CN106535139A - Wireless communication method for power outage maintenance - Google Patents

Wireless communication method for power outage maintenance Download PDF

Info

Publication number
CN106535139A
CN106535139A CN201611004977.6A CN201611004977A CN106535139A CN 106535139 A CN106535139 A CN 106535139A CN 201611004977 A CN201611004977 A CN 201611004977A CN 106535139 A CN106535139 A CN 106535139A
Authority
CN
China
Prior art keywords
node
communication
time
information
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611004977.6A
Other languages
Chinese (zh)
Other versions
CN106535139B (en
Inventor
赵威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Information and Telecommunication Branch of State Grid Heilongjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611004977.6A priority Critical patent/CN106535139B/en
Publication of CN106535139A publication Critical patent/CN106535139A/en
Application granted granted Critical
Publication of CN106535139B publication Critical patent/CN106535139B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/06Selective distribution of broadcast services, e.g. multimedia broadcast multicast service [MBMS]; Services to user groups; One-way selective calling services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Multimedia (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a wireless communication method for power outage maintenance, and relates to wireless communication technology for power outage maintenance. The invention aims at solving the problem of poor reliability of a communication mode between line maintenance personnel in the existing non-base station areas. According to the wireless communication method provided by the invention, under the condition of no base station, multicast wireless communication between the line maintenance personnel is performed within one area as a unit, and any node can serve as a publisher to publish information. The communication process is divided into two levels, the node with stronger signals simultaneously forwards received signals to increase the opportunity of the nodes with weak signal receiving ability to receive the signals. By adoption of the wireless communication method provided by the invention, the problem of dependence on the base station in the communication between the line maintenance personnel is solved, and the reliability of the communication is improved. The wireless communication method provided by the invention is suitable for communication occasions of the line maintenance personnel.

Description

For the method for the radio communication of power-off maintenance
Technical field
The present invention relates to be used for the wireless communication technology of power-off maintenance.
Background technology
Electric Power Line Overhaul refers to that each side switch of circuit is in cold standby or inspecting state and circuit outlet disconnecting link exists Open position, or all disconnecting links being connected with circuit are open position, circuit is not charged;The high anti-high-pressure side disconnecting link of circuit draws Open, circuit PT low-pressure sides disconnect, and each side grounding switch of circuit is closed position (or hanging up properly earth lead);If without particular/special requirement, line Road protection is stopped transport;There is the circuit of series compensation device, series compensation device should be in cold standby or inspecting state.
But at present, for line maintenance personnel job site in many cases, be where signal conditioning is poor, Communication relies on base station, and the communication reliability between maintainer is poor.
The content of the invention
The present invention be in order to solve it is existing without base station area, the communication mode poor reliability between line maintenance personnel Problem, so as to provide a kind of method of the radio communication for power-off maintenance.
For the method for the radio communication of power-off maintenance,
Before circuit maintainer enters a region without base station, one is installed to each line maintenance personnel Wireless Telecom Equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signal strength, i.e.,:Second level node and the 3rd Level node;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete one After time cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signal strength, i.e.,:Second level node and Third level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the company of free time for step one, the initiation knot adjustment that will communicate Continuous bandwidth, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive To the information of identical content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judging knot Fruit is no, then retain full detail.
For the method for the radio communication of power-off maintenance,
Before circuit maintainer enters a region without base station, one is installed to each line maintenance personnel Wireless Telecom Equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node and Three-level node;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete one After time cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node With third level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the company of free time for step one, the initiation knot adjustment that will communicate Continuous bandwidth, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive To the information of identical content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judging knot Fruit is no, then retain full detail.
The present invention in the case of without base station, with a region as unit, carry out between line maintenance personnel multicast formula without Line communicates, and any one node can enter row information issue as publisher.And the process for communicating is divided into two ranks, signal Forwarded while stronger node is by the signal of reception, increase signal and connect the chance that weak node receives signal.The present invention Solve the problems, such as that the communication between line maintenance personnel relies on base station, improve the reliability of communication.
Specific embodiment
The method of specific embodiment one, the radio communication overhauled for power-off,
Before circuit maintainer enters a region without base station, one is installed to each line maintenance personnel Wireless Telecom Equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signal strength, i.e.,:Second level node and the 3rd Level node;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete one After time cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signal strength, i.e.,:Second level node and Third level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the company of free time for step one, the initiation knot adjustment that will communicate Continuous bandwidth, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive To the information of identical content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judging knot Fruit is no, then retain full detail.
The present invention in the case of without base station, with a region as unit, carry out between line maintenance personnel multicast formula without Line communicates, and any one node can enter row information issue as publisher.And the process for communicating is divided into two ranks, signal Forwarded while stronger node is by the signal of reception, increase and decrease signal and connect the chance that weak node receives signal.The present invention Solve the problems, such as that the communication between line maintenance personnel relies on base station, improve the reliability of communication.
Specific embodiment two, this specific embodiment is for the wireless of power-off maintenance described in specific embodiment one The further restriction of the method for communication, each communication process are cast communication process.
Specific embodiment three, this specific embodiment is for the wireless of power-off maintenance described in specific embodiment two The further restriction of the method for communication, in each communication process, outside node AP can add communication, the section in region at any time Point AP can exit communication at any time.
The method of specific embodiment four, the radio communication overhauled for power-off,
Before circuit maintainer enters a region without base station, one is installed to each line maintenance personnel Wireless Telecom Equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node and Three-level node;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete one After time cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node With third level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the company of free time for step one, the initiation knot adjustment that will communicate Continuous bandwidth, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive To the information of identical content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judging knot Fruit is no, then retain full detail.
Specific embodiment five, this specific embodiment is for the wireless of power-off maintenance described in specific embodiment four The further restriction of the method for communication, each communication process are cast communication process.
Specific embodiment six, this specific embodiment is for the wireless of power-off maintenance described in specific embodiment four The further restriction of the method for communication, in each communication process, outside node AP can add communication, the section in region at any time Point AP can exit communication at any time.

Claims (6)

1. it is used for the method for the radio communication of power-off maintenance, it is characterized in that:
It is before circuit maintainer enters a region without base station, wireless to one is installed with each line maintenance personnel Communication equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signal strength, i.e.,:Second level node and third level section Point;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete a time After cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signal strength, i.e.,:Second level node and the 3rd Level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the continuous band of free time for step one, the initiation knot adjustment that will communicate Width, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive phase With the information of content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judged result is It is no, then retain full detail.
2. the method for the radio communication for power-off maintenance according to claim 1, it is characterised in that each communication process It is cast communication process.
3. the method for the radio communication for power-off maintenance according to claim 1, it is characterised in that each communication process In, outside node AP can add communication at any time, and the node AP in region can exit communication at any time.
4. it is used for the method for the radio communication of power-off maintenance, it is characterized in that:
It is before circuit maintainer enters a region without base station, wireless to one is installed with each line maintenance personnel Communication equipment, and it is designated as a node AP;Include N number of node AP altogether, N is positive integer;
N number of node AP is divided into into two ranks according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node and the third level Node;First order node is set, and in an initial condition, first order node is set to sky;
In a communication cycle, in addition to node is initiated, other node AP it has been classified and has no longer adjusted rank;Complete a time After cycle, N number of node AP is divided into two ranks again according to the threshold value of preset signals signal to noise ratio, i.e.,:Second level node and Three-level node;
In a communication cycle, one time communication process is:
, to the first order, node monitor channel is initiated in communication, if finding the continuous band of free time for step one, the initiation knot adjustment that will communicate Width, execution step two;
Step 2, communication are initiated node and send information in the continuous bandwidth of the free time found;
Step 3, each equal monitor channel of second level node, and the information for initiating that node sends is received, and forward;
Step 4, each equal monitor channel of third level node, and the information for initiating that node sends is received, and judge whether to receive phase With the information of content, if it is judged that being yes, then only retain the information of the identical content for receiving for the first time;If judged result is It is no, then retain full detail.
5. the method for the radio communication for power-off maintenance according to claim 4, it is characterised in that each communication process It is cast communication process.
6. the method for the radio communication for power-off maintenance according to claim 4, it is characterised in that each communication process In, outside node AP can add communication at any time, and the node AP in region can exit communication at any time.
CN201611004977.6A 2016-11-15 2016-11-15 Method for powering off the wireless communication of maintenance Active CN106535139B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611004977.6A CN106535139B (en) 2016-11-15 2016-11-15 Method for powering off the wireless communication of maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611004977.6A CN106535139B (en) 2016-11-15 2016-11-15 Method for powering off the wireless communication of maintenance

Publications (2)

Publication Number Publication Date
CN106535139A true CN106535139A (en) 2017-03-22
CN106535139B CN106535139B (en) 2019-06-21

Family

ID=58351719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611004977.6A Active CN106535139B (en) 2016-11-15 2016-11-15 Method for powering off the wireless communication of maintenance

Country Status (1)

Country Link
CN (1) CN106535139B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101197748A (en) * 2007-11-30 2008-06-11 华南理工大学 Multi-jump wireless self-organizing network construction method based on partition tree
US20120124627A1 (en) * 2010-11-11 2012-05-17 Electronics And Telecommunications Research Institute Terminal for repeating through mbs communication network and method of repeating using the same
CN102801637A (en) * 2012-09-06 2012-11-28 深圳市国电科技通信有限公司 Automatic power line-wireless communication mixed networking method
CN103024942A (en) * 2012-12-28 2013-04-03 南京理工大学常熟研究院有限公司 Intelligent mobile terminal based on Ad Hoc network
CN104143221A (en) * 2013-11-15 2014-11-12 国家电网公司 Novel power equipment inspection tour handheld terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101197748A (en) * 2007-11-30 2008-06-11 华南理工大学 Multi-jump wireless self-organizing network construction method based on partition tree
US20120124627A1 (en) * 2010-11-11 2012-05-17 Electronics And Telecommunications Research Institute Terminal for repeating through mbs communication network and method of repeating using the same
CN102801637A (en) * 2012-09-06 2012-11-28 深圳市国电科技通信有限公司 Automatic power line-wireless communication mixed networking method
CN103024942A (en) * 2012-12-28 2013-04-03 南京理工大学常熟研究院有限公司 Intelligent mobile terminal based on Ad Hoc network
CN104143221A (en) * 2013-11-15 2014-11-12 国家电网公司 Novel power equipment inspection tour handheld terminal

Also Published As

Publication number Publication date
CN106535139B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN108768494B (en) Relay measurement and control method for unmanned aerial vehicle
US9362738B2 (en) Intelligent control system for high-voltage switch and control method thereof
CN104242455B (en) 110 kV substation protection and control action cooperation strategy suitable for DG (distributed generation) accessing
RU154342U1 (en) OPEN DISTRIBUTION DEVICE OF SUBSTATION
CN105262069B (en) Hvdc transmission line longitudinal protection method based on failure DC component
CN109444661A (en) A kind of mixed power transmission line shorted to earth On-line Fault monitoring system and localization method
CN104993856A (en) Wireless router and method for switching master antenna and standby antenna thereof
WO2015077938A1 (en) Co-frequency range combiner/splitter and multi-system combining platform
CN203479951U (en) Channel switching testing device
CN107846002A (en) A kind of method using fast chopper limiting short-circuit current
CN104079066B (en) Method for judging disappearance of secondary direct-current power supply of far-end transformer substation
CN106535139A (en) Wireless communication method for power outage maintenance
CN102664672B (en) Bidirectional relay with automatic follow-up faulty cable disconnection and recovery functions and method for controlling bidirectional relay
CN103516443B (en) A kind of detection method and device to indoor unit working condition in microwave system
CN102684152B (en) Special fault electric arc detection arc-extinguishing device for photovoltaic confluence
CN104301021A (en) Bi-directional multi-relay transmission method suitable for electric power emergency communication system
CN202916375U (en) Data collection terminal and station area low-voltage zero line current leakage detection system using the same
CN204578068U (en) Line transformer group non-electricity protecting device and system
CN205404713U (en) Haul oneself willingly into logic testing instrument fully
CN103809060A (en) Data collection terminal and station area low-voltage zero line current leakage detection system using the same
CN202798715U (en) Both-way repeater possessing automatic docking and recovery functions
CN105406576A (en) Two-stage energy storage power supply circuit
CN103187797B (en) Early-warning device of converting station spare channel
CN202384841U (en) Early warning device for spare channel of transformer substation
CN104427533A (en) Neighbor cell optimization method and neighbor cell optimization device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant