Prior art keywords
parameter
comp
measurement event
measurement
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510571893.XA
Other languages
Chinese (zh)
Other versions
CN106535218A (en
Inventor
刘占波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201510571893.XA priority Critical patent/CN106535218B/en
Publication of CN106535218A publication Critical patent/CN106535218A/en
Application granted granted Critical
Publication of CN106535218B publication Critical patent/CN106535218B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a kind of CoMP algorithm parameter configuration method and device based on LTE system, are related to field of communication technology, which comprises add CoMP algorithm parameter in main plot;The request for receiving modification CoMP algorithm parameter modifies to CoMP algorithm parameter according to the request of modification CoMP algorithm parameter;When CoMP configuration feature switch in CoMP algorithm parameter is modified, the measurement purpose in adjustment A3 measurement event parameter is switched according to modified CoMP configuration feature.When CoMP configuration feature switch of the present invention in CoMP algorithm parameter is modified, the measurement purpose in adjustment A3 measurement event parameter is switched according to modified CoMP configuration feature, it is unable to normal use so as to avoid because of the CoMP function caused by lacking the A3 measurement event parameter based on CoMP, and because not having to be configured with UE caused by A3 measurement event parameter the problem of cell edge frequently reports A3 measurement report due to adding CoMP algorithm parameter.

Description

CoMP algorithm parameter configuration method and device based on LTE system
Technical field
The present invention relates to field of communication technology, in particular to a kind of CoMP algorithm parameter configuration method based on LTE system And device.
Background technique
The downlink and uplink of long term evolution (Long Term Evolution, LTE) system is all using based on orthogonal frequency division multiplexing With the orthogonal multi-access mode of (Orthogonal Frequency Division Multiplexing, OFDM), therefore minizone Interference become the system main interference.How inter-cell interference is reduced, improve identical networking is energy, becomes LTE system A main problem.Academia and industry a large number of studies show that, using multipoint cooperative technology (Coordinated Multi- Point, CoMP) inter-cell interference can be reduced, the spectrum efficiency of lifting system especially can effectively improve cell edge use The service rate at family.
CoMP refer to the antennas of multiple cell sites including main plot and adjacent cell in a manner of a kind of cooperation into Row reception/transmission, by the reception signal matter for improving user equipment (User Equipment, UE)/base station (eNodeB) cell Amount can be effectively reduced the interference of minizone, promote Cell Edge User service rate and cell average throughput.
The mode that design of the CoMP technology in LTE system is realized is as follows:
1) corresponding CoMP function algorithm parameter and the A3 measurement based on CoMP are added in configuration in network side base station cell Event argument;
2) UE is carried out in attachment access procedure in the cell for opening CoMP algorithm, and network side system will can be based on first The A3 control information of CoMP measurement is sent to UE by downlink RRC Reconfigation (RRC is reconfigured) message;
3) after cell attachment is successfully accessed, UE can start to open UE according to the A3 measuring control information based on CoMP measurement Dynamic measurement, if UE is moved to cell edge, and the metrical information of itself meets reporting for the A3 measurement event based on CoMP Condition will report the A3 measurement report based on CoMP to the base station cell where the UE;
It 4), can 2 medium access of layer by base station cell high-rise (RRC) to this cell after cell receives the A3 measurement report Control layer (MAC) sends the processing that joint assists scheduling message assist scheduling;
5) base station cell high-rise (RRC) simultaneously to the physical layer (PHY) of adjacent cell and joint assistance reception/transmission message into The corresponding assist process of row.
It can see CoMP function in the practical realization application of LTE system by being described above, CoMP algorithm parameter and base In CoMP A3 measurement parameter realization design and configuration be CoMP function can normal use it is most important and closely related two Partial parameters.
The cell opened in LTE system in CoMP technology, needs A3 measurement parameter and CoMP algorithm based on CoMP Parameter is added configuration simultaneously just can guarantee that the technology can effectively be applied.If because of the configuration of operation and maintenance personnel This two parts parameter is not added configuration simultaneously, then will lead to and lead because lacking the A3 measurement event parameter based on CoMP by fault It causes CoMP function to be unable to normal use in systems, or is only configured with because in no addition CoMP algorithm parameter based on CoMP A3 measurement event parameter, cause UE to disappear cell edge is meaningless because frequently reporting the useless A3 measurement report based on CoMP Power consumption is excessive.
Summary of the invention
In view of the above problems, it proposes on the present invention overcomes the above problem or at least be partially solved in order to provide one kind State a kind of CoMP algorithm parameter configuration method and device based on LTE system of problem.
According to one aspect of the present invention, a kind of CoMP algorithm parameter configuration method based on LTE system is provided, it is described Method includes:
Multipoint cooperative technology CoMP algorithm parameter is added in main plot;
The request for receiving modification CoMP algorithm parameter calculates the CoMP according to the request of the modification CoMP algorithm parameter Method parameter is modified;
When CoMP configuration feature switch in the CoMP algorithm parameter is modified, function is configured according to modified CoMP The measurement purpose in adjustment A3 measurement event parameter can be switched, the A3 measurement event parameter is the A3 measurement event based on CoMP Parameter.
Optionally, the measurement mesh switched according to modified CoMP configuration feature in adjustment A3 measurement event parameter , further comprise:
When the modified CoMP configuration feature switch is opens, by the measurement mesh in the A3 measurement event parameter Be adjusted to for CoMP function;
When the modified CoMP configuration feature switch is closes, by the measurement mesh in the A3 measurement event parameter Be adjusted to close.
Optionally, described before CoMP algorithm parameter is added in main plot, the method also includes:
The request for adding CoMP algorithm parameter is received, judges to whether there is A3 measurement event parameter in the main plot, The main plot executes described in main plot there are when A3 measurement event parameter according to the request of the addition CoMP algorithm parameter The step of adding CoMP algorithm parameter.
Optionally, when the main plot does not have A3 measurement event parameter, the CoMP algorithm parameter addition is prompted to lose It loses.
Optionally, after the prompt CoMP algorithm parameter addition failure, the method also includes:
The request of addition A3 measurement event parameter is received, the purpose of judging the measurement in the A3 measurement event parameter received is No is to close, if so, according to the request of the addition A3 measurement event parameter in main plot addition A3 measurement event ginseng Number, and the step of executing the request for receiving addition CoMP algorithm parameter;Otherwise the A3 measurement event parameter is prompted to add Failure.
Optionally, the method also includes:
The request for deleting CoMP algorithm parameter is received, according to the request for deleting CoMP algorithm parameter by the main plot In CoMP algorithm parameter delete, and by the main plot A3 measurement event parameter delete.
Optionally, the method also includes:
The request for deleting A3 measurement event parameter is received, is judged with the presence or absence of CoMP algorithm parameter in the main plot, if It is that the A3 measurement event parameter is then prompted to delete failure;Otherwise according to the request for deleting A3 measurement event parameter by institute The A3 measurement event parameter stated in main plot is deleted.
Optionally, the method also includes:
The request for modifying the measurement purpose in the A3 measurement event parameter is received, is prompted in the A3 measurement event parameter Measurement purpose modify failure.
According to another aspect of the invention, a kind of CoMP algorithm parameter configuration device based on LTE system, institute are provided Stating device includes:
Parameter adding unit, for adding multipoint cooperative technology CoMP algorithm parameter in main plot;
Parameter modifying unit, for receiving the request of modification CoMP algorithm parameter, according to the modification CoMP algorithm parameter Request modify to the CoMP algorithm parameter;
Adjustment unit is modified, when being modified for the CoMP configuration feature switch in the CoMP algorithm parameter, according to Measurement purpose in modified CoMP configuration feature switch adjustment A3 measurement event parameter, the A3 measurement event parameter is base In the A3 measurement event parameter of CoMP.
Optionally, the modification adjustment unit is further used in the modified CoMP configuration feature switch being to beat When opening, it is adjusted to the measurement purpose in the A3 measurement event parameter to be used for CoMP function;Match in the modified CoMP When setting functional switch to close, the measurement purpose in the A3 measurement event parameter is adjusted to close.
Optionally, described device further include:
Judging unit is received, for receiving the request of addition CoMP algorithm parameter, judges to whether there is in the main plot A3 measurement event parameter adds asking for CoMP algorithm parameter according to described in the main plot there are when A3 measurement event parameter It asks and calls the parameter adding unit.
Optionally, the reception judging unit is also used to when the main plot does not have A3 measurement event parameter, is prompted The CoMP algorithm parameter addition failure.
Optionally, described device further include:
Judging unit is requested, for receiving the request of addition A3 measurement event parameter, judges the A3 measurement event received Whether the measurement purpose in parameter is closing, if so, small in the master according to the request of the addition A3 measurement event parameter Area adds A3 measurement event parameter, and calls the parameter adding unit;Otherwise the A3 measurement event parameter addition is prompted to lose It loses.
Optionally, described device further include:
Parameter deletes unit, for receiving the request for deleting CoMP algorithm parameter, according to the deletion CoMP algorithm parameter Request by the main plot CoMP algorithm parameter delete, and by the main plot A3 measurement event parameter delete.
Optionally, described device further include:
Unit is deleted in request, for receiving the request for deleting A3 measurement event parameter, judges whether deposit in the main plot In CoMP algorithm parameter, if so, the A3 measurement event parameter is prompted to delete failure;Otherwise thing is measured according to the deletion A3 The A3 measurement event parameter in the main plot is deleted in the request of part parameter.
Optionally, described device further include:
Request modification unit prompts institute for receiving the request for modifying the measurement purpose in the A3 measurement event parameter State the measurement purpose modification failure in A3 measurement event parameter.
When the present invention is modified by the CoMP configuration feature switch in the CoMP algorithm parameter, according to modified Measurement purpose in CoMP configuration feature switch adjustment A3 measurement event parameter, is surveyed so as to avoid because lacking the A3 based on CoMP CoMP function caused by amount event argument is unable to normal use, and because not having only to be configured with A3 due to adding CoMP algorithm parameter UE caused by measurement event parameter is the problem of cell edge frequently reports useless A3 measurement report.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Fig. 1 is the flow chart of the CoMP algorithm parameter configuration method based on LTE system of one embodiment of the present invention;
Fig. 2 is the flow chart of the CoMP algorithm parameter configuration method based on LTE system of an embodiment of the present invention;
Fig. 3 is the structural block diagram of the CoMP algorithm parameter configuration device based on LTE system of an embodiment of the present invention.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Implement below Example is not intended to limit the scope of the invention for illustrating the present invention.
Fig. 1 is the flow chart of the CoMP algorithm parameter configuration method based on LTE system of one embodiment of the present invention;Ginseng According to Fig. 1, which comprises
S101: CoMP algorithm parameter is added in main plot;
It will be appreciated that the main plot is the cell of the currently practical ownership of user.
It should be noted that the CoMP algorithm parameter generally includes 5 parameters, it is respectively as follows:
(1), CoMPLcId: i.e. cell local ident, value range are usually [0,11].
(2), CompConfigFuncSwitch: i.e. CoMP configuration feature switchs, and when value is 0, represents " closing ";Value When being 1, " opening, CoMP collaboration user collection is selected according to A3 measurement event " is represented;
(3), CompForceSwitch: i.e. pressure CoMP switch when value is 0, represents " closing ", when value is 1, generation Table " opening ".
(4), CoMPMcsThres: i.e. CoMP user MCS thresholding, value range are usually [0,27], and default value is 10.
(5), CoMPMcsOffset: i.e. MCS thresholding deviates, for preventing MCS shake from user being caused to pass in and out at integration and cooperation Reason mode is too frequent, and value range is usually [0,27], and default value is 3.
S102: receiving the request of modification CoMP algorithm parameter, according to the request of the modification CoMP algorithm parameter to described CoMP algorithm parameter is modified;
It will be appreciated that " request " in present embodiment is inputted by operation and maintenance personnel, and certainly, " the modification There is CoMP algorithm parameter, according to the request of the modification CoMP algorithm parameter to described in the request of CoMP algorithm parameter " CoMP algorithm parameter is modified the CoMP algorithm parameter that can be regarded as according to the request of CoMP algorithm parameter " modification " It modifies to the CoMP algorithm parameter in main plot.
S103: when the CoMP configuration feature switch in the CoMP algorithm parameter is modified, according to modified CoMP Measurement purpose in configuration feature switch adjustment A3 measurement event parameter, the A3 measurement event parameter are that the A3 based on CoMP is surveyed Measure event argument.
In the concrete realization, it " opens in the setting of CoMP configuration feature switch, CoMP cooperation is selected according to A3 measurement event User's collection " and " closing " carry out pressure and are associated with " being used for CoMP function " and " closing " in measurement purpose respectively, are just avoided that Because the CoMP function caused by lacking the A3 measurement event parameter based on CoMP is unable to normal use, and because of no addition CoMP Algorithm parameter and be only configured with UE caused by the A3 measurement event parameter based on CoMP frequently reported in cell edge it is useless A3 measurement report based on CoMP.
The above-mentioned associated relationship of pressure specifically:
It is that " opening " (corresponds to and " open, selected according to A3 measurement event in the modified CoMP configuration feature switch Select CoMP collaboration user collection ") when, the measurement purpose in the A3 measurement event parameter is adjusted to " for CoMP function ";
When the modified CoMP configuration feature switch is closes, by the measurement mesh in the A3 measurement event parameter Be adjusted to close.
It should be noted that the A3 measurement event parameter is the A3 measurement event parameter based on CoMP, generally include 11 parameters, are respectively as follows:
(1) A3LcId: i.e. cell local ident, value range are usually [0,11].
(2) A3CfgId: i.e. A3 affair configures ID, and value range is usually [0,15].
(3) A3TrigQuantity: judgement measurand is reported to represent Reference Signal Received Power when value is 0 (rsrp);When value is 1, Reference Signal Received Quality (rsrq) is represented.
(4) A3Hysteresis: i.e. event triggers hysteresis factors, and value range is usually [0,15], unit dB.
(5) A3TimetoTrig: i.e. event triggers the duration, and value range is usually [0,5120], unit ms.
(6) A3MaxReportCell: i.e. measurement reporting subdistrict maximum number, value range are usually [1,8].
(7) A3RptInterval: i.e. periodic report interval, value range are usually [1,3600], unit s.
(8) A3RptAmount: i.e. periodic report number, value range are usually [1, unlimited].
(9) A3Offset:A3 event triggers deviant, and value range is usually [- 15~15], unit db.
(10) A3MeasAlgoType: i.e. A3 measurement relevant algorithm represents handover handoff algorithms when value is 0; When value is 1, icic Inter-Cell Interference Coordination algorithm is represented;When value is 2, CoMP function algorithm is represented.
(11) A3MeasPurpose: i.e. it is preferential to represent intraFreqPriHc identical frequency when value is 0 for measurement purpose The switching of grade;When value is 1, icic is represented for UE location information;When value is 2, represents and be used for CoMP function, value 8 When, represent this configuration closing of invalid.
When present embodiment is modified by the CoMP configuration feature switch in the CoMP algorithm parameter, according to modification The measurement purpose in CoMP configuration feature switch adjustment A3 measurement event parameter afterwards, so as to avoid because lacking based on CoMP's CoMP function caused by A3 measurement event parameter is unable to normal use, and because not having to be configured with due to adding CoMP algorithm parameter UE caused by A3 measurement event parameter is the problem of cell edge frequently reports useless A3 measurement report
Fig. 2 is the flow chart of the CoMP algorithm parameter configuration method based on LTE system of an embodiment of the present invention;Reference Fig. 2, which comprises
S201: receiving the request of addition CoMP algorithm parameter, judges to join in the main plot with the presence or absence of A3 measurement event Number executes step according to the request of the addition CoMP algorithm parameter in the main plot there are when A3 measurement event parameter S202;When the main plot does not have A3 measurement event parameter, step S205 is executed;
It should be noted that this step can first judge whether main plot has added A3 measurement event parameter, if small in master There are no configurations to add A3 measurement event parameter in area, then can prompt the warning information of configuration error, while prompting CoMP algorithm Parameter configuration addition failure.
I.e. system does not allow in main plot first configuration addition in the case where without configuration addition A3 measurement event parameter CoMP algorithm parameter, so that ensure that CoMP function is opened Yi Dan configuration can effectively be applied.
S202: CoMP algorithm parameter is added in main plot;
S203: receiving the request of modification CoMP algorithm parameter, according to the request of the modification CoMP algorithm parameter to described CoMP algorithm parameter is modified;
S204: when the CoMP configuration feature switch in the CoMP algorithm parameter is modified, according to modified CoMP Measurement purpose in configuration feature switch adjustment A3 measurement event parameter, and return step S203, the A3 measurement event parameter For the A3 measurement event parameter based on CoMP.
S205: the CoMP algorithm parameter addition failure is prompted;
S206: the request of addition A3 measurement event parameter is received, judges the measurement in the A3 measurement event parameter received Whether purpose is closing, if so, according to the request of the addition A3 measurement event parameter in main plot addition A3 measurement Event argument, and return step S201;Otherwise the A3 measurement event parameter addition failure is prompted.
In this step, during adding A3 measurement event parameter, only allowing to add measurement purpose is that the A3 closed is surveyed Event argument is measured, if measurement purpose is " being used for CoMP function ", prompts A3 measurement event parameter addition failure;
Above-mentioned realization is only configured with A3 measurement event parameter and is led it is possible to prevente effectively from no addition CoMP algorithm parameter Cause UE in cell edge because frequently reporting useless A3 measurement report.
In the concrete realization, if because the reasons such as the adjustment of network side characteristic application need to delete CoMP algorithm parameter, The A3 measurement event parameter of main plot also will be synchronized deletion simultaneously during deleting CoMP algorithm parameter by main plot, In present embodiment, the method also includes:
S207: receiving the request for deleting CoMP algorithm parameter, will be described according to the request for deleting CoMP algorithm parameter CoMP algorithm parameter in main plot is deleted, and the A3 measurement event parameter in the main plot is deleted;To effectively avoid CoMP configuration feature switch has been deleted for closing or CoMP algorithm parameter, and the measurement purpose of A3 measurement event parameter is still For for CoMP function, so that UE is after main plot attachment accesses and is moved to main plot edge, UE is frequent at main plot edge Report useless A3 measurement report.
In the concrete realization, if operation and maintenance personnel carries out delete processing, meeting to the A3 measurement event parameter of main plot First the CoMP algorithm parameter of main plot whether there is and judge, i.e., if the CoMP algorithm parameter of main plot exists, no Allow first to delete main plot based on the A3 measurement event of CoMP, prompt alarm information, and the A3 based on CoMP is reported to survey Amount event deletes the information of failure.If the CoMP algorithm parameter of main plot is not present, allow to delete A3 measurement event parameter, In present embodiment, the method also includes:
S208: receiving the request for deleting A3 measurement event parameter, judges to join in the main plot with the presence or absence of CoMP algorithm Number, if so, the A3 measurement event parameter is prompted to delete failure;Otherwise according to the request for deleting A3 measurement event parameter A3 measurement event parameter in the main plot is deleted;To guarantee not allow in the presence of CoMP algorithm parameter It first measures purpose to the A3 measurement event based on CoMP function to delete, thus the feelings for avoiding CoMP function from opening in systems Under condition, system cell CoMP function is caused to be unable to normal use because A3 measurement event parameter is not configured.
In the concrete realization, if operation and maintenance personnel modifies processing to the A3 measurement event parameter of main plot, it is System can generate the warning information of event notice class to maintenance personnel, and the measurement purpose in A3 measurement event parameter does not allow to modify, In present embodiment, the method also includes:
S209: the request for modifying the measurement purpose in the A3 measurement event parameter is received, the A3 measurement event is prompted Measurement purpose in parameter modifies failure.
For method implementation, for simple description, therefore, it is stated as a series of action combinations, but ability Field technique personnel should be aware of, and embodiment of the present invention is not limited by the described action sequence, because according to the present invention Embodiment, some steps may be performed in other sequences or simultaneously.Secondly, those skilled in the art should also know that, Embodiment described in this description belongs to preferred embodiment, related movement embodiment party not necessarily of the present invention Necessary to formula.
Fig. 3 is the structural block diagram of the CoMP algorithm parameter configuration device based on LTE system of an embodiment of the present invention;Ginseng According to Fig. 3, described device includes:
Parameter adding unit 301, for adding multipoint cooperative technology CoMP algorithm parameter in main plot;
Parameter modifying unit 302 is joined for receiving the request of modification CoMP algorithm parameter according to the modification CoMP algorithm Several requests modifies to the CoMP algorithm parameter;
Adjustment unit 303 is modified, when being modified for the CoMP configuration feature switch in the CoMP algorithm parameter, root The measurement purpose in adjustment A3 measurement event parameter is switched according to modified CoMP configuration feature, the A3 measurement event parameter is A3 measurement event parameter based on CoMP.
In a kind of optional embodiment of the invention, the modification adjustment unit 303 is further used in the modification When CoMP configuration feature switch afterwards is opens, it is adjusted to the measurement purpose in the A3 measurement event parameter to be used for CoMP function Energy;When the modified CoMP configuration feature switch is closes, by the measurement purpose tune in the A3 measurement event parameter Whole is to close.
In a kind of optional embodiment of the invention, described device further include:
Judging unit is received, for receiving the request of addition CoMP algorithm parameter, judges to whether there is in the main plot A3 measurement event parameter adds asking for CoMP algorithm parameter according to described in the main plot there are when A3 measurement event parameter It asks and calls the parameter adding unit.
In a kind of optional embodiment of the invention, the reception judging unit is also used to not deposit in the main plot In A3 measurement event parameter, the CoMP algorithm parameter addition failure is prompted.
In a kind of optional embodiment of the invention, described device further include:
Judging unit is requested, for receiving the request of addition A3 measurement event parameter, judges the A3 measurement event received Whether the measurement purpose in parameter is closing, if so, small in the master according to the request of the addition A3 measurement event parameter Area adds A3 measurement event parameter, and calls the parameter adding unit;Otherwise the A3 measurement event parameter addition is prompted to lose It loses.
In a kind of optional embodiment of the invention, described device further include:
Parameter deletes unit, for receiving the request for deleting CoMP algorithm parameter, according to the deletion CoMP algorithm parameter Request by the main plot CoMP algorithm parameter delete, and by the main plot A3 measurement event parameter delete.
In a kind of optional embodiment of the invention, described device further include:
Unit is deleted in request, for receiving the request for deleting A3 measurement event parameter, judges whether deposit in the main plot In CoMP algorithm parameter, if so, the A3 measurement event parameter is prompted to delete failure;Otherwise thing is measured according to the deletion A3 The A3 measurement event parameter in the main plot is deleted in the request of part parameter.
In a kind of optional embodiment of the invention, described device further include:
Request modification unit prompts institute for receiving the request for modifying the measurement purpose in the A3 measurement event parameter State the measurement purpose modification failure in A3 measurement event parameter.
For device embodiments, since it is substantially similar to method implementation, so be described relatively simple, Related place illustrates referring to the part of method implementation.
It should be noted that in all parts of the device of the invention, according to the function that it to be realized to therein Component has carried out logical partitioning, and still, the present invention is not only restricted to this, can according to need all parts are repartitioned or Person's combination for example, can be single component by some component combinations, or some components can be further broken into more Subassembly.
All parts embodiment of the invention can be implemented in hardware, or to transport on one or more processors Capable software module is realized, or is implemented in a combination thereof.It will be understood by those of skill in the art that can make in practice With some or complete in microprocessor or digital signal processor (DSP) Lai Shixian according to the present invention device of embodiment The some or all functions of portion's component.The present invention be also implemented as a part for executing method as described herein or The device or device program (for example, computer program and computer program product) of person's whole.Such realization is of the invention Program can store on a computer-readable medium, or may be in the form of one or more signals.Such signal It can be downloaded from an internet website to obtain, be perhaps provided on the carrier signal or be provided in any other form.
It should be noted that illustrate the present invention rather than limit it for above embodiment, and this Field technical staff can be designed replacement embodiment without departing from the scope of the appended claims.In claim In, any reference symbol between parentheses should not be configured to limitations on claims.Word "comprising" is not excluded for depositing In element or step not listed in the claims.Word "a" or "an" located in front of the element do not exclude the presence of it is multiple this The element of sample.The present invention can by means of include several different elements hardware and by means of properly programmed computer come It realizes.In the unit claims listing several devices, several in these devices can be through the same hardware It embodies.The use of word first, second, and third does not indicate any sequence.These words can be construed to Title.
The above embodiments are only used to illustrate the present invention, and not limitation of the present invention, in relation to the common of technical field Technical staff can also make a variety of changes and modification without departing from the spirit and scope of the present invention, therefore all Equivalent technical solution also belongs to scope of the invention, and scope of patent protection of the invention should be defined by the claims.

Claims (14)

1. a kind of CoMP algorithm parameter configuration method based on LTE system, which is characterized in that the described method includes:
Multipoint cooperative technology CoMP algorithm parameter is added in main plot;
The request for receiving modification CoMP algorithm parameter joins the CoMP algorithm according to the request of the modification CoMP algorithm parameter Number is modified;
When CoMP configuration feature switch in the CoMP algorithm parameter is modified, opened according to modified CoMP configuration feature The measurement purpose in adjustment A3 measurement event parameter is closed, the A3 measurement event parameter is the A3 measurement event ginseng based on CoMP Number;
The measurement purpose switched in adjustment A3 measurement event parameter according to modified CoMP configuration feature, is further wrapped It includes:
When the modified CoMP configuration feature switch is opens, by the measurement purpose tune in the A3 measurement event parameter Whole is for CoMP function;
When the modified CoMP configuration feature switch is closes, by the measurement purpose tune in the A3 measurement event parameter Whole is to close.
2. the method as described in claim 1, which is characterized in that it is described before CoMP algorithm parameter is added in main plot, it is described Method further include:
The request for receiving addition CoMP algorithm parameter judges with the presence or absence of A3 measurement event parameter in the main plot, described Main plot executes described in main plot addition there are when A3 measurement event parameter according to the request of the addition CoMP algorithm parameter The step of CoMP algorithm parameter.
3. method according to claim 2, which is characterized in that when the main plot does not have A3 measurement event parameter, mention Show the CoMP algorithm parameter addition failure.
4. method as claimed in claim 3, which is characterized in that after the prompt CoMP algorithm parameter addition failure, The method also includes:
Receive addition A3 measurement event parameter request, judge the measurement purpose in the A3 measurement event parameter received whether be It closes, if so, A3 measurement event parameter is added in the main plot according to the request of the addition A3 measurement event parameter, and The step of executing the request for receiving addition CoMP algorithm parameter;Otherwise the A3 measurement event parameter addition failure is prompted.
5. method as described in any one of claims 1 to 4, which is characterized in that the method also includes:
The request for deleting CoMP algorithm parameter is received, it will be in the main plot according to the request for deleting CoMP algorithm parameter CoMP algorithm parameter is deleted, and the A3 measurement event parameter in the main plot is deleted.
6. method as described in any one of claims 1 to 4, which is characterized in that the method also includes:
The request for deleting A3 measurement event parameter is received, is judged with the presence or absence of CoMP algorithm parameter in the main plot, if so, The A3 measurement event parameter is prompted to delete failure;Otherwise according to the request for deleting A3 measurement event parameter that the master is small A3 measurement event parameter in area is deleted.
7. method as described in any one of claims 1 to 4, which is characterized in that the method also includes:
The request for modifying the measurement purpose in the A3 measurement event parameter is received, the survey in the A3 measurement event parameter is prompted Measure purpose modification failure.
8. a kind of CoMP algorithm parameter configuration device based on LTE system, which is characterized in that described device includes:
Parameter adding unit, for adding multipoint cooperative technology CoMP algorithm parameter in main plot;
Parameter modifying unit, for receiving the request of modification CoMP algorithm parameter, according to asking for the modification CoMP algorithm parameter It asks and modifies to the CoMP algorithm parameter;
Adjustment unit is modified, when being modified for the CoMP configuration feature switch in the CoMP algorithm parameter, according to modification Afterwards CoMP configuration feature switch adjustment A3 measurement event parameter in measurement purpose, the A3 measurement event parameter be based on The A3 measurement event parameter of CoMP;
The modification adjustment unit is further used for when the modified CoMP configuration feature switch is opens, will be described Measurement purpose in A3 measurement event parameter is adjusted to for CoMP function;It is in the modified CoMP configuration feature switch When closing, the measurement purpose in the A3 measurement event parameter is adjusted to close.
9. device as claimed in claim 8, which is characterized in that described device further include:
Judging unit is received, for receiving the request of addition CoMP algorithm parameter, judges to survey in the main plot with the presence or absence of A3 Event argument is measured, in the main plot there are when A3 measurement event parameter, according to the request tune of the addition CoMP algorithm parameter With the parameter adding unit.
10. device as claimed in claim 9, which is characterized in that the reception judging unit, be also used to the main plot not There are when A3 measurement event parameter, prompt the CoMP algorithm parameter addition failure.
11. device as claimed in claim 10, which is characterized in that described device further include:
Judging unit is requested, for receiving the request of addition A3 measurement event parameter, judges the A3 measurement event parameter received In measurement purpose whether be closing, if so, according to it is described addition A3 measurement event parameter request add in the main plot Add A3 measurement event parameter, and calls the parameter adding unit;Otherwise the A3 measurement event parameter addition failure is prompted.
12. the device as described in any one of claim 8~11, which is characterized in that described device further include:
Parameter deletes unit, for receiving the request for deleting CoMP algorithm parameter, deletes asking for CoMP algorithm parameter according to described It asks and deletes the CoMP algorithm parameter in the main plot, and the A3 measurement event parameter in the main plot is deleted.
13. the device as described in any one of claim 8~11, which is characterized in that described device further include:
Unit is deleted in request, for receiving the request for deleting A3 measurement event parameter, judges to whether there is in the main plot CoMP algorithm parameter, if so, the A3 measurement event parameter is prompted to delete failure;Otherwise according to the deletion A3 measurement event The A3 measurement event parameter in the main plot is deleted in the request of parameter.
14. the device as described in any one of claim 8~11, which is characterized in that described device further include:
Request modification unit prompts the A3 for receiving the request for modifying the measurement purpose in the A3 measurement event parameter Measurement purpose in measurement event parameter modifies failure.
CN201510571893.XA 2015-09-09 2015-09-09 CoMP algorithm parameter configuration method and device based on LTE system Active CN106535218B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510571893.XA CN106535218B (en) 2015-09-09 2015-09-09 CoMP algorithm parameter configuration method and device based on LTE system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510571893.XA CN106535218B (en) 2015-09-09 2015-09-09 CoMP algorithm parameter configuration method and device based on LTE system

Publications (2)

Publication Number Publication Date
CN106535218A CN106535218A (en) 2017-03-22
CN106535218B true CN106535218B (en) 2019-08-23

Family

ID=58345652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510571893.XA Active CN106535218B (en) 2015-09-09 2015-09-09 CoMP algorithm parameter configuration method and device based on LTE system

Country Status (1)

Country Link
CN (1) CN106535218B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102932826A (en) * 2012-11-30 2013-02-13 北京邮电大学 Cell interruption detection positioning method in self-organizing network of cell mobile communication system
CN104202783A (en) * 2014-09-03 2014-12-10 苏州微站通信科技有限公司 Method for reducing switching frequency of micro base station and macro base station during cooperative work
CN104349483A (en) * 2013-08-07 2015-02-11 电信科学技术研究院 Resource dispatching method and device in CoMP (coordinated multiple points transmission/reception) scene

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9130709B2 (en) * 2012-09-12 2015-09-08 Telefonaktiebolaget L M Ericsson (Publ) Method for inter-cell downlink interference minimization via comp

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102932826A (en) * 2012-11-30 2013-02-13 北京邮电大学 Cell interruption detection positioning method in self-organizing network of cell mobile communication system
CN104349483A (en) * 2013-08-07 2015-02-11 电信科学技术研究院 Resource dispatching method and device in CoMP (coordinated multiple points transmission/reception) scene
CN104202783A (en) * 2014-09-03 2014-12-10 苏州微站通信科技有限公司 Method for reducing switching frequency of micro base station and macro base station during cooperative work

Also Published As

Publication number Publication date
CN106535218A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
US10506480B2 (en) Method and apparatus for enhancing measurement in wireless communication system
RU2621678C2 (en) Method and device relating to effective measurements with reduced interference
WO2020057518A1 (en) Method and device for cell measurement
CN105723764B (en) Method for the LTE channel selection in unlicensed frequency bands
CN104782193B (en) Uplink control and data transmission in the network for enabling multithread
EP2584819B1 (en) Measurement configuration and reporting method for multi-carrier system and device thereof
CN110062397A (en) In wireless communication multiple cell configuration under wave beam Trouble Report method and apparatus
KR101446320B1 (en) Generating and exchanging measurement information for coverage optimization in wireless networks
EP2695416B1 (en) Limiting interference in a heterogeneous wireless communication system
CA2798930C (en) Handover with carrier aggregation
EP2487951A1 (en) Coordination processing method and apparatus of self organizing operation, communication system
CN108476128A (en) For providing the ambulant technology based on uplink
EP2129175B1 (en) Method of detecting an outage of a radio cell
CN105940694A (en) Method and apparatus for applying resources in heterogeneous network system
CN108112067A (en) For the method and apparatus synchronous with the foundation of increased cell
WO2011126420A1 (en) Method and arrangement in a wireless communication system
TW201238267A (en) Method of UE RSRQ measurement precuation and UE
CN109392019A (en) A kind of LTE network capacity equilibrium optimization method
AU2009345733A1 (en) Method, system and apparatus for reading broadcast message
JP5890879B1 (en) User apparatus, base station, uplink transmission power report method, and parameter notification method
TW200948106A (en) Measurement bandwidth configuration method
CN107040901A (en) A kind of group's different-frequency measure gap configuration method and group system
CN109818770A (en) A kind of minimum drive test exception configuration processing method and device
CN106535218B (en) CoMP algorithm parameter configuration method and device based on LTE system
CN102238618B (en) The starting method of measurement task in multiple carriers and subscriber equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant