CN106535245A - Different system measurement method and multi-mode mobile terminal - Google Patents
Different system measurement method and multi-mode mobile terminal Download PDFInfo
- Publication number
- CN106535245A CN106535245A CN201510587334.8A CN201510587334A CN106535245A CN 106535245 A CN106535245 A CN 106535245A CN 201510587334 A CN201510587334 A CN 201510587334A CN 106535245 A CN106535245 A CN 106535245A
- Authority
- CN
- China
- Prior art keywords
- cycle
- mobile terminal
- network
- measure
- inter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/14—Reselecting a network or an air interface
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W36/00—Hand-off or reselection arrangements
- H04W36/24—Reselection being triggered by specific parameters
- H04W36/30—Reselection being triggered by specific parameters by measured or perceived connection quality data
Abstract
The invention discloses a different system measurement method and a multi-mode mobile terminal, and belongs to the technical field of mobile terminals. The method comprises the following steps: step S1, judging whether a measurement gap which has been set is in conflict with a service period which is allocated by a network side and used for receiving a cell broadcast service data block by the mobile terminal, and when the service period is in conflict with at least one measurement gap which has been set, turning to step S2; and step S2, taking a current measurement period as an initial measurement period, cancelling a measurement gap that is in conflict with the service period in an even number of measurement periods in a plurality of continuous measurement periods by the mobile terminal, so as to prepare to receive a data block which is associated with a cell broadcast service. The above technical scheme has the following beneficial effects: different system measurement and reselection can be guaranteed to be carried out when the cell broadcast service data block is received at the same time, a conflict concerning processing the time period between cell broadcast service data block receiving and different system measurement is effectively avoided, and the processing performance of the mobile terminal is improved.
Description
Technical field
The present invention relates to technical field of mobile terminals, more particularly to a kind of inter-system measuring method and multimode shifting
Dynamic terminal.
Background technology
In prior art, the multi-module mobile terminal mobile terminal of multiple network mode of operation (support) in
When working on certain communication network (such as WCDMA networks), because of the signal matter of its current service cell
Amount is not enough to support that normal Network is processed that the signal quality of its adjacent cell is equally not enough to just support
Normal Network processes (cannot carry out the cell reselection of homologous ray), and now mobile terminal may be touched
Send out system gravity treatment, i.e. gravity treatment different to certain different communication network (such as LTE network or GSM nets
Network) in work on.Therefore, in prior art, in order to support the different system reselection functionality of mobile terminal,
In the discontinuous receiving cycle (Discontinuous Reception, DRX) of mobile terminal, need to hold
Isosystem measurement is performed continuously, for example, the cell under LTE network or GSM network is measured,
To be ready to gravity treatment to corresponding LTE network or GSM network.
Meanwhile, in prior art, need to receive cell broadcast service to mobile terminal side distribution in network side
The period of (Cell Broadcast Service, CBS) data block, mobile terminal can receive CBS data
Block, network side then realize the distribution of Radio Resource by issuing CBS data blocks.
Therefore, in same DRX cycle, it is understood that there may be CBS data block reception periods and different system
The afoul situation of measurement gap (gap) of measurement.It is in prior art, for above-mentioned situation, common
Way is all to cancel (carry out regreting frame process) all measurement gap of conflict part, by DRX
Period allocated is used to CBS data blocks are received.It is done so that the isosystem measurement of mobile terminal can be affected
Operation, and and then affect mobile terminal different system reselection operation.
The content of the invention
According to problems of the prior art, a kind of inter-system measuring method is now provided and multimode movement is whole
The technical scheme at end, it is intended to ensure to carry out the measurement of different system while cell broadcast service data block reception
And gravity treatment.
Above-mentioned technical proposal is specifically included:
A kind of inter-system measuring method, it is adaptable to based on the multi-module mobile terminal that a first network works;Its
In, in each measure the cycle, mobile terminal be respectively provided be associated with one second network measurement gap and/
Or the measurement gap of one the 3rd network is associated with, also comprise the steps:
Step S1, the mobile terminal judge whether the measurement gap being set is distributed with network side
The service window for receiving cell broadcast service data block mutually conflict, and the service window with extremely
A few measurement gap being set turns to step S2 when mutually conflicting;
Step S2, with the current measure the cycle as the measure the cycle of starting, the mobile terminal is cancelled
Mutually conflict with the service window in measure the cycle described in even number in continuous multiple measure the cycles
The measurement gap, to prepare to receive the data block for being associated with the cell broadcast service.
Preferably, the inter-system measuring method, wherein, in step S1, if the service window
Mutually do not conflict with the measurement gap that any one has been set, then the mobile terminal execution is following sentences
It is disconnected:
The mobile terminal persistently detects whether the network side is modified to the service window, and
The network side returns step S1 after being modified to the service window, set with rejudging
Whether the measurement gap put mutually is conflicted with the service window for passing through change.
Preferably, the inter-system measuring method, wherein, includes at least one in each described measure the cycle
Discontinuous receiving cycle.
Preferably, the inter-system measuring method, it is wherein, corresponding including one in each described measure the cycle
Discontinuous receiving cycle;
The time span of each discontinuous receiving cycle is 320ms;
Include corresponding one measurement for being associated with second network in each described measure the cycle
Gap.
Preferably, the inter-system measuring method, it is wherein, corresponding including one in each described measure the cycle
Discontinuous receiving cycle;
The time span of each discontinuous receiving cycle is 320ms;
Include corresponding one measurement for being associated with the 3rd network in each described measure the cycle
Gap.
Preferably, the inter-system measuring method, it is wherein, continuous including two in each described measure the cycle
Discontinuous receiving cycle;
The time span of each discontinuous receiving cycle is 320ms;
In the adjacent discontinuous receiving cycle of two in each described measure the cycle, it is respectively provided with
It is associated with the measurement gap of second network, and the measurement for being associated with the 3rd network
Gap.
Preferably, the inter-system measuring method, wherein, includes corresponding one in each described measure the cycle
Individual discontinuous receiving cycle;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement for being associated with the 3rd network in each described measure the cycle
Gap.
Preferably, the inter-system measuring method, wherein, includes at least one in each described measure the cycle
Discontinuous receiving cycle;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement for being associated with second network in each described measure the cycle
Gap;
Then before step S2 is performed, following step is first carried out:
Step S21a, the mobile terminal judge whether to need to save work(according to user identification module
Consumption, and step S22a is turned to when the mobile terminal needs to save power consumption;
Step S22a, the mobile terminal retain all measurement gaps.
Preferably, the inter-system measuring method, wherein, in step S21a, if the mobile terminal
Judge to save power consumption according to the user identification module, then continue executing with step S2.
Preferably, the inter-system measuring method, wherein, includes a non-company in each described measure the cycle
The cycle is received in continued access;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement for being associated with the 3rd network in each described measure the cycle
Gap;And
Every the measure the cycle of predetermined number, arrange corresponding one and be associated with second network
The measurement gap;
Then before step S2 is performed, following step is first carried out:
Step S21b, the mobile terminal judge whether to need to save work(according to user identification module
Consumption, and step S22b is turned to when the mobile terminal needs to save power consumption;
Step S22b, the mobile terminal retain between all measurements for being associated with second network
Gap;
Step S23b, with the current measure the cycle as the measure the cycle of starting, the mobile terminal takes
The institute for being associated with the 3rd network afoul with the service window in the measure the cycle described in even number that disappears
State measurement gap.
Preferably, the inter-system measuring method, wherein, in step S21b, if described mobile whole
End judges to save power consumption according to the user identification module, then continue executing with the step
S2。
Preferably, the inter-system measuring method, wherein, in the process for performing the inter-system measuring method
In, if the mobile terminal detects the network side and the service window is modified, directly return
Return step S1, with rejudge the measurement gap being set whether with pass through described in change
Service window mutually conflicts.
Preferably, the inter-system measuring method, wherein, the first network is WCDMA communication networks.
Preferably, the inter-system measuring method, wherein, second network is LTE communication network.
Preferably, the inter-system measuring method, wherein, the 3rd network is GSM communication network.
A kind of multi-module mobile terminal, wherein, using above-mentioned inter-system measuring method.
The beneficial effect of above-mentioned technical proposal is:A kind of inter-system measuring method is provided, can ensure little
Area's broadcast service data block carries out the measurement and gravity treatment of different system while reception, effectively prevent cell wide
Broadcast between service data block reception and isosystem measurement with regard to processing conflicting for period, lift mobile terminal
Process performance.
Description of the drawings
During Fig. 1 is the preferred embodiment of the present invention, a kind of overall procedure of inter-system measuring method is illustrated
Figure;
During Fig. 2-3 is the preferred embodiment of the present invention, on the basis of Fig. 1, between isosystem measurement
The schematic flow sheet processed by gap;
During Fig. 4-11 is the different embodiment of the present invention, the signal that measurement gap is distributed in measure the cycle
Figure.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the invention, and
It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are without work
The every other embodiment obtained on the premise of going out creative work, belongs to the scope of protection of the invention.
It should be noted that the embodiment and the spy in embodiment in the case where not conflicting, in the present invention
Levy and can be mutually combined.
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings, but not as the present invention's
Limit.
In prior art, can for the distribution of the measurement gap (hereinafter referred to as gap) of isosystem measurement
To be carried out by mobile terminal side, but for the period of CBS data block receptions needs to be carried out point by network side
Match somebody with somebody, therefore inevitably lead to CBS data block receptions and can clash with the gap of isosystem measurement,
So as to cause isosystem measurement gap to be performed repentant frame (Wrecking) process, therefore can affect whole different
Systematic survey and the process of gravity treatment.
Then in preferred embodiment of the invention, based on the above-mentioned problems in the prior art, now provide
A kind of inter-system measuring method, it is adaptable to mobile terminal.Further, preferred embodiment of the invention
In, above-mentioned mobile terminal is multi-module mobile terminal, i.e., can be entered based on various different network mode of operation
The mobile terminal of row work.Relatively common multi-module mobile terminal can support 3G (WCDMA) network,
And while support 2G (GSM) networks and the one kind in 4G (LTE) network.Therefore, Yu Duo
In mould mobile terminal, there is the process of corresponding isosystem measurement and gravity treatment.
In the preferred embodiment of the present invention, above-mentioned mobile terminal is currently based on first network work.This
In one preferred embodiment of invention, above-mentioned first network can be WCDMA communication networks, that is, move
Dynamic terminal is currently based on the work of WCDMA communication networks.
In the preferred embodiment of the present invention, in mobile terminal side, in continuous multiple measure the cycles,
Mobile terminal is respectively provided with the measurement gap that is associated with one second network and/or is associated with one the 3rd network
Measurement gap (gap)
In one preferred embodiment of the present invention, above-mentioned second network can be LTE communication network, on
It can be GSM communication network to state the 3rd network.Then below based on above-mentioned first network (WCDMA
Communication network), the second network (LTE communication network) and the 3rd network (GSM communication network) it is right
Technical solution of the present invention is described.
In the preferred embodiment of the present invention, be associated with the second network or the 3rd network one is so-called
Measure the cycle, can be set by mobile terminal self, and its minimum sets unit as a DRX cycle,
I.e. one measure the cycle includes at least one DRX cycle.
Then in preferred embodiment of the invention, above-mentioned inter-system measuring method is as shown in figure 1, concrete wrap
Include:
Whether step S1, mobile terminal judge the measurement gap that has been set with network side distribution for connecing
The service window for zooming in area's broadcast service data block mutually conflicts, and is divided in service window and at least one
Step S2 is turned to when the measurement gap matched somebody with somebody mutually conflicts;
Step S2, with current measure the cycle as the measure the cycle of starting, mobile terminal is cancelled continuous many
With the afoul measurement gap of service window in even number measure the cycle in individual measure the cycle, to prepare to connect
Receipts are associated with the data block of cell broadcast service.
In a specific embodiment, the movement for working under first network (WCDMA communication networks)
Terminal, first determines whether the measurement gap in its measure the cycle for having set, if distribute with network side
The service window for being associated with CBS data block receptions (mobile terminal receives corresponding by network side before
Configuration information is known) between produce conflict:
If 1) produce between the gap that service window has been set with wherein at least one conflict, in execution
State step S2, i.e., start to count with current measure the cycle, cancel even number (the 2nd, the 4th,
The gap included in measure the cycle 6th ... ..., by that analogy), and these measure the cycles are left a blank,
To prepare to distribute to above-mentioned service window, that is, prepare to receive CBS data blocks.Correspondingly, other surveys are retained
The gap included in the amount cycle.
If 2) produce between the gap that service window has not been set with any one conflict, retain all
The gap being set.
In the embodiment, if the gap phases that above-mentioned service window has not been set with any one conflict,
Retain it is all be set gap while, perform following judgements:
Mobile terminal persistently detects whether network side is modified to service window, and in network side to service
Period is modified rear return to step S1, with rejudge the measurement gap being set whether with through more
The service window for changing mutually conflicts.
In other words, in preferred embodiment of the invention, network side may be changed and be associated with CBS data
The service window that block is received.If mobile terminal detect network side have change service window operation (for example
Receive the configuration through change that network side is issued), then above-mentioned steps S1 are directly returned, i.e., is sentenced again
Whether the disconnected service window for being associated with CBS data block receptions being currently configured is between the measurement being set
Gap mutually conflicts, and continues executing with above-mentioned steps S1-S2 according to judged result.
It is in the preferred embodiment of the present invention, during above-mentioned inter-system measuring method is performed, mobile
Terminal equally monitors operation of the network side with the presence or absence of change service window at any time, and takes in network side change
The step of jumping out current execution during the business period, to return to above-mentioned steps S1, rejudges and is currently configured
The service window for being associated with CBS data block receptions whether mutually conflict with the measurement gap being set, and
Above-mentioned steps S1-S2 are continued executing with according to judged result.
Hereinafter, gap for the setting of different measure the cycles and different is arranged, according to above
Described in technical scheme be specifically described:
1), in a preferred embodiment of the invention, in above-mentioned each measure the cycle, include a DRX
In the cycle, the time span (DRX Cycle Length) of each DRX cycle is 320ms.In each survey
(to be in each DRX cycle) in the amount cycle arrange one is associated with the second network (i.e. LTE communication net
Network) gap.In the embodiment, the concrete setting of measure the cycle is as shown in Figure 4.In other words, at this
In embodiment, LTE measurements in the isosystem measurement of mobile terminal, are only existed.
Then in the embodiment, using the above inter-system measuring method, with current measure the cycle
For starting measure the cycle (A1 as shown in Figure 4), and by even number measure the cycle (such as Fig. 4
Shown in A2 and A4) afoul with above-mentioned service window be associated with the second network (LTE communication net
Network) gap cancel, i.e., LTE gap afoul with above-mentioned service window in the several measure the cycles of antithesis
Carry out regreting frame process.
In the preferred embodiment of the present invention, as shown in figure 4, the measurement in acquiescence even number measure the cycle
Gap is mutually conflicted with above-mentioned service window, same setting in other specific embodiments hereinafter,
Therefore no longer describe in detail.
2), in a preferred embodiment of the invention, in above-mentioned each measure the cycle, include a DRX
In the cycle, the time span (DRX Cycle Length) of each DRX cycle is 320ms.In each survey
(to be in each DRX cycle) in the amount cycle arrange one is associated with the 3rd network (i.e. gsm communication net
Network) gap.In the embodiment, the concrete setting of measure the cycle is as shown in Figure 5.In other words, the reality
Apply in example, only exist GSM measurements in the isosystem measurement of mobile terminal.
Then in the embodiment, using the above inter-system measuring method, with current measure the cycle
For starting measure the cycle (B1 as shown in Figure 5), and by even number measure the cycle (such as Fig. 5
Shown in B2 and B4) afoul with above-mentioned service window be associated with the 3rd network (gsm communication net
Network) gap cancel, i.e., GSM gap afoul with above-mentioned service window in the several measure the cycles of antithesis
Carry out regreting frame process.
3), in a preferred embodiment of the invention, two DRX in above-mentioned each measure the cycle, are included
In the cycle, the time span (DRX Cycle Length) of each DRX cycle is 320ms.Then in each
In two adjacent DRX cycles in measure the cycle, be respectively provided be associated with the second network (LTE lead to
Communication network) gap, and the gap for being associated with the 3rd network (GSM communication network).In other words,
In the embodiment, as shown in fig. 6, for continuous DRX cycle, be crisscross arranged GSM gap and LTE
Gap (such as C11 is LTE gap, and C12 is GSM gap, and C21 is LTE gap, by that analogy),
Subsequently two adjacent DRX cycles are merged to form a measure the cycle, then bag in each measure the cycle
Include an a GSM gap and LTE gap.In other words, in the embodiment, in the different system of mobile terminal
There is GSM measurements and LTE measurements in unified test amount simultaneously, above two isosystem measurement is alternately.
Then in the embodiment, according to the above inter-system measuring method, mobile terminal is with current
Measure the cycle (i.e. C1) be starting measure the cycle, by even number measure the cycle (i.e. C2, C4 ... ...,
By that analogy) all gap afoul with above-mentioned service window cancels, i.e., in the several measure the cycles of antithesis
Gap afoul with above-mentioned service window carries out regreting frame process.
4), in a preferred embodiment of the invention, in above-mentioned each measure the cycle, include corresponding one
DRX cycle, the time span of each DRX cycle are more than 320ms, and in each measure the cycle
Including corresponding one gap for being associated with the 3rd network (GSM communication network).In other words, in the reality
Apply in example, in the isosystem measurement of mobile terminal, only exist GSM measurements.
In the preferred embodiment of the present invention, associated description (the 3GPP TS 25.133 based on 3GPP agreements
4.2.2 chapters and sections in agreement), in different DRX cycles, the collection of the effective sampling point of isosystem measurement
Speed has different requirements.Therefore above DRX cycle is divided into equal to 320ms and more than 320ms
Two kinds, it is intended that specify to carry out different divisions to isosystem measurement gap according to agreement.
For DRX cycle of the time span more than 320ms (in Fig. 7 by taking DRX2560 as an example,
I.e. DRX cycle is 2560ms), the concrete setting of the measure the cycle in above-described embodiment is as shown in Figure 7.
Using the above inter-system measuring method, with current measure the cycle as the measure the cycle of starting (such as
D1 shown in Fig. 7), and by (D2 as shown in Figure 7 and D4) in even number measure the cycle with
The afoul gap for being associated with the 3rd network (GSM communication network) of above-mentioned service window cancels, i.e., right
In even number measure the cycle, GSM gap afoul with above-mentioned service window carries out regreting frame process.
5), in a preferred embodiment of the invention, in each measure the cycle, include at least one DRX
Cycle, the time span of each DRX cycle are more than 320ms;
Then the second network (LTE communication network) is associated with including corresponding one in each measure the cycle
Measurement gap (LTE gap).In other words, in this embodiment, the isosystem measurement of mobile terminal
In only exist LTE measurement.
Then in the embodiment, as shown in Fig. 2 before above-mentioned steps S2 are performed, being first carried out following
Step:
Step S21a, mobile terminal judge whether to need to save power consumption according to user identification module, and
Step S22a is turned to when mobile terminal needs to save power consumption;
In the preferred embodiment of the present invention, so-called user identification module, i.e. SIM.It is then above-mentioned
In step S21a, according to current SIM, mobile terminal judges whether mobile terminal is currently in first
Need to save the state of power consumption.
In a specific embodiment, for experiment is with test SIM, due to corresponding mobile
Considering for terminal is to test its performance, therefore is not very high to power consumption requirements, does not correspondingly save work(
The demand of consumption.
In another specific embodiment, for the real net SIM that operator provides, for guarantee
The endurance of mobile terminal and considering for the factors such as the caloric value of mobile terminal is reduced, now to movement
The power consumption requirements of terminal are higher, that is, need to carry out mobile terminal the corresponding operating of Save power consumption.
Step S22a, mobile terminal retain all measurement gaps.
In the preferred embodiment of the present invention, for it need not save the mobile terminal of power consumption (for example
For mobile terminal of the application experiment with test SIM), the distribution of its LTE gap may than comparatively dense,
A LTE gap is set in each DRX cycle for example, then can now continue executing with above-mentioned steps
With the afoul measurement gap of above-mentioned service window (LTE gap) in S2, i.e. cancellation even number measure the cycle.
In the preferred embodiment of the present invention, (for example should for needing to save the mobile terminal of power consumption
For mobile terminal with operator's reality net SIM), the distribution of its LTE gap may than sparse,
For example a LTE gap can be just arranged every 5.12s.Now, if carrying out regreting frame process to LTE gap again,
Being normally carried out for isosystem measurement and gravity treatment can then be ensured.Therefore, in these cases, no matter CBS
Whether the service window of data block reception is conflicted with LTE gap, can not all be regreted frame, that is, be retained all LTE
gap。
Specifically, a kind of of above-described embodiment is arranged as shown in figure 8, including in each measure the cycle
One corresponding DRX cycle (measure the cycle and DRX cycle are represented simultaneously with E1-E4), each
The time span of DRX cycle is more than 320ms, in each DRX cycle there is a LTE gap.
In other words, in the setting, state of the mobile terminal in saving power consumption, such as application experiment are used
Test SIM work.
Then in the present arrangement, in the several measure the cycles of mobile terminal antithesis (i.e. E2 and E4) with above-mentioned clothes
Business period afoul LTE gap carry out regreting frame process.
Specifically, the another kind of of above-described embodiment is arranged as shown in figure 9, wrapping in each measure the cycle
Including multiple corresponding DRX cycles (such as, in Fig. 9, includes two DRX in measure the cycle F1
Cycle F11 and F12), the time span of each DRX cycle is more than 320ms, in each measure the cycle
One LTE gap of interior presence.In other words, in the setting, shape of the mobile terminal in saving power consumption is needed
State, such as using operator's reality net SIM work.
Then in the present arrangement, mobile terminal retains all LTE gap, i.e., do not do any repentant frame and process.
6), in preferred embodiment of the invention, include a DRX cycle in each measure the cycle, often
The time span of individual DRX cycle is more than 320ms.
Specifically, in a preferred embodiment of the invention, the time span of a DRX cycle is big
In 320ms;
Then the 3rd network (GSM communication network) is associated with including corresponding one in each measure the cycle
Measurement gap (GSM gap);And every the measure the cycle of predetermined number, arrange corresponding one
It is associated with the measurement gap (LTE gap) of the second network (LTE communication network).In other words, the reality
Apply in example, there is GSM measurements simultaneously in the isosystem measurement of mobile terminal and LTE is measured.
Then in the embodiment, as shown in figure 3, before above-mentioned steps S2 are performed, being first carried out following
Step:
Step S21b, mobile terminal judge whether to need to save power consumption according to user identification module, and
Step S22b is turned to when mobile terminal needs to save power consumption;
In the preferred embodiment of the present invention, also according to SIM, mobile terminal judges whether which needs section
Power consumption is saved, such as application experiment is with test SIM or using operation network reality network interface card.
Step S22b, mobile terminal retain all measurement gaps for being associated with the second network;
In the preferred embodiment of the present invention, for it need not save the mobile terminal of power consumption (for example
For mobile terminal of the application experiment with test SIM), the distribution of its LTE gap may than comparatively dense,
A LTE gap is set in each DRX cycle for example, then can now continue executing with above-mentioned steps
S2, that is, cancel the measurement gap (LTE gap) in even number measure the cycle.
In the preferred embodiment of the present invention, (for example should for needing to save the mobile terminal of power consumption
For mobile terminal with operator's reality net SIM), the distribution of its LTE gap may than sparse,
For example a LTE gap can be just arranged every 5.12s.Now, if carrying out regreting frame process to LTE gap again,
Being normally carried out for isosystem measurement and gravity treatment can then be ensured.Therefore, in these cases, no matter CBS
Whether the service window of data block reception is conflicted with LTE gap, can not all be regreted frame, that is, be retained all LTE
gap。
Step S23b, with current measure the cycle as the measure the cycle of starting, mobile terminal cancels even number
With the afoul measurement gap for being associated with the 3rd network of service window in measure the cycle.The present invention's is preferable
Embodiment in, for GSM is measured, mobile terminal still cancel in even number measure the cycle with it is above-mentioned
The afoul GSM gap of service window.
The present invention preferred embodiment in, due to the time of DRX cycle specified in communication protocol it is long
The setting of degree, the maximum time length of DRX are set to 5120ms, it is possible to be set to 1/2 it is maximum
Time span, i.e. 2560ms, it is possible to be set to the length of 1/4 5120ms, i.e. 1280ms, with
This analogizes (time span of DRX cycle is more than 320ms).A then of the invention preferred embodiment
In, carry out so that the time span of current DRX cycle is set equal to 2560ms as an example discussed below:
Specifically, a kind of of above-described embodiment arranges as shown in Figure 10, i.e., equal in each DRX cycle
Arrange GSM gap and LTE gap (then above-mentioned predetermined number is 0).One measure the cycle (is for example surveyed
Amount cycle G1) in i.e. include a DRX cycle.In other words, mobile terminal is currently at and need not save
Save the state of power consumption, the test SIM work of such as application experiment.
Above-mentioned inter-system measuring method, the several measure the cycles of mobile terminal antithesis (G2 and G4) are applied then
Interior GSM gap and LTE gap afoul with above-mentioned service window carries out regreting frame process.
Specifically, the another kind of of above-described embodiment arranges as shown in figure 11, i.e., in each measure the cycle
(H1-H4) a GSM gap is set in, and every a measure the cycle (i.e. above-mentioned predetermined number
For 1) arranging a LTE gap (such as arranging LTE gap in measure the cycle H1 and H3).
Above-mentioned inter-system measuring method is then applied, in the present arrangement, for GSM gap, cancels even
GSM gap afoul with above-mentioned service window in several measure the cycles.
And for LTE gap, mobile terminal retains all LTE gap.In other words, mobile terminal
The state for needing to save power consumption is currently at, such as using operator's reality net SIM work.
In sum, in technical solution of the present invention, entered by the measurement gap in the several measure the cycles of antithesis
The repentant frame of row is processed, to vacate corresponding measure the cycle for carrying out the reception of CBS data blocks, while ensureing
Isosystem measurement is normally carried out.
In the preferred embodiment of the present invention, a kind of multi-module mobile terminal is also provided, wherein using above
Described inter-system measuring method.
The foregoing is only preferred embodiments of the present invention, not thereby limit embodiments of the present invention and
Protection domain, to those skilled in the art, should can appreciate that all utilization description of the invention
And the equivalent done by diagramatic content and the scheme obtained by obvious change, should include
Within the scope of the present invention.
Claims (16)
1. a kind of inter-system measuring method, it is adaptable to based on the multi-module mobile terminal that a first network works;Characterized in that, in each measure the cycle, mobile terminal is respectively provided with the measurement gap for being associated with one second network and/or the measurement gap for being associated with one the 3rd network, also comprises the steps:
Step S1, the mobile terminal judges whether the measurement gap being set is mutually conflicted with the service window for receiving cell broadcast service data block of network side distribution, and turns to step S2 when the service window is mutually conflicted with the measurement gap that at least one has been set;
Step S2, with the current measure the cycle as the measure the cycle of starting, the measurement gap afoul with the service window in measure the cycle described in the even number that the mobile terminal is cancelled in continuous multiple measure the cycles, to prepare to receive the data block for being associated with the cell broadcast service.
2. inter-system measuring method as claimed in claim 1, it is characterised in that in step S1, if the service window is not mutually conflicted with the measurement gap that any one has been set, the mobile terminal perform following judgements:
The mobile terminal persistently detects whether the network side is modified to the service window, and step S1 is returned after the network side is modified to the service window, to rejudge whether the measurement gap being set is mutually conflicted with the service window for passing through change.
3. inter-system measuring method as claimed in claim 1, it is characterised in that include at least one discontinuous receiving cycle in each described measure the cycle.
4. inter-system measuring method as claimed in claim 1, it is characterised in that include a corresponding discontinuous receiving cycle in each described measure the cycle;
The time span of each discontinuous receiving cycle is 320ms;
Include corresponding one measurement gap for being associated with second network in each described measure the cycle.
5. inter-system measuring method as claimed in claim 1, it is characterised in that include a corresponding discontinuous receiving cycle in each described measure the cycle;
The time span of each discontinuous receiving cycle is 320ms;
Include corresponding one measurement gap for being associated with the 3rd network in each described measure the cycle.
6. inter-system measuring method as claimed in claim 1, it is characterised in that include two continuous discontinuous receiving cycles in each described measure the cycle;
The time span of each discontinuous receiving cycle is 320ms;
In the adjacent discontinuous receiving cycle of two in each described measure the cycle, the measurement gap for being associated with second network, and the measurement gap for being associated with the 3rd network is respectively provided with.
7. inter-system measuring method as claimed in claim 1, it is characterised in that include a corresponding discontinuous receiving cycle in each described measure the cycle;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement gap for being associated with the 3rd network in each described measure the cycle.
8. inter-system measuring method as claimed in claim 1, it is characterised in that include at least one discontinuous receiving cycle in each described measure the cycle;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement gap for being associated with second network in each described measure the cycle;
Then before step S2 is performed, following step is first carried out:
Step S21a, the mobile terminal judge whether to need to save power consumption according to user identification module, and turn to step S22a when the mobile terminal needs to save power consumption;
Step S22a, the mobile terminal retain all measurement gaps.
9. inter-system measuring method as claimed in claim 8, it is characterised in that in step S21a, if the mobile terminal judges to save power consumption according to the user identification module, continues executing with step S2.
10. inter-system measuring method as claimed in claim 1, it is characterised in that include a discontinuous receiving cycle in each described measure the cycle;
The time span of each discontinuous receiving cycle is more than 320ms;
Include corresponding one measurement gap for being associated with the 3rd network in each described measure the cycle;And
Every the measure the cycle of predetermined number, a corresponding measurement gap for being associated with second network is set;
Then before step S2 is performed, following step is first carried out:
Step S21b, the mobile terminal judge whether to need to save power consumption according to user identification module, and turn to step S22b when the mobile terminal needs to save power consumption;
Step S22b, the mobile terminal retain all measurement gaps for being associated with second network;
Step S23b, with the current measure the cycle as the measure the cycle of starting, the mobile terminal cancels the measurement gap for being associated with the 3rd network afoul with the service window in measure the cycle described in even number.
11. inter-system measuring methods as claimed in claim 10, it is characterised in that in step S21b, if the mobile terminal judges to save power consumption according to the user identification module, continue executing with step S2.
12. inter-system measuring methods as claimed in claim 1, it is characterized in that, during the inter-system measuring method is performed, if the mobile terminal detects the network side and the service window is modified, step S1 is directly returned then, to rejudge whether the measurement gap being set is mutually conflicted with the service window for passing through change.
13. inter-system measuring methods as claimed in claim 1, it is characterised in that the first network is WCDMA communication networks.
14. inter-system measuring methods as claimed in claim 1, it is characterised in that second network is LTE communication network.
15. inter-system measuring methods as claimed in claim 1, it is characterised in that the 3rd network is GSM communication network.
16. a kind of multi-module mobile terminals, it is characterised in that using the inter-system measuring method as described in claim 1-15.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510587334.8A CN106535245B (en) | 2015-09-15 | 2015-09-15 | Inter-system measurement method and multi-mode mobile terminal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510587334.8A CN106535245B (en) | 2015-09-15 | 2015-09-15 | Inter-system measurement method and multi-mode mobile terminal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106535245A true CN106535245A (en) | 2017-03-22 |
CN106535245B CN106535245B (en) | 2019-12-27 |
Family
ID=58348651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510587334.8A Active CN106535245B (en) | 2015-09-15 | 2015-09-15 | Inter-system measurement method and multi-mode mobile terminal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106535245B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110099394A (en) * | 2018-01-29 | 2019-08-06 | 展讯通信(上海)有限公司 | The implementation method of different-frequency measure and isosystem measurement, device and user equipment |
CN110324895A (en) * | 2018-03-30 | 2019-10-11 | 展讯通信(上海)有限公司 | Alien frequencies or inter-system measuring method, device and user equipment |
CN110876152A (en) * | 2018-09-03 | 2020-03-10 | 中国移动通信有限公司研究院 | Continuous measurement implementation method and device and computer readable storage medium |
WO2020063546A1 (en) * | 2018-09-28 | 2020-04-02 | 华为技术有限公司 | Indication method, apparatus, and system |
WO2023044733A1 (en) * | 2021-09-24 | 2023-03-30 | Apple Inc. | Measurment gap cancellation |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101646251A (en) * | 2008-08-07 | 2010-02-10 | 中兴通讯股份有限公司 | Method for processing conflict of random access process and measurement clearance |
US20140086173A1 (en) * | 2012-09-26 | 2014-03-27 | Interdigital Patent Holdings, Inc. | Methods, systems and apparatuses for operation in long-term evolution systems |
CN104054361A (en) * | 2011-07-15 | 2014-09-17 | 高通股份有限公司 | Receiving cell broadcast (CB) messages |
-
2015
- 2015-09-15 CN CN201510587334.8A patent/CN106535245B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101646251A (en) * | 2008-08-07 | 2010-02-10 | 中兴通讯股份有限公司 | Method for processing conflict of random access process and measurement clearance |
CN104054361A (en) * | 2011-07-15 | 2014-09-17 | 高通股份有限公司 | Receiving cell broadcast (CB) messages |
US20140086173A1 (en) * | 2012-09-26 | 2014-03-27 | Interdigital Patent Holdings, Inc. | Methods, systems and apparatuses for operation in long-term evolution systems |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110099394A (en) * | 2018-01-29 | 2019-08-06 | 展讯通信(上海)有限公司 | The implementation method of different-frequency measure and isosystem measurement, device and user equipment |
CN110324895A (en) * | 2018-03-30 | 2019-10-11 | 展讯通信(上海)有限公司 | Alien frequencies or inter-system measuring method, device and user equipment |
CN110324895B (en) * | 2018-03-30 | 2023-04-07 | 展讯通信(上海)有限公司 | Different-frequency or different-system measurement method and device and user equipment |
CN110876152A (en) * | 2018-09-03 | 2020-03-10 | 中国移动通信有限公司研究院 | Continuous measurement implementation method and device and computer readable storage medium |
CN110876152B (en) * | 2018-09-03 | 2023-06-27 | 中国移动通信有限公司研究院 | Continuous measurement implementation method and device and computer readable storage medium |
WO2020063546A1 (en) * | 2018-09-28 | 2020-04-02 | 华为技术有限公司 | Indication method, apparatus, and system |
WO2023044733A1 (en) * | 2021-09-24 | 2023-03-30 | Apple Inc. | Measurment gap cancellation |
Also Published As
Publication number | Publication date |
---|---|
CN106535245B (en) | 2019-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106535245A (en) | Different system measurement method and multi-mode mobile terminal | |
EP3779687A1 (en) | Virtual machine scheduling method and device | |
CN110601922B (en) | Method and device for realizing comparison experiment, electronic equipment and storage medium | |
CN105406892B (en) | A kind of determination method, device and mobile terminal of network formats | |
CN107409272B (en) | Apparatus and method for broadcast aging for bluetooth low energy | |
CN105556421A (en) | System and method for conserving memory power using dynamic memory i/o resizing | |
CN106559770A (en) | A kind of network selection method and system on other places roaming border | |
CN107729129A (en) | A kind of multithread processing method based on synchrolock, terminal and storage medium | |
CN109068376A (en) | Method and device, storage medium into low power consumpting state | |
CN112333779A (en) | Method and device for controlling equipment, storage medium, processor and terminal | |
CN105278918B (en) | The read method of register and the register using the read method | |
JP6495363B2 (en) | Method and apparatus for setting CN0 reduction amount | |
EP2559313A2 (en) | Method and device of managing mtc devices in a mtc network environment | |
CN104247518A (en) | Cell search control method, cell search control apparatus, mobile communication terminal, computer program and storage medium | |
CN109417560A (en) | A kind of cut-in method, base station and equipment | |
CN102938903A (en) | Method and device for avoiding confliction between measuring opportunity and data transmission opportunity | |
CN103200680B (en) | Paging method, core network element, access network elements and terminal equipment | |
CN102595474B (en) | Method for establishing communication connection and user equipment | |
CN111225432A (en) | Cell registration method, terminal and storage medium | |
CN110475297A (en) | Processing method, device, system, relevant device and storage medium based on BWP | |
CN105451311B (en) | The synchronous method and device of a kind of dormancy awakening | |
US9042278B2 (en) | Method and apparatus for detecting synchronization position of LTE cell | |
CN103906276B (en) | Mobile terminal and its message treatment method and device | |
CN106332227A (en) | Network search method and network search device | |
CN109219070A (en) | Supplementary service configuration method, device and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |