CN106542114B - Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage - Google Patents

Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage Download PDF

Info

Publication number
CN106542114B
CN106542114B CN201610957694.7A CN201610957694A CN106542114B CN 106542114 B CN106542114 B CN 106542114B CN 201610957694 A CN201610957694 A CN 201610957694A CN 106542114 B CN106542114 B CN 106542114B
Authority
CN
China
Prior art keywords
error
mass center
satellite
stage
less
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610957694.7A
Other languages
Chinese (zh)
Other versions
CN106542114A (en
Inventor
陈晓杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Satellite Engineering
Original Assignee
Shanghai Institute of Satellite Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Satellite Engineering filed Critical Shanghai Institute of Satellite Engineering
Priority to CN201610957694.7A priority Critical patent/CN106542114B/en
Publication of CN106542114A publication Critical patent/CN106542114A/en
Application granted granted Critical
Publication of CN106542114B publication Critical patent/CN106542114B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B64AIRCRAFT; AVIATION; COSMONAUTICS
    • B64GCOSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
    • B64G1/00Cosmonautic vehicles
    • B64G1/10Artificial satellites; Systems of such satellites; Interplanetary vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • Astronomy & Astrophysics (AREA)
  • General Physics & Mathematics (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Testing Of Engines (AREA)

Abstract

The present invention provides a kind of tiling tank satellite in parallel the AIT stage lateral mass center high-precision ensuring method, comprising: in the Standard stage, control Form and position error, the apogee engine bracket installation error of tank mounting plate;It is welded the stage in propulsion system, control tank error in mounting position, apogee engine installation site and error in pointing;In the whole star general assembly stage, solar array is controlled in the quality and mass center of unfolded state;Before factory, whole star transverse direction mass center is carried out by the whole star mass center test equipment of high-precision and is tested.The present invention implements multinomial lateral mass center safeguard measure in whole star AIT each stage, lateral mass center by satellite in outspreading sailboard original state controls near origin, and improve the determination precision (being less than or equal to 1mm) of satellite transverse direction mass center, reduce the lateral mass center variation of Satellite Orbit Maneuver section, to reduce the disturbance torque of apogee engine generation, ensure to become safely rail, meanwhile, save propellant.

Description

Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage
Technical field
The present invention relates to satellite general technical fields, and in particular, to a kind of tiling tank satellite in parallel is in AIT The lateral mass center high-precision ensuring method in (Assembly Integration and Test, general assembly, integrated and test) stage.
Background technique
What precision was affected, which has tank Form and position error, solar array exhibition, is determined to outspreading sailboard moment satellite transverse direction mass center Open state mass center error, apogee engine position and error in pointing, mass center test error, the wherein influence of tank Form and position error Caused by being the particularity as tank parallel connection tiling layout.During Satellite Orbit Maneuver section apogee motor firing, when whole star matter When the heart is not put on motor power axis in distant, disturbance torque can be generated;With the consumption of propellant, mass center determines precision meeting It is deteriorated, i.e., error is constantly amplified, and the disturbance torque that apogee engine generates can become larger therewith;Tank parallel connection tiling is defended For star, the determination error of lateral mass center can be further amplified in the uneven discharge of propellant.Therefore, during satellite AIT Tank Form and position error, Stretching of solar wings state mass center error, apogee engine position and error in pointing, mass center test are missed Difference implements control, is the effective means for reducing outspreading sailboard moment satellite transverse direction mass center and determining precision.
Currently, general high rail satellite controls apogee engine position and error in pointing, centroid of satellite test is missed Difference does not find the systems approach through the whole star AIT stage in 2-3mm to guarantee that satellite transverse direction mass center determines the report of precision Or technology.
Summary of the invention
For the defects in the prior art, the object of the present invention is to provide a kind of tiling tank satellites in parallel in the AIT stage Lateral mass center high-precision ensuring method.
Lateral mass center high-precision ensuring method of the tiling tank satellite in parallel provided according to the present invention in the AIT stage, packet Include following steps:
Step 1: in the Standard stage, controlled by way of Combined machining tank mounting surface to satellite and the rocket parting surfaces away from From error, the combined planar degree formed with the depth of parallelism of satellite and the rocket parting surface and multiple tank mounting surfaces;Pass through repair and gasket Mode realize the adjustment to apogee engine bracket, the distance of control apogee engine bracket to satellite and the rocket parting surface is missed Difference, the depth of parallelism with satellite and the rocket parting surface;
Step 2: being welded the stage in propulsion system, tank position is measured by three-coordinate instrument, and implement according to tank position Adjustment to tank controls tank distributing position error;By transit survey apogee engine position and direction, with repair Implement the adjustment to apogee engine with the mode of gasket, controls apogee engine error in mounting position and error in pointing;
Step 3: in the whole star general assembly stage, quality and mass center of the actual measurement solar windsurfing in unfolded state, it is desirable that quality test Error is less than or equal to 0.2kg, and mass center test error is less than or equal to 3mm;
Step 4: before factory, whole star transverse direction mass center being carried out by the whole star mass center test equipment of high-precision and is tested, ground is lateral The test error of mass center test macro is less than or equal to 0.5mm.
Preferably, in the Standard stage, the range error for controlling tank mounting surface to satellite and the rocket parting surface is less than or equal to The parallelism error of 0.5mm and satellite and the rocket parting surface is less than or equal to 1.0mm, and the combined planar degree that multiple tank mounting surfaces are formed misses Difference is less than or equal to 0.5mm, and the range error of apogee engine bracket to satellite and the rocket parting surface is less than or equal to 0.5mm, divides with the satellite and the rocket Parallelism error from face is less than or equal to 0.1mm.
Preferably, it is welded the stage in propulsion system, control tank distributing position error is less than or equal to 0.5mm, apogee hair Motivation error in mounting position is less than or equal to 0.2mm and error in pointing is less than or equal to 1 '.
Compared with prior art, the present invention have it is following the utility model has the advantages that
The present invention implements multinomial lateral mass center safeguard measure in whole star AIT each stage, by satellite in outspreading sailboard initial shape The lateral mass center of state controls near origin, and improves the determination precision (being less than or equal to 1mm) of satellite transverse direction mass center, reduces and defends Star becomes the lateral mass center variation of rail section, to reduce the disturbance torque of apogee engine generation, it is ensured that and safety becomes rail, meanwhile, Save propellant.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the flow diagram of method in the present invention;
Fig. 2 is certain satellite model apogee engine and its bracket scheme of installation.
In figure:
1- apogee engine.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, several changes and improvements can also be made.These belong to the present invention Protection scope.
The present invention is that the parallel connection that technical solution used by solving its technical problem is to provide tiles tank satellite in AIT rank The lateral mass center high-precision ensuring method of section, specific as follows:
1) in the Standard stage, the distance for controlling tank mounting surface to satellite and the rocket parting surface by way of Combined machining is missed Difference is less than or equal to 0.5mm and the parallelism error of satellite and the rocket parting surface is less than or equal to 1.0mm, the group that multiple tank mounting surfaces are formed It closes flatness error and is less than or equal to 0.5mm;The adjustment to apogee engine bracket is realized by way of repair and gasket, is controlled The range error of apogee engine bracket processed to satellite and the rocket parting surface is less than or equal to 0.5mm, the depth of parallelism mistake with satellite and the rocket parting surface Difference is less than or equal to 0.1mm.
2) it is welded the stage in propulsion system, tank position is measured by three-coordinate instrument and implements the adjustment to tank accordingly, It controls tank distributing position error and is less than or equal to 0.5mm;By transit survey apogee engine position and direction, and Implement the adjustment to apogee engine in a manner of repair and gasket, control apogee engine error in mounting position is less than etc. It is less than or equal to 1 ' in 0.2mm and error in pointing.
3) in whole star general assembly stage, quality and mass center of the actual measurement solar windsurfing in unfolded state, it is desirable that quality test error Less than or equal to 0.2kg, mass center test error is less than or equal to 3mm.
4) before dispatching from the factory, lateral mass center test, the test of ground transverse direction mass center are carried out by the whole star mass center test equipment of high-precision The test error of system is less than or equal to 0.5mm.
Specifically, four propellant tanks are separately mounted on two pieces of tank mounting plates, two using tiling layout in parallel The position of oxidant tank indicates that two incendiary agent tank positions are indicated with A2 and B2 with A1 and B1, and being symmetrically distributed in radius is r On the circle of=960mm.
In the Standard stage, to 4 tank mounting surfaces composition on tank mounting plate by way of Combined machining Plane is combined processing, so that tank mounting surface to the range error of satellite and the rocket parting surface is less than or equal to 0.5mm, with satellite and the rocket parting surface Parallelism error be less than or equal to 1.0mm, the combined planar degree error of plane of 4 tank mounting surfaces composition is less than or equal to 0.5mm;The adjustment to apogee engine bracket is realized by way of repair and gasket, makes to send out on apogee engine bracket The mounting flange face of motivation and the parallelism error of satellite and the rocket parting surface are less than or equal to 0.1mm, apogee engine mounting surface and star Arrow parting surface range error is less than or equal to 0.5mm.
It is welded the stage in propulsion system, tank position is measured by three-coordinate instrument and implements the adjustment to tank accordingly, make The installation site of tank meets the requirement of 960 ± 0.5mm of distribution radius, 30 ± 0.05 ° of distribution angle;It is remote by transit survey Place engine location and direction, and implement in a manner of repair and gasket the adjustment to apogee engine, after marking heat Coaxially, the installation site deviation of X and Y-direction under co-ordinates of satellite are less than or equal to the thrust vectoring and satellite+Z axis (shown in Fig. 2) arrived 0.2mm, motor power vector and satellite+Z axis angular deviation are less than or equal to 1 '.
In the whole star general assembly stage, quality and mass center of the actual measurement solar windsurfing in unfolded state, it is desirable that quality test error is small In being equal to 0.2kg, mass center test error is less than or equal to 3mm, controls installation accuracy of the solar array on star.
Before factory, lateral mass center test, ground transverse direction mass center test system are carried out by the whole star mass center test equipment of high-precision The test error of system is less than or equal to 0.5mm.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, those skilled in the art can make a variety of changes or modify within the scope of the claims, this not shadow Ring substantive content of the invention.In the absence of conflict, the feature in embodiments herein and embodiment can any phase Mutually combination.

Claims (3)

1. a kind of tiling tank satellite in parallel is in the lateral mass center high-precision ensuring method in AIT stage, which is characterized in that including such as Lower step:
Step 1: in the Standard stage, the distance for controlling tank mounting surface to satellite and the rocket parting surface by way of Combined machining is missed Difference, the combined planar degree formed with the depth of parallelism of satellite and the rocket parting surface and multiple tank mounting surfaces;Pass through the side of repair and gasket Formula realizes adjustment to apogee engine bracket, the range error of control apogee engine bracket to satellite and the rocket parting surface, with The depth of parallelism of satellite and the rocket parting surface;
Step 2: being welded the stage in propulsion system, tank position is measured by three-coordinate instrument, and implement to storage according to tank position The adjustment of case controls tank distributing position error;By transit survey apogee engine position and direction, with repair and pad The mode of piece implements the adjustment to apogee engine, controls apogee engine error in mounting position and error in pointing;
Step 3: in the whole star general assembly stage, quality and mass center of the actual measurement solar windsurfing in unfolded state, it is desirable that quality test error Less than or equal to 0.2kg, mass center test error is less than or equal to 3mm;
Step 4: before factory, whole star transverse direction mass center is carried out by the whole star mass center test equipment of high-precision and is tested, ground transverse direction mass center The test error of test macro is less than or equal to 0.5mm.
2. lateral mass center high-precision ensuring method of the tiling tank satellite in parallel according to claim 1 in the AIT stage, Be characterized in that, in the Standard stage, the range error for controlling tank mounting surface to satellite and the rocket parting surface be less than or equal to 0.5mm, with The parallelism error of satellite and the rocket parting surface is less than or equal to 1.0mm, and the combined planar degree error that multiple tank mounting surfaces are formed is less than etc. In 0.5mm, the range error of apogee engine bracket to satellite and the rocket parting surface is less than or equal to 0.5mm, flat with satellite and the rocket parting surface Row degree error is less than or equal to 0.1mm.
3. lateral mass center high-precision ensuring method of the tiling tank satellite in parallel according to claim 1 in the AIT stage, It is characterized in that, is welded the stage in propulsion system, control tank distributing position error is less than or equal to 0.5mm, apogee engine peace Holding position error is less than or equal to 0.2mm and error in pointing is less than or equal to 1 '.
CN201610957694.7A 2016-11-03 2016-11-03 Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage Active CN106542114B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610957694.7A CN106542114B (en) 2016-11-03 2016-11-03 Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610957694.7A CN106542114B (en) 2016-11-03 2016-11-03 Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage

Publications (2)

Publication Number Publication Date
CN106542114A CN106542114A (en) 2017-03-29
CN106542114B true CN106542114B (en) 2019-05-03

Family

ID=58393619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610957694.7A Active CN106542114B (en) 2016-11-03 2016-11-03 Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage

Country Status (1)

Country Link
CN (1) CN106542114B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108791957B (en) * 2018-06-14 2020-10-27 上海卫星工程研究所 High-precision real-time identification method for transverse mass center during satellite orbit transfer
CN113148235B (en) * 2020-01-09 2023-04-14 中国空间技术研究院 Method for adjusting transverse mass center of satellite of parallel storage box
CN111562124B (en) * 2020-05-07 2022-08-09 上海宇航系统工程研究所 Precision measuring method for storage tank flat-laying configuration spacecraft
CN112705920B (en) * 2020-12-16 2021-08-10 中国科学院微小卫星创新研究院 Satellite assembling method
CN116395148B (en) * 2023-03-20 2023-09-15 银河航天(北京)网络技术有限公司 Satellite and rocket separation control system and control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693213A (en) * 2013-12-06 2014-04-02 上海卫星工程研究所 Magnetic tape type satellite mass center regulating mechanism
CN104401506A (en) * 2014-10-23 2015-03-11 上海卫星工程研究所 Zero-counterweight barycenter deploying method for parallel tiling tank satellite
CN104458123A (en) * 2014-11-03 2015-03-25 上海卫星工程研究所 Method for calculating satellite barycenter by utilizing mass and barycenter information of part
CN106516167A (en) * 2016-11-03 2017-03-22 上海卫星工程研究所 High precision propellant filling method for high orbit satellite with parallel-connection flat-laid storage tanks

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103693213A (en) * 2013-12-06 2014-04-02 上海卫星工程研究所 Magnetic tape type satellite mass center regulating mechanism
CN104401506A (en) * 2014-10-23 2015-03-11 上海卫星工程研究所 Zero-counterweight barycenter deploying method for parallel tiling tank satellite
CN104458123A (en) * 2014-11-03 2015-03-25 上海卫星工程研究所 Method for calculating satellite barycenter by utilizing mass and barycenter information of part
CN106516167A (en) * 2016-11-03 2017-03-22 上海卫星工程研究所 High precision propellant filling method for high orbit satellite with parallel-connection flat-laid storage tanks

Also Published As

Publication number Publication date
CN106542114A (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN106542114B (en) Lateral mass center high-precision ensuring method of the parallel connection tiling tank satellite in the AIT stage
CN105197257B (en) A kind of truss-like GEO satellite thruster layout method of subdivision optimization design
CN108490963B (en) Position keeping method and system under fault mode of full-electric propulsion satellite electric thruster
CN106516167B (en) The high-precision repropellenting method of high rail parallel connection tiling tank satellite
CN101101332A (en) CCD laser theodolite dynamic radar calibration method
CN106229605A (en) A kind of massive phased array accurate installation method of antenna based on mathematical modeling
CN104848833A (en) Method for establishing joint measurement system based on electronic theodolite and laser tracker
CN109633724A (en) Passive object localization method based on single star Yu more earth station's combined measurements
CN108820255A (en) A kind of full physical verification system and method for three hypervisors of moving-target pointing
CN107985631B (en) Low-orbit micro-nano satellite and on-orbit installation method suitable for pulse micro-arc electric thruster
CN114018161A (en) High-precision distance calibration method for measurement and control system
CN113998150A (en) Ultra-low orbit satellite full-electric propulsion orbit maintaining system
CN105035364B (en) Solar array driving swinging method for low-dip-angle orbit radar satellite
CN105116906A (en) Spacecraft orbit maneuver motor disturbance moment calculation method based on vector theory
CN107444677B (en) Optical-mechanical-thermal integrated structure for multi-load high-precision splicing
CN105675323A (en) Method for ground test of heat stability of satellite structure
CN101858712A (en) Digital aerogun target-correcting method applied to airplane general assembly
CN101254826A (en) Method for avoiding 90 degree singular point of helicopter photoelectric gondolas pitching angle
CN107839900B (en) Formation layout and installation system for triaxial stabilized satellites
CN107063567A (en) High rail parallel connection tiling tank satellite transfer leg mass property calculation method
ZHANG et al. A finite-time cooperative guidance method considering cooperative detection efficiency
CN109507909B (en) Satellite co-location analysis modeling method and system based on hybrid power orbit control technology
Shmatov et al. Combined system for the compensation of the solar pressure-induced disturbing torque for geostationary satellites
Wu et al. Pointing error analysis of star sensor on geo satellite
Zhang et al. Research on the optimization layout of spacecraft navigation receiving antenna

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant