting yoke, promotes the oblique two piece strut being connected with pull bar to stretch, while driving two pole points Portion under strut promotion is constantly stretched and is rolled tightly with the CFRP cloth that roll type is anchored;
Step 5:Tack coat 7 is smeared in xoncrete structure lower surface to be reinforced;
Step 6:Elevation and subsidence regulating device is adjusted, the CFRP cloth after stretching is heightened makes which with xoncrete structure to be reinforced The tack coat of lower surface is bonded together;
Step 7:After layer to be bonded reaches adhesion strength, CFRP cloth is cut off at reel and pull bar, strut, reel is removed And elevation and subsidence regulating device.
Shorten the pulling force and strut component force balance feature for producing according to pull bar, arranged using asymmetric, and pull bar Hinge-connection form is adopted with strut point of intersection, CFRP cloth and body structure surface position self adaptation is realized.
As shown in Figure 2:If 1 section of reinforced structure is low, using penetration tension structure, the top of pull bar is stretched out and will be added 1 upper surface of fixing structure is simultaneously fixed by upper adjusting nut 9;
As shown in Figure 3:If reinforced structure 1 is hollow-core construction, the bottom slab stress peace of such as box-shaped beam section, and tension Entirely, intracavity can be adopted;Pull bar penetrates in the middle part of which from 1 bottom up of reinforced structure and is located in reinforced structure 1 and passes through Upper adjusting nut 9 is fixed;
As shown in Figure 4:When xoncrete structure section to be reinforced is thick, the top of pull bar is located in reinforced structure 1 and leads to Cross bar planting or anchor bolt 10 is fixed.
Anchor force is provided by the frictional force of CFRP cloth interlayer itself, pull bar bottom both sides difference is oblique to connect a strut, According to strut and the motor-driven principle of connecting rod, the change of length of connecting rod, realize that strut tip spacing stretches, be inconjunction with strut end to roll up The CFRP cloth of cartridge type anchoring is stretched and is rolled tightly, the spacing of CFRP and ruggedized construction after adjusting stretching, after stretching CFRP cloth is pasted on reinforced structure, when layer to be bonded reaches design strength, is cut CFRP and release pole structure, that is, is realized Prestressed reinforcement to structure.

Claims (3)

1. a kind of prestress reinforced construction method of xoncrete structure, it is characterised in that it comprises the steps:
Step one:Drill on xoncrete structure to be reinforced;
Step 2:Pull bar is penetrated in above-mentioned hole, the upper and lower ends of the pull bar are provided with screw thread, and the top of pull bar is stretched out and will be reinforced Xoncrete structure upper surface or in xoncrete structure to be reinforced and fixed, coagulation to be reinforced is stretched out in the bottom of pull bar Soil structure lower surface, the bottom both sides of pull bar pass through one end of hinge two struts of oblique connection respectively, under two struts pass through Adjusting nut is fixed on pull bar bottom;The xoncrete structure two ends bottom to be reinforced is respectively equipped with elevation and subsidence regulating device, rises Falling tone regulating device is provided between the xoncrete structure to be reinforced on reel, reel and its top space, two struts it is another One end connects the center of two reels respectively;
Step 3:CFRP cloth is wound on reel;
Step 4:Adjusting yoke, promotes the oblique two piece strut that is connected with pull bar to stretch, at the same two strut ends of drive with The CFRP cloth of roll type anchoring under strut promotion is constantly stretched and is rolled tightly;
Step 5:Tack coat is smeared in xoncrete structure lower surface to be reinforced;
Step 6:Elevation and subsidence regulating device is adjusted, the CFRP cloth after stretching is heightened makes which with xoncrete structure following table to be reinforced The tack coat in face is bonded together;
Step 7:After layer to be bonded reaches adhesion strength, CFRP cloth is cut off at reel and pull bar, strut, reel and liter is removed Falling tone regulating device.
2. the prestress reinforced construction method of xoncrete structure according to claim 1, it is characterised in that:To be reinforced is mixed When Xtah Crude Clay structure section is low, the top of pull bar is stretched out xoncrete structure upper surface to be reinforced and is fixed by upper adjusting nut; When xoncrete structure to be reinforced is hollow-core construction, the top of pull bar is in xoncrete structure to be reinforced and by upper regulation Nut is fixed;When xoncrete structure section to be reinforced is thick, the top of pull bar is located in xoncrete structure to be reinforced and passes through Bar planting or anchor bolt are fixed.
3. the prestress reinforced construction method of xoncrete structure according to claim 2, it is characterised in that:Under the pull bar The strut of portion both sides is arranged using asymmetric.
CN201610963502.3A 2016-10-28 2016-10-28 The prestress reinforced construction method of concrete structure Active CN106544962B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610963502.3A CN106544962B (en) 2016-10-28 2016-10-28 The prestress reinforced construction method of concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610963502.3A CN106544962B (en) 2016-10-28 2016-10-28 The prestress reinforced construction method of concrete structure

Publications (2)

Publication Number Publication Date
CN106544962A true CN106544962A (en) 2017-03-29
CN106544962B CN106544962B (en) 2018-07-03

Family

ID=58394411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610963502.3A Active CN106544962B (en) 2016-10-28 2016-10-28 The prestress reinforced construction method of concrete structure

Country Status (1)

Country Link
CN (1) CN106544962B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339457A (en) * 2018-10-29 2019-02-15 东南大学 It is a kind of to be displaced from constraint formula pre-stress FRP sheet material tensioning equipment and its implementation method
CN114135118A (en) * 2021-12-09 2022-03-04 同济大学 FRP prestress monitoring and adjusting device and method capable of realizing intelligent service
CN114809704A (en) * 2022-05-24 2022-07-29 重庆达力索缆科技有限公司 Tightening type external prestress CFRP material reinforcing system and construction method
CN114892549A (en) * 2022-05-24 2022-08-12 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981091B1 (en) * 2009-10-23 2010-09-09 리플래시기술 주식회사 Construction method for repairing/reinforcing concrete structure
CN105064224A (en) * 2015-09-02 2015-11-18 山东大学 Device and method for tensioning and reinforcing double layers of pre-stress carbon fiber sheet at same time
CN105507169A (en) * 2016-01-16 2016-04-20 哈尔滨工业大学 Tensioning and anchoring device for reinforcing reinforced concrete bridge through prestress FRP(fiber reinforced plastic) cloth and reinforcing method
CN205476522U (en) * 2016-03-28 2016-08-17 中国电力工程顾问集团东北电力设计院有限公司 From locking -type prestressing force carbon cloth tensioning equipment
CN105887702A (en) * 2016-04-20 2016-08-24 武汉理工大学 Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981091B1 (en) * 2009-10-23 2010-09-09 리플래시기술 주식회사 Construction method for repairing/reinforcing concrete structure
CN105064224A (en) * 2015-09-02 2015-11-18 山东大学 Device and method for tensioning and reinforcing double layers of pre-stress carbon fiber sheet at same time
CN105507169A (en) * 2016-01-16 2016-04-20 哈尔滨工业大学 Tensioning and anchoring device for reinforcing reinforced concrete bridge through prestress FRP(fiber reinforced plastic) cloth and reinforcing method
CN205476522U (en) * 2016-03-28 2016-08-17 中国电力工程顾问集团东北电力设计院有限公司 From locking -type prestressing force carbon cloth tensioning equipment
CN105887702A (en) * 2016-04-20 2016-08-24 武汉理工大学 Method for reinforcing concrete beam by prestressed carbon fiber plate and steel-concrete

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339457A (en) * 2018-10-29 2019-02-15 东南大学 It is a kind of to be displaced from constraint formula pre-stress FRP sheet material tensioning equipment and its implementation method
CN114135118A (en) * 2021-12-09 2022-03-04 同济大学 FRP prestress monitoring and adjusting device and method capable of realizing intelligent service
CN114135118B (en) * 2021-12-09 2022-08-09 同济大学 FRP prestress monitoring and adjusting device and method capable of realizing intelligent service
CN114809704A (en) * 2022-05-24 2022-07-29 重庆达力索缆科技有限公司 Tightening type external prestress CFRP material reinforcing system and construction method
CN114892549A (en) * 2022-05-24 2022-08-12 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof
CN114809704B (en) * 2022-05-24 2024-01-26 重庆达力索缆科技有限公司 Tightening type external prestress CFRP material reinforcing system and construction method
CN114892549B (en) * 2022-05-24 2024-05-14 重庆达力索缆科技有限公司 Expansion filling type external prestress CFRP material reinforcing system and construction method thereof

Also Published As

Publication number Publication date
CN106544962B (en) 2018-07-03

Similar Documents

Publication Publication Date Title
CN106544962B (en) The prestress reinforced construction method of concrete structure
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN103321430B (en) Pre-stressed carbon fiber sheet material is reinforced greatly across the construction method of concrete structure
CN109972538B (en) Steel plate inner filling material combined reinforced concrete bridge structure and construction technology
CN105484151B (en) The construction and its construction method connected between a kind of enhancing precast concrete segment
CN203741730U (en) T-shaped bridge reinforcing structure
CN203821254U (en) Rigid connection reinforcing device for hinge joint of fabricated plate girders
CN106522114B (en) The prestressed reinforcement device of concrete structure is carried out using CFRP cloth materials
CN101245668A (en) Construction method for two-side reinforcing engineering structure
CN101974959A (en) Concrete structure FRP end anchor device
US11674323B2 (en) Device and method for reinforcing round section wood beam by combination of prestressed FRP sheet and high strength steel wire rope
CN109025353A (en) A kind of device and construction method of pre-stress FRP sheet material reinforcement of rc beam
CN104264594A (en) Self-balancing tied arch system for improving bearing force of PSC continuous box girder bridge and reinforcing method by applying self-balancing tie bar arch system
CN103291082A (en) Wood beam reinforcing body external pre-stress construction method
CN202090290U (en) Prestressed reinforcement tensioning tool
CN105507169B (en) Tensioning and anchoring device for reinforcing reinforced concrete bridge through prestress FRP(fiber reinforced plastic) cloth and reinforcing method
CN101368374B (en) Pretensioning method for converting old simply supported beam bridge into continuous bridge
CN202787099U (en) Reinforced concrete cap beam external prestressing structure
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN101463590B (en) External prestress steel structure and reinforcing means for reinforcing old bridge
CN101929254B (en) Method for lapping and anchoring fiber sheet around rod to reinforce structural component
CN203307736U (en) Reinforced concrete T-shaped beam bridge reinforced structure
CN203007855U (en) Stretch-draw anchoring system of pre-stress fiber composite plate
JPH04285247A (en) Member for introducing prestress and method of introducing prestress
CN206681268U (en) A kind of bracing means for controlling steel strand prestress value

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant