CN106532956B - Intelligent distribution network interconnection switch adaptive method for switching - Google Patents

Intelligent distribution network interconnection switch adaptive method for switching Download PDF

Info

Publication number
CN106532956B
CN106532956B CN201611169867.5A CN201611169867A CN106532956B CN 106532956 B CN106532956 B CN 106532956B CN 201611169867 A CN201611169867 A CN 201611169867A CN 106532956 B CN106532956 B CN 106532956B
Authority
CN
China
Prior art keywords
ftu
interconnection switch
location information
request
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611169867.5A
Other languages
Chinese (zh)
Other versions
CN106532956A (en
Inventor
陈春
王炜宇
邹勇军
姜鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Excellent Power Polytron Technologies Inc
Original Assignee
Hunan Excellent Power Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Excellent Power Polytron Technologies Inc filed Critical Hunan Excellent Power Polytron Technologies Inc
Priority to CN201611169867.5A priority Critical patent/CN106532956B/en
Publication of CN106532956A publication Critical patent/CN106532956A/en
Application granted granted Critical
Publication of CN106532956B publication Critical patent/CN106532956B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • H02J13/0013

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of intelligent distribution network interconnection switch adaptive method for switching, include the following steps:Determine the energy ring belonging to each FTU;FTU and new interconnection switch place FTU others FTU into energy ring send out coherent signal from where former interconnection switch, FTU is modified itself link table information after receiving corresponding request signal, interconnection switch position requests are removed if had received, remove the interconnection switch location information preserved in its chained list;If having received update interconnection switch position requests, first determines whether itself chained list has removed the location information of interconnection switch, new interconnection switch location information is updated if removing, update action is not executed if not removing.The present invention realizes after feeder line interconnection switch changes, and is detected by terminal and updated the change information of interconnection switch automatically, is not necessarily to human intervention, than the manually mode working efficiency and accuracy rate higher of instruction modification interconnection switch at present.

Description

Intelligent distribution network interconnection switch adaptive method for switching
Technical field
The present invention relates to intelligent power distribution field, more particularly to a kind of intelligent distribution network interconnection switch adaptive method for switching.
Background technology
Intelligent distribution network self-healing control is that existing utilization rate of equipment and installations is low for a long time, power supply is reliable for solution China's power distribution network Property it is low, line loss per unit is high key issues of core technology, be to solve the key technology that largely accesses of distributed generation resource, be modern electricity The inevitable choice of network technology development.That embody self-healing control earliest in distribution system is feeder automation (Feeder Automation, FA) technology, i.e., from substation's outlet to the feeder line automation user power utilization equipment.Feeder line is automatic The core content of change technology is fault detect, Fault Isolation, load transfer and the service restoration control of power distribution network in the state of accident System.Power distribution automation (Distribution Automation, DA) technology is on the basis of feeder automation, in conjunction with to match Electric SCADA be core Distribution Management System, realize to entire distribution system in the case that normal operation and accident monitoring, protect Shield, the technology of control and management.The adaptive purpose of intelligent distribution network interconnection switch is the optimization system in power distribution network operational process System operating status, reduces human intervention when distribution network operation, reduces the influence of disturbance or failure to power grid and user, and reduction stops Electric number, greatly reducing customer outage hours and having a power failure influences number of users.
Invention content
Work efficiency is high, accuracy rate is high, high degree of automation in order to solve the above technical problem, the present invention provides a kind of Intelligent distribution network interconnection switch adaptive method for switching.
Technical proposal that the invention solves the above-mentioned problems is:A kind of intelligent distribution network interconnection switch adaptive method for switching, Include the following steps:
Step 1:Determine the energy ring belonging to each FTU, after some interconnection switch is closed, electric energy is from a substation The circulation path that busbar flows to another substation bus bar is known as energy ring;
Step 2:A FTU is selected, judges whether there is interconnection switch in this FTU, if so, three are then entered step, if not having Have, then enters step four;
Step 3:Judge whether selected FTU receives the request of the combined floodgate from main website, if receiving, by the contact of selected FTU Switch closes a floodgate, and other all FTU send out removing interconnection switch location information request, energy into the energy ring belonging to selected FTU After other FTU receive the request in amount ring, removes interconnection switch location information in chained list and enter step eight if not receiving;
Step 4:Judge whether selected FTU receives the request of the separating brake from main website, if receiving, selected FTU is ordered to correspond to Separating brake is switched, and it is interconnection switch to change the switchtype, then other all FTU are sent into the energy ring belonging to selected FTU The request of update interconnection switch location information enters step five if not receiving:
Step 5:Judge whether selected FTU receives removing interconnection switch location information request and remove chained list if receiving Middle interconnection switch location information enters step six if not receiving;
Step 6:Judge whether selected FTU receives update interconnection switch location information request and entered step if receiving Seven, if not receiving, enter step eight;
Step 7:Judge whether interconnection switch location information is empty in selected FTU chained lists, if so, joining in update chained list Network position of the switch information, if it is not, then entering step eight;
Step 8:Interconnection switch location information, finishing switching are not updated.
Above-mentioned intelligent distribution network interconnection switch adaptive method for switching works as receipts if the FTU of selection is in multiple energy rings The command request from some energy ring is arrived, then FTU only updates the corresponding interconnection switch situation of the energy ring, keeps other energy It is constant to measure ring.
The beneficial effects of the present invention are:The present invention is being joined by interconnection switch adaptive method for switching, each intelligent terminal Network switch is communicated when switch, and FTU where FTU and new interconnection switch from where former interconnection switch is to energy ring Interior others FTU sends out coherent signal, and FTU is modified itself link table information after receiving corresponding request signal, if It has received and removes interconnection switch position requests, then remove the interconnection switch location information preserved in its chained list;If had received more New interconnection switch position requests, then first determine whether itself chained list has removed the location information of interconnection switch, if removed It then updates new interconnection switch location information, update action is not executed if not removing;It is got in touch in feeder line to realize After switch changes, the change information of interconnection switch is detected by terminal and updated automatically, is not necessarily to human intervention, than depending on people at present The mode working efficiency and accuracy rate higher of work instruction modification interconnection switch.
Description of the drawings
Fig. 1 is the flow chart of switching method of the present invention.
Fig. 2 is the fundamental diagram of the embodiment of the present invention one.
Fig. 3 is the fundamental diagram of the embodiment of the present invention two.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figure 1, a kind of intelligent distribution network interconnection switch adaptive method for switching, includes the following steps:
Step 1:Determine the energy ring belonging to each FTU (feed line automatization terminal);After some interconnection switch is closed, The circulation path that electric energy flows to another substation bus bar from a substation bus bar is known as energy ring.
Step 2:A FTU is selected, judges whether there is interconnection switch in this FTU, if so, three are then entered step, if not having Have, then enters step four.
Step 3:Judge whether selected FTU receives the request of the combined floodgate from main website, if receiving, by the contact of selected FTU Switch closes a floodgate, and other all FTU send out removing interconnection switch location information request, energy into the energy ring belonging to selected FTU After other FTU receive the request in amount ring, removes interconnection switch location information in chained list and enter step eight if not receiving.
Step 4:Judge whether selected FTU receives the request of the separating brake from main website, if receiving, selected FTU is ordered to correspond to Separating brake is switched, and it is interconnection switch to change the switchtype, then other all FTU are sent into the energy ring belonging to selected FTU The request of update interconnection switch location information enters step five if not receiving.
Step 5:Judge whether selected FTU receives removing interconnection switch location information request and remove chained list if receiving Middle interconnection switch location information enters step six if not receiving.
Step 6:Judge whether selected FTU receives update interconnection switch location information request and entered step if receiving Seven, if not receiving, enter step eight.
Step 7:Judge whether interconnection switch location information is empty in selected FTU chained lists, if so, joining in update chained list Network position of the switch information, if it is not, then entering step eight.
Step 8:Interconnection switch location information, finishing switching are not updated.
It should be noted that:If the FTU of selection is in multiple energy rings, when having received the order from some energy ring Request, then FTU only updates the corresponding interconnection switch situation of the energy ring, keeps other energy rings constant.
For example, when network structure is relatively simple, each FTU is existed only in an energy ring.As shown in Fig. 2, by Load is fallen in main website, and the TS1 of H5 closes a floodgate, and H5 FTU into all rings send out the request for removing interconnection switch location information.New connection The S1 that network switch is H4, H4 FTU into all rings send out update interconnection switch location information request, first after FTU receives request The neighbours' interconnection switch location information for first checking oneself has been cleared by, and then preserves the location information of H4S1.
When network structure is complex, there may be in two or more energy ring by FTU.It will as shown in figure 3, working as main website The S2 of H22 closes a floodgate, and H22 will send the request for removing interconnection switch location information by FTU (H21, H23, H24) into ring 2, H21, H23 and H24 receive request after remove chained list in interconnection switch location information.After the TS5 separating brakes of main website order H21, due to H21 Belong to ring 1 and ring 2 simultaneously, therefore H21 can send out update interconnection switch to all FTU of ring 1 and ring 2 and ask, but only ring 2 FTU remove the location information of interconnection switch in chained list, therefore only H22~H24 can be updated.

Claims (2)

1. a kind of intelligent distribution network interconnection switch adaptive method for switching, includes the following steps:
Step 1:Determine the energy ring belonging to each FTU, after some interconnection switch is closed, electric energy is from a substation bus bar The circulation path for flowing to another substation bus bar is known as energy ring;
Step 2:A FTU is selected, judges whether there is interconnection switch in this FTU, if so, three are then entered step, if not having, Enter step four;
Step 3:Judge whether selected FTU receives the request of the combined floodgate from main website, if receiving, by the interconnection switch of selected FTU It closes a floodgate, and other all FTU send out removing interconnection switch location information request, energy ring into the energy ring belonging to selected FTU After other interior FTU receive the request, removes interconnection switch location information in chained list and enter step eight if not receiving;
Step 4:Judge whether selected FTU receives the request of the separating brake from main website, if receiving, orders selected FTU to inductive switch Separating brake, and it is interconnection switch to change the switchtype, then other all FTU send update into the energy ring belonging to selected FTU The request of interconnection switch location information enters step five if not receiving;
Step 5:Judge whether selected FTU receives removing interconnection switch location information request and remove in chained list and join if receiving Network position of the switch information enters step six if not receiving;
Step 6:Judge whether selected FTU receives update interconnection switch location information request and enter step seven if receiving, if It does not receive, then enters step eight;
Step 7:Judge that whether interconnection switch location information is empty in selected FTU chained lists, opens if so, being got in touch in update chained list Off position information, if it is not, then entering step eight;
Step 8:Interconnection switch location information, finishing switching are not updated.
2. intelligent distribution network interconnection switch adaptive method for switching according to claim 1, it is characterised in that:If selection FTU is in multiple energy rings, and when having received the command request from some energy ring, then FTU only updates energy ring correspondence Interconnection switch situation, keep other energy rings constant.
CN201611169867.5A 2016-12-16 2016-12-16 Intelligent distribution network interconnection switch adaptive method for switching Active CN106532956B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611169867.5A CN106532956B (en) 2016-12-16 2016-12-16 Intelligent distribution network interconnection switch adaptive method for switching

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611169867.5A CN106532956B (en) 2016-12-16 2016-12-16 Intelligent distribution network interconnection switch adaptive method for switching

Publications (2)

Publication Number Publication Date
CN106532956A CN106532956A (en) 2017-03-22
CN106532956B true CN106532956B (en) 2018-10-30

Family

ID=58340198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611169867.5A Active CN106532956B (en) 2016-12-16 2016-12-16 Intelligent distribution network interconnection switch adaptive method for switching

Country Status (1)

Country Link
CN (1) CN106532956B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110086255A (en) * 2019-05-06 2019-08-02 广东电网有限责任公司 A kind of distribution open loop point management method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204833851U (en) * 2015-07-06 2015-12-02 国家电网公司 Can demonstrate appearance by assembled voltage - time type feeder automation

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204833851U (en) * 2015-07-06 2015-12-02 国家电网公司 Can demonstrate appearance by assembled voltage - time type feeder automation

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Feeder Reconfiguration for Loss Reduction in Three Phase Distribution System under Unbalanced Loading Conditions;N. Rugthaicharoencheep等;《45th International Universities Power Engineering Conference UPEC2010》;20101203;第1-6页 *
考虑可靠性的配电网网架多目标规划;聂明林等;《电力系统及其自动化学报》;20160131;第28卷(第1期);第10-16页 *

Also Published As

Publication number Publication date
CN106532956A (en) 2017-03-22

Similar Documents

Publication Publication Date Title
EP2812972B1 (en) Method and apparatus for managing the distribution of electrical energy in a power distribution grid
WO2017166735A1 (en) Power-grid self-healing system and self-healing logic thereof in 110kv chain power-supply mode
CN101673965B (en) Automatic switching control method for wide-area emergency power source of electric power system
CN104518564B (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN109787224B (en) Method for generating regional power grid load transfer strategy for preventing cascading overload
CN204089179U (en) Radial pattern power distribution network self-healing control system
CN103022994A (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN210780230U (en) Switch device for switching high power from off-grid to grid-connected
CN104993596A (en) A distribution network automation remote terminal unit based on embedded multiple ARM processors
CN110739694A (en) distribution network management and control method and system based on distribution area interconnection
CN104410165B (en) A kind of method and system of micro-internetworking
CN103872770A (en) Different power supply region feeder automation collocation method based on wiring mode
CN101976886B (en) Distributed data collection partitioning mutual backup method for power dispatching automation system
CN104882959A (en) Power distribution network area management method and system
CN202076849U (en) Centralized protection, measurement and control device for transformer station
CN103855810A (en) Self-healing security and stability system for 110KV substation
CN113632335A (en) Transformer isolation response using DC link
CN106532956B (en) Intelligent distribution network interconnection switch adaptive method for switching
CN204330940U (en) A kind of line fault monitoring system
CN106300339A (en) A kind of Fault Isolation based on unit style power distribution network and service restoration method
CN202550668U (en) Distributed power distribution network management terminal
CN204156609U (en) Unattended substation remote control/remote signaling function on-Line Monitor Device
CN110890790A (en) Multi-interval integrated digital measurement and control device and main/standby machine switching method thereof
CN105680426A (en) Neural network based intelligent processing method for power-losing accident of 35kv line fault
CN104242448A (en) Feeder automation and differentiation optimal configuration method for 10-kV power distribution network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant